(a) Street work performed according to plan. The developer shall construct the street according to the approved plan. Any change from the approved plan or the standards of this article during the construction process shall void the action of the planning and design review board in approval of the preliminary plan, requiring that a new plan be submitted by the developer. (b) Modification of street plan. Should the developer find it necessary, during the construction phase, to change the plan, then he may apply to the planning and design review board for a modification by the same process as stated in this article. The planning and design review board is hereby authorized to modify the plan for a good and sufficient reason, and such reason shall be set out by motion granting the modification. (c) Final approval. (1) Following completion of the construction, upon the posting of a guaranty or surety and upon the submittal of a set of as-built plans conforming with the approved plan and the standards of this article as surveyed by a registered surveyor or civil engineer, the city commission shall approve the street and authorize the city manager or designee to issue building permits for lots abutting the street. (2) Following the approval of the street by the city commission, the city clerk shall note the approval of the street upon four copies of a plat of the street, two copies of which can be recorded in the minutes of the city, one copy to be recorded by the developer in the records of the clerk of court of the county, and one copy to be retained by the developer.