Skip to content
Georgia Commons
Menu

Hawkinsville · Zoning Ordinance

Appendix A - UNIFIED LAND DEVELOPMENT REGULATIONS / Article VI - PLANS AND PROCEDURES / Division 4 - CIVIL DESIGN AND CONSTRUCTION DRAWINGS

Sec. 6.4.2. Erosion and sediment control plan.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

a. Plans must be prepared to meet the minimum requirements for erosion and sedimentation control using best management practices under Article 5 of this ordinance. Conformance with the minimum requirements may be attained through the use of design criteria in the current issue of the Manual for Erosion and Sediment Control in Georgia, published by the Georgia Soil and Water Conservation Commission as a guide; or through the use of alternate design criteria which conform to sound conservation and engineering practices. The erosion and sediment control plan shall consider the interrelationship of the soil types, geological and hydrological characteristics, topography, watershed, vegetation, proposed permanent structures including roadways, constructed waterways, sediment control and stormwater management facilities, local ordinances and State laws.

b. Data Required for Erosion and Sediment Control Plan.

(1) Narrative or notes, and other information: Notes or narrative to be located on the site plan in general notes or in erosion and sediment control notes.

(2) Description of existing land use at project site and description of proposed project.

(3) Name, address, and phone number of the property owner.

(4) Name and phone number of 24-hour local contact who is responsible for erosion and sedimentation controls.

(5) Size of project, or phase under construction, in acres.

(6) Activity schedule showing anticipated starting and completion dates for the project.

Include the statement in bold letters, that "the installation of erosion and sediment control measures and practices shall occur prior to or concurrent with land-disturbing activities."

(7) Stormwater and sedimentation management systems-storage capacity, hydrologic study, and calculations, including off-site drainage areas.

(8) Vegetative plan for all temporary and permanent vegetative practices, including species, planting dates, and seeding, fertilizer, lime and mulching rates. The vegetative plan should show options for year-round seeding.

(9) Detail drawings for all structural practices. Specifications may follow guidelines set forth in the Manual for Erosion and Sediment Control in Georgia.

(10) Maintenance statement: "Erosion and sediment control measures will be maintained at all times. Additional erosion and sediment control measures and practices will be installed if deemed necessary by on-site inspection."

c. Maps, drawings, and supportive computations shall bear the signature/seal of a registered or certified professional in engineering, architecture, landscape architecture, land surveying or erosion and sediment control. The certified plans shall contain:

(1) Graphic scale and north point or arrow indicating magnetic north.

(2) Vicinity map showing location of project and existing streets.

(3) Boundary line survey.

(4) Delineation of disturbed areas within project boundary.

(5) Existing and planed contours, with contour lines drawn with an interval in accordance with the following:

Map Scale Ground Slope Contour Interval, ft.

1 inch = 100 ft. Flat 0-2% .5 or 1 or larger scale Rolling 2-8% 1 or 2 Steep 8% + 2.5 or 10

(6) Adjacent areas and features such as streams lakes, residential areas, etc. which might be affected should be indicated on the plan.

(7) Proposed structures or additions to existing structures and paved areas.

(8) Delineate the 25-foot horizontal greenway adjacent to state waters and the specified width in MRPA areas.

(9) Delineate the specified horizontal greenway along designated trout streams, where applicable.

(10) Location of erosion and sediment control measures and practices using coding symbols from the Manual for Erosion and Sediment Control in Georgia, Chapter 6.

(11) Maintenance of all soil erosion and sediment control practices, whether temporary or permanent, shall be at all times the responsibility of the property owner.

History

The history line the source prints at the end of the section.

(Ord. of 5-10-96)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hawkinsville/zoning/6.4.2@2026-11-11-fad2a67bdc

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hawkinsville Zoning Ordinance, Sec. 6.4.2. Erosion and sediment control plan | Georgia Commons