--- title: Harris County Zoning Ordinance, 1016.05. New dams subject to regulation by collection: local-codes id: local-code:harris-county/zoning/1016.05 cite_as: Harris County, Ga., Zoning Ordinance ยง 1016.05 canonical_url: https://georgiacommons.org/code/local/harris-county/zoning/1016.05 md_url: https://georgiacommons.org/code/local/harris-county/zoning/1016.05.md text_url: https://georgiacommons.org/code/local/harris-county/zoning/1016.05/text source_url: https://library.municode.com/ga/harris_county/codes/code_of_ordinances date: 2023-12-05 status: active jurisdiction: county:harris jurisdiction_name: Harris County county_fips: "13145" corpus_version: local-codes-harris-county-7fc9415fb593 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/harris-county/zoning/~appendix-a/~article-10/~division-3.md previous: https://georgiacommons.org/code/local/harris-county/zoning/1016.04.md next: https://georgiacommons.org/code/local/harris-county/zoning/article-11.md index: https://georgiacommons.org/code/local/harris-county.md branch: zoning edition: As published by Municode, current through 2023-12-05 edition_date_kind: current_through source_publisher: Municode version_id: local-code:harris-county/zoning/1016.05@2023-12-05-2f43c8c6d5 --- # Harris County Zoning Ordinance, 1016.05. New dams subject to regulation by > As published by Municode, current through 2023-12-05 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE / Article 10 - EROSION CONTROL AND STORMWATER MANAGEMENT / Division 3 - DAMS Harris County. Dams proposed to be 9 feet or more in height, but less than 25 feet in height, in combination with an impounding capacity proposed to be 20 acre-feet or more at maximum water storage elevation, but less than 100 acre-feet, shall be subject to the following: (a) If the developer elects not to construct the new dam to the design standards for new dams as contained in the Rules for Dam Safety, then a dam breach analysis for the dam shall be submitted with the construction plans for review and authorization prior to securing a permit from the Community Development Department. The design engineer shall utilize the computer model entitled "DAMBRK" for the dam breach analysis. (b) Should the new dam not meet the design standards for new dams as contained in the Rules for Dam Safety, then only the following uses and structures shall be permitted within the dam breach zone: (1) Agriculture which requires no structures for human habitation within the dam breach zone including forestry, livestock raising, and agricultural and forestry access roads. (2) Fences. (3) Signs in accordance with Article 6 of this Development Code. (4) Roads, driveways and parking areas. (5) Utility poles, towers, pipelines, water treatment outfalls and facilities, or similar facilities and structures. (c) If the developer elects to construct the new dam in accordance with the design standards for new dams as contained in the Rules for Dam Safety, then new development shall be permitted within the dam breach zone. However, the dam shall meet the design standards for new dams as contained in the Rules for Dam Safety if development currently exists or is proposed in the dam breach zone. (d) Construction plans for new dams defined herein shall be submitted to the Community Development Department for review for the project and the dam prior to securing a permit from the Department. (e) For any dam that is proposed not to meet the design standards for new dams as contained in the Rules for Dam Safety, the developer shall obtain a dam breach easement, recorded with the Clerk of Superior Court, from any offsite property owner where it is proposed for the dam breach zone to extend off the property where the dam is being constructed. The developer shall also cause a dam breach easement to be recorded upon the property being developed. (f) Prior to recording of a Final Plat or issuance of a Certificate of Occupancy, as appropriate, an as-built certification from a registered professional engineer shall be submitted to the Community Development Department. The certification shall state that the dam is constructed in accordance with the provisions of these regulations as well as the authorized construction plans. If the project is for the development of a subdivision, the developer shall also establish a legal entity, acceptable to Harris County, such as a mandatory Homeowners Owner's Association, at time of recording of the Final Plat, responsible for the maintenance of the dam and its impoundment. (g) In addition to State requirements, a new dam shall be on a single parcel of land so that it is owned and maintained by a single owner or entity.