--- title: Harris County Zoning Ordinance, 341.07. Application procedures for all collection: local-codes id: local-code:harris-county/zoning/341.07 cite_as: Harris County, Ga., Zoning Ordinance § 341.07 canonical_url: https://georgiacommons.org/code/local/harris-county/zoning/341.07 md_url: https://georgiacommons.org/code/local/harris-county/zoning/341.07.md text_url: https://georgiacommons.org/code/local/harris-county/zoning/341.07/text source_url: https://library.municode.com/ga/harris_county/codes/code_of_ordinances date: 2023-12-05 status: active jurisdiction: county:harris jurisdiction_name: Harris County county_fips: "13145" corpus_version: local-codes-harris-county-7fc9415fb593 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/harris-county/zoning/~appendix-a/~article-3/~division-2.md previous: https://georgiacommons.org/code/local/harris-county/zoning/341.06.md next: https://georgiacommons.org/code/local/harris-county/zoning/341.08.md index: https://georgiacommons.org/code/local/harris-county.md branch: zoning edition: As published by Municode, current through 2023-12-05 edition_date_kind: current_through source_publisher: Municode version_id: local-code:harris-county/zoning/341.07@2023-12-05-24644faec3 --- # Harris County Zoning Ordinance, 341.07. Application procedures for all > As published by Municode, current through 2023-12-05 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE / Article 3 - RESTRICTIONS ON PARTICULAR USES / Division 2 - RESTRICTIONS THAT APPLY TO PRINCIPAL OR ACCESSORY USES towers and antennas. The following must be provided when applying for a permit for a telecommunications facility: (a) Site plan, prepared and sealed by an appropriate licensing professional, to scale specifying the location of the telecommunications facilities, height of facilities, set-backs, transmission building and/or other accessory uses, access, parking, fences, landscape plan, and adjacent land uses. (b) A full description of the environment surrounding the proposed telecommunications facility, including any adjacent residential structures and districts, structures and sites of historic significance, or scenic view corridors. (c) A description of anticipated maintenance needs for the telecommunications facility, including frequency of service, personAPPENDIX A—UNIFIED DEVELOPMENT CODE 341.07 nel needs, equipment needs, and traffic, noise, or safety impacts of such maintenance. (d) Report from a qualified, independent engineer licensed in the State of Georgia, documenting the following: (1) Telecommunications facility height and design, including technical, engineering, economic, and other pertinent factors governing selection of the proposed design; (2) Total anticipated capacity of the telecommunications facility; including number and types of antennas which can be accommodated; (3) Evidence of structural integrity of the tower structure; and (4) Structural failure characteristics of the telecommunications facility and demonstration that site and setbacks are of adequate size to contain debris should a failure occur. (5) A definition of the area of service to be served by the antenna or tower and whether such antenna or tower is needed for coverage or capacity. (6) Information showing the proposed facility would provide the needed coverage or capacity, and that they cannot provide personal wireless communication service without the use of the proposed tower or antennas. (7) The identity of a community liaison officer appointed by the applicant to resolve issues of concern to neighbors and residents relating to the construction and operation of the facility. Include name, address, telephone number, facsimile number, and electronic mail address and pager number, if applicable. (8) Identification of the geographic service area for the subject installation, including: a. A map showing the site and the nearest or associated telecommunications facility sites within the network; b. A description of the distance between existing or proposed telecommunications facility sites; and c. A description of how this service area fits into and is necessary for the service network. (9) Provide information to justify why co-location on an existing tower is not being proposed. (10) If the proposed site is zoned residential applicants must justify why alternative non-residential sites have not been proposed. (e) Each application shall include a fiveyear facilities plan and site inventory including the following: (1) A list of all existing, to be upgraded or replaced, and proposed telecommunications facility sites within Harris County and a map showing these sites. The list must include: a. Street address, land lot, section, district, and parcel number; b. Zoning district; c. Type of building and number of stories; d. The number of antennas and base transceiver stations per site and the location and type of antenna installation (stand alone, rooftop, building facade, etc.), and location of the base transceiver station installation(s); e. The height from ground to the top of the antenna installation; and f. The radio frequency range in megahertz, the wattage output of the equipment and effective radiated power. (2) Furthermore, after a tower structure has been approved, the applicant must submit a permit renewal application, which reports the status on the use of said tower, annually to the Community Development Department for administrative approval. (3) If the applicant does not know specific future tower and antenna site locations but does know of areas where telecommunications facilities will be needed within the next five years to provide service, the applicant shall list the land lots contained within the anticipated geographic service area and identify each geographic service are with a number that will correspond to the future telecommunication facility site. (f) A copy of the license and supporting documentation (i.e. reports) from the Federal Communication Commission and a written statement from the Federal Aviation Agency and any appropriate state review authority (i.e. State Historic Preservation Officer-SHPO, etc.) stating that the proposed telecommunications facility complies with regulations administered by that agency or that the tower is exempt from those regulations. (g) The applicant shall provide a list of all residences and businesses within the proposed coverage area. (h) The applicant shall provide any other information requested by the Community Development Department in order to fully evaluate the potential impact of the proposed facility. (i) The applicant shall pay all applicable fees as set out in the Schedule Fees for the Community Development Department.