a. Pavement cuts for the installation of utilities shall be avoided whenever possible. Utility crossings shall be bored across any arterial, subject to the approval of the Georgia DOT, and across any collector unless a pavement cut is approved by the Board of Commissioners. b. Pavement cuts across local streets shall be permitted, provided the road is repaired with a least six (6) inches of 3000 psi Portland cement and topped with two (2) inches of E or F hot plant mix asphaltic cement. Pavement cuts across local streets shall conform to the following: pavement cuts (Ord. of 5-10-96)