Skip to content
Georgia Commons
Menu

Harris County · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE / Article 9 - PROJECT DESIGN AND CONSTRUCTION STANDARDS / Division I - PROJECT DESIGN STANDARDS / 908 - Streets.

908.03. Project access improvements.

About this text

  • As published by Municode, current through 2023-12-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Single family detached, single family attached, and duplex residential subdivisions.

(1) When property fronting on an existing or proposed County or State roadway, is to be developed or redeveloped as a single family or duplex subdivision, and the County or State road will provide access to the property, access improvements to the road (deceleration lanes, turn lanes, etc.) shall be provided by the developer as required herein.

(2) A deceleration lane shall be required, to be provided by the applicant/developer, at each subdivision street entrance that is provided street access to a major thoroughfare or State road, unless determined unnecessary by the County.

(3) Other Project Access Improvements may be required by the County upon the recommendation of the GDOT in order to ensure adequate site access, pedestrian access, convenience and safety to the motoring public.

(4) The developer shall be responsible for the relocation of public or private utilities and drainage structures as may be occasioned by the required roadway

improvements.

(b) Multi-family and nonresidential developments.

(1) When property fronting on an existing or proposed County or State roadway is to be developed or redeveloped for multifamily or nonresidential uses and the County or State roadway will provide

access to the property, access improvements to the County road (deceleration lanes, turn lanes, etc.) shall be provided

by the developer as required herein.

(2) A deceleration lane shall be required to be provided at each subdivision street entrance that is provided street access to a major thoroughfare or State road, unless determined unnecessary by the County.

(3) Other Project Access Improvements may be required by the County upon the recommendation of the GDOT in order to ensure adequate site access, pedestrian access, convenience and safety to the motoring public.

(4) The Developer shall be responsible for the relocation of public or private utilities and drainage structures as may be occasioned by the required roadway

improvements.

(c) Development along major street, limitedaccess highway or railroad right-of-way. Where a subdivision abuts or contains a major street, a

limited-access highway or a railroad right-ofway, the Planning Commission shall require the following:

(1) A street approximately parallel to and on each side of such right-of-way either as a marginal-access street, or at a distance suitable for an appropriate use of the intervening land, with a non-access reservation.

(2) Due regard should be given to requirements for approach grades and future grade separations in determining

distances.

(3) Such lots shall not have access to a major street (or limited-access highway), but only to the access street.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:harris-county/zoning/908.03@2023-12-05-9f1b79407b

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Harris County Zoning Ordinance, 908.03. Project access improvements | Georgia Commons