a. Headwalls are required at the inlet and outlet on all street cross drains and storm drain pipes. b. Headwalls are to be precast concrete, stone masonry with reinforced concrete footings, or poured-in-place, reinforced concrete with reinforced concrete footings. c. High water elevation contour is to be based on a twenty-five (25) year storm at the entrance of each head wall. d. Energy dissipation devices, such as splash pads, riprap, stilling basins, etc., shall be provided at the outlet of every street cross drain and storm drain pipe.