--- title: Hawkinsville Zoning Ordinance, Sec. 4.6.7. Stormwater detention collection: local-codes id: local-code:hawkinsville/zoning/4.6.7 cite_as: Hawkinsville, Ga., Zoning Ordinance ยง 4.6.7 canonical_url: https://georgiacommons.org/code/local/hawkinsville/zoning/4.6.7 md_url: https://georgiacommons.org/code/local/hawkinsville/zoning/4.6.7.md text_url: https://georgiacommons.org/code/local/hawkinsville/zoning/4.6.7/text source_url: https://library.municode.com/ga/hawkinsville/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:hawkinsville jurisdiction_name: Hawkinsville place_fips: "1337396" corpus_version: local-codes-hawkinsville-021eb34226d7 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/hawkinsville/zoning/~appendix-a/~article-iv/~division-6.md previous: https://georgiacommons.org/code/local/hawkinsville/zoning/4.6.6.md next: https://georgiacommons.org/code/local/hawkinsville/zoning/appendix-a-article-iv-division-7-division-7.md index: https://georgiacommons.org/code/local/hawkinsville.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:hawkinsville/zoning/4.6.7@2026-11-11-ad0edf7f3b --- # Hawkinsville Zoning Ordinance, Sec. 4.6.7. Stormwater detention > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED LAND DEVELOPMENT REGULATIONS / Article IV - DEVELOPMENT DESIGN STANDARDS / Division 6 - STORM DRAINAGE a. Stormwater detention facilities providing for the storage and controlled release of runoff shall be required for any development activity that will increase the peak rate of discharge by one percent or more for the 10-year frequency storm. b. All stormwater detention facilities shall be designed to control the runoff volumes associated with storms having 2-year, 10-year, and 25-year return frequencies, considered individually. The design of the facility shall also consider the ponding limits of the 100-year storm. c. Detention shall be provided such that the peak rate of flow from the site after development will not exceed the corresponding flow that would have been created by the same return frequency storms prior to development. d. Reservoir routing methods shall be used for all detention facility design. e. Principal outlets such as weirs shall be constructed of concrete block or reinforced concrete with watertight joints. Outlet pipes shall be at least six (6) inches in diameter. Riser pipes, if used, shall be at least eight (8) inches in diameter. f. No portion of any detention facility shall be located in any required buffer or within a flood hazard area. g. The 100-year ponding limits of a detention facility shall not encroach upon a public street. h. An easement at least twenty-five (25) feet in width shall be required to provide access to the detention facility from a street. i. Every detention facility shall be completely enclosed within a drainage easement. The drainage easement shall extend at least ten (10) feet beyond the ponding limits of the 100-year storm. ## History (Ord. of 5-10-96)