Harris County · Zoning Ordinance
Appendix A - UNIFIED DEVELOPMENT CODE / Article 11 - PROCEDURES AND PERMITS / Division 3 - DEVELOPMENT CONSTRUCTION APPROVAL
1118.03. Construction stage submittal
About this text
- As published by Municode, current through 2023-12-05
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
requirements.
(a) Certification required.
(1) For all new construction and substantial improvements, the permit holder shall provide to the administrator an as-built certification of the regulatory floor elevation or floodproofing level immediately after the lowest floor or floodproofing is
completed.
(2) Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a
registered land surveyor or professional engineer and certified by same.
(3) When floodproofing is utilized for nonresidential structures, said certification shall be prepared by or under the direct
supervision of a professional engineer or architect and certified by same.
(b) Review of certification data.
(1) The Community Development Director shall review the above referenced certification data submitted.
(2) Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further progressive work being allowed to proceed.
(3) Failure to submit certification or failure to make said corrections required hereby, shall be caused to issue a stop work order for the project.
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.