Skip to content
Georgia Commons
Menu

Harris County · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE / Article 5 - SUBDIVISIONS AND PLANNED DEVELOPMENTS

504.03. Application requirements.

About this text

  • As published by Municode, current through 2023-12-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

At the time of development review (i.e., preliminary plat), or zoning action (i.e., rezonAPPENDIX A—UNIFIED DEVELOPMENT CODE 504.03 ing) for the development of a conservation subdivision, the following items shall be provided in addition to the zoning or development application.

(a) Yield Plan. At time of development review or if a zoning action is proposed, a Yield Plan at the same scale and size as the Site Analysis map and conservation Concept Master Plan, prepared by a registered landscape architect, engineer or land surveyor must be provided to determine the maximum allowable net density for the development.

A Yield Plan shall contain the following information with respect to the tract:

(1) A topographic map prepared from aerial or field data of a contour interval of five feet or less;

(2) Exact boundary lines of the tract with bearings and distances;

(3) The location, width and names of all existing or platted streets, easements or other public ways within or adjacent to the subdivision, existing permanent buildings, railroad rights-of-way, natural watercourses,

flood hazard areas, wetlands, utilities and other significant natural and man-made features;

(4) Proposed street rights-of-way and pavement locations and widths;

(5) Proposed lot locations with preliminary lot dimensions noted and designed to the requirements and standards for conventional subdivision design in the underlying zoning district of this Development Code;

(6) Proposed location of storm water detention or retention facilities;

(7) Graphic scale and north arrow;

(8) Notation in table format as to the number of lots on the Yield Plan, the total acreage of the property, minimum lot size, average lot size;

and

(9) Any additional information as may be reasonably required to permit an adequate evaluation of the proposed Yield Plan to accurately determine the maximum number of lots.

(b) Site Analysis Map. At time of development review, or if a zoning action is proposed, an existing features site

analysis, sealed by a registered engineer or landscape architect, must be provided to identify areas that are most significant for designation as conservation areas.

The existing features site analysis shall include the following information:

(1) Property boundaries

(2) Topographic contours at intervals no greater than two feet

(3) Delineation of streams, rivers, lakes, wetlands and other hydrologic features to include the source of this information

(4) All conservation areas labeled, as described in Section 512;

(5) General soil types, locations and characteristics;

(6) Identification of tree lines, woodlands, open fields or meadows;

(7) Delineation of steep slope areas (i.e.

greater than 25 percent and at least 5,000 square feet contiguous area);

(8) Identification of known cultural resources, including a brief description of historical and archeological features and structures;

(9) Identification of existing roads, structures and easements; and

(10) Identification of open space in adjacent developments including potential connection to existing trails and greenspace

(c) Concept Master Plan and conservation subdivision preliminary plat. Based on the density determination (calculation shown in table format on the yield plan) and the existing features site analysis, an overall Concept Master Plan showing development of the entire tract shall be submitted by the developer for review and approval in accordance with the preliminary plat and/or rezoning requirements and procedures of Article 11 (Procedures and Permits) of this Development Code.

A Concept Master Plan shall include the following information:

(1) Delineation and specifications of conservation areas including calculations and exclusions, and any "pocket parks," "greens," play areas, or trail

system to be constructed.

(2) Delineation of residential development lots indicating lot size, lot width, building setback lines, offstreet parking, street trees, sidewalks, and street pavement and

right-of-way width.

(3) Lot width average, area and percent of floodplain specifications in tabular form; and density calculations (gross and net).

(4) Designation on each proposed lot of a minimum 25,500 square feet (not including house and pavement footprints) of soil areas suitable for residential septic systems based on a Level II (or higher) Soil Scientist Report, prepared by a Georgia licensed Soil Scientist or other professional licensed by the State of Georgia to perform soil analysis.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:harris-county/zoning/504.03@2023-12-05-870b2be8f9

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Harris County Zoning Ordinance, 504.03. Application requirements | Georgia Commons