--- title: Hawkinsville Zoning Ordinance, Sec. 6.8.2. Building inspection collection: local-codes id: local-code:hawkinsville/zoning/6.8.2 cite_as: Hawkinsville, Ga., Zoning Ordinance ยง 6.8.2 canonical_url: https://georgiacommons.org/code/local/hawkinsville/zoning/6.8.2 md_url: https://georgiacommons.org/code/local/hawkinsville/zoning/6.8.2.md text_url: https://georgiacommons.org/code/local/hawkinsville/zoning/6.8.2/text source_url: https://library.municode.com/ga/hawkinsville/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:hawkinsville jurisdiction_name: Hawkinsville place_fips: "1337396" corpus_version: local-codes-hawkinsville-021eb34226d7 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/hawkinsville/zoning/~appendix-a/~article-vi/~division-8.md previous: https://georgiacommons.org/code/local/hawkinsville/zoning/6.8.1.md next: https://georgiacommons.org/code/local/hawkinsville/zoning/6.8.3.md index: https://georgiacommons.org/code/local/hawkinsville.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:hawkinsville/zoning/6.8.2@2026-11-11-d6850a0c15 --- # Hawkinsville Zoning Ordinance, Sec. 6.8.2. Building inspection > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Appendix A - UNIFIED LAND DEVELOPMENT REGULATIONS / Article VI - PLANS AND PROCEDURES / Division 8 - BUILDING CONSTRUCTION a. Inspections shall be scheduled with the Building Inspector at least twenty-four (24) hours before the inspection is needed. Requests for inspection should include the street address, lot number, building permit number, and type of inspection. b. Required Inspections: (1) Foundation. Verify minimum required building setbacks, footing, trenches dug and reinforcing steel in place. (2) Plumbing Connections. Water supply line connected to meter and sewer lateral connected to clean-out. Pressure test lines. (3) Slab Preparation. After gravel, vapor barrier, and reinforcing wire is in place. (4) Framing. Completion of all rough-ins and after insulation is installed. (5) Interior walls may not be covered until the following inspections are completed: (a) Mechanical. Rough-ins complete with pressure test on gas line. (b) Electrical. Rough-ins with neutral ground, and service cable wired. (c) Plumbing. Rough-ins complete and all fixtures installed. (6) Meter Approval (Gas and Electric). When building is safe. No loose wires, furnace vents installed, thermostats installed, and gas piping connected. (7) Final Inspection. Building is complete and ready to occupy except for carpet and those fixtures omitted for home purchaser selection (see Designer Houses, below). ## History (Ord. of 5-10-96)