a. Inlets and catch basins shall be designed in accordance with the Georgia Department of Transportation's Drainage Manual for Highways, latest edition. b. Frames and grates shall be Campbell Foundry Company Pattern No. 2617 Bicycle Grates with stream-flowing grating, or equivalent. c. Stormwater catch basins shall be spaced so that the spread in the street for a 10-year design peak rate of discharge shall not exceed eight (8) feet, as measured from the face of the curb. d. Catch basins shall be located at all low points of streets and shall be located so as to service no more than four (4) acres.