--- title: Hawkinsville Zoning Ordinance, Sec. 6.1.2. Overview—land development collection: local-codes id: local-code:hawkinsville/zoning/6.1.2 cite_as: Hawkinsville, Ga., Zoning Ordinance § 6.1.2 canonical_url: https://georgiacommons.org/code/local/hawkinsville/zoning/6.1.2 md_url: https://georgiacommons.org/code/local/hawkinsville/zoning/6.1.2.md text_url: https://georgiacommons.org/code/local/hawkinsville/zoning/6.1.2/text source_url: https://library.municode.com/ga/hawkinsville/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:hawkinsville jurisdiction_name: Hawkinsville place_fips: "1337396" corpus_version: local-codes-hawkinsville-021eb34226d7 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/hawkinsville/zoning/~appendix-a/~article-vi/~division-1.md previous: https://georgiacommons.org/code/local/hawkinsville/zoning/6.1.1.md next: https://georgiacommons.org/code/local/hawkinsville/zoning/6.1.3.md index: https://georgiacommons.org/code/local/hawkinsville.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:hawkinsville/zoning/6.1.2@2026-11-11-23151abf3c --- # Hawkinsville Zoning Ordinance, Sec. 6.1.2. Overview—land development > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED LAND DEVELOPMENT REGULATIONS / Article VI - PLANS AND PROCEDURES / Division 1 - GENERALLY The following presents a graphic illustration of the plans and procedures involved in the land development approval and construction process, described below. sketch plan a. Zoning Changes. An application for rezoning or approval of a conditional use must include a sketch plan of the proposed use of the property. b. Subdivisions with Public Improvements. The division of land into two (2) or more lots that will require the construction or extension of public streets, water or sanitary sewerage (other than the direct connection of buildings to existing facilities) shall be conducted as follows: (1) Project Approval is granted by the Planning Commission upon review and approval of a Preliminary Subdivision Plat. (2) A Development Permit is issued by the Building Inspector based on review and approval of civil drawings for construction of the subdivision. (3) Receipt by the Building Inspector of accurate surveys of the as-built condition of public improvements is required in order to allow filing of a Final Plat. (4) Approval of a Final Subdivision Plat and acceptance of public improvements by the Board of Commissioners will authorize recordation of the plat with the Clerk of the Superior Court. (5) After recordation of the Final Plat, the lots may be sold and building permits on the lots may be obtained. c. Minor Subdivisions. The division of land into two (2) or more lots, each of which will be adequately served by existing public streets, water and sanitary sewerage, shall be conducted as follows: (1) Approval of a Final Subdivision Plat by the Board of Commissioners will authorize recordation of the plat with the Clerk of the Superior Court. (2) After recordation of the Final Plat, the lots may be sold and building permits on the lots may be obtained. d. Multi-Family and Nonresidential Projects. (1) Project Approval is granted by the Planning Commission upon review and approval of a Site Plan for the project. (2) A Development Permit is issued by the Building Inspector based on review and approval of civil drawings for construction of the project. (3) A Building Permit is issued by the Building Inspector based on review and approval of architectural plans. Buildings falling under the authority of the State Fire Marshall shall be approved by the State prior to issuance of the building permit. (4) Receipt by the Building Inspector of accurate surveys of the as-built condition of all public improvements is required in order to authorize permanent water and sanitary sewer service. (5) Permanent electric power and occupancy of the building is authorized by the Building Inspector based on final inspection and issuance of a Certificate of Occupancy. ## History (Ord. of 5-10-96)