Construction of a building for which a flood area permit was issued as part of a development permit shall be governed by the following: a. Upon placement of the lowest floor, or floodproofing by whatever construction means, or upon placement of the horizontal structural members of the lowest floor, whichever is applicable, it shall be the duty of the development permit holder to submit to the Building Inspector a certification of the elevation of the lowest floor, floodproofed elevation, or the elevation of the lowest portion of the horizontal structural members of the lowest floor, whichever is applicable, as built, in relation to mean sea level. b. Certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified by such registered land surveyor or professional engineer. When floodproofing is utilized for a particular building, the certification shall be prepared by or under the direct supervision of a professional engineer or architect and certified by the professional engineer or architect. c. Any work undertaken prior to submission of the certification shall be at the development permit holder's risk. d. The Building Inspector shall review the floor elevation survey data submitted. Deficiencies detected by such review shall be corrected by the development permit holder immediately and prior to further progressive work being permitted to proceed. Failure to submit the survey or failure to make the corrections shall be cause to issue a stop-work order for the project.