--- title: Harris County Zoning Ordinance, 911.01. Initiation of clearing and grading collection: local-codes id: local-code:harris-county/zoning/911.01 cite_as: Harris County, Ga., Zoning Ordinance ยง 911.01 canonical_url: https://georgiacommons.org/code/local/harris-county/zoning/911.01 md_url: https://georgiacommons.org/code/local/harris-county/zoning/911.01.md text_url: https://georgiacommons.org/code/local/harris-county/zoning/911.01/text source_url: https://library.municode.com/ga/harris_county/codes/code_of_ordinances date: 2023-12-05 status: active jurisdiction: county:harris jurisdiction_name: Harris County county_fips: "13145" corpus_version: local-codes-harris-county-7fc9415fb593 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/harris-county/zoning/~appendix-a/~article-9/~division-ii.md previous: https://georgiacommons.org/code/local/harris-county/zoning/911.md next: https://georgiacommons.org/code/local/harris-county/zoning/911.02.md index: https://georgiacommons.org/code/local/harris-county.md branch: zoning edition: As published by Municode, current through 2023-12-05 edition_date_kind: current_through source_publisher: Municode version_id: local-code:harris-county/zoning/911.01@2023-12-05-0ff5e6ec12 --- # Harris County Zoning Ordinance, 911.01. Initiation of clearing and grading > As published by Municode, current through 2023-12-05 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE / Article 9 - PROJECT DESIGN AND CONSTRUCTION STANDARDS / Division II - PROJECT CONSTRUCTION STANDARDS activities. (a) Clearing and grading shall not proceed until issuance of an approved development permit authorizing such activities. No development permit authorizing clearing or grading shall be issued prior to review and approval by the County of construction plans as applicable to the property. See Article 11: Procedures and Permits of this Development Code for details. (b) Grading shall be done in accordance with the lines and grades drawn on the approved grading plan. Protective devices for undisturbed areas, if any are required, must be installed, inspected and approved in accordance with the approved construction plans prior to the initiation of clearing and grading activities. (c) Erosion and sedimentation control measures. (1) Required erosion and sedimentation control measures must be installed, inspected and approved in accordance with the approved soil erosion and sedimentation control plan prior to any major development activity, and shall be maintained or supplemented as development progresses. (d) Stormwater drainage facilities. (1) Required stormwater drainage facilities are to be installed in accordance with the approved stormwater management plan as development progresses.