1126.01 Driveway permit requirements. (a) Property owners shall secure a permit from the Public Works Department for the construction of driveways leading from county roads, to give access to their property. (b) Any person desiring a driveway leading from a county road shall make application for a permit from the Public Works Director to construct the driveway. (c) The application for a permit shall contain the following information (the permit shall contain the same information that is contained on the application): (1) The name, address and phone number of the applicant; (2) The location of the property; and (3) The date the driveway is to be installed. (d) Upon receipt of the application, the Public Works Director shall inspect the site to determine if a driveway pipe is required and that the slope is in accordance with county standards. If a pipe is required, he shall establish the size and length of pipe needed. (e) If a pipe is needed, it shall be installed under the supervision of the Public Works Director to ensure installation in accordance with county standards. (f) The permit shall be posted in a conspicuous place at the site during installation. (g) If an extension of time is required by the applicant to install the pipe or construct the driveway, an extension may be granted by the Public Works Director if request is made seven days prior to the expiration of the permit. (h) Failure to comply with any of the conditions in this section may result in the driveway being closed by the County until compliance is obtained.