Skip to content
Georgia Commons
Menu

Harris County · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE / Article 11 - PROCEDURES AND PERMITS / Division 3 - DEVELOPMENT CONSTRUCTION APPROVAL

1120.01. General requirements: development construction plans.

About this text

  • As published by Municode, current through 2023-12-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

Upon approval of a preliminary plat or preliminary site plan:

(a) The owner shall obtain an engineering layout and profile of all proposed streets, utilities, storm drainage and other

improvements for the development prepared by a Licensed Professional Engineer, Landscape Architect, or Land Surveyor.

(b) Any utility system design must be performed by a Licensed Professional Engineer.

(c) Said development construction plans shall include topographic data, existing and

proposed contours, all signs and other required improvements specified in this Development Code.

(d) No grading or clearing for construction of streets, utilities, storm drainage or other improvements shall commence until after

written approval of the soil erosion and sediment control plan required by the

Soil Erosion and Sedimentation Control regulations of Article 10 of this Development Code and provided that project engineering layout and road profiles have been approved by the Community

Development Department who shall distribute the same to the applicable County departments for review, comment and subsequent correction by the developer before construction.

(e) The development construction plans for a project shall conform in all respects

with the requirements of this Development Code and shall include each of the plans in this Section as appropriate to

the project. These include but are not limited to:

(1) Erosion and Sedimentation Control Plan;

(2) Grading Plan;

(3) Stormwater Management Plan;

(4) Street Improvement Plan;

(5) Site Landscaping Plans;

(6) Public Utility Plans;

(7) On-site Septic System Plans; and

(8) Lighting Plans and/or any other required plans.

(f) All development construction plans and supporting studies shall be prepared by

or under the supervision of a professional engineer or landscape architect registered in the State of Georgia,

provided, however, that nothing in this Section shall prohibit a Georgia licensed design professional from providing

services in a manner consistent with State regulations governing said design professionals.

(g) The plans shall be drawn on standard size sheets as determined by the Community Development Department.

(h) One copy of approved development construction plans must be at the job site when work is in progress.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:harris-county/zoning/1120.01@2023-12-05-73cb1052e9

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Harris County Zoning Ordinance, 1120.01. General requirements: development construction plans | Georgia Commons