913.03. Installation of utilities, general.

About this text

  • As published by Municode, current through 2023-12-05
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) General. All streets, roads, and alleys shall be constructed to provide the necessary paving, roadway, drainage, and safety requirements as provided herein and by other specifications of Harris County.

(b) Clearing and grubbing. All streets, roads and alleys shall be graded to their full width so that pavement, shoulders and sidewalks, where required or proposed for future installation, can be constructed on a uniform plane. The right-ofway shall be cleared of all trees. Additional trees shall be removed outside of the right-of-way if

the area under the dripline of the tree in the right-of-way is disturbed, or as directed by the Community Development Director, Public Works Director or designee.

(c) Placement of utilities.

(1) All authorized public underground utilities shall be located within the right-ofway of a public street or within an easement designated for such use. Within

public street rights-of- way, placement of the various authorized utilities (power, gas, cable TV, water and sewer) shall conform to the specific locations designated for such use by Harris County, as determined by the Public Works Department.

(2) No other underground utilities, such as private lawn sprinkler systems, yard lighting, etc., shall be installed within a public right-of-way or easement except by

authorization of the Public Works Department. Such authorization, if issued, shall require the applicant to assume all repair

costs of the applicant's facilities should they be damaged during the course of installation, maintenance or repair of any of the public utilities authorized to occupy said right-of-way or easement

(3) Placement of utilities shall be in conformance with this Development Code and Chapter 7, Water, Sewage, and Utilities, of the Harris County Code of Ordinances.

(d) Underground utilities construction.

(1) All water and sanitary sewer utilities and storm drain facilities within the curbs shall be installed and the ditches backfilled and thoroughly compacted before any pavement or base is installed.

(2) Once the base has been placed, all further installation of utilities under the roadway shall be bored or otherwise comply with all County and Public Works Department requirements for street cuts.

(3) All utility manholes and valve boxes shall be brought flush to the finished grade within the roadway section.

(4) All utility locations shall adhere to the details found in the Standard Details and Specifications.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:harris-county/zoning/913.03@2023-12-05-441ff5583b

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Harris County Zoning Ordinance, 913.03. Installation of utilities, general | Georgia Commons