(a) Upon completion of the development activity as authorized by the development permit and prior to final development inspection of public and private improvements, the owner shall submit to the Community Development Department, Public Works Department and the Water Works Department, as appropriate, for review and approval, a complete set of record drawings showing "as-built" conditions prepared by the design professional of record who prepared the original plans, or a professional land surveyor, engineer or landscape architect licensed in the State of Georgia. These drawings shall show the location of: (1) Street centerlines and rights-of-way lines. (2) Drainage system pipes, manholes and channels, including finished elevations. (3) Storm water detention facilities including finished elevations. (4) Sanitary sewer system (if any) including finished elevations. (5) Water system (if any) and reuse water system (if any) including finished elevations. (b) The as-built data shall be certified and sealed by the design professional of record or other professional preparer, subject to the tolerances of accuracy indicated in the certification.