(a) Storm sewers and drains shall meet the following requirements: (1) Shall be provided in each subdivision. (2) Shall be designed to carry not less than the stormwater from a rainfall expected to occur once in ten years, with a runoff of 90 percent for pavements and buildings and a variable runoff factor depending upon topography or ground for other purposes. (3) Storm drain pipes shall consist of reinforced concrete. (4) The storm sewer system shall be designed and sized to accommodate and provide for future extensions. (5) The entire storm sewer system shall be approved by the County engineer or duly appointed agent of the Board of Commissioners prior its installation. (b) Drainage swales and ditches. All drainage swales and ditches shall meet the following requirements: (1) Shall be a minimum of six feet wide with a 3:1 slope on each side. (2) Shall be constructed asphalt or concrete or planted with sod sufficient to prevent erosion. (c) Stormwater detention facilities. Detention facilities shall be planned, designed and provided in accordance with Article 10, Division 2 of this Development Code.