Harris County · Zoning Ordinance

Appendix A - UNIFIED DEVELOPMENT CODE / Article 9 - PROJECT DESIGN AND CONSTRUCTION STANDARDS / Division II - PROJECT CONSTRUCTION STANDARDS

913.01. Permits

About this text

  • As published by Municode, current through 2023-12-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Clearing, grading or other land disturbing activities associated with subdivision construction shall not commence until the preliminary plat, engineered construction plans and soil erosion/sediment control plans have all been approved by Harris County. This shall not be construed to

prohibit necessary logging or survey operations prior to approval of such plans.

(b) Permits shall be required for utility installation.

(1) The Water Works Department and all other utility companies (telephone, electric, pipelines, etc.) shall be contacted by the contractor prior to the beginning of any type street/road construction within Harris County. (See also County Code of Ordinances Chapter 7, Water, Sewage and Utilities.)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:harris-county/zoning/913.01@2023-12-05-78c0a4b39c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Harris County Zoning Ordinance, 913.01. Permits | Georgia Commons