Skip to content
Georgia Commons
Menu

Harris County · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE / Article 11 - PROCEDURES AND PERMITS / Division 2 - PROJECT APPROVAL

1111.03. Final development plan.

About this text

  • As published by Municode, current through 2023-12-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Prior to the removal of natural vegetation, restructuring of the land, or construction of any improvements, an approved final development plan is required. A final development plan, which shall be consistent with the preliminary development plan, shall be submitted to the Community Development Department, and shall contain:

(a) A site plan showing:

(1) The direction of north, appropriate scale, and topography in not greater than the intervals required under the Erosion and Sedimentation Act [of 1975] (O.C.G.A. § 12-7-1 et seq.)

and listed in the "Manual for Erosion and Sediment Control in Georgia."

(2) The proposed location and height of all structures.

(3) The use of all land and structures.

(4) The location and use of structures adjacent to the site.

(5) The location and dimensions of street, common driveways and walkways pertinent to the site.

(6) The location of service and loading areas and spaces.

(7) The location, size, number, and character of all exterior signs and lighting.

(8) The location, character, and extent of vegetative landscaping, retaining and screening walls, and other treatments for the protection of adjoining properties.

(9) The facilities for stormwater drainage and control.

(10) The location and character of all public improvements including utilities.

(b) A copy of any deed restrictions to be recorded.

(c) A comprehensive impact analysis indicating the probable effect of the planned development on the County school system, emergency services (fire, law enforcement, EMS) and any probable impact on existing traffic patterns and capacities of adjacent roads/streets in the immediate

area. Such analysis shall be prepared by a professional civil engineer, registered in the State of Georgia, or other individual whose profession lends itself to adequate analysis.

(1) If land disturbance permits have not been applied for five years after the final approval date of the final development plan, the impact analysis shall be updated and resubmitted to the Community Development Director to include analysis with current data.

(d) A development schedule indicating the appropriate date when construction of

the project, or stage thereof, can be expected to begin and be completed.

(e) Any other information necessary to establish compliance with this and other ordinances of the availability of adequate utility compliance.

(f) A detailed fire protection plan indicating the location and size of all existing and proposed fire mains, fire hydrants, and

fire access lanes, as well as a description of all fire protection measures and devices for structures.

(g) The public improvements included in the final development plan shall be consistent with this Development Code, and compliance with all applicable regulations shall be reviewed as part of the final development process.

(h) The applicant shall provide for and establish an organization or other legal entity for the control and maintenance of any common property designated on the

final development plan. Such entity shall be created by covenants running with

the land, and such covenants shall be included as part of the final development plans and subject to approval by the

board of commissioners.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:harris-county/zoning/1111.03@2023-12-05-20743dca3d

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Harris County Zoning Ordinance, 1111.03. Final development plan | Georgia Commons