a. Preconstruction activity. Following the issuance of any permit authorizing clearing and grading of a site: (1) Required erosion and sedimentation control measures must be installed where practical by the owner and inspected and approved by the Building Inspector prior to any major development activity. (2) Areas required to be undisturbed, such as natural buffers or stream greenways, shall be designated by survey stakes, flags, ribbon, or other appropriate markings and shall be inspected and approved by the Building Inspector prior to the commencement of any clearing or grading activities. b. Grading. (1) Grading shall be done in accordance with the lines and grades drawn on the approved grading plan. (2) Earthen embankments shall be placed in uniform layers not to exceed a compacted thickness of six (6) inches per layer and shall be compacted to a density of ninety-five (95) percent of the maximum laboratory dry weight per cubic foot as determined by AASHTO Method T-99 in all areas where structures, parking lots and drives, streets, and utilities are to be placed. All other embankments are to be compacted to at least ninety (90) percent.