Skip to content
Georgia Commons
Menu

Heard County · Zoning Ordinance

Part II - CODE OF ORDINANCES / Chapter 46 - ZONING / Article VIII - BUFFER REQUIREMENTS

Sec. 46-219. Determination of buffer requirements between residential, commercial and industrial zones.

About this text

  • As published by Municode, current through 2024-07-16
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Most intensive uses provide buffers. When two adjoining properties are is dissimilar residential, commercial or industrial zone districts as indicated in table 46-218, the property within the zone district allowing the most intensive uses is required to provide the buffer when acquiring a building permit unless the buffer was preexisting. When two adjoining vacant parcels are in dissimilar zone districts as indicated in table 46-218, no buffer is required when the parcel zoned for the less intensive use acquires a building permit.

(b) Buffer requirements.

(1) The required buffer shall consist of plantings or a fence, wall (not otherwise part of a structure or accessory structure), or a berm, which meets the screening standards of section 46-220. If plantings are chosen as the method of screening, the planting area shall have a minimum base width of 12 feet.

(2) The required buffer shall not less than a 20-foot base width and shall consist of plantings plus a fence, wall (not otherwise part of a structure or accessory structure), or a berm, or any combination thereof, which meets the screening standards of section 46-220.

(3) The required buffer shall consist of a 50-foot setback from the adjoining property line containing not less than a 20-foot base width consisting of plantings plus a fence, wall (not otherwise part of a structure or accessory structure), berm, or any combination thereof, which meets the screening standards of section 46-220.

(4) The required buffer shall consist of a 100-foot setback from the adjoining property line containing not less than a 20-foot base width consisting of plantings plus a fence, wall (not otherwise part of a structure or accessory structure), a berm, or any combination thereof, which meets the screening standards of section 46-220.

(5) The required buffer shall consist of either an unvegetated 500-foot setback of 200-foot vegetated setback from the adjoining property line. A 200-foot minimum setback shall consist of 75-foot of vegetated buffer area, measured along the entire portion of the property line abutting said use, and such buffer shall extend an additional 125 feet in each direction along the common property line.

The 75-foot vegetated buffer shall meet the planting requirements contained in section 46-220.

History

The history line the source prints at the end of the section.

(Ord. No. 80-100, § 9.1, 1-12-1999)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:heard-county/zoning/46-219@2024-07-16-2ed400084e

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Heard County Zoning Ordinance, Sec. 46-219. Determination of buffer requirements between residential, commercial and industrial zones | Georgia Commons