909.01. Utility facilities and equipment

About this text

  • As published by Municode, current through 2023-12-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

near County roads.

(a) In order to more efficiently provide for the safety of persons and vehicles traveling on the County roads, and the maintenance of roads in the County, the Board of Commissioners does ordain and enact into law the provisions of this section, as allowed under O.C.G.A. § 32-4-42(6).

(b) Encroachment permit; required.

(1) When a utility company, private company, or an individual plans to place any type utility wire, line, cable, conduit, pipe or any other object underground along the

rights-of-way of the County's roads, streets or easements, they must first secure a

written permit from the Public Works Department.

(2) Prior to securing an Encroachment Permit, all utility companies proposing to install any type pf new utility lines within County right-of-way must have a utility locate

called in before applying for an Encroachment Permit. The utility provider shall not begin any work until the Encroachment Permit has been signed by the Public Works Director and said permit is posted on site along with a copy of Harris County Department of Public Works

Regulations and Special Provisions for Utility Installation, Restoration and Cleanup document.

(3) Application and review procedures.

Application for a permit for utility facility encroachment shall be presented to the Public Works Department with a

sketch or plan attached indicating the exact location of subject line, conduit, etc. The application form can be secured from the Public Works Department.

(4) Location requirements.

a. All utilities, including any type of utility wire, line, cable, conduit, pipe or any other object to be laid

underground shall be placed a minimum of three feet deep and placed as close as possible along the back side of the right-of-way; and

b. Unless otherwise approved or directed by the Public Works Director, all water pipes, sewer pipes, etc., shall be placed on the right

side of the road (as one drives north to south or east to west); and

c. All telephone, electrical and other cables, etc., shall be placed on the left side of the road (as one drives north to south or east to west) unless otherwise approved or directed by the Public Works Director.

d. Any variance to this directive must be approved by the Public Works Director prior to construction.

(5) Procedures for required removal or relocation of utility facilities.

a. When the Board of Commissioners shall reasonably determine that any pipe, main, conduit, cable, wire, pole, tower or other signal, and other equipment, facilities or appliances of any utility in, on, along, over or under the public roads of the County should be removed or relocated, because it has become an obstruction or interference with the use and safe operation of a county road,

or will become an obstruction or interference with the use and safe operation of a contemplated county road, a written notice shall be directed to the utility company giving at least 60 days' notice in which to make such change as is necessary for removal or relocation as may be necessary.

b. If the utility does not thereafter begin removal procedures within a reasonable time sufficient to allow for engineering and other activities necessary to the removal and relocation of the utility facility, the commissioners may give the utility a final notice directing that such

removal shall commence not later than ten days from receipt of such final notice.

c. If such removal has not begun, or if such removal has begun and the relocation has not been completed within a reasonable time, the Board of Commissioners may remove or relocate the same with its own employees, or by contracted labor, tools, equipment, supervision, or other necessary services or materials and whatever else is necessary to accomplish the removal or relocation, and the expense thereof shall be charged to the utility.

d. The expense shall be certified to the County attorney, who shall have the

authority to proceed with suit against the utility for same if payment or arrangements to make payment are not made within 60 days.

(6) Nothing in this section shall be construed so as to deprive any utility, relocated

from a location in which it owned a property interest, of compensation for such property interest.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:harris-county/zoning/909.01@2023-12-05-1850bbf5ec

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Harris County Zoning Ordinance, 909.01. Utility facilities and equipment | Georgia Commons