Regardless of the minimum requirements of individual zoning districts, a plat shall not be approved until the buildable area of every lot is determined to be sufficient to accommodate the minimum building area required by the zoning district. No part of the required minimum lot size shall be permanently inundated by water or covered with designated wetlands.