--- title: Harris County Zoning Ordinance, 913.05. Construction methods, roadways collection: local-codes id: local-code:harris-county/zoning/913.05 cite_as: Harris County, Ga., Zoning Ordinance § 913.05 canonical_url: https://georgiacommons.org/code/local/harris-county/zoning/913.05 md_url: https://georgiacommons.org/code/local/harris-county/zoning/913.05.md text_url: https://georgiacommons.org/code/local/harris-county/zoning/913.05/text source_url: https://library.municode.com/ga/harris_county/codes/code_of_ordinances date: 2023-12-05 status: active jurisdiction: county:harris jurisdiction_name: Harris County county_fips: "13145" corpus_version: local-codes-harris-county-7fc9415fb593 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/harris-county/zoning/~appendix-a/~article-9/~division-ii.md previous: https://georgiacommons.org/code/local/harris-county/zoning/913.04.md next: https://georgiacommons.org/code/local/harris-county/zoning/914.01.md index: https://georgiacommons.org/code/local/harris-county.md branch: zoning edition: As published by Municode, current through 2023-12-05 edition_date_kind: current_through source_publisher: Municode version_id: local-code:harris-county/zoning/913.05@2023-12-05-1ebb5c5f50 --- # Harris County Zoning Ordinance, 913.05. Construction methods, roadways > As published by Municode, current through 2023-12-05 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED DEVELOPMENT CODE / Article 9 - PROJECT DESIGN AND CONSTRUCTION STANDARDS / Division II - PROJECT CONSTRUCTION STANDARDS (a) New major thoroughfares. Major thoroughfares abutting residential or nonresidential development projects shall be constructed in accordance with designs prepared by Harris County or GDOT, or, if no design has been prepared, in accordance with the following standards and standard details of the Public Works Department. (b) Station numbers are to be placed at 100- foot intervals and located in areas where they will not be destroyed. (c) Roadway grading and embankments. (1) All streets and roads shall be graded to their full width by the subdivider so that pavements and sidewalks, where required or proposed for future installation, can be constructed on a level plane as shown in the cross-sections on the approved plans. (2) The entire area within the typical grading section shall be cleared and grubbed of all trees, bushes, stumps and debris. Such debris shall be disposed of in a lawful manner and shall not be buried in the right-of-way or within the project limits. (3) Road fill of suitable material free of organic matter shall be placed in uniform eight-inch layers compacted to at least 95 percent of maximum density throughout as specified for construction and testing in the GDOT standards for embankments. Embankment compaction test shall be taken at an interval not exceeding 2,500 cubic yards. All storm drainage and other underground utilities installed under the roadbed and the backfill in all ditches shall be compacted to at least 95 percent maximum density. Compaction testing of backfill for said structures shall be taken at a minimum interval not less than one between any two structures. Compaction test results shall be reported to the County immediately after results are obtained. (4) Cut and fill slope ratios shall start at the edge of the right-of-way and shall not exceed 3:1 in the right-of-way and 2:1 outside of the right-of-way. In lieu of a cut or fill slope, a retaining wall may be utilized where necessary with the approval of the County. (5) Cut or fill slopes shall be uniform for each section of cut or fill. The depth of cut or fill shall be constructed to the maximum cut or fill occurring in any one section. When a cut made in rock requires blasting, the slope may be changed to an alternative slope grade upon written approval of the County. (6) If paving is to be delayed, provisions shall be made to drain low points in the roadway. If curbing has not been installed, a break in the berm section may be provided. If curbing is in place, four-inch pipe sections shall be used to provide drainage under the curb to side slopes. (7) All work must be approved by the County prior to preparation of the subgrade. It is the duty of the design professional to inspect and confirm that road grading specifications have been met. The developer will provide to the County a statement of inspection completed by a registered professional engineer, licensed by the State of Georgia, that all construction requirements have been met for roadway grading. The developer shall also provide certification to the County, by a professional land surveyor or engineer licensed in the State of Georgia, that grading has been completed to the lines and grades to a tolerance of +/- 6 inches. The developer will also provide staking of the roadway centerline in conjunction with said certification for verification by the Public Works Director or designee. Upon approval of such certification documentation by the County, road construction may continue. (d) Preparation of subgrade for all streets shall include the following. (1) Sub-grade preparation shall be in accordance with GDOT specifications and this Article. (2) Prior to placing base, the entire surface of in-place subgrade shall be processed (plowed and harrowed). (3) After material has been thoroughly mixed, the subgrade shall be brought to a final grade and compacted to 100 percent. (4) Subgrade shall be tested by a registered soils/geotechnical engineer and/or by proofrolling the entire road with a loaded truck (18-ton minimum). (5) Compaction tests shall be taken every 500 feet or at intervals specified by the Public Works Director or his designee, and the results of said tests shall be provided to the Public Works Director or his designee. (6) Prior to placing any subsequent layer of base materials, the subgrade shall have sufficient stability to support construction equipment without excessive movement regardless of compaction. (7) Areas of subgrade that are unstable shall be remixed to a moisture content that will provide stability and compaction to the satisfaction of the Public Works Director or designee. (8) It is the duty of the design professional to inspect and confirm that subgrade preparation specifications have been met. The Developer will provide to the Public Works Director a statement of inspection completed by a registered professional engineer, licensed by the State of Georgia, that all construction requirements have been met for roadway subgrade preparation. Upon presentation and approval of such documentation by the Public Works Director, roadway construction may continue. (e) Preparation of street aggregate base course. (1) A minimum of eight-inch base, 22 feet wide, constructed of GDOT-approved graded aggregate base (GAB) compacted 100 percent shall be installed. (2) All base course material shall be deposited and spread by means of spreader boxes, or approved mechanical equipment, or from moving vehicles equipped to distribute the material in a uniform layer. (3) Immediately following the spreading of the coarse aggregate, all material placed shall be compacted to the full width by rolling with a smooth wheel power roller of adequate size and weight to achieve compaction. (4) Any irregularities, areas of segregation, or depressions that develop under such rolling shall be corrected by loosening the material at these places and adding or removing material until the surface is smooth and uniform. The application of water, applied uniformly over the base course, may be required to achieve adequate compaction. Shaping and rolling shall be performed alternately as required to maintain a uniform compacted base until a surface or treatment has been applied to the base. Along curbs, headers and walls and at all places not accessible to the roller, the base course material shall be tamped thoroughly with mechanical tampers or approved hand tampers. (5) Compaction tests shall be taken every 500 feet or at intervals specified by the Public Works Director or designee, and the results of said tests shall be provided to the Public Works Director or designee. a. No graded aggregated base shall be placed on muddy or frozen subgrade. The moisture content of the graded aggregate base shall be uniformly distributed and shall be adequate to allow compaction to the specified density. After the material placed has been shaped to line, grade and cross section, it shall be rolled until the course has been uniformly compacted to at least 100 percent of the maximum dry density when Group 2 aggregate is used, or to at least 98 percent of maximum dry density when Group 1 aggregate is used. The theoretical maximum dry density shall be established using the appropriate test methods of the GDOT Sampling, Testing and Inspection Manual. Moisture content shall be within ± three percent of the optimum content. Compaction test results shall be reported to the Public Works Director immediately after results are obtained. (6) After the base course has been installed and inspected, and before any surface is applied, all residential streets shall be primed with suitable asphaltic materials as per GDOT Specification 412. a. Prime may be omitted if paving can be done within 24 hours and the base is moist. (7) A good grade of material which will meet Class B specifications shall be placed on the shoulder. Public Works Director shall confirm and provide Class B specifications upon request. (8) It is the duty of the design professional to inspect and confirm that graded aggregate base course preparation specifications have been met. The developer will provide to the County a statement of inspection completed by a registered professional engineer, licensed by the State of Georgia, that all construction requirements have been met for roadway graded aggregate base course preparation. Upon presentation and approval of such documentation by the County, roadway construction may continue. (f) Curb and gutter. (1) Curb and gutter shall be set true to line and grade, horizontal be field staked, and finished to the section shown on the plans. Along the Project Access Improvements of a road for which the GDOT of or the Public Works Department resurfacing has been scheduled within one year of the new construction, the grade of the new gutter shall be placed one inch above the Project Access Improvement pavement grade in areas where drainage will not be adversely affected. (2) Line and grade shall be set by developer's engineer or surveyor on grade less than two percent and greater than 12 percent, and within 100 feet in both directions from all low points. (3) One-half inch expansion joints or premolded bituminous expansion joint material shall be provided at all structures and radius points and at intervals not to exceed 250 feet in the remaining sections of the curb and gutter. (4) Inferior workmanship or unprofessional construction methods resulting in unacceptable curb and gutter will be cause for rejection of the finished work. (5) Disturbed areas along all curbing shall be backfilled, stabilized, and grassed. (g) Asphaltic concrete construction. (1) The paved roadway: a. Shall be a 2.5-inch binder (i.e., asphalt concrete), either 12.5 MM level A or 9.5 MM level A with a one-inch topping, which shall meet GDOT specifications. The topping shall be applied in accordance with (7) below. b. Shall be placed by a qualified person/ company with a Barber Green or equivalent asphalt paver and shall be smoothed and compacted to meet Harris County specifications. (2) Corings to verify thickness shall be taken every 1,000 feet or at intervals specified by the Public Works Director or designee, and the results of said corings shall be provided to the Public Works Director or designee. (3) Material, equipment, seasonal and weather limitations, preparation of road surface, material application and construction methods shall be the same as set out in the GDOT's Standard Specifications for Road and Bridges, latest edition, and any amendments thereto. (4) Mix design(s) shall be provided to the County for approval at least a minimum of two weeks prior to paving operations. (5) Where a binder course is provided on streets, a tack coat shall be applied to all prepared road surfaces as provided in GDOT Specifications. (6) On streets where a binder course is provided, the final layer of asphalt shall be placed no later than one year after the binder course is laid or when 80 percent of the project is built-out whichever comes first. Any broken or cracked asphalt shall be removed and patched, and paved roadway shall be tacked and overlaid with a one-inch thick layer of type 12.5 MM level A or 9.5 MM level A. (7) The Public Works Director shall require that all work meet or exceed the above requirements. (8) It is the duty of the design professional to inspect and confirm that the roadway asphaltic concrete construction specifications have been met. The developer will provide to the County a statement of inspection completed by a registered professional engineer, licensed by the State of Georgia, that all construction requirements have been met for roadway asphaltic concrete construction. Upon presentation and approval of such documentation by the County, roadway construction will be considered as complete for the purpose of final plat.