requirements. Applications for a development permit within the aquifer recharge area district shall include a site plan, with the exception of certain exempted activities identified in this Section. The following information is required for all site plans: (a) A map, drawn to a scale of one inch = 50 feet, showing all planned improvements including the width, depth, and length of all existing and proposed structures, roads, watercourses, and drainage ways; water, wastewater, and stormwater facilities; and utility installations. (b) Location, dimensions and area of all impervious surfaces, both existing and proposed, on the site. (c) The orientation and distance from the boundaries of the proposed site to the nearest bank of an affected perennial stream or water body. (d) Elevations of the site and adjacent lands within 200 feet of the site at contour intervals of no greater than five feet. (e) Location and detailed design of spill and leak collection systems designed for the purpose of containing accidentally released hazardous or toxic materials. (f) Calculations of the amount of cut and fill proposed and cross-sectional drawings showing existing and proposed grades in areas of fill or excavation. Elevations, horizontal scales, and vertical scales must be shown on cross-sectional drawings. (g) Activities to comply with site plan. All development activities or site work conducted after approval of the site plan shall conform with the specifications of said site plan. Significant changes to the site plan, that would alter the amount and velocity of stormwater runoff from the site, increase the amount of impervious surface with the development, alter the overall density of development, result in a considerable increase in the amount of excavation, fill, or removal of vegetation during construction, or otherwise result in an alteration of the overall appearance of the development as proposed, can be amended only with the approval of the Harris Community Development Department. Minor changes, such as realignment of streets, or minor alterations to drainage structures and other infrastructure, to meet unexpected conditions, are exempted from this requirement.