Skip to content
Georgia Commons
Menu

Hawkinsville · Zoning Ordinance

Appendix A - UNIFIED LAND DEVELOPMENT REGULATIONS / Article VI - PLANS AND PROCEDURES / Division 7 - FINAL SUBDIVISION PLAT

Sec. 6.7.2. Procedures for final plat approval.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

a. Prior to submission of an application for final subdivision plat approval, either:

(1) All public improvements shall have been properly installed and completed in accordance with all requirements and standards of this ordinance (other than traffic signs, street name signs, street striping, and signalization); or,

(2) A guarantee in lieu of completed improvements shall have been received by the Building Inspector as provided under Article 4 of this ordinance.

b. Application for a final subdivision plat approval shall be made to the Building Inspector.

The application shall include:

(1) A properly completed application form, as furnished by the Building Inspector, requesting final subdivision plat review.

(2) Ten (10) copies of the final subdivision plat drawing prepared in conformance with the specifications in this Section.

(3) Payment of all applicable final subdivision plat application and review fees, as established by the Board of Commissioners from time to time.

(4) Payment to the City for materials and installation of traffic signs and street name signs. Payment of the cost of street striping or signalization, if required and not completed by the owner, shall also be included in the application.

(5) A maintenance bond providing for the maintenance of all public improvements required by this ordinance in the subdivision for a period of twelve (12) months following the date of approval of the final plat.

c. The Building Inspector shall review the application for completeness at the time of submission. Incomplete applications will be returned to the applicant.

d. Within two (2) weeks following receipt of the application, the Building Inspector shall indicate on the drawing or in writing all comments related to compliance with this ordinance.

The Building Inspector shall have sole authority to determine the applicability of any provisions of this ordinance to the project.

e. The owner shall be responsible for compliance with all codes, regulations, and zoning requirements, and for the satisfaction of all the noted and written comments of the Building Inspector. Resubmission of all revised drawings shall be made to the Building Inspector.

f. When all of the requirements of this ordinance, and any conditions of zoning approval, have been met, or upon the request of the applicant, the Building Inspector shall forward the final subdivision plat to the Board of Commissioners for action at their next meeting.

g. When the Board of Commissions has determined that the final subdivision plat is in compliance with this ordinance, it shall be approved. The Chairman or Vice-Chairman shall sign and date the CERTIFICATE OF FINAL PLAT APPROVAL stamped or printed on a reproducible copy of the final subdivision plat. The executed original of the approved drawing shall be transmitted to the applicant and one copy shall be retained by the Building Inspector.

h. Once the final subdivision plat has been so certified, it shall be recorded by the owner with the Clerk of the Superior Court. The owner shall provide the Building Inspector with two

(2) copies of the plat as recorded.

History

The history line the source prints at the end of the section.

(Ord. of 5-10-96)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hawkinsville/zoning/6.7.2@2026-11-11-6cc0ff0b35

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hawkinsville Zoning Ordinance, Sec. 6.7.2. Procedures for final plat approval | Georgia Commons