--- title: Henry County Zoning Ordinance (the whole text) collection: local-codes id: local-code:henry-county/zoning/whole cite_as: Henry County, Ga., Zoning Ordinance canonical_url: https://georgiacommons.org/code/local/henry-county/zoning/whole md_url: https://georgiacommons.org/code/local/henry-county/zoning/whole.md text_url: https://georgiacommons.org/code/local/henry-county/zoning/whole/text source_url: https://library.municode.com/ga/henry_county/codes/code_of_ordinances date: 2026-05-28 status: active jurisdiction: county:henry jurisdiction_name: Henry County county_fips: "13151" corpus_version: local-codes-henry-county-a33fcb57a380 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/henry-county/zoning.md previous: https://georgiacommons.org/code/local/henry-county/code/whole.md index: https://georgiacommons.org/code/local/henry-county.md branch: zoning edition: As published by Municode, current through 2026-05-28 edition_date_kind: current_through source_publisher: Municode version_id: local-code:henry-county/zoning/whole@2026-05-28-92759d7580 --- # Henry County Zoning Ordinance (the whole text) > As published by Municode, current through 2026-05-28 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. APPENDIX A UNIFIED LAND DEVELOPMENT CODE* TABLE OF CONTENTS CHAPTER 1. GENERAL PROVISIONS Sec. 1.01.00. Title. These land development regulations shall be known as the "Unified Land Development Code of Henry County, Georgia", and may be referred to as the "ULDC." Sec. 1.02.00. Authority. The ULDC is enacted pursuant to the requirements and authority granted by the Constitution and laws of the State of Georgia, in particular, House Bill No. 51 amending Title 36 of the Official Code of Georgia Annotated to include Chapter 66, the "Zoning Procedures" law. The ULDC therefore replaces Chapters 3-6 through 3-11 of the Henry County Code. Sec. 1.03.00. Applicability. 1.03.01. Generally. The regulations, standards, criteria, and procedures set forth in this ULDC shall govern the design, development, and use of all land within the unincorporated areas of Henry County. 1.03.02. Exemptions and exceptions. The following situations are exempt from the requirements of the ULDC: A. Buildings or structures that are legally under construction on the date of adoption of the ULDC. B. Buildings or structures for which a building permit has been issued as of the effective date of this ULDC, provided that construction commences prior to the expiration of the building permit, and continues until completed. C. Provided that development pursuant to an approved development plan or subdivision plat approved prior to the effective date of this ULDC, commences not later than one (1) year after the effective date of this ULDC. D. The proposed use of property lawfully approved as of the effective date of this ULDC. E. Applications for building permits, development permits and zoning requests legally submitted, with a completed application and paid fees prior to the adoption of this ULDC, shall not be required to meet the requirements of the adopted ULDC, but shall meet the requirements of adopted ordinances at the time of application. F. Zoning requests denied, but legally submitted pending the appeal of the board of commissioners. Sec. 1.04.00. Purpose and intent. The purpose and intent of the ULDC is to: A. Promote the health, safety, aesthetics, convenience, order, prosperity, and the general welfare of the present and future inhabitants of Henry County; B. Lessen congestion on the public streets; C. Further traffic safety; D. Secure safety from fire, flood and other dangers; E. Provide adequate light and air; F. Prevent the overcrowding of land, avoiding both undue concentration of population, and urban sprawl; G. Facilitate the adequate provision of transportation, water, sewerage collection, schools, parks and other public requirements; H. Protect property against blight and depreciation; I. Encourage the most appropriate use of land, buildings, and other structures throughout the county; J. Ensure economy in government expenditures for infrastructure; and K. Preserve natural resources. Sec. 1.05.00. Relationship to the comprehensive plan. The Henry County/Cities Joint Comprehensive Development Plan (comprehensive plan) is the official development policy and implementation guide for the county to coordinate and direct physical and economic development, related public investment, and to provide reasonable regulations for the development of private property in the interest of public health, safety, and welfare. The ULDC is designed to implement all provisions of that plan for the development and use of land. Sec. 1.06.00. Administrator. The planning and zoning department is the administrative agency charged with the administration of this code and may therefore establish such rules and procedures as may be necessary, including, but not limited to, administrative procedures for the filing of applications for amendment to the official zoning map of Henry County (i.e., zoning requests), variances, and other applications for development approval. The administrator or assigned designee is hereby authorized to interpret the provisions of this code when warranted and appropriate. Sec. 1.07.00. Documents adopted by reference. 1.07.01. Official zoning map. A. The official zoning map shall be adopted by resolution of the board of commissioners, which directs the identification of the official zoning map by the signature of the chairman of the board of commissioners, attested by the county clerk, and bearing the seal of the county under the following words: "This is to certify that this is the Official Zoning Map of Henry County", together with the date of adoption. B. The official zoning map of Henry County, Georgia, together with all explanatory matter thereon, is hereby adopted by reference and declared to be a part of this ULDC. C. If, in accordance with the procedural requirements set forth in section 12.02.09 regarding amendments to the official zoning map, changes are made in district boundaries or other matter portrayed on the official zoning map, such changes shall be entered on the official zoning map once a year after the amendment has been approved by the board of commissioners, with an entry in the minutes of such board of commissioners meeting as follows: "On , 20 by official action of the board of commissioners, the following (change) changes (was) were made to the official zoning map: (brief description of nature of change or changes)," which entry shall be signed by the chairman of the board of commissioners, and attested by the county clerk. D. The official zoning map, located in the office of the planning and zoning department shall be the final authority as to the current zoning status of any parcel or lot in the county. E. In the event that the official zoning map becomes damaged, destroyed, lost, or difficult to interpret because of the nature or number of changes and additions, the board of commissioners may, by ordinance, adopt a new official zoning map, which shall supersede the prior official zoning map. 1. The new official zoning map may correct drafting or other errors or omissions in the prior official zoning map, but no such correction shall have the effect of amending the original official zoning map. 2. The official zoning map shall be adopted every twelve (12) months or one (1) year, as needed, by the board of commissioners. 3. This new official zoning map shall be identified by the signature of the chairman of the board of commissioners, attested by the county clerk, and bearing the seal of the county under the following words: "This is to certify that this Official Zoning Map supersedes and replaces the Official Zoning Map adopted on , 20 as part of the ULDC." 4. Unless the previous official zoning map has been lost, or has been totally destroyed, the prior map or any significant remaining parts thereof shall be preserved, together with all available records pertaining to its adoption or amendment. 5. If official zoning records are in conflict with the official zoning map and reveal drafting or other errors, such records shall be used to amend the official zoning map administratively. Further, notification of such errors shall be made to the board of commissioners for certification and adoption. 1.07.02. Functional road plan The functional road plan, adopted in the comprehensive plan, describing the functional classifications and associated right-of-way requirements, is hereby adopted by reference and declared to be a part of this ULDC. This plan provides information to guide Henry County in requiring the dedication or preservation of land for rights-of-way for future streets. 1.07.03. Georgia Stormwater Management Manual. The Georgia Stormwater Management Manual (GSMM) is hereby adopted by reference and declared to be a part of this ULDC. The GSMM specifies the channel protection, flood control requirements and design standards necessary to control stormwater runoff and protect water quality. 1.07.04. Metro North Georgia Water Planning District. The Metropolitan North Georgia Water Planning District was signed into law on April 5, 2001, (2001 S.B. 130) to develop regional and watershed specific plans for a sixteen-county area. Henry County is a member of the water supply area and a member of the Metropolitan North Georgia Water Planning District; thus enabling legislation also requires that all provisions established by the district be implemented by the local governments. 1.07.05. Floodplain management. Henry County is required to adhere to floodplain management standards referenced in Paragraph 60.3(d) (44 CFR 59) based on participation with the National Flood Insurance Program (NFIP). The adopted flood insurance study (FIS), dated May 16, 2006, with accompanying maps and other supporting data and any revision thereto, are hereby adopted by reference and shall be the final authority as to indicate base flood elevations (BFE) for Henry County, if available. Other methods can be used to determine the BFE as detailed in subsection 3.01.01(C)(2) where the FIS did not establish a BFE. 1.07.06. Building and construction codes. Each building and construction code listed in subsections 1.07.06(A) through (O) as approved by the State of Georgia, including any attachments, future editions and amendments are hereby adopted by reference as if set forth in its entirety. Consult the website for the Henry County Board of Commissioners at www.co.henry.ga.us/buildingdepartment for the latest codes in effect. A. International Building Code (ICC) B. National Electric Code as published by the National Fire Protection Association (NFPA) C. International Fuel Gas Code (ICC) D. International Mechanical Code (ICC) E. International Plumbing Code (ICC) F. International Residential Code for One- and Two-Family Dwellings (ICC) G. International Energy Conservation Code (ICC) H. International Fire Code (ICC) I. International Property Maintenance Code (ICC) J. Standard Amusement Device Code (SBCCI/ICC) K. Excavation and Grading Code (SBCCI/ICC) L. International Existing Buildings Code (ICC) M. Standard Swimming Pool Code (SBCCI/ICC) N. Standard Unsafe Building Abatement Code (SBCCI/ICC) O. The Code for Safety of Life from Fire in Buildings and Structures as contained in the National Fire Prevention Association Publication 101 (NFPA). 1.07.07. OSHA safety and health regulations regarding excavating and trenching. All safety and health regulations promulgated by OSHA with regard to excavating and trenching operations, particularly Part 1926, Subpart P, Excavation, Trenching, and Shoring, sections 1926.650, 1926.651, and 1926.652 of the Code of Federal Regulations, as the same now exists or may be hereafter amended, are hereby adopted as a part of this ULDC as if it were quoted verbatim herein. Sec. 1.08.00. Rules of interpretation. 1.08.01. Generally. A. The following rules of interpretation shall apply in the administration of the ULDC: 1. In the administration of the ULDC, where there is any conflict between text within the ULDC and any caption, illustration, or graphic presentation, the text shall control. 2. All statements that refer to "section" means sections of this ULDC unless the statement clearly provides a citation to another document. 3. More specific provisions of this ULDC shall be followed in lieu of more general provisions. 4. Where more than one (1) standard on the same subject is applied to the design and development of land, the stricter standard shall apply. 5. In interpreting and applying the provisions of this ULDC, the provisions shall be the minimum requirements for the promotion of health, safety, aesthetics, and welfare of the general public. 1.08.02 Rules for boundary interpretations It is the intent of this Unified Land Development Code that the entire area of the county, including all land, water areas, rivers, streets, alleys, railroad and other rights-of-way, be included in the districts established by this Unified Land Development Code. Where uncertainty exists with respect to the location of the boundaries of any zoning district in Henry County the following rules shall apply: A. District boundaries indicated as approximately following the centerlines of streets or highways shall be construed as following the indicated centerline. B. District boundaries indicated as approximately following street or highway right-of-way lines shall be construed as following the street or highway right-of-way lines. C. District boundaries indicated as approximately following lot or property lines shall be construed to follow such lot or property lines. D. District boundaries indicated as approximately parallel to the centerlines of streets, roads, highways, or railroads, or rights-of-way of same, shall be construed as being parallel thereto and at such distance as indicated on the official zoning map. If no distance or legal description is given, the dimension shall be determined by the use of the scale shown on the official zoning map. E. Where a district boundary line divides a lot that is in single ownership at the time of enactment of this ULDC, the district requirements for each portion of such lot shall be deemed to apply. F. In the case of a through lot fronting on two (2) approximately parallel streets that is divided by a zoning district boundary line paralleling the streets, the restrictions of the zoning district in which each frontage of the through lot lies shall apply to that portion of the through lot. G. Where zoning district boundaries are in doubt, the administrator shall make such interpretation using the appropriate scale from the official zoning map. H. All rights-of-way; not otherwise specifically designated, shall be zoned RA. 1.08.03. Rules of construction. A. Words used in the present tense shall include the future tense. B. Words used in the singular number shall include the plural number, and words used in the plural number shall include the singular number. C. A word importing the masculine gender shall extend and be applied to female persons and to firms, partnerships, and corporations, as well as to male persons. D. The word may is always permissive and never mandatory. The word shall is always mandatory. E. The word month shall mean thirty (30) days. F. The word person shall extend and be applied to associations, clubs, societies, firms, partnerships, and bodies both political and corporate, as well as to individuals. G. The word includes shall not limit a term to the specified examples, but is intended to extend its meaning to other instances or circumstances of like kind or character. 1.08.04. Computation of time. Except as required by state or federal law, or as interpreted by the courts, the time within which an act shall be done shall be computed by working days, excluding the first and including the last day. Saturdays, Sundays, and legal holidays in Henry County shall be excluded from the computation. (Ord. No. 13-03, § I, 3-19-13) Sec. 1.09.00. Abrogation. This ULDC is not intended to repeal, abrogate, or impair any existing easements, covenants, or deed restrictions. However, where this ULDC and another ordinance conflict or overlap, whichever imposes the more stringent restrictions shall prevail. Sec. 1.10.00. Severability. If any section, paragraph, clause, phrase, or provision of this ULDC shall be adjudged invalid or held unconstitutional, such decisions shall not affect the validity of remaining portions of this ULDC. Sec. 1.11.00. Conversion of previous zoning districts. A. Zoning districts as were established under the previous zoning ordinance of Henry County are hereby renamed to the following zoning district names and designations under this ULDC, as shown in Table 1.11.00(A). All regulations, requirements and provisions of this ULDC applicable to a zoning district established under this section shall apply to the previously named zoning district as now named, as shown in Table 2.01.07(A). B. All special conditions and special stipulations imposed as conditions of rezoning of property prior to adoption of this ULDC are hereby retained and reaffirmed, and shall continue in full force and effect until such time as the property is rezoned or the prior zoning action of the board of commissioners is amended through the rezoning process established by this ULDC. Table 1.11.00(A): Conversion of Previous Zoning Districts Previous Zoning District Designation Zoning District Designation under this ULDC Residential Zoning Districts RA RA R-1 R-1 R-2 (30,000 square feet) R-2 R-2 (18,000 square feet) R-3 R-3 R-4 N/A R-5 RD RD RM RM N/A RS RMH RMH Commercial, Office and Institution Zoning Districts OI OI C-1 C-1 C-2 C-2 C-3 C-3 Industrial Zoning Districts M-1 M-1 M-2 M-2 Mixed Use Districts PD Deleted N/A MU N/A IAC C. Any subdivision (residential or commercial), platted prior to the September 15, 2009 adoption of the Unified Land Development Code (ULDC), shall retain all development standards which were in place at the time of platting. (Ord. No. 10-20, § I(1), 6-15-10) CHAPTER 2. ZONING DISTRICTS Sec. 2.00.00. Generally. The use of buildings, structures, and land in accordance with the land use plan for Henry County shall comply with the use requirements for zoning districts set forth in chapter 2. Buildings, structures, or land shall be occupied or used only in conformity with all of the regulations set forth herein for the district in which it is located. Sec. 2.01.00. Establishment of base zoning districts. 2.01.01. Official zoning map. A. Henry County is hereby divided into zoning districts, as shown on the official zoning map which, together with all explanatory matter thereon, is hereby adopted by reference and declared to be a part of this ULDC. B. The official zoning map may be amended according to the procedures set forth in section 12.02.09 of the ULDC. 2.01.02. Residential zoning districts. The following residential zoning districts are established: A. RA: Residential-agricultural zoning district. This district is intended to preserve the mixed agricultural and residential character of land while providing a transition between rural and agricultural land and suburban and urban land; and locations to carry out agricultural activities, including those related to crops, livestock, and timber. This district will also provide for detached single-family residential dwellings that are site-built, manufactured or industrialized on lots. 1. Development standards. Minimum lot area 43,560 square feet lots or 1 acre in area with septic system and county water. 1.25 acres in area with septic system and private well. 87,120 square feet or 2 acres in area for new subdivisions. Minimum lot width 175 feet Minimum front yard setback 75 feet from right-of-way line; 50 feet from right-of-way when part of a subdivision requiring new streets Minimum side yard setback 20 feet Minimum rear yard setback 40 feet Maximum height 45 feet for new subdivisions, 35 feet for all other situations. Minimum heated floor area 1,500 square feet Curb and gutter Required in subdivisions Paved driveway Required in subdivisions; otherwise not required Sewage system Septic tank permitted Water system Well or county water 2. Permitted uses and supplemental standards: See tables 2.03.02 and 2.03.03. 3. Accessory uses: See table 2.03.04. B. R-1: Single-family residence zoning district. This district is intended to provide for detached single-family residential dwellings that are site-built, manufactured or industrialized on lots. 1. Development standards. Minimum lot area 43,560 square feet (1 acre) Minimum lot width 150 feet Minimum front yard setback 50 feet from right-of-way line Minimum side yard setback 20 feet Minimum rear yard setback 40 feet Maximum height 45 feet for new subdivisions, 35 feet for all other situations. Minimum heated floor area 1,500 square feet Curb and gutter Required Paved driveway Required Sewage system Septic tank permitted Water system County water system 2. Permitted uses and supplemental standards: See tables 2.03.02 and 2.03.03. 3. Accessory uses: See table 2.03.04. C. R-2/R-2(sewer): Single-family residence zoning district. This district is intended to provide for detached single-family residential dwellings that are either site-built or industrialized on lots. 1. Development standards: Minimum lot area 30,000 square feet (septic) 22,000 square feet (sewer) Minimum lot width 125 feet (septic) 115 feet (sewer) Minimum front yard setback 40 feet from right-of-way line (septic) 30 feet from the right-of-way line (sewer) Minimum side yard setback 15 feet (septic) 10 feet (sewer) Minimum rear yard setback 30 feet Maximum height 45 feet for new subdivisions, 35 feet for all other situations. Minimum heated floor area 1,600 square feet (septic) 1,700 square feet (sewer) Curb and gutter Required Paved driveway Required Sewage system Septic or public sewer system Water system County water system 2. Permitted uses and supplemental standards: See tables 2.03.02 and 2.03.03. 3. Accessory uses: See table 2.03.04. D. R-3: Single-family residence zoning district. This district is intended to provide for detached single-family residential dwellings that are either site-built or industrialized on lots. 1. Development standards: Minimum lot area 18,000 square feet Minimum lot width 100 feet Minimum front yard setback 30 feet from right-of-way line Minimum side yard setback 10 feet Minimum rear yard setback 30 feet Maximum height 45 feet for new subdivisions, 35 feet for all other situations. Minimum heated floor area 1,800 square feet Curb and gutter Required Paved driveway Required Sewage system Public sewer system Water system County water system Zero lot line developments are allowed as an optional development pattern by right for single-family uses within this zoning district. 2. Permitted uses and supplemental standards: See tables 2.03.02 and 2.03.03. 3. Accessory uses: See table 2.03.04. E. R-4: Single-family residence zoning district. This district is intended to provide for detached single-family residential dwellings that are either site-built or industrialized on lots. 1. Development standards: Minimum lot area 12,000 square feet Minimum lot width 75 feet Minimum front yard setback 25 feet from right-of-way line Minimum side yard setback 10 feet Minimum rear yard setback 25 feet Maximum height 45 feet for new subdivisions, 35 feet for all other situations. Minimum heated floor area 1,800 square feet Curb and gutter Required Paved driveway Required Sewage system Public sewer system Water system County water system Zero lot line developments are allowed as an optional development pattern by right for single-family uses within this zoning district. 2. Permitted uses and supplemental standards: See tables 2.03.02 and 2.03.03. 3. Accessory uses: See table 2.03.04. F. R-5: Single-family residence zoning district. This district is intended to provide for detached single-family residential dwellings that are either site-built or industrialized on lots. This district is also intended to provide locations for the development of horizontal multifamily and townhome developments, where appropriate. 1. Development standards for detached single-family developments: Minimum lot area 10,890 square feet Minimum lot width 75 feet Minimum front yard setback 25 feet from right-of-way line Minimum side yard setback 10 feet Minimum rear yard setback 25 feet Maximum height 45 feet for new subdivisions, 35 feet for all other situations. Minimum heated floor area 1,800 square feet Curb and gutter Required Paved driveway Required Sewage system Public sewer system Water system County water system Zero lot line developments are allowed as an optional development pattern by right for single-family uses within this zoning district. Horizontal multifamily and townhomes are allowed as an optional development pattern within this zoning district subject to multifamily standards in section 4.04.10. 2. Permitted uses and supplemental standards: See tables 2.03.02 and 2.03.03. 3. Accessory uses: See table 2.03.04. 4. Development standards for horizontal multifamily and townhomes: See section 4.04.10 subject to architectural and site plan review by Henry County Architectural Review Committee. G. RD: Residential duplex district. This district is intended to provide locations for duplex structures, where central water and central sewer are available on lots. 1. Development standards. Minimum lot area 30,000 square feet Minimum lot width 125 feet Minimum front yard setback 40 feet from right-of-way line Minimum side yard setback 15 feet Minimum rear yard setback 30 feet Maximum height 45 feet for new subdivisions, 35 feet for all other situations. Minimum heated floor area 1,000 square feet per dwelling unit. Curb and gutter Required Paved driveway Required Sewage system Public sewer system Water system County water system Zero lot line developments are allowed as an optional development pattern by right for single-family uses within this zoning district. 2. Permitted uses and supplemental standards: See tables 2.03.02 and 2.03.03. 3. Accessory uses: See table 2.03.04. H. RM: Multifamily residential district. This district is intended to provide locations for the development of multifamily residences or cluster housing developments. 1. Development standards: Minimum lot area 43,560 square feet or one acre in area Minimum lot width 100 feet Minimum front yard setback 60 feet from right-of-way line Minimum side yard setback 15 feet Minimum rear yard setback 20 feet Maximum height 65 feet for new development, 50 feet for all other situations Minimum heated floor area See section 4.04.10 for multifamily standards Curb and gutter Required Paved driveway Required Sewage system Public sewer system Water system County water system 2. Permitted uses and supplemental standards: See tables 2.03.02 and 2.03.03. 3. Accessory uses: See table 2.03.04. 4. Multifamily standards: See section 4.04.10, subject to architectural and site plan review by Henry County Planning and Zoning. I. RS: Residential suburban district. This district is intended to provide locations for a combination of two (2) of the following: single-family, duplex, or multifamily developments. 1. Development standards: Minimum lot area 217,800 square feet or five acres in area Minimum lot size per unit See section 4.04.10 for multifamily standards Minimum lot width 60 feet Minimum front yard setback 25 feet from right-of-way line Minimum side yard setback 10 feet Minimum rear yard setback 25 feet Maximum height 45 feet for new development, 35 feet for all other situations. Minimum heated floor area 1,800 square feet for single-family homes 1,000 square feet per dwelling unit for duplexes Apartments: 650 square feet for a one bedroom 900 square feet for a two bedrooms 200 square feet for each additional bedroom over two See section 4.04.10 for multifamily standards Curb and gutter Required Paved driveway Required Sewage system Public sewer system Water system County water system 2. Permitted uses and supplemental standards: See tables 2.03.02 and 2.03.03. 3. Accessory uses: See table 2.03.04. 4. Multifamily standards: See section 4.04.10, subject to architectural and plan review by Henry County Planning and Zoning. J. RMH: Mobile or manufactured home development district. This district is intended to provide locations for mobile or manufactured homes in parks, subdivisions, or other similar unified development arrangements on lots. See section 4.03.16 for manufactured home park standards. This district is also intended to provide locations for the development of horizontal multifamily and townhome developments, where appropriate. 1. Development standards. Minimum lot area 30,000 square feet with septic system and county water 18,000 square feet with public sewer and county water Minimum lot width 125 feet Minimum front yard setback 60 feet from right-of-way line Minimum side yard setback 15 feet Minimum rear yard setback 40 feet Maximum height 35 feet Minimum heated floor area 1,000 square feet Curb and gutter Required Paved driveway Required Sewage system Septic tank permitted or public sewer system Water system County water system Horizontal multifamily and townhomes are allowed as an optional development pattern within this zoning district subject to multifamily standards in section 4.04.10. 2. Permitted uses and supplemental standards: See tables 2.03.02 and 2.03.03. 3. Accessory uses: See table 2.03.04. 4. Development standards for horizontal multifamily townhomes: See section 4.04.10, subject to architectural and site plan review by Henry County Planning and Zoning. 2.01.03. Commercial, office and institutional zoning districts. A. OI: Office-institutional district. This district is intended to provide for the development of a complimentary mix of business, professional and institutional activities that are compatible with the primary purpose of this district. Limited retail uses normally associated with office or institutional uses, accessory structures, and essential public services are also permissible. 1. Development standards. Minimum lot area 32,670 square feet with septic system and county water 10,000 square feet with public sewer and county water Minimum lot width 125 feet with septic system, 100 feet with public sewer Minimum front yard setback 50 feet from right-of-way line Minimum side yard setback 15 feet Minimum rear yard setback 20 feet Maximum height Unlimited for new development, 75 feet for all other situations Sewage system Septic tank permitted or public sewer system Water system County water system 2. Permitted uses and supplemental standards: See tables 2.03.02 and 2.03.03. 3. Accessory uses: See table 2.03.04. B. C-1: Neighborhood commercial district. This district is intended to provide locations for limited retail and service uses to satisfy the common and frequent needs of residents of nearby residential neighborhoods. It is further the intent of this district to encourage such uses to be a part of a neighborhood convenience shopping center. Accessory uses and structures and essential public services are permissible. 1. Development standards. Minimum lot area 32,670 square feet with septic system and county water 10,000 square feet with public sewer and county water Minimum lot width 125 feet with septic system 60 feet with public sewer Minimum front yard setback 50 feet from right-of-way line Minimum side yard setback None, except 30 feet on corner lots Minimum rear yard setback 20 feet Maximum height Unlimited for new development, 50 feet [for all other situations] Sewage system Septic tank permitted or public sewer system Water system County water system 2. Permitted uses and supplemental standards: See tables 2.03.02 and 2.03.03. 3. Accessory uses: See table 2.03.04. C. C-2: General commercial district. This district is intended to provide locations for a wide variety of retail and service uses to satisfy the common and frequent needs of residents in large sections of the county and of the traveling public. It is the intent of this district to encourage businesses to be part of planned commercial centers, neighborhood shopping centers, or community shopping centers. Accessory uses and structures, essential public services and all "permitted" C-1 uses are permissible. 1. Development standards: Minimum lot area 32,670 square feet with septic system and county water 10,000 square feet with public sewer and county water Minimum lot width 125 feet with septic system 100 feet with public sewer Minimum front yard setback 50 feet from right-of-way line Minimum side yard setback None, except 30 feet on corner lots Minimum rear yard setback 20 feet Maximum height Unlimited for new development, 50 feet [for all other situations] Sewage system Septic tank permitted or public sewer system Water system County water system D. C-3: Highway commercial district. This district is intended to provide areas for commercial activities which provide products and services that require locations with the highest level of access to major highways and regional transportation systems. Permissible uses also include essential public services, accessory uses and structures, and all "permitted" C-1 and C-2 uses. 1. Development standards: Minimum lot area 32,670 square feet with septic system and county water 10,000 square feet with public sewer and county water Minimum lot width 125 feet with septic system 100 feet with public sewer Minimum front yard setback 50 feet from right-of-way line Minimum side yard setback None, except 30 feet on corner lots Minimum rear yard setback 20 feet Maximum height Unlimited for new development, 50 feet [for all other situations] Sewage system Septic tank permitted or public sewer system Water system County water system 2. Permitted uses and supplemental standards: See tables 2.03.02 and 2.03.03. 3. Accessory uses: See table 2.03.04. 2.01.04. Industrial zoning districts. A. M-1: Light manufacturing district. This district is intended to provide for light industrial uses which do not produce, store, or handle hazardous wastes. Permissible uses include commercial and industrial activities involved in manufacturing, processing, assembly, storage, or sale of products. Accessory uses and structures and essential public services are permissible. 1. Development standards. Minimum lot area 43,560 square feet with septic system and county water 30,000 square feet with public sewer and county water Minimum lot width 125 feet with septic system 100 feet with public sewer Minimum front yard setback 70 feet from right-of-way line Minimum side yard setback None, except 30 feet on corner lots Minimum rear yard setback 40 feet Maximum height Unlimited for new development, 75 feet for all other situations Sewage system Septic tank permitted or public sewer system Water system County water system 2. Permitted uses and supplemental standards: See tables 2.03.02 and 2.03.03. 3. Accessory uses: See table 2.03.04. B. M-2: Heavy manufacturing district. This district is intended to provide for the broadest range of industrial operations permitted in the county. It is the district for location of those industries which may have negative impacts or nuisance factors. Accessory uses and structures, essential public services and all "permitted" M-1 uses are permissible. 1. Development standards: Minimum lot area 43,560 square feet Minimum lot width 150 feet Minimum front yard setback 70 feet from right-of-way line Minimum side yard setback None, except 30 feet on corner lots Minimum rear yard setback 40 feet Maximum height Unlimited for new development, 75 feet for all other situations Sewage system Septic tank permitted or public sewer system Water system County water system 2. Permitted uses and supplemental standards: See tables 2.03.02 and 2.03.03. 3. Accessory uses: See table 2.03.04. 2.01.05. Mixture of residential, office and institutional, commercial, and industrial zoning districts. A. MU: Mixed-use district. This district is intended to provide locations for office, institutional, personal service, single-family, duplex, cluster housing, and multifamily residential uses, accessory uses or structures, and essential public services. Lots and parcels may be used for a single use, or may contain a mixture of uses within a single development site. This district is intended to allow the flexibility of development standards. Accessory uses and structures and essential public services are permissible. 1. Development standards: Minimum lot area 10,890 square feet Minimum lot width 75 feet Minimum front yard setback 20 feet from right-of-way line Minimum side yard setback 10 feet Minimum rear yard setback 30 feet Maximum height Unlimited for new development, 75 feet for all other situations Sewage system Public sewer system Water system County water system Zero lot line developments are allowed as an optional development pattern by right for single-family uses within this zoning district. 2. Permitted uses and supplemental standards: See tables 2.03.02 and 2.03.03. 3. Accessory uses: See table 2.03.04. B. IAC: Interchange activity center district. This district is intended to provide locations at the intersection of two (2) major arterials or at interstate interchanges to accommodate transient shopping, lodging, and hospitality uses, and to provide locations with the highest level of access to meet the needs for product distribution. This district is intended as a mixed-use development. The following types of uses are permissible: multifamily residential, regional commercial, lodging, regional services, and essential public services. Uses may be combined within a development project in this district. 1. Development standards: Minimum lot area 32,670 square feet Minimum lot width 75 feet Minimum front yard setback 50 feet from right-of-way line Minimum side yard setback None, except 30 feet on corner lots Minimum rear yard setback 20 feet Maximum height Unlimited for new development, 125 feet for all other situations Sewage system Public sewer system Water system County water system Zero lot line developments are allowed as an optional development pattern by right for single-family uses within this zoning district. 2. Permitted uses and supplemental standards: See tables 2.03.02 and 2.03.03. 3. Accessory uses: See table 2.03.04. (Ord. No. 10-20, § I(2)—(4), 6-15-10; Ord. No. 11-05, § I, 7-19-11; Ord. No. 17-14, § I, 7-18-17; Ord. No. 23-08, § I, 6-20-23) Sec. 2.02.00. Establishment of overlay districts. 2.02.01. Generally. These districts are superimposed on top of portions of one (1) or more underlying base zoning districts that allow application of additional standards addressing a special purpose, such as historic preservation or floodplain protection. An overlay district may be used to add a village center or community commercial district as described in the comprehensive plan. See section 4.02.00 for the regulations for overlay districts. Sec. 2.03.00. Uses allowed in base zoning districts. 2.03.01. Generally. The tables in this section describe those uses that are permissible in each base zoning district. 2.03.02. Residential land uses in base zoning districts (see table 2.03.02). The table in this section identifies the permissible residential uses within base zoning districts. Allowable density in residential districts shall be consistent with the comprehensive plan. Within the following table, the letter "P" means the identified use is permissible, subject to the standards and criteria applicable to the zoning district. The letter "S" means the use is permissible, subject to the standards and criteria applicable to the zoning district and supplemental standards applicable to the specific use. The section number for supplemental standards is listed within the cell. A blank cell means the use is prohibited in the indicated zoning district. Table 2.03.02. Residential Land Uses in Base Zoning Districts. Zoning Districts: P = Permitted S = Supplemental Blank cell = Prohibited RA1 R-1 R-2 R-3 R-4 R-5 RS RD RM RMH MU OI C-1 C-2 C-3 IAC M-1 M-2 RESIDENTIAL ACTIVITIES Single-family dwellings P P P P P P P P P P Duplex P P Manufactured homes S 4.01.07 S 4.01.07 P Industrialized/ modular homes P P P P P P P Move-in structures P 2.03.05 Multifamily dwellings (including townhouses, feesimple condos and apartments) 3 + units P P P P TRANSIENT LIVING Motels and hotels P P P Recreational vehicle parks and campgrounds S 4.03.17 S 4.03.17 S 4.03.17 Bed and breakfast (not in subdivisions) S 4.03.28 S 4.03.28 S 4.03.28 Private membership recreational facility (not in a platted subdivision) S 4.03.33 S 4.03.33 S 4.03.33 S 4.03.33 S 4.03.33 S 4.03.33 S 4.03.33 S 4.03.33 S 4.03.33 S 4.03.33 INSTITUTIONAL LIVING Boarding and rooming houses S 4.03.29 S 4.03.29 S 4.03.29 S 4.03.29 S 4.03.29 Nursing homes, group homes, care homes, assisted living and hospice care facilities, S 4.03.18 P P P Personal care homes S 4.03.19 S 4.03.19 S 4.03.19 S 4.03.19 S 4.03.19 S 4.03.19 S 4.03.19 S 4.03.19 S 4.03.19 S 4.03.19 USES PERMITTED UNDER A DEVELOPMENT AGREEMENT Uses set forth in conditions of a zoning decision or in a development agreement P 1 Single-family, duplex, multifamily, and/or institutional living may be permissible where the development within the RA zoning district is proposed as a traditional neighborhood development, pursuant to section 6.01.00. 2.03.03. Nonresidential land uses in base zoning districts. The table in this section identifies the permissible nonresidential uses within each base zoning district. Within the following table, the letter "P" means the identified use is permissible, subject to the standards and criteria applicable to the zoning district. The letter "S" means the use is permissible, subject to the standards and criteria applicable to the zoning district and supplemental standards applicable to the specific use. The letter "H" means that use is permissible as a home occupation, subject to the supplemental standards and criteria applicable within chapter 7, section 7.01.00. A blank cell means the use is prohibited in the indicated zoning district. Permissible accessory uses are identified in table 2.03.04. Land uses permitted in the C-1 zoning district are permitted in C-2 and C-3 zoning districts. Land uses permitted in the M-1 zoning district are permitted in the M-2 zoning district. Table 2.03.03. Nonresidential Land Uses in Base Zoning Districts. Zoning Districts: P = Permitted S = Supplemental H = Home Occupation CU = Conditional Use Blank cell = Prohibited RA1 R-1 R-2 R-3 R-4 R-5 RS RD RM RMH MU OI C-1 C-2 C-3 IAC M-1 M-2 SHOPPING, BUSINESS, OR TRADE ACTIVITIES Vehicle sales new or used P P Vehicle body shop P P P Bicycle sales and repair shop P P P P P Gasoline service S 4.03.09 S 4.03.09 S 4.03.09 S 4.03.09 S 4.03.09 Heavy consumer goods sales or service P P P P Lawn and garden P P P P P Lumber yard and building materials P P P P Durable consumer goods sales or service P P P P Consumer goods, other P P P P P Grocery, food, beverage, dairy, etc. P P P P P Farmer's market (no sale or raising of livestock) P P P P Health and personal services P P P P P Pet supplies; pet stores P P P P P Pet grooming H H H H H H P P P P P Rental of vehicles and equipment P P P P Gun sales P P P Pawn shops S 4.03.32.1 S 4.03.32.1 S 4.03.32.1 Gunsmith H Adult entertainment establishments S 4.03.32 Animal sanctuary and rehabilitation facilitiles CU 4.03.37 RESTAURANT-TYPE ACTIVITY Restaurant P P P P P Zoning Districts: P = Permitted S = Supplemental H = Home Occupation CU = Conditional Use Blank cell = Prohibited RA 1 R-1 R-2 R-3 R-4 R-5 RS RD RM RMH MU OI C-1 C-2 C-3 IAC M-1 M-2 Bar or drinking (alcoholic) beverage establishment P P P P P Portable or mobile restaurants and food services, temporary outdoor and sales (transient merchant), and sidewalk sales P P P P P P P Caterer and food service contractor H H H H H H H H H H P P P P P P P P OFFICE ACTIVITIES Finance and insurance H H H H H H H H H H P P P P P P P P Business, professional, scientific, and technical services H H H H H H H H H H P P P P P P P P Professional services H H H H H H H H H H P P P P P P P P Veterinary services (no outside runs or pens) CU 4.03.01 S 4.03.01 S 4.03.01 S 4.03.01 S 4.03.01 S 4.03.01 S 4.03.01 S 4.03.01 S 4.03.01 Services to buildings and dwellings H H H H H H H H H H P P P P P Governmental and public buildings P P P P P P P P P P P P P P P P P P Real estate sales, rental, and management H H H H H H H H H H P P P P P P P P Medical and dental offices, clinics and related services P P P P P P P P INDUSTRIAL, MANUFACTURING, AND WASTE-RELATED ACTIVITIES Food, textiles, and related products P P Food processing plants S 4.03.03 S 4.03.03 Wood, paper, and printing products P P Planing and sawmills P Chemicals, metals, machinery, and electronics manufacture P Cosmetic and pharmaceutical storage and production P P Zoning Districts: P = Permitted S = Supplemental H = Home Occupation CU = Conditional Use Blank cell = Prohibited RA 1 R-1 R-2 R-3 R-4 R-5 RS RD RM RMH MU OI C-1 C-2 C-3 IAC M-1 M-2 Asphalt and concrete batching; central mixing plants for cement, mortar, plaster, or housing materials manufacture S 4.03.03 Electronic equipment, appliance, and components manufacture P P Wholesale trade establishment P P Warehouse and storage services P P P Self-service storage facility S 4.03.23 S 4.03.23 S 4.03.23 S 4.03.23 Construction-related business P P Construction-related business (including open storage) P P Inert landfill (from off-site source) S 3-5- 109 S 3-5- 109 S 3-5- 109 Salvage, junkyards CU 4.03.21 Wrecker services (with storage area) CU 4.03.21 CU 4.03.21 Wrecker service (without storage area) P Dry cleaning and laundering plants P P Solid waste management facilities P Recycling centers P Industrialized and modular buildings S 4.03.31 S 4.03.31 S 4.03.31 S 4.03.31 S 4.03.31 S 4.03.31 S 4.03.31 Mining including surface and subsurface strip mining S 4.03.15 SOCIAL, INSTITUTIONAL, OR INFRASTRUCTURE-RELATED ACTIVITIES Libraries P P P P P P P P P P P P P P P P Public and private schools S 4.03.22 S 4.03.22 S 4.03.22 S 4.03.22 S 4.03.22 S 4.03.22 S 4.03.22 S 4.03.22 S 4.03.22 S 4.03.22 S 4.03.22 P P P P P S 4.03.22 S 4.03.22 Day care or nursery centers, child care S 4.03.04 S 4.03.04 S 4.03.04 S 4.03.04 S 4.03.04 S 4.03.04 S 4.03.04 S 4.03.04 S 4.03.04 S 4.03.04 S 4.03.04 S 4.03.04 S 4.03.04 S 4.03.04 S 4.03.04 S 4.03.04 S 4.03.04 S 4.03.04 Colleges and universities P P P P P P S 4.03.22 S 4.03.22 Zoning Districts: P = Permitted S = Supplemental H = Home Occupation CU = Conditional Use Blank cell = Prohibited RA 1 R-1 R-2 R-3 R-4 R-5 RS RD RM RMH MU OI C-1 C-2 C-3 IAC M-1 M-2 Technical, trade, and other specialty schools P P P P P P P P Emergency response or public safetyrelated activities S 4.03.06 S 4.03.06 S 4.03.06 S 4.03.06 S 4.03.06 S 4.03.06 S 4.03.06 S 4.03.06 S 4.03.06 S 4.03.06 S 4.03.06 S 4.03.06 S 4.03.06 S 4.03.06 S 4.03.06 S 4.03.06 S 4.03.06 S 4.03.06 Hospitals CU 4.05.12 P P P P P P Road, ground passenger, and transit transportation P P P P P P P P Taxi office P P P P P Truck and freight transportation services P P P P Postal, courier and messenger services P P P P P P P P Trains or other rail movement P P P P P P P P Aircraft takeoff, landing, taxiing, and parking S 4.03.25 S 4.03.25 S 4.03.25 P P Wireless communication facilities (WCF) CU 7.05.00 CU 7.05.00 CU 7.05.00 CU 7.05.00 CU 7.05.00 CU 7.05.00 CU 7.05.00 CU 7.05.00 CU 7.05.00 CU 7.05.00 CU 7.05.00 CU 7.05.00 CU 7.05.00 CU 7.05.00 CU 7.05.00 CU 7.05.00 CU 7.05.00 CU 7.05.00 ACTIVITIES ASSOCIATED WITH UTILITIES Utility and utility services P P P Radio and television stations P P P Essential public services P P P P P P P P P P P P P P P P P P Electrical substations S 4.03.05 S 4.03.05 S 4.03.05 S 4.03.05 S 4.03.05 S 4.03.05 S 4.03.05 S 4.03.05 S 4.03.05 S 4.03.05 S 4.03.05 S 4.03.05 S 4.03.05 S 4.03.05 S 4.03.05 S 4.03.05 S 4.03.05 S 4.03.05 INTERMENT, CREMATION, OR GRAVEDIGGING Funeral homes and mortuaries (with or without crematoriums) S 4.03.08 S 4.03.08 S 4.03.08 Cemeteries S 4.03.02 S 4.03.02 S 4.03.02 S 4.03.02 S 4.03.02 S 4.03.02 S 4.03.02 S 4.03.02 S 4.03.02 S 4.03.02 S 4.03.02 S 4.03.02 S 4.03.02 S 4.03.02 S 4.03.02 S 4.03.02 S 4.03.02 S 4.03.02 Crematoriums S 4.03.08 S 4.03.08 S 4.03.08 P P SOCIAL, CULTURAL, OR RELIGIOUS ASSEMBLY Churches and similar religious facilities CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 P P P P P P CU 4.03.14 CU 4.03.14 Lodges, event facilities, etc. S 4.03.27 P P P P P P CU 4.03.27 CU 4.03.27 Children and youth centers P P P P P P CU CU Zoning Districts: P = Permitted S = Supplemental H = Home Occupation CU = Conditional Use Blank cell = Prohibited RA1 R-1 R-2 R-3 R-4 R-5 RS RD RM RMH MU OI C-1 C-2 C-3 IAC M-1 M-2 Museums, aquariums, zoological park, convention center CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 Movies, concerts, or entertainment shows S 4.03.14 P P P Fairs and exhibitions CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 ACTIVE LEISURE SPORTS OR RELATED ACTIVITIES Amusement, sports, or recreation establishment P P P P P CU CU Miniature golf CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 Outdoor golf driving ranges S 4.03.10 S 4.03.10 S 4.03.10 S 4.03.10 S 4.03.10 S 4.03.10 S 4.03.10 S 4.03.10 S 4.03.10 S 4.03.10 Fitness club, spas and gyms P P P P P P Golf courses S 4.03.10 S 4.03.10 S 4.03.10 S 4.03.10 S 4.03.10 S 4.03.10 S 4.03.10 S 4.03.10 S 4.03.10 S 4.03.10 Stables and riding açademies S 4.03.01 PASSIVE LEISURE ACTIVITY Recreational vehicle parks and campgrounds S 4.03.17 S 4.03.17 S 4.03.17 Parks P P P P P P P P P P P P P P P P P P Athletic fields CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 CU 4.03.14 FARMING, TILLING, PLOWING, HARVESTING, OR RELATED ACTIVITIES Agriculture P Crop garden P Greenhouses and nurseries S 4.03.11 S 4.03.11 S 4.03.11 Support functions for agriculture P P Roadside stands (for agricultural products) S 4.03.20 Forestry P Vineyards with or without wineries S 4.03.36 LIVESTOCK-RELATED ACTIVITIES Livestock processing or feedlots S 4.03.26 S 4.03.26 Kennels CU 4.03.01 S 4.03.01 S 4.03.01 S 4.03.01 S 4.03.01 S 4.03.01 S 4.03.01 Pasturing, grazing, etc. P USES PERMITTED UNDER A DEVELOPMENT AGREEMENT Zoning Districts: P = Permitted S = Supplemental H = Home Occupation CU = Conditional Use Blank cell = Prohibited RA1 R-1 R-2 R-3 R-4 R-5 RS RD RM RMH MU OI C-1 C-2 C-3 IAC M-1 M-2 Uses set forth in conditions of a zoning decision or in a development agreement P 2.03.04. Accessory land uses in base zoning districts. The table in this section identifies the permissible accessory uses within each base zoning district. Individual accessory uses are listed, together with an indication as to whether the use is permissible, as an accessory use, within each zoning district. Some uses are permissible by right in a zoning district, and are so indicated in tables 2.03.03 and 2.03.04. Consult each table for a determination as to whether the indicated use is permissible by right, or as an accessory use. Where the cell is blank in all tables for a specified use in a specified zoning district, the use is prohibited. All accessory structures/uses require that a building permit be issued prior to placement through the Henry County Building Department. Table 2.03.04. Accessory Land Uses in Base Zoning Districts Zoning Districts: A = Accessory Section Cross Reference RA R-1 R-2 R-3 R-4 R-5 RS RD RM RMH MU OI C-1 C-2 C-3 IAC M-1 M-2 Accessory dwellings 7.02.02 A A A A A A A A A Employee support facilities 7.02.08 A A A A A A A A Fallout shelters 7.02.03 A A A A A A A A A A A A A A A A A A Outside storage 7.02.05 A A* A A A A Storage buildings, sheds, greenhouses 7.02.01 A A A A A A A A A A A A A A A A A A Swimming pools 7.02.07 A A A A A A A A A A A A A A A A A Satellite dish antennas 7.02.06 A A A A A A A A A A A A A A A A A A *Permitted only for lawn and garden, and greenhouses/nursery uses where a building is on the lot. 2.03.05. Move-in structure uses in base zoning districts. A. [Applicability.] Except as provided in this section, no application for a move-in structure permit shall be approved, nor any structure moved or occupied, in Henry County, Georgia, prior to completion of all the requirements of this section. B. [Defined.] A move-in structure is defined as a preexisting structure relocated to another property or on the same property. Factory-built modular and manufactured homes as defined in the ULDC (Appendix A) are exempt from this section. C. [Permitted use.] Move-in houses shall be a permitted use only in the RA (residentialagricultural) zoning district as defined in the ULDC, section 2.01.02 and are subject to all lot size and setback requirements of the RA district, and shall be subject to all regulations of the Henry County Health Department concerning on-site sewage disposal facilities and private wells. D. Inspections. 1. Preliminary inspections. No building permit application for a move-in structure shall be approved until a complete inspection of the structure is made by the Henry County Building Department. An application for a move-in structure inspection shall be completed on forms provided by the building department prior to the inspection being made. The building department inspection shall determine the compliance or the feasibility of compliance to all existing building codes, development codes and ordinances adopted by the Henry County Board of Commissioners. Depending upon the size, age, condition or design of the structure, the building official or his authorized representative may require an inspection and report from a structural engineer to evaluate the suitability of the structure for moving. The engineering inspection and report fee shall be paid by the applicant for the move-in structure. If the building official or his authorized representative determines that compliance with existing codes is not feasible, the application for the building permits shall be denied. All such denials shall be in writing specifying the reasons therefore and signed by the building official. 2. Follow-up inspection. Following relocation of the structure and prior to and for the purpose of re-inspecting, the owner of the move-in structure shall, at the owner's choice, remove either the interior wall covering on all exterior walls or the exterior wall covering on all exterior walls. If necessary, and at the direction of the building official or his authorized representative regarding the interior load-bearing walls, the owner shall remove one (1) side of these interior walls and the building department shall then re-inspect the structure to insure that its structural integrity has not been compromised and that any required improvements are still feasible. 3. Inspection fee. The inspection fee shall be as set forth in the Henry County Building Department Fee Schedule which shall be paid to the building department prior to the inspection being made. E. Performance letter of credit or escrow letter of surety required of owner of the structure. To ensure that the structure will meet all of Henry County's current building construction codes and that the renovation of the move-in structure is completed and ready for occupancy within six (6) months from the date the building permit is issued, the owner of the move-in structure shall provide an irrevocable letter of credit or irrevocable bank escrow letter of surety in the amount of ten thousand dollars ($10,000.00), meeting the requirements of section 12.02.13. Such irrevocable letters of credit or irrevocable bank escrow letters of surety shall be issued from a federally insured banking institution. F. Building permit. A building permit shall be obtained from the building department for a move-in structure before it can be located on a lot in Henry County. The fee for the permit shall be as set forth in the Henry County building department fee schedule. G. Owner certification. All applications for permit shall be accompanied by a sworn affidavit that said applicant is the owner of the move-in structure and the owner of real property where the structure is to be relocated if the structure is to be located in Henry County. Prior to habitation, said owner shall be required to obtain a certificate of occupancy to verify completion of all work and that the structure is ready for habitation. H. Route approval. 1. Structures to be located within Henry County. Prior to the issuance of a permit for a move-in structure, the applicant must first submit and receive approval from the Henry County Police Department, Henry County Department of Transportation, and Henry County Code Enforcement Division regarding the proposed route. The applicants shall provide information concerning the name and address of the moving company, owner of structure to be moved, destination of structure, type and size of structure, map of the proposed route and insurance company. Said approval and information must be on forms furnished by the Henry County Building Department. Routes must comply with the Henry County Truck Route Ordinance. 2. Structures to be located outside of Henry County. Prior to moving a preexisting structure through Henry County, routes must be established by the Henry County Police Department, Henry County Department of Transportation, and Henry County Code Enforcement Division on forms provided by the Henry County Building Department. The applicants shall provide information concerning the name and address of the moving company, owner of structure to be moved, destination of structure, type and size of structure, map of the proposed route and insurance company. Required police escort must be prearranged with the Henry County Police Department three (3) days prior to moving structure from Henry County. Move-through structures will be allowed only on routes established in the Henry County Truck Route Ordinance. I. Requirements for moving companies. Any firm or individual moving structures into or through Henry County shall provide a valid copy of the Georgia Department of Transportation Oversize/Overweight Permit for the structures and a certificate of liability, naming Henry County as the certificate holder, that meets or exceeds the minimum insurance standards required by the Georgia Department of Transportation. J. Guarantee of completion. No application for a building permit shall be approved until a performance bond, irrevocable letter of credit, or irrevocable bank escrow letter of surety shall first be provided as referred to in subsection E., above. K. Time of completion. All permits for move-in structures must be completed in compliance with all codes and ordinances of Henry County within six (6) months from the date of granting of the building permit, unless extended as provided herein. In the event said structure is not in compliance and/or is not completed within the specified time limit, the building official or his authorized representative shall notify, in writing, the owner giving specific causes of noncompliance or noncompletion. Upon notification, the owner has thirty (30) days to correct said causes of noncompliance or noncompletion. In the event of failure of the owner to correct causes of noncompliance or noncompletion, and the owner has not received an extension of completion time, a notice to move or demolish said structure shall be issued to the owner immediately. Failure to move or demolish said structure within ten (10) days of this notice shall be deemed a violation of this section and shall be punishable in the Magistrate Court of Henry County and the Henry County Building Official or his authorized representative shall authorize the surety or bank issuing the irrevocable letter of credit or escrow letter of surety to release to the county all funds. L. Extension of completion time. The Henry County Building Official or his authorized representative, upon written request by the owner which states the reason for the request and payment of applicable fees, may issue a 90-day extension of completion time for cause beyond the original six-month compliance/completion period. A second 90-day extension of completion time, upon written request by the owner which states the reason for the second request, may be issued after the first 90-day extension of completion time has elapsed. Approved or denied extension of compliance/completion time requests shall be in writing and signed by the building official or his authorized representative. Permission for a greater extension of time may be granted only by the Henry County Board of Commissioners in regular public session. Application to appear before the board of commissioners shall be on forms provided by the Henry County Building Department. For any extension of completion time request, the performance irrevocable letter of credit, or irrevocable bank escrow letter of surety may be required to be extended if the performance letter of credit or irrevocable bank escrow letter of surety does not have sufficient time remaining to ensure that the structure will meet all of Henry County's current building construction codes and that the renovation of the move-in structure is completed and ready for occupancy within the requested time. The fees for each extension of completion time request shall be as set forth in the Henry County Building Department Fee Schedule. M. Certification of occupancy. A certificate of occupancy shall be issued upon the passing of a final inspection of a structure and shall verify the completion requirements hereinabove set forth, including compliance with all existing building and life safety codes. (Ord. No. 10-12, § I, 10-18-10; Ord. No. 10-14, § I, 10-18-10; Ord. No. 10-18, § I, 11-16-10; Ord. No. 10-20, § I(5)—(8), 6-15-10; Ord. No. 10-15, § I, 10-18-10; Ord. No. 11-02, § I, 4-4-11; Ord. No. 11-08, § I, 12-5-11; Ord. No. 11-09, § I, 12-19-11; Ord. No. 12-10, § I, 2-1-12; Ord. No. 12-15, § I, 7-17-12; Res. No. 13-05, Exh. A, 4-16-13; Ord. No. 15-05, § I, 7-7-15; Ord. No. 17-15, 8-1-17; Ord. No. 23-07, § I, 6-6-23; Ord. No. 25-4, § IV, 3-18-25; Ord. No. 25-10, § I, 10-21-25) Sec. 2.04.00. Miscellaneous provisions. 2.04.01. Parking and storage of major recreational equipment. Major recreational equipment may be parked or stored on side yards or rear yards or in a carport or enclosed building; provided that public right-of-way, sidewalk or sight distance, as defined in chapter 8, section 8.01.08 of the ULDC, is not obstructed. In addition, temporary parking is permitted within front yards for a period not to exceed twenty-four (24) hours during loading or unloading. The administrator is authorized to allow such equipment to be used as temporary living quarters in the following situations provided adequate documentation is provided prior to establishing such: 1. Family hardships and catastrophic events. 2. Temporary visitations. 3. Temporary dwelling when a primary structure is being built or modified on the same property. No more than two (2) such vehicles are allowed to be occupied on site at any one time. No separate permanent utility hook-ups or fixtures may be installed at any time. Services required to facilitate temporary habitation, included, but not limited to, liquid waste containment and disposal, solid waste disposal (e.g., dumpsters, trash cans), potable water, power, etc., shall be approved by administrator. Such equipment may be used for a period not to exceed thirty (30) consecutive days; however, the administrator may approve two (2) extensions up to ninety (90) days each. Any further extensions must be approved by the county manager. 2.04.02. Parking and storage of commercial vehicles. The parking and storage of commercial vehicles shall be regulated in accordance with Henry County Code of Ordinances Chapter 3-16, Article 5, Commercial vehicles. 2.04.03. Keeping and raising of livestock. The keeping and raising of all farm animals and fowl and use of private stables shall be limited to property located within the RA zoning district and must have a minimum lot area of three (3) acres. The keeping and raising of animals and fowl shall be subject to all regulations of the Henry County Health Department and the Henry County Animal Control Ordinance. See section 3-4-15 of the Henry County Code of Ordinances for the requirements for raising backyard chickens on lots less than three (3) acres. 2.04.04. Abandoned, wrecked, or junked vehicles. Parking or storing abandoned, wrecked or junked vehicles, power-driven construction equipment, lumber, metal, or any other miscellaneous scrap or salvageable material is prohibited in all residential zoning districts. 2.04.05. Accumulation of garbage, trash and rubbish. It shall be prohibited in all residential districts to place, deposit, or allow the accumulation of, household garbage, rubbish, trash, refuse or any condition which provides harborage for rats, mice, snakes and other vermin. 2.04.06. Encroachment on public rights-of-way. No building, structure, fence, service area, parking facility/area, loading area, except driveways shall be permitted to encroach on public right-of-way. All permanent structures or inorganic objects which are placed near but not within the right-of-way shall be located as not to obstruct, hinder or impede the view or movement of pedestrian and vehicular traffic as to become a nuisance, danger or hazard to the general public. 2.04.07. Posting. Each dwelling unit and place of business shall have light-reflective numbers posted and maintained in a prominent place on the property, visible from the street providing public access, the address of the dwelling unit or place of business. (1) For residences using mailboxes: Two-inch high light-reflective number with contrasting background; (2) For residences which do not use mailboxes and within one hundred (100) feet of roadway: Three-inch high light-reflective numbers with contrasting background; (3) For residences which do not use mailboxes and are more than one hundred (100) feet from a roadway: Three-inch high light-reflective numbers visible from the roadway with contrasting background; and (4) For all commercial establishments: Three-inch high light-reflective numbers with contrasting backgrounds. (Ord. No. 10-09, § I, 8-17-10; Ord. No. 12-01, § I, 1-3-12; Ord. No. 12-13, § I, 8-20-12; Ord. No. 13-09, 7-16-13; Ord. No. 22-02, § I, 3-1-22) CHAPTER 3. PROTECTION OF NATURAL FEATURES AND RESOURCES Sec. 3.00.00. Generally. The provisions set forth in chapter 3 are intended to protect the natural features and natural resources within Henry County, and to implement policies in the Henry County Comprehensive Plan. The natural features and natural resources included in chapter 3 are the floodplain, watersheds, wetlands, groundwater, river corridors, and open spaces. Sec. 3.01.00. Floodplain protection. 3.01.01. General provisions. A. The purpose of this article is to protect, maintain and enhance the public health, safety, environment and general welfare and to minimize public and private losses due to flood conditions in flood hazard areas, as well as to protect the beneficial uses of floodplain areas for water quality protection, streambank and stream corridor protection, wetlands preservation, and ecological and environmental protection by provisions designed to: 1. Require that uses vulnerable to floods, including facilities which serve such uses, be protected against flood damage at the time of initial development, ground disturbance or construction; 2. Restrict or prohibit uses which are dangerous to health, safety and property due to flooding or erosion hazards, or which increase flood heights, velocities, or erosion; 3. Control filling, grading, dredging, and other development which may increase flood damage or erosion; 4. Prevent or regulate the construction of flood barriers which will unnaturally divert flood waters or which may increase flood hazards to other lands; 5. Limit the alteration of natural floodplains, stream channels, and natural protective barriers, which are involved in the accommodation of flood waters; and 6. Protect the stormwater management, water quality, streambank protection, stream corridor protection, wetland preservation, and ecological functions of natural floodplain areas. B. Applicability. This article shall be applicable to all areas of special flood hazard within Henry County. C. Basis for establishing areas of special flood hazard, areas of future-conditions flood hazard and associated floodplain characteristics—Flood area maps and studies. For the purposes of defining and determining "areas of special flood hazard,""areas of future-conditions flood hazard,""areas of shallow flooding,""base flood elevations,""floodplains,""floodways," "future-conditions flood elevations,""future-conditions floodplains," potential flood hazard or risk categories as shown on FIRM maps, and other terms used in this article, the following documents and sources may be used for such purposes and are adopted by reference thereto: 1. The flood insurance study (FIS), dated May 16, 2006, with accompanying maps and other supporting data and any revision thereto. For those land areas acquired by a municipality through annexation, the current effective FIS and data for Henry County dated May 16, 2006, with accompanying maps and other supporting data and any revision thereto. 2. Other studies, which may be relied upon for the establishment of the base flood elevation or delineation of the base or one-percent (100-year) floodplain and flood-prone areas, including: a. Any flood or flood-related study conducted by the United States Army Corps of Engineers, the United States Geological Survey or any other local, state or federal agency applicable to Henry County; and b. Any base flood study conducted by a licensed professional engineer which has been prepared utilizing FEMA approved methodology and approved by Henry County Stormwater Management Department. 3. Other studies, which may be relied upon for the establishment of the future-conditions flood elevation or delineation of the future-conditions floodplain and flood-prone areas, including: a. Any flood or flood-related study conducted by the United States Army Corps of Engineers, the United States Geological Survey, or any other local, state or federal agency applicable to Henry County; and b. Any future-conditions flood study conducted by a licensed professional engineer which has been prepared utilizing FEMA approved methodology approved by the Henry County Stormwater Management Department. 4. The repository for public inspection of the FIS, accompanying maps and other supporting data is located at Henry County Stormwater Management Department. D. Warning and disclaimer of liability. The degree of flood protection required by this article is considered reasonable for regulatory purposes and is based on scientific and engineering considerations. Larger floods can and will occur; flood heights may be increased by manmade or natural causes. This article does not imply that land outside the areas of special flood hazard or uses permitted within such areas will be free from flooding or flood damages. This article shall not create liability on the part of Henry County or any officer or employee thereof for any flood damages that result from reliance on this article or any administrative decision lawfully made there under. E. Compatibility with other regulations. This article is not intended to modify or repeal any other article, rule, regulation, statute, easement, covenant, deed restriction or other provision of law. The requirements of this article are in addition to the requirements of any other article, rule, regulation or other provision of law, and where any provision of this article imposes restrictions different from those imposed by any other article, rule, regulation or other provision of law, whichever provision is more restrictive or imposes higher protective standards for human health or the environment shall control. F. Severability. If the provisions of any section, subsection, paragraph, subdivision or clause of this article shall be adjudged invalid by a court of competent Henry County, such judgment shall not affect or invalidate the remainder of any section, subsection, paragraph, subdivision or clause of this article. G. Responsibility for administration. The Henry County Stormwater Management Department Director or designee is hereby appointed to administer and implement the provisions of this article. 3.01.02. Permit procedures and requirements. A. Permit application requirements. No owner or developer shall perform any development activities on a site where an area of special flood hazard or area of future-conditions flood hazard is located without first meeting the requirements of this article prior to commencing the proposed activity. Unless specifically excluded by this article, any landowner or developer desiring a permit for a development activity shall submit to the Henry County Environmental Compliance and Plan Review Department a permit application on a form provided by the Environmental Compliance and Plan Review Department for that purpose. No permit will be approved for any development activities that do not meet the requirements, restrictions and criteria of this article. B. Floodplain management plan requirements. An application for a development project with any area of special flood hazard or area of future-conditions flood hazard located on the site shall include a floodplain management/flood damage prevention plan. This plan shall include the following items: 1. Site plan drawn to scale, which includes, but is not limited to: a. Existing and proposed elevations of the area in question and the nature, location and dimensions of existing and/or proposed structures, earthen fill placement, amount and location of excavation material, and storage of materials or equipment; b. For all proposed structures, spot ground elevations at building corners and twentyfoot or smaller intervals along the foundation footprint, or one (1) foot contour elevations throughout the building site; c. Proposed locations of water supply, sanitary sewer, and utilities; d. Proposed locations of drainage and stormwater management facilities; e. Proposed grading plan; f. Base flood elevations and future-conditions flood elevations; g. Boundaries of the base flood floodplain and future-conditions floodplain; h. If applicable, the location of the floodway; and i. Certification of the above by a licensed professional engineer or surveyor. 2. Building and foundation design detail, including, but not limited to: a. Elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all proposed structures; b. Elevation in relation to mean sea level to which any nonresidential structure will be floodproofed; c. Certification that any proposed nonresidential floodproofed structure meets the criteria in subsection 3.01.03.C.2.; d. For enclosures below the base flood elevation, location and total net area of flood openings as required in subsection 3.01.04.A.5.; and e. Design plans certified by a licensed professional engineer for all proposed structure(s). 3. Description of the extent to which any watercourse will be altered or relocated as a result of the proposed development; 4. Hard copies and digital files of computer models, if any, copies of work maps, comparison of pre- and post-development conditions base flood elevations, future-conditions flood elevations, flood protection elevations, special flood hazard areas and regulatory floodways, flood profiles and all other computations and other information similar to that presented in the FIS; 5. Copies of all applicable state and federal permits necessary for proposed development, including, but not limited to, permits required by Section 404 of the Federal Water Pollution Control Act, Amendments of 1972, 33 U.S.C. 1334; and 6. All appropriate certifications required under this article. The approved floodplain management/flood damage prevention plan shall contain certification by the applicant that all development activities will be done according to the plan or previously approved revisions. Any and all development permits and/or use and occupancy certificates or permits may be revoked at any time if the construction and development activities are not in strict accordance with approved plans. C. Construction stage submittal requirements. For all new construction and substantial improvements on sites with a floodplain management/flood damage prevention plan, the permit holder shall provide to the director of the building department or designee: 1. A certified as-built elevation certificate; or 2. Floodproofing certificate for nonresidential construction including the lowest floor elevation or floodproofing level immediately after the lowest floor or floodproofing is completed. A final elevation certificate shall be provided after completion of construction including final grading of the site. Any lowest floor certification made relative to mean sea level shall be prepared by or under the direct supervision of a licensed land surveyor or professional engineer and certified by same. When floodproofing is utilized for nonresidential structures, said certification shall be prepared by or under the direct supervision of a licensed professional engineer or architect and certified by same using the FEMA Floodproofing Certificate. This certification shall also include the design and operation/maintenance plan to assure continued viability of the floodproofing measures. Any work undertaken prior to approval of these certifications shall be at the permit holder’s risk. The Henry County Stormwater Management Department Director or designee shall review the above referenced certification data submitted. Deficiencies detected by such review shall be corrected by the permit holder immediately and prior to further work being allowed to proceed. Failure to submit certification or failure to make the corrections required hereby shall be cause to issue a stop work order for the project. D. Duties and responsibilities of the administrator. Duties of the Henry County Stormwater Management Department Director or designee shall include, but shall not be limited to: 1. Review all development applications and permits to assure that the requirements of this article have been satisfied and to determine whether proposed building sites will be reasonably safe from flooding; 2. Review proposed development to assure that all necessary permits have been received from those governmental agencies from which approval is required by federal or state law, including, but not limited to, Section 404 of the Federal Water Pollution Control Act, Amendments of 1972, 33 U.S.C. 1334; 3. When base flood elevation data or floodway data have not been provided, then the Henry County Stormwater Management Department Director or designee shall require the applicant to obtain, review and reasonably utilize any base flood elevation and floodway data available from a federal, state or other sources in order to meet the provisions of sections 3.01.03 and 3.01.04; 4. Review and record the actual elevation in relation to mean sea level (or highest adjacent grade) of the lowest floor, including basement, of all new and substantially improved structures; 5. Review and record the actual elevation, in relation to mean sea level to which any substantially improved structures have been floodproofed; 6. When floodproofing is utilized for a nonresidential structure, the Henry County Stormwater Management Department Director or designee shall review the design and operation/maintenance plan and obtain certification from a licensed professional engineer or architect; 7. Notify affected adjacent communities and the Georgia Department of Natural Resources (GA DNR) prior to any alteration or relocation of a watercourse and submit evidence of such notification to the Federal Emergency Management Agency (FEMA); 8. Where interpretation is needed as to the exact location of boundaries of the areas of special flood hazard (e.g. where there appears to be a conflict between a mapped boundary and actual field conditions) the Henry County Stormwater Management Department Director or designee shall make the necessary interpretation. Any person contesting the location of the boundary shall be given a reasonable opportunity to appeal the interpretation as provided in this article. Where floodplain elevations have been defined, the floodplain shall be determined based on flood elevations rather than the area graphically delineated on the floodplain maps; 9. All records pertaining to the provisions of this article shall be maintained in the office of the Henry County Stormwater Management Department Director or designee and shall be open for public inspection; 10. Coordinate all FIRM revisions with the GA DNR and FEMA; and 11. Coordinate with the planning and zoning department the review of applicable variance applications and make recommendations that will be presented to the Henry County Board of Commissioners. 3.01.03. Standards for development. A. Definition of floodplain boundaries. 1. Studied A zones, as identified in the FIS, shall be used to establish base flood elevations whenever available. 2. For all streams with a drainage area of one hundred (100) acres or greater, the future-conditions flood elevations shall be provided by the Henry County Stormwater Management Department. If future-conditions elevation data is not available from the Henry County Stormwater Management Department, then it shall be determined by a licensed professional engineer using a method approved by FEMA and the Henry County Stormwater Management Department. B. Definition of floodway boundaries. The width of a floodway shall be determined from the FIS or FEMA approved flood study. For all streams with a drainage area of one hundred (100) acres or greater, the regulatory floodway shall be provided by the Henry County Stormwater Management Department. If floodway data is not available from the Henry County Stormwater Management Department, it shall be determined by a licensed professional engineer using a method approved by FEMA and the Henry County Stormwater Management Department. C. General standards. 1. No development shall be allowed within any area of special flood hazard or area of future-conditions flood hazard that could result in any of the following: a. Raising the base flood elevation or future-conditions flood elevation equal to or more than 0.01 foot; b. Reducing the base flood or future-conditions flood storage capacity; c. Changing the flow characteristics as to the depth and velocity of the waters of the base flood or future-conditions flood as they pass both the upstream and the downstream boundaries of the development area; or d. Creating hazardous or erosion-producing velocities, or resulting in excessive sedimentation. 2. Any development within any area of special flood hazard or area of future-conditions flood hazard allowed under subsection 3.01.03.C.1. shall also meet the following conditions: a. Compensation for storage capacity shall occur between the average ground water table elevation and the base flood elevation for the base flood, and between the average ground water table elevation and the future-condition flood elevation for the future-conditions flood, and lie either within the boundaries of ownership of the property being developed and shall be within the immediate vicinity of the location of the encroachment. Acceptable means of providing required compensation include lowering of natural ground elevations within the floodplain, or lowering of adjoining land areas to create additional floodplain storage. In no case shall any required compensation be provided via bottom storage or by excavating below the elevation of the natural (pre-development) stream channel unless such excavation results from the widening or relocation of the stream channel; b. Cut areas shall be stabilized and graded to a slope of no less than two (2.0) percent; c. Effective transitions shall be provided such that flow velocities occurring on both upstream and downstream properties are not increased or decreased; d. Verification of no-rise conditions (less than 0.01 foot), flood storage volumes, and flow characteristics shall be provided via a step-backwater analysis meeting the requirements of subsection 3.01.03.D.; e. Public utilities and facilities, such as water, sanitary sewer, gas, and electrical systems, shall be located and constructed to minimize or eliminate infiltration or contamination from floodwaters; and f. Any significant physical changes to the base flood floodplain shall be submitted as a conditional letter of map revision (CLOMR) or conditional letter of map amendment (CLOMA), whichever is applicable. The CLOMR submittal shall be subject to approval by the Henry County Stormwater Management Department using the FEMA Community Concurrence forms before forwarding the submittal package to FEMA for final approval. The responsibility for forwarding the CLOMR to FEMA and for obtaining the CLOMR approval shall be the responsibility of the applicant. Within six (6) months of the completion of development, the applicant shall submit as-built surveys and plans for a final letter of map revision (LOMR). D. Engineering study requirements for floodplain encroachments. An engineering study is required, as appropriate to the proposed development activities on the site, whenever a development proposes to disturb any land within the future-conditions floodplain, except for a residential single-lot development on streams without established base flood elevations and floodways. This study shall be prepared by a licensed professional engineer and made a part of the application for a permit. This information shall be submitted to and approved by the Henry County Stormwater Management Department prior to the approval of any permit which would authorize the disturbance of land located within the future-conditions floodplain. Such study shall include: 1. Description of the extent to which any watercourse or floodplain will be altered or relocated as a result of the proposed development; 2. Step-backwater analysis, using a FEMA-approved methodology approved by the Henry County Stormwater Management Department. Cross-sections (which may be supplemented by the applicant) and flow information will be obtained whenever available. Computations will be shown duplicating FIS results and will then be rerun with the proposed modifications to determine the new base flood profiles, and future-conditions flood profiles; 3. Floodplain storage calculations based on cross-sections (at least one (1) every one hundred (100) feet) showing existing and proposed floodplain conditions to show that base flood floodplain and future-conditions floodplain storage capacity would not be diminished by the development; 4. The study shall include a preliminary plat, grading plan, or site plan, as appropriate, which shall clearly define all future-conditions floodplain encroachments. E. Floodway encroachments. Located within areas of special flood hazard are areas designated as floodway. A floodway may be an extremely hazardous area due to velocity flood waters, debris or erosion potential. In addition, floodways must remain free of encroachment in order to allow for the discharge of the base flood without increased flood heights. Therefore, the following provisions shall apply: 1. Encroachments are prohibited, including earthen fill, new construction, substantial improvements or other development within the regulatory floodway, except for activities specifically allowed in subsection 3.01.03.E.2. below. 2. Encroachments for bridges, culverts, roadways and utilities within the regulatory floodway may be permitted provided it is demonstrated through hydrologic and hydraulic analyses performed in accordance with standard engineering practice that the encroachment will not result in any increase to the pre-project base flood elevations, floodway elevations, or floodway widths during the base flood discharge. A licensed professional engineer must provide supporting technical data and certification thereof; and 3. If the applicant proposes to revise the floodway boundaries, no permit authorizing the encroachment into or an alteration of the floodway shall be issued by the environmental compliance and plan review department until an affirmative conditional letter of map revision (CLOMR) is issued by FEMA or a no-rise certification is approved by the Henry County Stormwater Management Department. F. Maintenance requirements. The property owner shall be responsible for continuing maintenance as may be needed within an altered or relocated portion of a floodplain on the property so that the flood-carrying or flood storage capacity is maintained. The Henry County Stormwater Management Department may direct the property owner (at no cost to Henry County) to restore the flood-carrying or flood storage capacity of the floodplain if the owner has not performed maintenance as required by the approved floodplain management plan on file with the Henry County Stormwater Management Department. 3.01.04. Provisions for flood damage reduction. A. General standards. In all areas of special flood hazard and areas of future-conditions flood hazard the following provisions apply: 1. New construction and substantial improvements of structures (residential or nonresidential), including manufactured homes, shall not be allowed within the limits of the futureconditions floodplain, unless all requirements of subsections 3.01.03.C., D., and E. have been met; 2. New construction and substantial improvements shall be anchored to prevent flotation, collapse and lateral movement of the structure; 3. New construction and substantial improvements shall be constructed with materials and utility equipment resistant to flood damage; 4. New construction and substantial improvements shall be constructed by methods and practices that minimize flood damage; 5. Elevated buildings. All new construction and substantial improvements that include any fully enclosed area located below the lowest floor formed by foundation and other exterior walls shall be designed so as to be an unfinished or flood resistant enclosure. The enclosure shall be designed to equalize hydrostatic flood forces on exterior walls by allowing for the automatic entry and exit of floodwater. a. Designs for complying with this requirement must either be certified by a licensed professional engineer or architect to meet or exceed the following minimum criteria: 1. Provide a minimum of two (2) openings having a total net area of not less than one (1) square inch for every square foot of enclosed area subject to flooding; 2. The bottom of all openings shall be no higher than one (1) foot above grade; and 3. Openings may be equipped with screens, louvers, valves or other coverings or devices provided they permit the automatic flow of floodwater in both directions. b. So as not to violate the lowest floor criteria of this article, the unfinished and flood resistant enclosure shall solely be used for parking of vehicles, limited storage of maintenance equipment used in connection with the premises, or entry to the elevated area; and c. The interior portion of such enclosed area shall not be finished or partitioned into separate rooms. 6. All heating and air conditioning equipment and components (including ductwork), all electrical, ventilation, plumbing, and other service facilities shall be designed and/or located three (3) feet above the base flood elevation or one (1) foot above the futureconditions flood elevation, whichever is higher, so as to prevent water from entering or accumulating within the components during conditions of flooding; 7. Manufactured homes shall be anchored to prevent flotation, collapse, and lateral movement. Methods of anchoring may include, but are not limited to, use of over-the-top or frame ties to ground anchors. This standard shall be in addition to and consistent with applicable state requirements for resisting wind forces; 8. All proposed development shall include adequate drainage and stormwater management facilities per the requirements of the Henry County Stormwater Management Department to reduce exposure to flood hazards; 9. New and replacement water supply systems shall be designed to minimize or eliminate infiltration of floodwaters into the system; 10. New and replacement sanitary sewage systems shall be designed to minimize or eliminate infiltration of floodwaters into the systems and discharges from the systems into floodwaters; 11. On-site waste disposal systems shall be located and constructed to avoid impairment to, or contamination from, such systems during flooding; 12. Other public utilities such as gas and electric systems shall be located and constructed to avoid impairment to them, or public safety hazards from them, during flooding; 13. Any alteration, repair, reconstruction or improvement to a structure which is not compliant with the provisions of this article, shall be undertaken only if the nonconformity is not furthered, extended or replaced; 14. If the proposed development is located in multiple flood zones, or multiple base flood elevations cross the proposed site, the higher or more restrictive base flood elevation or future condition elevation and development standards shall take precedence; 15. When only a portion of a proposed structure is located within a flood zone or the future conditions floodplain, the entire structure shall meet the requirements of this article; and 16. Subdivision proposals and other proposed new development, including manufactured home parks or subdivisions, shall be reasonably safe from flooding: a. All such proposals shall be consistent with the need to minimize flood damage within the flood-prone area; b. All public utilities and facilities, such as sewer, gas, electrical, and water systems shall be located and constructed to minimize or eliminate flood damage; and c. Adequate drainage shall be provided to reduce exposure to flood hazards. B. Building standards for structures and buildings within the future-conditions floodplain. 1. Residential buildings. a. New construction. New construction of principal residential structures shall not be allowed within the limits of the future-conditions floodplain unless all requirements of subsections 3.01.03.C., D., and E. have been met. If all of the requirements of subsections 3.01.03.C., D., and E. have been met, all new construction shall have the lowest floor, including basement, elevated no lower than three (3) feet above the base flood elevation or one (1) foot above the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of subsection 3.01.04.A.5. b. Substantial improvements. Substantial improvement of any principal residential structure shall have the lowest floor, including basement, elevated no lower than three (3) feet above the base flood elevation or one (1) foot above the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate a structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of subsection 3.01.04.A.5. 2. Nonresidential buildings. a. New construction. New construction of principal nonresidential structures shall not be allowed within the limits of the future-conditions floodplain unless all requirements of subsections 3.01.03.C., D. and E. have been met. If all of the requirements of subsections 3.01.03.C., D. and E. have been met, all new construction shall have the lowest floor, including basement, elevated no lower than one (1) foot above the base flood elevation or at least as high as the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of subsection 3.01.04.A.5. New construction that has met all of the requirements of subsections 3.01.03.C., D. and E. may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to one (1) foot above the base flood elevation, or at least as high as the future-conditions flood elevation, whichever is higher, with walls substantially impermeable to the passage of water and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A licensed profes-sional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the Henry County Stormwater Management Department Director or designee using the FEMA Floodproofing Certificate along with the design and operation/maintenance plan. b. Substantial improvements. Substantial improvement of any principal nonresidential structure located in A1-30, AE, or AH zones, may be authorized by the Henry County Stormwater Management Department Director or designee to be elevated or floodproofed. Substantial improvements shall have the lowest floor, including basement, elevated no lower than one (1) foot above the base flood elevation or at least as high as the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of subsection 3.01.04(A)5. Substantial improvements may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be watertight to one (1) foot above the base flood elevation, or at least as high as the future-conditions flood elevation, whichever is higher, with walls substantially impermeable to the passage of water and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A licensed professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice for meeting the provisions above, and shall provide such certification to the Henry County Stormwater Management Department Director or designee using the FEMA Floodproofing Certificate along with the design and operation/maintenance plan. 3. Accessory structures and facilities. Accessory structures and facilities (i.e., barns, sheds, gazebos, detached garages, recreational facilities and other similar non-habitable structures and facilities) which meet the requirements of subsections 3.01.03.C., D. and E. and are permitted to be located within the limits of the future-conditions floodplain shall be constructed of flood-resistant materials and designed to provide adequate flood openings in accordance with subsection 3.01.04.A.5. and be anchored to prevent flotation, collapse and lateral movement of the structure. 4. Standards for recreational vehicles. All recreational vehicles placed on sites must either: a. Be on the site for fewer than one hundred eighty (180) consecutive days and be fully licensed and ready for highway use (a recreational vehicle is ready for highway use if it is licensed, on its wheels or jacking system, attached to the site only by quick disconnect type utilities and security devices, and has no permanently attached structures or additions); or b. Meet all the requirements for residential buildings—substantial improvements (subsection 3.01.04(B)1.b.), including the anchoring and elevation requirements. 5. Standards for manufactured homes. a. New manufactured homes shall not be allowed to be placed within the limits of the future-conditions floodplain unless all requirements of subsections 3.01.03(C), (D) and (E) have been met. If all of the requirements of subsections 3.01.03(C), (D) and (E) have been met, all new construction and substantial improvement shall have the lowest floor, including basement, elevated no lower than three (3) feet above the base flood elevation or one (1) foot above the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of subsection 3.01.04.A.5. b. Manufactured homes placed and/or substantially improved in an existing manufactured home park or subdivision shall be elevated so that: 1. The lowest floor of the manufactured home is elevated no lower than three (3) feet above the level of the base flood elevation, or one (1) foot above the future-conditions flood elevation, whichever is higher; and 2. The manufactured home chassis is elevated and supported by reinforced piers (or other foundation elements of at least an equivalent strength) of no less than thirty-six (36) inches in height above grade. c. All manufactured homes must be securely anchored to an adequately anchored foundation system to resist flotation, collapse and lateral movement in accordance with standards of subsection 3.01.04.A.7. C. Building standards for structures and buildings authorized adjacent to the future-conditions floodplain. 1. Residential buildings. For new construction and substantial improvement of any principal residential building or manufactured home, the elevation of the lowest floor, including basement and access to the building, shall be at least three (3) feet above the base flood elevation or one (1) foot above the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of subsection 3.01.04.A.5. 2. Nonresidential buildings. For new construction and substantial improvement of any principal nonresidential building, the elevation of the lowest floor, including basement and access to the building, shall be at least one (1) foot above the level of the base flood elevation or at least as high as the future-conditions flood elevation, whichever is higher. Should solid foundation perimeter walls be used to elevate the structure, openings sufficient to automatically equalize the hydrostatic flood forces on exterior walls shall be provided in accordance with standards of subsection 3.01.04.A.5. Nonresidential buildings may be floodproofed in lieu of elevation. D. Building standards for residential single-lot developments on streams without established base flood elevations and floodway (A-zones). For a residential single-lot development not part of a subdivision that has areas of special flood hazard, where streams exist but no base flood data have been provided (A-zones), the Henry County Stormwater Management Department Director or designee shall review and reasonably utilize any available scientific or historic flood elevation data, base flood elevation and floodway data, or future-conditions flood elevation data available from a federal, state, local or other source, in order to administer the provisions and standards of this article. If data are not available from any of these sources, the following provisions shall apply: 1. No encroachments, including structures or fill material, shall be located within an area equal to twice the width of the stream or fifty (50) feet from the top of the bank of the stream, whichever is greater. 2. In special flood hazard areas without base flood or future-conditions flood elevation data, new construction and substantial improvements shall have the lowest floor of the lowest enclosed area (including basement) elevated no less than three (3) feet above the highest adjacent grade at the building site. Flood openings sufficient to facilitate automatic equalization of hydrostatic flood forces shall be provided for flood-prone enclosures in accordance with subsection 3.01.04.A.5. E. Building standards for areas of shallow flooding (AO-zones). Areas of special flood hazard may include designated "AO" shallow flooding areas. These areas have base flood depths of one (1) to three (3) feet above ground, with no clearly defined channel. In these areas the following provisions apply: 1. All new construction and substantial improvements of residential and nonresidential structures shall have the lowest floor, including basement, elevated to no lower than one (1) foot above the flood depth number in feet specified on the flood insurance rate map (FIRM), above the highest adjacent grade. If no flood depth number is specified, the lowest floor, including basement, shall be elevated at least three (3) feet above the highest adjacent grade. Flood openings sufficient to facilitate automatic equalization of hydrostatic flood forces shall be provided in accordance with standards of subsection 3.01.04.A.5.; 2. New construction and substantial improvement of a nonresidential structure may be floodproofed in lieu of elevation. The structure, together with attendant utility and sanitary facilities, must be designed to be water tight to the specified FIRM flood level plus one (1) foot above the highest adjacent grade, with walls substantially impermeable to the passage of water, and structural components having the capability of resisting hydrostatic and hydrodynamic loads and the effect of buoyancy. A licensed professional engineer or architect shall certify that the design and methods of construction are in accordance with accepted standards of practice, and shall provide such certification to the Henry County Stormwater Management Department Director or designee using the FEMA Floodproofing Certificate along with the design and operation/maintenance plan; and 3. Drainage paths shall be provided to guide floodwater around and away from any proposed structure. F. Standards for subdivisions. 1. All subdivision proposals shall identify the areas of special flood hazard and areas of future-conditions flood hazard therein and provide base flood elevation data and future-conditions flood elevation data; 2. All residential lots in a subdivision proposal shall have sufficient buildable area outside of the future-conditions floodplain such that encroachments into the future-conditions floodplain for residential structures will not be required; and 3. All subdivision plans will provide the elevations of proposed structures in accordance with subsection 3.01.02.B. 3.01.05. [Reserved.] (Variance procedures are found in section 11.02.04 of ULDC.) 3.01.06. Violations, enforcement and penalties. Any action or inaction which violates the provisions of this article or the requirements of an approved stormwater management plan or permit, may be subject to the enforcement actions outlined in this section. Any such action or inaction which is continuous with respect to time is deemed to be a public nuisance and may be abated by injunctive or other equitable relief. The imposition of any of the penalties described below shall not prevent such equitable relief. A. Notice of violation. If the Henry County Stormwater Management Department Director or designee determines that an applicant or other responsible person has failed to comply with the terms and conditions of a permit, an approved stormwater management plan or the provisions of this article, it shall issue a written notice of violation to such applicant or other responsible person. Where a person is engaged in activity covered by this article without having first secured a permit therefor, the notice of violation shall be served on the owner or the responsible person in charge of the activity being conducted on the site. The notice of violation shall contain: 1. The name and address of the owner or the applicant or the responsible person; 2. The address or other description of the site upon which the violation is occurring; 3. A statement specifying the nature of the violation; 4. A description of the remedial measures necessary to bring the action or inaction into compliance with the permit, the stormwater management plan or this article and the date for the completion of such remedial action; 5. A statement of the penalty or penalties that may be assessed against the person to whom the notice of violation is directed; and 6. A statement that the determination of violation may be appealed to the Henry County Stormwater Management Department by filing a written notice of appeal within thirty (30) days after the notice of violation. B. Penalties. In the event the remedial measures described in the notice of violation have not been completed by the date set forth for such completion in the notice of violation, any one (1) or more of the following actions or penalties may be taken or assessed against the person to whom the notice of violation was directed. Before taking any of the following actions or imposing any of the following penalties, the Henry County Stormwater Management Department shall first notify the applicant or other responsible person in writing of its intended action, and shall provide a reasonable opportunity, of not less than ten (10) days (except, that in the event the violation constitutes an immediate danger to public health or public safety, twenty-four (24) hours' notice shall be sufficient) to cure such violation. In the event the applicant or other responsible person fails to cure such violation after such notice and cure period, the Henry County Stormwater Management Department may take any one (1) or more of the following actions or impose any one (1) or more of the following penalties: 1. Stop work order. The environmental compliance and plan review department may issue a stop work order which shall be served on the applicant or other responsible person. The stop work order shall remain in effect until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violation or violations described therein, provided the stop work order may be withdrawn or modified to enable the applicant or other responsible person to take the necessary remedial measures to cure such violation or violations. 2. Withhold certificate of occupancy. The Henry County Building Department may refuse to issue a certificate of occupancy for the building or other improvements constructed or being constructed on the site until the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein. 3. Suspension, revocation or modification of permit. The Henry County Stormwater Management Department may suspend, revoke or modify the permit authorizing the development project. A suspended, revoked or modified permit may be reinstated after the applicant or other responsible person has taken the remedial measures set forth in the notice of violation or has otherwise cured the violations described therein, provided such permit may be reinstated (upon such conditions as the Henry County Stormwater Management Department may deem necessary) to enable the applicant or other responsible person to take the necessary remedial measures to cure such violations. 4. Civil penalties. In the event the applicant or other responsible person fails to take the remedial measures set forth in the notice of violation or otherwise fails to cure the violations described therein within ten (10) days, or such greater period as the Henry County Stormwater Management Department shall deem appropriate (except, that in the event the violation constitutes an immediate danger to public health or public safety, twenty-four (24) hours' notice shall be sufficient) after the Henry County Stormwater Management Department has taken one (1) or more of the actions described above, the Henry County Stormwater Management Department may impose a penalty not to exceed one thousand dollars ($1,000.00) (depending on the severity of the violation) for each day the violation remains unremedied after receipt of the notice of violation. 5. Criminal penalties. For intentional and flagrant violations of this article, the Henry County Code Enforcement Department may issue a citation to the applicant or other responsible person, requiring such person to appear in Henry County Magistrate Court to answer charges for such violation. Upon conviction, such person shall be punished by a fine not to exceed one thousand dollars ($1,000.00) or imprisonment for sixty (60) days or both. Each act of violation and each day upon which any violation shall occur shall constitute a separate offense. (Ord. No. 15-04, 4-21-15; Ord. No. 22-12, § I, 11-29-22) Sec. 3.02.00. Illicit discharge. 3.02.01. Description. An illicit discharge is defined as any discharge to a municipal or county separate storm sewer system (stormwater drainage system) that is not composed entirely of stormwater runoff, except for discharges allowed under a national pollutant discharge elimination system (NPDES) permit or nonpolluting flows. These nonstormwater discharges occur due to illegal dumping or illegal connections to the stormwater drainage system. This model ordinance provides communities with the authority to deal with illicit discharges and establishes enforcement actions for those persons or entities found to be in noncompliance or that refuse to allow access to their facilities. 3.02.02. Introduction. It is hereby determined that: Discharges to Henry County's separate storm sewer system that are not composed entirely of stormwater runoff contribute to increased nonpoint source pollution and degradation of receiving waters; These nonstormwater discharges occur due to spills, dumping and improper connections to Henry County's separate storm sewer system from residential, industrial, commercial or institutional establishments. These nonstormwater discharges not only impact waterways individually, but geographically dispersed, small volume nonstormwater discharges can have cumulative impacts on receiving waters. The impacts of these discharges adversely affect public health and safety, drinking water supplies, recreation, fish and other aquatic life, property values and other uses of lands and waters; These impacts can be minimized through the regulation of spills, dumping and discharges into Henry County's separate storm sewer system; Localities in the State of Georgia are required to comply with a number of state and federal laws, regulations and permits which require a locality to address the impacts of stormwater runoff quality and nonpoint source pollution due to improper nonstormwater discharges to Henry County's separate storm sewer system. It is determined that the regulation of spills, improper dumping and discharges to the Henry County's separate storm sewer system is in the public interest and will prevent threats to public health and safety, and the environment. 3.02.03. General provisions. A. Purpose and intent. The purpose of this section is to protect the public health, safety, environment and general welfare through the regulation of nonstormwater discharges to Henry County's separate storm sewer system to the maximum extent practicable as required by federal law. This section establishes methods for controlling the introduction of pollutants into Henry County's separate storm sewer system in order to comply with requirements of the NPDES permit process. The objectives of this section are to: 1. Regulate the contribution of pollutants to Henry County's separate storm sewer system by any person; 2. Prohibit illicit discharges and illegal connections to Henry County's separate storm sewer system; 3. Prevent nonstormwater discharges, generated as a result of spills, inappropriate dumping or disposal, to Henry County's separate storm sewer system; and 4. To establish legal authority to carry out all inspection, surveillance, monitoring and enforcement procedures necessary to ensure compliance with this section. B. Applicability. The provisions of this section shall apply throughout the unincorporated area of Henry County. C. Compatibility with other regulations. This section is not intended to modify or repeal any other ordinance, rule, regulation, other provision of law. The requirements of this section are in addition to the requirements of any other ordinance, rule, regulation, or other provision of law, and where any provision of this section imposes restrictions different from those imposed by any other ordinance, rule, regulation, or other provision of law, whichever provision is more restrictive or imposes higher protective standards for human health or the environment shall control. D. Severability. If the provisions of any section, subsection, paragraph, subdivision or clause of this section shall be adjudged invalid by a court of law within Henry County, such judgment shall not affect or invalidate the remainder of any section, subsection, paragraph, subdivision or clause of this section. E. Responsibility for administration. Henry County Stormwater Management Department shall be responsible for the implementation and administration of this section. Authorized staff within the department, in cooperation with public officers of Henry County Code Enforcement, shall be responsible for the enforcement of the provisions contained herein. 3.02.04. Prohibitions. A. Prohibition of illicit discharges. No person shall throw, drain, or otherwise discharge, cause, or allow others under its control to throw, drain, or otherwise discharge into Henry County's separate storm sewer system any pollutants or waters containing any pollutants, other than stormwater. The following discharges are exempt from the prohibition provision above: 1. Water line flushing performed by a government agency, other potable water sources, landscape irrigation or lawn watering, diverted stream flows, rising groundwater, groundwater infiltration to storm drains, uncontaminated pumped groundwater, foundation or footing drains (not including active groundwater dewatering systems), crawl space pumps, air conditioning condensation, springs, natural riparian habitat or wetland flows, and any other water source not containing pollutants; 2. Discharges or flows from firefighting, and other discharges specified in writing by Henry County as being necessary to protect public health and safety; 3. The prohibition provision above shall not apply to any nonstormwater discharge permitted under an NPDES permit or order issued to the discharger and administered under the authority of the state and the Federal Environmental Protection Agency, provided that the discharger is in full compliance with all requirements of the permit, waiver, or order and other applicable laws and regulations, and provided that written approval has been granted for any discharge to Henry County's separate storm sewer system. B. Prohibition of illegal connections. The construction, connection, use, maintenance or continued existence of any illegal connection to Henry County's separate storm sewer system is prohibited. 1. This prohibition expressly includes, without limitation, illegal connections made in the past, regardless of whether the connection was permissible under law or practices applicable or prevailing at the time of connection. 2. A person violates this ordinance if the person connects a line conveying sewage to Henry County's separate storm sewer system, or allows such a connection to continue. 3. Improper connections in violation of this ordinance must be disconnected and redirected, if necessary, to an approved onsite wastewater management system or the sanitary sewer system upon approval of the Henry County Water and Sewerage Authority. 4. Any drain or conveyance that has not been documented in plans, maps or equivalent, and which may be connected to the storm sewer system, shall be located by the owner or occupant of that property upon receipt of written notice of violation from Henry County requiring that such locating be completed. Such notice will specify a reasonable time period within which the location of the drain or conveyance is to be completed, that the drain or conveyance be identified as storm sewer, sanitary sewer or other, and that the outfall location or point of connection to the storm sewer system, sanitary sewer system or other discharge point be identified. Results of these investigations are to be documented and provided to Henry County. 3.02.05. Industrial or construction activity discharges. Any person subject to an industrial or construction activity NPDES stormwater discharge permit shall comply with all provisions of such permit. Proof of compliance with said permit may be required in a form acceptable to Henry County prior to allowing discharges to Henry County's separate storm sewer system. 3.02.06. Access and inspection of properties and facilities. Duly authorized representatives from the Henry County Stormwater Management Department shall be permitted to enter and inspect properties and facilities at reasonable times as often as may be necessary to determine compliance with this section. A. If a property or facility has security measures in force which require proper identification and clearance before entry into its premises, the owner or operator shall make the necessary arrangements to allow access by stormwater management staff. B. The owner or operator shall allow stormwater management staff ready access to all parts of the premises for the purposes of inspection, sampling, photography, videotaping, examination and copying of any records that are required under the conditions of an NPDES permit to discharge stormwater. C. Stormwater management staff shall have the right to set up on any property or facility such devices as are necessary in the opinion of Henry County to conduct monitoring and/or sampling of flow discharges. D. The stormwater management department may require the owner or operator to install monitoring equipment and perform monitoring as necessary, and make the monitoring data available to stormwater management staff. This sampling and monitoring equipment shall be maintained at all times in a safe and proper operating condition by the owner or operator at his/her own expense. All devices used to measure flow and quality shall be calibrated to ensure their accuracy. E. Any temporary or permanent obstruction to safe and easy access to the property or facility to be inspected and/or sampled shall be promptly removed by the owner or operator at the written or oral request of Henry County Stormwater Management Department and shall not be replaced. The costs of clearing such access shall be borne by the owner or operator. F. Unreasonable delays in allowing stormwater management staff access to a facility is a violation of this section. G. If the stormwater management department has been refused access to any part of the premises from which stormwater is discharged, and stormwater management staff is able to demonstrate probable cause to believe that there may be a violation of this section, or that there is a need to inspect and/or sample as part of a routine inspection and sampling program designed to verify compliance with this section or any order issued hereunder, or to protect the overall public health, safety, environment and welfare of the community, then the stormwater management department may seek issuance of a search warrant from the magistrate court of Henry County. 3.02.07. Notification of accidental discharges and spills. Notwithstanding other requirements of law, as soon as any person responsible for a facility, activity or operation, or responsible for emergency response for a facility, activity or operation has information of any known or suspected release of pollutants or nonstormwater discharges from that facility or operation which are resulting or may result in illicit discharges or pollutants discharging into stormwater, Henry County's separate storm sewer system, state waters, or waters of the U.S., said person shall take all necessary steps to ensure the discovery, containment, and cleanup of such release so as to minimize the effects of the discharge. Said person shall notify the authorized enforcement agency in person or by phone, facsimile or in person no later than twenty-four (24) hours of the nature, quantity and time of occurrence of the discharge. Notifications in person or by phone shall be confirmed by written notice addressed and mailed to Henry County Stormwater Management Department within three (3) business days of the phone or in person notice. If the discharge of prohibited materials emanates from a commercial or industrial establishment, the owner or operator of such establishment shall also retain an on-site written record of the discharge and the actions taken to prevent its recurrence. Such records shall be retained for at least three (3) years. Said person shall also take immediate steps to ensure no recurrence of the discharge or spill. In the event of such a release of hazardous materials, emergency response agencies and/or other appropriate agencies shall be immediately notified. Failure to provide notification of a release as provided above is a violation of this section. 3.02.08. Violations, enforcement and penalties. A. Violations. It shall be unlawful for any person to violate any provision or fail to comply with any of the requirements of this section. Any person who has violated or continues to violate the provisions of this section, may be subject to the enforcement actions outlined in this section or may be restrained by injunction or otherwise abated in a manner provided by law. In the event the violation constitutes an immediate danger to public health or public safety, stormwater management staff are authorized to enter upon the subject private property, without giving prior notice, to take any and all measures necessary to abate the violation and/or restore the property. The stormwater management department is authorized to seek costs of the abatement as outlined in [subsection] 3.02.08.E. B. Notice of violation. Whenever the stormwater management department finds that a violation of this section has occurred, they may order compliance by written notice of violation. 1. The notice of violation shall contain: a. The name and address of the alleged violator; b. The address when available or a description of the building, structure or land upon which the violation is occurring, or has occurred; c. A statement specifying the nature of the violation; d. A description of the remedial measures necessary to restore compliance with this ordinance and a time schedule for the completion of such remedial action; e. A statement of the penalty or penalties that shall or may be assessed against the person to whom the notice of violation is directed; and f. A statement that the determination of violation may be appealed to the Henry County Board of Commissioners by filing a written notice of appeal within thirty (30) days of service of notice of violation. 2. Such notice may require without limitation: a. The performance of monitoring, analyses, and reporting; b. The elimination of illicit discharges and illegal connections; c. That violating discharges, practices, or operations shall cease and desist; d. The abatement or remediation of stormwater pollution or contamination hazards and the restoration of any affected property; e. Payment of costs to cover administrative and abatement costs; and f. The implementation of pollution prevention practices. C. Appeal of notice of violation. Any person receiving a notice of violation may appeal the determination to the board of commissioners. The notice of appeal must be received within thirty (30) days from the date of the notice of violation. Hearing on the appeal before the board of commissioners or his/her designee shall take place within thirty (30) days from the date of receipt of the notice of appeal. The decision of the appropriate authority or their designee shall be final. D. Enforcement measures after appeal. If the violation has not been corrected pursuant to the requirements set forth in the notice of violation, or, in the event of an appeal, within fifteen (15) days of the decision of the appropriate authority upholding the decision by Henry County, then representatives of the stormwater management department may enter upon the subject private property and are authorized to take any and all measures necessary to abate the violation and/or restore the property. It shall be unlawful for any person, owner, agent or person in possession of any premises to refuse to allow the government agency or designated contractor to enter upon the premises for the purposes set forth above. E. Costs of abatement of the violation. Within fifteen (15) days after abatement of the violation, the owner of the property will be notified of the cost of abatement, including administrative costs. The property owner may file a written protest objecting to the assessment or to the amount of the assessment within fifteen (15) days of such notice. If the amount due is not paid within thirty (30) days after receipt of the notice, or if an appeal is taken, within thirty (30) days after a decision on said appeal, the charges shall become a special assessment against the property and shall constitute a lien on the property for the amount of the assessment, at the discretion of the county attorney. Any person violating any of the provisions of this section shall become liable to Henry County by reason of such violation. F. Civil penalties. In the event the alleged violator fails to take the remedial measures set forth in the notice of violation or otherwise fails to cure the violations described therein within ten (10) days, or such greater period as Henry County shall deem appropriate, after Henry County has taken one (1) or more of the actions described above, Henry County may impose a penalty not to exceed one thousand dollars ($1,000.00) for each day the violation remains unremedied after receipt of the notice of violation. G. Criminal penalties. For intentional and flagrant violations of this section, Henry County may issue a citation to the alleged violator requiring such person to appear in the Magistrate Court of Henry County Court to answer charges for such violation. Upon conviction, such person shall be punished by a fine not to exceed one thousand dollars ($1,000.00) or imprisonment for sixty (60) days or both. Each act of violation and each day upon which any violation shall occur shall constitute a separate offense. H. Violations deemed a public nuisance. In addition to the enforcement processes and penalties provided, any condition caused or permitted to exist in violation of any of the provisions of this section is a threat to public health, safety, welfare, and environment and is declared and deemed a nuisance, and may be abated by injunctive or other equitable relief as provided by law. I. Remedies not exclusive. The remedies listed in this ordinance are not exclusive of any other remedies available under any applicable federal, state or local law and Henry County may seek cumulative remedies. Henry County may recover attorney's fees, court costs, and other expenses associated with enforcement of this section, including sampling and monitoring expenses. Sec. 3.03.00. Stream buffer protection. 3.03.01. Description. This section provides a framework to develop buffer zones for streams, as well as the requirements that minimize land development within those buffers. It is the purpose of these buffer zone requirements to protect and stabilize stream banks, protect water quality and preserve aquatic and riparian habitat. 3.03.02 Title. This section shall be known as the "Henry County Stream Buffer Protection Ordinance." 3.03.03 Findings and purposes. A. Findings. Whereas, the Henry County Board of Commissioners find that buffers adjacent to streams provide numerous benefits, including: 1. Protecting, restoring, and maintaining the chemical, physical and biological integrity of streams and their water resources; 2. Removing pollutants delivered in urban stormwater; 3. Reducing erosion and controlling sedimentation; 4. Protecting and stabilizing stream banks; 5. Providing for infiltration of stormwater runoff; 6. Maintaining base flow of streams; 7. Contributing organic matter that is a source of food and energy for the aquatic ecosystem; 8. Providing tree canopy to shade streams and promote desirable aquatic habitat; 9. Providing riparian wildlife habitat; 10. Furnishing scenic value and recreational opportunity; 11. Providing opportunities for the protection and restoration of greenspace. B. Purposes. It is the purpose of this section to protect the public health, safety, environment, and general welfare; to minimize public and private losses due to erosion, siltation, and water pollution; and to maintain stream water quality by provisions designed to: 1. Create buffer zones along the streams of Henry County for the protection of water resources; and 2. Minimize land development within such buffers by establishing buffer zone requirements and by requiring authorization for any such activities. 3.03.04. Applicability. This section shall apply to all land development activity on property containing a stream protection area as defined in this section. These requirements are in addition to, and do not replace or supersede, any other applicable buffer requirements established under state law and approval or exemption from these requirements do not constitute approval or exemption from buffer requirements established under state law or from other applicable local, state or federal regulations. A. Grandfather provisions. This section shall not apply to the following activities: 1. Work consisting of the repair or maintenance of any lawful use of land that is zoned and approved for such use on or before the effective date of this section. 2. Existing development and on-going land disturbance activities including but not limited to existing agriculture, silviculture, landscaping, gardening, and lawn maintenance, except that new development or land disturbance activities on such properties will be subject to all applicable buffer requirements. 3. Any land development activity that is under construction, fully approved for development, scheduled for permit approval or has been submitted for approval as of the effective date of this section. 4. Land development activity that has not been submitted for approval, but that is part of a larger master development plan, such as for an office park or other phased development that has been previously approved within two (2) years of the effective date of this section. B. Exemptions. The following specific activities are exempt from this section. Exemption of these activities does not constitute an exemption for any other activity proposed on a property. 1. Activities for the purpose of building one (1) of the following: a. A stream crossing by a driveway, transportation route or utility line; b. Public water supply intake or public wastewater outfall structures; c. Intrusions necessary to provide access to a property; d. Public access facilities that must be on the water including boat ramps, docks, foot trails leading directly to the river, fishing platforms and overlooks; e. Unpaved foot trails and paths; f. Activities to restore and enhance stream bank stability, vegetation, water quality and/or aquatic habitat, so long as native vegetation and bioengineering techniques are used. 2. Public sewer line easements paralleling the creek, except that all easements (permanent and construction) and land disturbance should be at least twenty-five (25) feet from the top of the bank. This includes such impervious cover as is necessary for the operation and maintenance of the utility, including, but not limited to, manholes, vents, and valve structures. This exemption shall not be construed as allowing the construction of roads, bike paths or other transportation routes in such easements, regardless of paving material, except for access for the uses specifically cited above. 3. Land development activities within a right-of-way existing at the time this section takes effect or approved under the terms of this section. 4. Within an easement of any utility existing at the time this section takes effect or approved under the terms of this section, land disturbance activities and such impervious cover as is necessary for the operation and maintenance of the utility, including, but not limited to, manholes, vents, and valve structures. 5. Emergency work necessary to preserve life or property. However, when emergency work is performed under this section, the person performing it shall report such work to Henry County on the next business day after commencement of the work. Within ten (10) days thereafter, the person shall apply for a permit and perform such work within such time period as may be determined by Henry County to be reasonably necessary to correct any impairment such emergency work may have caused to the water conveyance capacity, stability or water quality of the protection area. 6. Forestry and silviculture activities on land that is zoned for forestry, silvicultural or agricultural uses and are not incidental to other land development activity. If such activity results in land disturbance in the buffer that would otherwise be prohibited, then no other land disturbing activity other than normal forest management practices will be allowed on the entire property for three (3) years after the end of the activities that intruded on the buffer. After the effective date of this section, it shall apply to new subdividing and platting activities. Any land development activity within a buffer established hereunder is prohibited unless a variance or administrative waiver is granted pursuant to chapter 11. 3.03.05. Land development requirements. A. Buffer requirements. All land development activity subject to this section shall meet the following requirements: 1. An undisturbed natural vegetative buffer shall be maintained for fifty (50) feet, measured horizontally, on both banks (as applicable) of the stream as measured from the top of the stream bank. If defined banks are not identifiable, the protected buffer shall be measured from other identifiable features such as the "point of wrested vegetation" (O.C.G.A. § 12-7-6(15)(A)) or the "ordinary high water mark" (33 CFR 328.3(e)). 2. An additional setback shall be maintained for twenty-five (25) feet, measured horizontally, beyond the undisturbed natural vegetated buffer, in which all impervious cover shall be prohibited. Grading, filling and earthmoving shall be minimized within the setback, as determined by the director of stormwater management or designee. 3. For all proposed residential site developments utilizing mass grading/master drainage plans, an undisturbed natural vegetative buffer shall be maintained for seventy-five (75) linear feet, measured horizontally, on both sides of all streams (as applicable) on or adjacent to the subject property, as measured from the top of the streambank(s). If defined banks are not identifiable, the protected buffer shall be measured from other identifiable features such as the "point of wrested vegetation" (O.C.G.A. § 12-7-6(15)(A)) or the "ordinary high water mark" (33 CFR 328.3(e)). An additional setback shall be maintained for twenty-five (25) linear feet, measured horizontally, beyond the undisturbed natural vegetative buffer, in which all impervious cover shall be prohibited (totaling one hundred (100) linear feet). Additionally, an undisturbed natural vegetative buffer shall be maintained for fifty (50) linear feet, measured horizontally, from all wetlands located on or adjacent to the subject site. 4. No septic tanks or septic tank drain fields shall be permitted within the buffers described above in sections 3.03.05.1., 3.03.05.2., and 3.03.05.3. 3.03.06. Variance procedures. A. Variances from the above buffer requirements may be granted in accordance with the following: 1. Where a parcel was platted prior to the effective date of this section, and its shape, topography or other existing physical condition prevents land development consistent with this section, and the Henry County Stormwater Management Department finds and determines that the requirements of this section prohibit the otherwise lawful use of the property by the owner, the Henry County Board of Commissioners of Stormwater Management Department may grant a variance, per chapter 11, from the buffer requirements hereunder, provided such variance require mitigation measures to offset the effects of any proposed land development on the parcel. 3.03.07. Compatibility with other buffer regulations and requirements. This section is not intended to interfere with, abrogate or annul any other ordinance, rule or regulation, statute, or other provision of law. The requirements of this section should be considered minimum requirements, and where any provision of this section imposes restrictions different from those imposed by any other ordinance, rule, regulation or other provision of law, whichever provisions are more restrictive or impose higher protective standards for human health or the environment shall be considered to take precedence. 3.03.08. Additional information requirements for development on properties with a buffer zone. Any permit applications for property requiring buffers hereunder must include the following: A. A site plan showing: 1. The location of all streams on the property; 2. Limits of required stream buffers on the property; 3. Buffer zone topography with contour lines at no greater than five-foot contour intervals; 4. Delineation of forested and open areas in the buffer zone; and, 5. Detailed plans of all proposed land development in the buffer; B. A description of all proposed land development within the buffer; and, C. Any other documentation that Henry County may reasonably deem necessary for review of the application and to ensure that the buffer zone ordinance is addressed in the approval process. D. All buffer areas must be recorded on the final plat of the property following plan approval. 3.03.09. Responsibility. Neither the issuance of a development permit nor compliance with the conditions thereof, nor with the provisions of this section shall relieve any person from any responsibility otherwise imposed by law for damage to persons or property; nor shall the issuance of any permit hereunder serve to impose any liability upon Henry County, its officers or employees, for injury or damage to persons or property. 3.03.10. Inspection. Henry County may cause inspections of the work in the buffer to be made periodically during the course thereof and shall make a final inspection following completion of the work. The permittee shall assist Henry County in making such inspections. Henry County shall have the authority to conduct such investigations as it may reasonably deem necessary to carry out its duties as prescribed in this section, and for this purpose to enter at reasonable time upon any property, public or private, for the purpose of investigating and inspecting the sites of any land development activities within the protection area. No person shall refuse entry or access to any authorized representative or agent who requests entry for purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper, or interfere with any such representative while in the process of carrying out official duties. 3.03.11. Violations, enforcement and penalties. Any action or inaction which violates the provisions of this section, or the requirements of an approved site plan or permit may be subject to the enforcement actions outlined in chapter 12. Any such action or inaction which is continuous with respect to time is deemed to be a public nuisance and may be abated by injunctive or other equitable relief. The imposition of any of the penalties described in chapter 12 shall not prevent such equitable relief. 3.03.12. Appeal. Any person aggrieved by a decision or order of Henry County, may appeal in accordance with section 12.04.00 of the ULDC. 3.03.13. Severability. If any article, section, subsection, paragraph, clause, phrase, or provision of this section shall be adjudged invalid or held unconstitutional, such decision shall not affect or invalidate the remaining portions of this section. (Ord. No. 17-17, § I, 12-5-17; Ord. No. 23-10, § I, 11-28-23) Sec. 3.04.00. Watershed protection areas. 3.04.01. Generally. A. Purpose. The purpose of this section is to identify and protect the established water supply watershed districts within Henry County. This section sets forth development standards intended to maintain the quality and quantity of the water supply in Henry County and adjacent jurisdictions. B. Applicability. Regulations in this section are to be applied in addition to regulations found elsewhere in this ULDC for the specified watershed protection areas and be consistent with the goals of the comprehensive plan. 3.04.02. Establishment of watershed protection areas. The following watershed protection areas (WPA) are hereby established and designated. The WPA's listed below with an asterisk (*) are subject to the water quality critical area and limited development area development regulations in sections 3.04.04 and 3.04.05. A. Indian Creek Watershed Protection Area (ICWPA).* The Indian Creek Watershed Protection Area is defined as follows: All land that lies on each side of Indian Creek and each perennial stream that flows into Indian Creek to the ridge line from the S.H. Gardner Reservoir Dam located on Indian Creek just north of Indian Creek Road to the beginning points of Indian Creek and each perennial stream that drains into Indian Creek within said area. Indian Creek is a tributary to the Towaliga River and is contained within the Towaliga River Watershed Protection Area. B. Long Branch Creek Watershed Protection Area (LBWPA).* The Long Branch Creek Watershed Protection Area is defined as follows: All land that lies on each side of Long Branch Creek and each perennial stream that flows into Long Branch Creek to the ridge line from the Long Branch Dam located just north of Locust Grove-Griffin Road to the beginning points of Long Branch Creek and each perennial stream that drains into Long Branch Creek in said area. Long Branch Creek is a tributary to the Towaliga River and is contained within the Towaliga River Watershed Protection Area. C. Shoal Creek Watershed Protection Area (SCWPA).* The SCWPA is described and designated as follows: All land within the boundaries of Henry County located in the Shoal Creek drainage basin upstream from the Shoal Creek Tandem Reservoir Dam, being that portion of Henry County which lies northerly and westerly of Lovejoy Road. D. Towaliga River Watershed Protection Area (TRWPA).* The TRWPA is described and designated as follows: All land that lies on each side of the Towaliga River and each perennial stream that flows into the Towaliga River to the ridge line from Steel Mills Dam located just north of Locust Grove-Griffin Road to the beginning points of the Towaliga River and each perennial stream that drains into the Towaliga River in said area. E. Tussahaw Creek Watershed Protection Area (TCWPA).* The TCWPA is described and designated as follows: All land that lies on each side of Tussahaw Creek and each perennial stream that flows into Tussahaw Creek to the ridge line from the Tussahaw Reservior Dam located just west of Fincherville Road to the beginning points of Tussahaw Creek and each perennial stream that drains into Tussahaw Creek in said area. The main perennial streams that flow into the Tussahaw Creek are: Peeksville Creek and its tributaries; Wolf Creek and its tributaries; and Malholms Creek and its tributaries. All of said creeks are located in the Tussahaw Watershed Protection Area. F. Walnut Creek Watershed Protection Area (WCWPA). The WCWPA is described and designated as including tracts and parcels of land that lie within the 6th and 7th Districts of Henry County, Georgia, as delineated on the Walnut Creek Watershed Map which is made part of this section. The WCWPA includes Walnut Creek and tributaries, including Birch Creek and Crittle Creek. The WCWPA also includes the City of McDonough reservoir. Refer to Ordinance No. 03-06-16 of the City of McDonough Walnut Creek and Tussahaw Creek Watershed Protection Districts. G. Little Cotton Indian Creek Watershed Protection Area (LCICWPA). The LCICWPA is described and designated as follows: All land that lies on each side of Little Cotton Indian Creek and each perennial stream that flows into Little Cotton Indian Creek to the ridge line from the WJ Hooper Reservoir Dam located just west of Springdale Road to the beginning points of Little Cotton Indian Creek and each perennial stream that drains into Little Cotton Indian Creek in said area. The main perennial streams that flow into the WJ Hooper Reservoir are: Rum Creek and its tributaries; Reeves Creek and its tributaries; Little Cotton Indian Creek and its tributaries; and Pates Creek and its tributaries. All of said creeks are located in the Little Cotton Indian Creek Watershed Protection Area. The LCICWPA flows into the WJ Hooper Reservoir which is owned and operated by the Clayton County Water Authority. H. Pates Creek Watershed Protection Area (PCWPA). The PCWPA is described and designated as follows: All land within the boundaries of Henry County located in the Pates Creek Reservoir drainage basin upstream from the Edgar J. Blalock Reservoir Dam, being that portion of Henry County which lies westerly of Pates Creek Drive. The PCWPA flows into the Edgar J. Blalock Reservoir which is owned and operated by the Clayton County Water Authority. 3.04.03. Watershed protection area map. A map of each watershed protection area shall be maintained by Henry County and the Henry County Water and Sewerage Authority or the Clayton County Water Authority (hereinafter called "authority"). These maps are adopted herein by reference. The following map is for illustrative purposes; maps described in section 3.04.02 are the official maps of watershed protection areas. and its tributaries; Reeves Creek and its tributaries; Little Cotton Indian Creek and its tributaries; and Pates Creek and its tributaries. All of said creeks are located in the Little Cotton Indian Creek Watershed Protection Area. The LCICWPA flows into the WJ Hooper Reservoir which is owned and operated by the Clayton County Water Authority. H. Pates Creek Watershed Protection Area (PCWPA). The PCWPA is described and designated as follows: All land within the boundaries of Henry County located in the Pates Creek Reservoir drainage basin upstream from the Edgar J. Blalock Reservoir Dam, being that portion of Henry County which lies westerly of Pates Creek Drive. The PCWPA flows into the Edgar J. Blalock Reservoir which is owned and operated by the Clayton County Water Authority. 3.04.03. Watershed protection area map. A map of each watershed protection area shall be maintained by Henry County and the Henry County Water and Sewerage Authority or the Clayton County Water Authority (hereinafter called authority). These maps are adopted herein by reference. The following map is for illustrative purposes; maps described in section 3.04.02 are the official maps of watershed protection areas. Figure 3.1 Watershed Protection Areas Map 3.04.04. Water quality critical area. A water quality critical area is established for each watershed protection area. The water quality critical area for each of the above-stated watershed protection area, except the WCWPA, is: A.. All land that lies adjacent to the normal pool level of a reservoir and extending either to the ridge line boundary of the watershed or five hundred (500) feet, whichever is shorter; and B. All land extending a distance of three (3) miles upstream from the normal pool level of the reservoir that is adjacent to each perennial stream upstream from the reservoir and extending either to the ridge line boundary of the watershed on each side of the perennial stream or five hundred (500) feet, whichever is shorter. UNIFIED LAND DEVELOPMENT CODE § 3.04.00 STATE OF GEORGIA PATES CREEi 1r.:itEFISI-EO PRL')l!:;Cl!CW OIS'tRICT ~ t c-·---·---i_ ___ r--~-- \ 1! !; 1.----- WATERSrlED PROTECTION AREAS INO JAN CREEK/ LONG BRANCH CREEK LITTLE COTTON IND IAN CREEK PATES CREEK SHOAL CREEK fOWAL IGA TUSSAHAW WALNUT CREEK 3.04.07. Specific provisions for LCICWPA and PCWPA. A. The Little Cotton Indian Creek Reservoir Protection Area and Pates Creek Reservoir Protection Area are established as that area one hundred fifty (150) feet in width surrounding each respective reservoir's normal pool elevation. B. The perennial stream corridors of the LCICWPA and PCWPA shall be protected by the following criteria: 1. An undisturbed buffer shall be maintained for a distance of one hundred (100) feet on both sides of the stream measured from the stream banks. 2. No impervious surface shall be constructed within a 150-foot setback on both sides of the stream as measured from the stream banks. 3. Septic tanks and septic tank drainfields are prohibited in the 150-foot setback on both sides of the stream as measured from the stream banks. For the purposes of subsection 3.04.07, perennial streams are defined as streams that flow throughout the whole year as indicated on the most current USGS quadrangle map. C. The following uses shall be exempted from the above buffers and setbacks, provided the listed uses do not impair the quality of the drinking water stream: 1. Utilities, provided that said utilities: a. Are located as far from stream bank as reasonably possible, b. The installation and maintenance of the utilities shall be such to protect the integrity of the buffer and setback areas to the extent reasonably possible. 2. Forestry and agricultural activities. 3. Structures and infrastructure existing within the above setback and buffer, as of date of adoption. 4. Development activities on recorded parcels existing at the date of adoption that would be unbuildable by the above buffer and setback requirements. D. Hazardous or toxic materials storage, disposal, use or generation (except handling as regulated in section 3.04.10) is prohibited within both watershed protection areas. E. New sanitary landfills shall have synthetic liners and leachate collection systems. F. Sections 3.04.09 and 3.04.11 are not applicable to either the LCICWPA and PCWPA. G. Variances from the provisions of this subsection may be granted in accordance with section 11.02.06. 3.04.08. Uses in watershed protection areas. The following table identifies permissible and prohibited uses within the water quality critical area and limited development area of watershed protection areas: Table 3.04.08. Uses in Watershed Protection Areas and Limited Development Areas. Land Uses Water Quality Critical Area (except for WCWPA) Limited Development Area (except for WCWPA) WCWPA Reservoir Protection Area Limited Development Area Residential Multifamily dwellings prohibited See table 3.04.10 See table 3.04.10 Multifamily dwellings prohibited See table 3.04.10 Shopping, business, or trade Prohibited See table 3.04.10 Prohibited See table 3.04.10 Industrial, manufacturing, and waste-related (except as limited below) Prohibited See table 3.04.10 Prohibited See table 3.04.10 Hazardous or toxic materials storage, disposal, use or generation (except handling as regulated in section 3.04.09) Prohibited Prohibited Prohibited Prohibited Landfills and waste disposal Prohibited (except for septic tanks approved by the Henry County Health Department and wastewater disposals facilities owned and operated by the authority) Prohibited (except for septic tanks approved by the Henry County Health Department and wastewater disposals facilities owned and operated by the authority) Prohibited (except for septic tanks approved by the Henry County Health Department and wastewater disposals facilities owned and operated by the authority) No additional limitations Social, institutional, or infrastructure-related Prohibited See table 3.04.10 Prohibited See table 3.04.10 Travel or movement Prohibited (except roads and sidewalks) See table 3.04.10 Prohibited (except roads and sidewalks) See table 3.04.10 Mass assembly of people Prohibited See table 3.04.10 Prohibited See table 3.04.10 Leisure See table 3.04.10 See table 3.04.10 Prohibited See table 3.04.10 Natural resources Confined animal feeding operations prohibited; No silviculture within 25 feet of a water body No silviculture within 25 feet of a water body No silviculture within 25 feet of a water body No silviculture within 25 feet of a water body 3.04.09. Hazardous materials handling. New facilities located within the watershed protection area that handle hazardous materials of a type and amounts requiring a permit from the Georgia DNR or that require disposal by a hazardous materials handler permitted or licensed by the Georgia DNR at a hazardous materials facility, shall perform their operations on impermeable surfaces having spill and leak collection systems. Such spill and leak collections systems shall be shown on the development plan in detail and shall be approved pursuant to procedures for development plan approval set forth in subsection 12.02.02.E.6. 3.04.10. Site design standards for specific uses in watershed protection areas. Proposed development shall comply with both the standards for watershed protection areas and the standards for the zoning district in which the proposed development is located. Where standards are specified for the same item in both the zoning district standards and the watershed protection area standards, the stricter standard shall be required. Table 3.04.10. Site Design Requirements Within Watershed Protection Areas. Land Uses Water Quality Critical Area Limited Development Area Limited Development Area with Perennial Streams Abutting or Crossing All Uses Minimum setback of buildings and all impervious surfaces from normal pool level of surface water 200 feet 150 feet 200 feet Residential Minimum single-family residential lot size (served by a septic tank) 2 acres 1 acre 1.25 acres Minimum single-family residential lot size (served by a public sewer system) 1.5 acres 10,890 square feet 1 acre Minimum multifamily residential lot size (served by a public sewer system) Prohibited 1 acre 2 acres Minimum lot width (served by a septic tank) 175 175 175 Minimum lot width (served by a public sewer system) 100 100 175 Maximum impervious surface coverage 20% 25% See subsection 3.04.13.B. or C. 25% Shopping, Business, or Trade Activities Minimum parcel size (served by a septic tank) N/A 1.5 acres 2 acres Minimum parcel size (served by a public sewer system) N/A 1 acres 1.5 acres Maximum impervious surface coverage N/A 25% See subsection 3.04.13.C. 25% Land Uses Water Quality Critical Area Limited Development Area Limited Development Area with Perennial Streams Abutting or Crossing Industrial Minimum parcel size (served by a septic tank) N/A 4 acres 5 acres Minimum parcel size (served by a public sewer system) N/A 2 acres 2 acres Maximum impervious surface coverage N/A 25% See subsection 3.04.13.C. 25% Social, Institutional, or Infrastructure-Related Minimum parcel size (served by a septic tank) N/A 1.5 acres 2 acres Minimum parcel size (served by a public sewer system) N/A 1 acres 1.5 acres Maximum impervious surface coverage N/A 25% 25% Travel or Movement Minimum parcel size (served by a septic tank) N/A 4 acres 5 acres Minimum parcel size (served by a public sewer system) N/A 2 acres 2 acres Maximum impervious surface coverage N/A 25% See subsection 3.04.13.C. 25% Mass Assembly of People Minimum parcel size (served by a septic tank) N/A 1.5 acres 2 acres Minimum parcel size (served by a public sewer system) N/A 1 acres 1.5 acres Maximum impervious surface coverage N/A 25% See subsection 3.04.13.C. 25% Leisure Minimum parcel size (served by a septic tank) 2 acres 1 acre 1.25 acres Minimum parcel size (served by a public sewer system) 1.5 acres 0.5 of an acre (21,780 square feet) 1 acre Maximum impervious surface coverage 20% 25% See subsection 3.04.13.C. 25% Natural Resources Minimum parcel size (served by a septic tank) 2 acres 1 acre 1.25 acres Land Uses Water Quality Critical Area Limited Development Area Limited Development Area with Perennial Streams Abutting or Crossing Minimum parcel size (served by a public sewer system) 1.5 acres 0.5 of an acre (21,780 square feet) 1 acre Maximum impervious surface coverage 20% 25% See subsection 3.04.13.C. 25% 3.04.11. Buffers in watershed protection areas. Buffers are required in watershed protection area as follows: A. Buffers within water quality critical areas and the City of McDonough reservoir protection area. A natural or enhanced vegetative buffer shall be maintained for a distance of one hundred fifty (150) feet from the normal pool level of a reservoir and one hundred (100) feet on both sides of any other surface water as measured from the banks. B. Surface water buffers within the limited development area. A natural or enhanced vegetative buffer shall be maintained for a distance of one hundred (100) feet on both sides of any surface water as measured from the banks. 3.04.12. Specific requirements for septic tanks and drainfields within watershed protection areas. A. Septic tanks and septic tank drain fields are prohibited in the setback areas established in section 3.04.10 for buildings and impervious surfaces in watershed protection areas. B. Septic tanks and septic tank drain fields for residential development shall have a minimum one hundred (100) feet setback from any surface water. C. In the City of McDonough Reservoir protection area, septic tanks and septic tank drain fields for residential development shall have a minimum one hundred fifty (150) feet setback from the normal pool elevation of the reservoir and from any surface water. 3.04.13. Alternative provisions for impervious surface limitations. A. The percentage of impervious surface shall be determined by the sum of all land areas to be covered by impervious structures during the development of the property (i.e., roads, streets, driveways, houses, buildings, parking areas), divided by the total site area. B. The impervious surface of a single-family residential development within the limited development area may be increased up to thirty-five (35) percent provided that: 1. Development of land in the limited development area includes area(s) set aside to remain in natural vegetation or open space in the amount of two (2) times the area of impervious surface above the twenty-five (25) percent limit. Ownership of such parcels in fee simple or as a conservation easement shall be conveyed to the county, a homeowners' association, a government agency, or nonprofit entity, as approved by the county. 2. If the recipient of the property or conservation easement is to be an existing or proposed organization other than a governmental entity, the developer shall submit to the county articles of association or incorporation which establish the entity. Said document shall be approved in writing by the county prior to approving said development. Any proposed changes in said articles shall require the prior written approval of the county. 3. If the recipient is a homeowners' association, membership in the homeowners' association shall be mandatory for property owners and made a required covenant in all deeds issued or passed. The association shall provide voting and use rights in the natural vegetated area when applicable and charge dues or levy assessments to cover expenses which may include tax liabilities of common areas, and for the maintenance of such common areas, natural vegetated areas, improvements, rights-of-way, utilities, etc. Such association shall be responsible for the perpetuation, maintenance, and function of all common lands, uses, and facilities. 4. All lands and improvements shall be described and identified as to location, size, use and control in a restrictive covenant. The details of all easements conveyed shall be likewise described. These restrictive covenants shall be written so as to run with the land and become a part of the deed of each lot or dwelling unit within the development. 5. Such restrictive covenants and the association shall continue in effect so as to control the availability of facilities for their intended function, and to protect the development from additional unplanned densities and use. Such associations shall not be dissolved, nor shall such association dispose of any land set aside for the purposes of this section, by sale or otherwise without prior written consent of the county. 6. Any and all natural vegetated areas shall be held in common ownership by the dwelling unit owners. Any change in the natural or vegetated area, other than to maintain it in reasonable order and condition in accordance with the approved final development plan, shall require prior written approval of the county. 7. The natural vegetated area may be set aside by the developer by acquiring property in fee simple or a conservation easement within the watershed district. C. The impervious surfaces for industrial, commercial, offices, institutional, public, and multifamily residential development within the limited development area may be increased up to seventy-five (75) percent impervious surfaces. 1. All permanent stormwater control structures and easements for maintenance and access shall be recorded in the final plat of the property in accordance with the procedures set forth in subsection 12.02.03. D. A development may participate in a regional wet detention pond program which has been established by one (1) or more public or private entities subject to the following conditions: 1. Runoff from the development drains into a regional stormwater management control facility approved by the county. 2. An agreement between the county and the landowner has been executed which guarantees participation in the regional stormwater arrangement of the property and the detention pond. 3. Construction of a regional detention pond meets or exceeds the design requirements of the stormwater management provisions set forth in section 8.04.00. E. A development may provide an alternative method for stormwater control other than a wet detention pond provided that it is in compliance with the stormwater management requirements set forth in section 8.04.00, and design criteria for pollutant removal equivalent to those associated with wet detention ponds included in the Georgia Stormwater Management Manual, as amended. (Ord. No. 12-06, § I, 2-7-12; Ord. No. 12-08, § I, 5-19-12) Sec. 3.05.00. Wetland protection. 3.05.01. Generally. A. Purpose. The purpose of the regulations in this section is to promote wetland protection, while taking into account varying ecological, economic development, recreational, and aesthetic values. The regulations set forth in this section are intended to limit activities that may damage wetlands, and to require that such activities be located on upland sites to the greatest degree practicable as described in the comprehensive plan. The regulations set forth in this section are further intended to protect wetlands from alterations that will significantly affect or reduce their primary functions for water quality, floodplain protection, erosion control, groundwater recharge, aesthetic nature, and provision of wildlife habitat. B. Applicability. Regulations for the protection of wetlands, set forth in this section, shall apply to all lands within wetlands located within the jurisdiction of Henry County. 3.05.02. National wetland inventory (NWI) maps. The U.S. Department of the Interior, National Wetland Inventory Maps (NWI Maps), together with all explanatory matter thereon and attached thereto, is hereby adopted by reference and declared to be a part of this ULDC. NWI maps are available at http:wetlands.fws.gov. 3.05.03. Determination of wetlands boundary. A. Generally. 1. The NWI maps are general reference documents, and wetland boundaries indicated on the maps are approximations. The purpose of the NWI maps is to alert developers/landowners if the property proposed for development is within or adjacent to a wetland. 2. The NWI maps do not represent the boundaries of jurisdictional wetlands within Henry County and cannot serve as a substitute for a delineation of wetland boundaries by the U.S. Army Corps of Engineers, as required by Section 404 of the Clean Water Act, as amended. B. Where it is determined that wetlands are located on property proposed for development, a determination of the location and extent of the wetlands shall be made by the U.S. Army Corps of Engineers or a qualified environmental engineer. A local permit for development within wetlands shall not be issued until a determination has been made by the U.S. Army Corps of Engineers as to whether jurisdictional wetlands exist on the site. If there are jurisdictional wetlands on the site that will be disturbed by the proposed development, the applicant shall first obtain a wetlands alteration section 404 permit from the U.S. Army Corps of Engineers. 3.05.04. Permissible activities within wetlands. Lawful activities set forth in this section shall be allowed as of right within a wetland. Constructing, grading, filling, draining, or dredging shall be permissible only as provided. A. Conservation or preservation of soil, water, vegetation, fish, and other wildlife, provided they do not affect waters of Georgia or of the United States in such a way that would require a permit as required by section 404 of the Clean Water Act. B. Outdoor passive recreational activities, including fishing, bird watching, hiking, boating, horseback riding, and canoeing. C. Forestry practices applied in accordance with best management practices approved by the Georgia Forestry Commission and as specified in section 404 of the Clean Water Act. D. The cultivation of agricultural crops. Agricultural activities shall be subject to best management practices approved by the Georgia Department of Agriculture. E. The pasturing of livestock, provided that riparian wetlands are protected, that soil profiles are not disturbed, and that approved agricultural best management practices are followed. F. Education, scientific research, and nature trails. 3.05.05. Prohibited activities within wetlands. The following activities are prohibited within wetlands: A. Receiving areas for toxic or hazardous waste or other contaminants. B. Hazardous or sanitary waste landfills. C. Other uses prohibited in the underlying zoning district. 3.05.06. Temporary activities within wetlands. The following activities may be permissible on a temporary basis, provided that emergency conditions require the activity: A. Maintenance or repair, subject to the following requirements: 1. Maintenance and repair is limited to lawfully located roads, structures, and facilities used in the service to the public to provide transportation, electricity, gas, water, telephone, telegraph, telecommunication, or other services; 2. The roads, structures, or facilities are not materially changed or enlarged; 3. Written notice prior to the commencement of work has been given to Henry County; and 4. The work is conducted using best management practices to ensure that flow and circulation patterns and chemical and biological characteristics of the wetland are not impaired and that any adverse effect on the aquatic environment shall be minimized. B. Temporary water level stabilization measures associated with ongoing silvicultural operations. C. Limited ditching, tilling, dredging, excavating, or filling done solely for the purpose of maintaining or repairing existing drainage systems necessary for the cultivation of agricultural crops, provided that the maintenance or repair activity does not result in the impairment, alteration, or loss of wetlands not previously subject to agricultural and silvicultural use as set forth in subsection 3.05.04.D. above. D. Limited excavating and filling necessary for the repair and maintenance of piers, walkways, nature trails, observation decks, wildlife management shelters, boathouses, or other similar water-related structures, provided that they are built on pilings to allow unobstructed flow of water and preserve the natural contour of the wetland. 3.05.07. Buffers required. A. Location of buffer. A buffer shall be located adjacent to and running parallel with the boundary established pursuant to subsection 3.05.03 above. The buffer shall provide an area of protection between the wetland, whether or not subsequently removed pursuant to U.S. Army Corps of Engineers permit and any permissible activity within or adjacent to the wetland. B. Buffer standards. 1. The buffer shall be a minimum of twenty-five (25) feet in width. 2. All natural vegetation shall be retained and maintained within the buffer. 3. The number and types of plants required within the buffer shall be as set forth in section 5.02.00. Sec. 3.06.00. Groundwater recharge protection. 3.06.01. Generally. A. Purpose. The provisions of this section are intended to protect groundwater as follows: 1. Restricting land uses that generate, use, or store dangerous pollutants in recharge areas; 2. Limiting density of development; and 3. Ensuring that any development that occurs within the recharge area shall have no adverse effect on groundwater quality. B. Applicability. The provisions of this section apply to all lands mapped as significant recharge areas by the Georgia Department of Natural Resources (DNR) in Hydrologic Atlas 18, 1989 edition, as amended, or as identified in the comprehensive plan. 3.06.02. Determination of pollution susceptability. Limitations on land use activities are based on the degree to which the aquifer is susceptible, or at risk, to pollution from spills, discharges, leaks, impoundments, application of chemicals, injections, and other human activities. The Georgia DNR has prepared maps of pollution susceptibility, which categorize land in areas of high, medium, and low potential for groundwater pollution. These maps shall be the basis for determining the locations for limited land use activities set forth in subsection 3.06.03. 3.06.03. Limitations and site design requirements for land use activities. Table 3.06.03. Land Use Limitations and Site Design Requirements Within the Groundwater Protection Area. Use or Activity Development Standards New above-ground chemical or petroleum storage tanks having a minimum volume of 660 gallons Secondary containment for: 110 percent of the volume of such tanks, or 110 percent of the volume of the largest tank in a cluster of tanks New agricultural waste impoundment sites Lined if they are in the following locations: • high pollution susceptibility area • medium pollution susceptibility area and the site exceeds 15 acre-feet • low pollution susceptibility area and the site exceeds 50 acre-feet The liner shall meet the standards set forth in subsection 3.06.03.A. New wastewater treatment basins Impermeable liner approved by the Georgia Environmental Protection Division Wastewater spray irrigation systems or land spreading of wastewater sludge Compliance with the Georgia DNR criteria for slow rate land treatment and proof of receipt of a land application system permit from the Georgia Environmental Protection Division New homes served by septic tank/drain field systems Lots shall meet the minimum size limitations identified on Table MT-1 of the Department of Human Resources (DHR) Manual for On-Site Sewage Management Systems, or the minimum lot area for the zoning district in which the new home will be located, whichever is larger: Use or Activity Development Standards • Within a high pollution susceptibility area • 150 percent of the subdivision minimum lot size • Within a medium pollution susceptibility area • 125 percent of the subdivision minimum lot size • Within a low pollution susceptibility area • 110 percent of the subdivision minimum lot size New mobile home parks served by septic tank/ drain field systems Lots shall meet the minimum size limitations identified on Table MT-2 of the DHR Manual for On-Site Sewage Management Systems, or the minimum lot area for the zoning district in which the new home will be located, whichever is larger: • Within a high pollution susceptibility area • 150 percent of the subdivision minimum lot size • Within a medium pollution susceptibility area • 125 percent of the subdivision minimum lot size • Within a low pollution susceptibility area • 110 percent of the subdivision minimum lot size (Soil groupings for use with Tables DHR MT-1 and DHR MT-2 are contained in subsection 3.06.03.B.) New facilities which handle hazardous materials, of types and in amounts regulated by the Georgia DNR Perform operations on impermeable surfaces having spill and leak collection systems meeting the standards of the Georgia DNR A. At a minimum, the liner required for new agricultural waste impoundment sites shall be constructed of compacted clay having a thickness of one (1) foot and a vertical hydraulic conductivity of less than 5 × 10-7 cm/sec or other criteria established by the U.S. Soil Conservation Service. B. The following soil groupings are for use with Tables DHR MT-1 and DHR MT-2. Group 1: Well drained to excessively drained soils with percolation rates from <5 to 10 min./in. Ailey Flomation Kershaw Paola Americus Foxwoth Lakeland (Huckabee) Troup Blaney Fripp Louisburg Valdosta Bonneau Fuquay (Norfolk and Tifton thick surface; Lakewood shallow) Lucy Wagram Cainhoy (Galestown, Pam Beach) Haywood Molena Wicksburg Eustis Group 2: Well drained to moderately well drained soils with percolation rates from 10 to 30 min./in. Allen Etowah (Nolichucky) Jefferson Norfolk Bodine Euharlee Johns Orangeburg Brevard Eunola Kalmia Porters Brookshire Evard Linker Red Bay (Ruston) Cahaba Faceville Lockhart Sequatchie Chandler Fullerton Louisa Stilson Citico Goldsboro Lowndes Tifton Clarendon Haywood Masada Tusquitee DeKalb Irvington Maxton Wedowee Edneyville Izagora Nella Wickham Group 3: Well drained to moderately drained soils with percolation from 30 to 60 min./in. Also includes somewhat poorly drained soils with percolation rates from 5 to 30 min./in. Albany Dothan Leesburg Shack (Clarksville) Ardilla Durham Locust Shelocta Bartha Echaw Lynchburg Ocilla Shouns Braddock Fannin Minvale Suffolk Bradson Greenville (Magnolia) Mountview Tate Capshaw Grover Olustee (Ona) Tatum Carnegie Holston Pattsburg Terllico Centenary Hornsville Rigdon Tidings Chipley Kanapana Rome Varina Decatur Leefield Seneca Shabuta Dillard Group 4: Well drained to moderately drained soils with percolation from 60 to 90 min./in. Also poorly drained soils with percolation rates from 10 to 15 min./in. Chestatee Dyke Hulett Rabun Colbert Enders Kolomoki Sapelo Cowarts Enon Leon Sawyer Cunningham Farragut Litz St. Johns Cuthbert Georgeville Lynn Haven Sequoia Davidson Gilead Madarin Shabuta Dewey (Muse) Hayesville Nankin Steekee Dogue Herndon Nason Waynesboro Duplin Group 5: Poorly drained soils that have water tables very near the surface with percolation rates from 5 to 10 min./in. Alapha Pelham Plummer Riceboro Sec. 3.07.00. River corridor protection. 3.07.01. Generally. A. Purpose. The purpose of river corridor protection standards is to help maintain high water quality of the designated rivers. B. Applicability. The standards of this section apply to all river corridors designated by the State of Georgia because of their unique environmental importance. The South River in Henry County is a designated river. C. Stricter standards apply. Proposed development shall comply with both the standards for river corridor protection, the standards for the zoning district in which the proposed development is located, and the goals of the comprehensive plan. Where standards are specified for the same item in both the zoning district standards and the river corridor standards, the stricter standard shall be required. 3.07.02. River corridor protection area. The river corridor protection area extends from the top of the riverbank on both sides of the river for a distance of one hundred fifty (150) feet landward. The top of the riverbank is the uppermost part of the riverbank, usually marked by a break in the slope. All land that lies within this corridor is part of the river corridor protection area. 3.07.03. Buffer requirements for the river corridor protection area. A natural vegetative buffer area shall be maintained for a distance of one hundred (100) feet on both sides of the river as measured from the riverbanks. 3.07.04. Permissible uses within the river corridor protection area. The following specific land uses are permissible within the river corridor protection area, subject to the standards listed for each use: A. A single-family dwelling together with permissible accessory structures, limited to one (1) per tract of land, may be located within the buffer area; B. Road crossings and utility crossings; C. Timber production and harvesting, consistent with best management practices of the Georgia Forestry Commission, and protection of the water quality of the river as required by the Clean Water Act; D. Wildlife and fishery management activities; E. Wastewater treatment; F. Recreational activities that are river dependent and that do not interfere with the maintenance of the required buffer; G. Walking paths; H. Natural water quality treatment or purification; I. Agricultural production and management, consistent with best management practices of the Georgia Soil and Water Conservation Commission, protection of the water quality of the river as required by the Clean Water Act, and consistent with all requirements of the Georgia Department of Agriculture; and J. Uses that are specifically permissible by the Georgia DNR or under section 404 of the Clean Water Act. 3.07.05. Prohibited uses within the river corridor protection area. The following specific land uses are prohibited within the river corridor protection area: A. Septic tanks and septic tank drain fields; B. Handling areas for receiving and storage of hazardous waste, unless located within port facilities that comply with all federal and state laws and regulations for the handling and transport of hazardous waste and the operations are performed on impermeable surfaces having spill and leak protection systems as described by the Georgia DNR; C. Hazardous waste landfill; and D. Solid waste landfill. Sec. 3.08.00. Open space connectivity system and green space system. (Reserved) CHAPTER 4. SITE DESIGN STANDARDS Sec. 4.00.00. Generally. 4.00.01. Purpose. The purpose of this chapter is to provide site design and development standards applicable to both public and private development activity within the county. More specifically, the purpose of the regulations set forth in chapter 4 is to ensure the proper location, height, bulk, and size of buildings and other structures; to ensure the proper size of yards and other features of a development site; to ensure the proper layout and design of subdivisions; and to provide for compatibility between proposed development and existing development. 4.00.02. Principles of site design and development. A. Site design and development shall first take into account the protection of natural resources as set forth in chapter 3 of this ULDC. All development shall be designed to avoid unnecessary impervious surface cover; to provide adequate access to lots and sites; to ensure compatibility; and to ensure site design that is consistent with the standards set forth within chapter 4. Landscaping, buffering, and tree protection standards are applicable to site design and development, and are set forth in chapter 5. Property owners and applicants may elect to design a site according to the alternative standards that are provided in chapter 6. B. No building or other structure shall be constructed, installed, erected, or altered except in compliance with the site design and development standards set forth in this ULDC. C. No open space shall be encroached upon or reduced in any manner except in conformity to the yard, setback, off-street parking spaces, and such other regulations required by this ULDC for the zoning district and/or overlay district in which such open space is located. D. No part of any yard, other open space, off-street parking, or loading space required in connection with any building, structure, or use by this ULDC shall be considered to be part of a required yard, other open space, off-street parking, loading space, for any other building, structure, or use, except as explicitly provided in this ULDC. 4.00.03. Applicability. A. The site design standards described for a base zoning district in sections 2.01.02 through 2.01.05 and section 4.01.00 shall apply to all development within that district. B. Where an overlay district applies to a site, the standards for that district, as set forth in section 4.02.00, shall apply. C. In addition to standards for all development within a zoning district, supplemental standards are provided for the MU zoning district and the IAC zoning district, as well as specified individual uses. These supplemental standards are set forth in section 4.03.00. D. Where conflict arises between standards required in a base zoning district, an overlay district, supplemental standards, or specific standards for specific situations, the following rules shall be used in the application of standards: 1. Where a master plan, development agreement, or other legally binding document applies to the proposed development, the standards in the legally binding document shall apply. 2. In all other situations, the stricter standard shall apply. Sec. 4.01.00. Site design standards for base zoning districts. 4.01.01. Design standards for lots. A. Only one (1) principal residential building and its allowable accessory buildings may hereafter be erected on any one (1) lot in any single-family or two-family residential district. Where contiguous lots have been combined, the combined lot shall be considered one (1) lot. B. Except as specifically provided in this ULDC, no lot existing at the time of adoption of this ULDC shall be reduced, divided, or changed so as to produce a lot or tract of land which does not comply with the minimum dimensional standards for its appropriate zoning district. C. Land which is required, dedicated or donated and accepted for public use is exempt from the requirement of subsection 4.01.01.B. D. Measurement of lot width: 1. Lot width shall be measured at the right-of-way, along the frontage of the lot, except for cul-de-sac lots. 2. For cul-de-sac lots, lot width shall be measured at the right-of-way and shall be a minimum of fifty (50) percent of the required width of the zoning district requirement. 4.01.02. Dimensional standards for building height and location. A. Applicability of height standards. The height limitations of this section shall not apply to church spires, belfries, flagpoles, monuments, cupolas, domes, ornamental towers, or observation towers not intended for human occupancy, water towers, transmission towers, radio or television towers or aerials. B. Measurement of setbacks. Setbacks shall be measured from the front, side, or rear property line to the nearest building or structure. C. Encroachments into required setbacks. 1. Architectural features such as cornices, eaves, steps, gutters, and fire escapes may project up to three (3) feet beyond a required setback line, except where such projections would obstruct driveways which are used or may be used for access of service and/or emergency vehicles. 2. In the case of automobile service stations, motels, and similar uses which serve the motoring public, canopies shall be allowed over a driveway or walkway within the front or side yard not to extend from the principal building to a point any closer than fifteen (15) feet from the street right-of-way line or future right-of-way line as designated by the comprehensive transportation plan. D. Setback requirements for corner lots for both the primary and secondary structures. 1. Side yard setback requirements from the right-of-way of abutting streets shall be equal to seventy-five (75) percent of the front yard setback. 2. It shall be permissible for purposes of this section, to construe a residence to be fronting on a street other than the street which the entrance (front door) faces. In this situation, development plans and plats shall clearly identify the front, side, and rear yards. Setbacks for side and rear yards shall be established according to the standards in the table below for the yards as indicated on the plan or plat. E. Property with a side lot line adjacent to a railroad right-of-way shall provide a ten-foot side yard setback. F. If a building is constructed on a through lot having frontage on two (2) roads (not at an intersection), a setback from each road shall be provided equal to the front yard requirement for the district in which the lot is located. 4.01.03. Appearance standards for commercial and industrial buildings. A. All buildings constructed within the C-1, C-2, C-3, OI, MU, M-1 and M-2 zoning districts shall meet the development standards in subsection 2.01.03 or 2.01.04 or 2.01.05 and the appearance standards set forth in this section. B. Each commercial or industrial building shall maintain a decorative facing on that portion of the building which faces on all public streets. The decorative facing shall consist of brick, masonry, and/or wood. Glass may be used in combination with brick, masonry, and/or wood. All windows shall be consistent with the decorative facade design, considering materials and color. C. Mechanical equipment, electrical meter and service components, and similar utility devices, whether ground level, wall mounted, or roof mounted, shall be screened from public rights-of-way views through one (1) of the following methods: 1. Where equipment is at ground level, screening may be provided through landscaping sufficient to block the view from public rights-of-way. 2. Where brick, wood, or masonry materials are used to screen the equipment or devices, the materials shall be the same as the predominant exterior building materials for the principal building on the site. D. Street level retail uses with sidewalk frontage shall provide an entrance to the building from the sidewalk in addition to any other access that may be provided to the building. E. All entrance and exit driveways shall be paved with asphalt, concrete, or pavers. 4.01.04. Standards for commercial or industrial infill development. A. Applicability. The standards of this section shall apply to proposed commercial or industrial development on a vacant or redeveloped lot in the OI, C-1, C-2, C-3, MU, IAC, M-1, and M-2 zoning districts, where the lots on the same street and in the surrounding adjacent area are undeveloped. B. Front yard setbacks. Where the actual front yard setbacks within the surrounding area are greater or less than the required front yard setback, as set forth in subsection 4.01.02, the required front yard setback shall be not less than the average front yard setback on the block where the property is located (See figure 4-3). C. [Materials.] Buildings shall be of similar materials, textures, and designs as the surrounding area, as determined by the administrator. D. [Building tops or cornices.] Building tops or first floor cornices shall be aligned. E. [Exceeding predominant height.] Where the height of proposed buildings exceeds the predominant height of buildings in the surrounding area, there shall be a transition in height. The transition shall occur in "step increases" of building height, such that adjacent buildings do not exceed one hundred fifty (150) percent of the height of existing buildings, to the maximum allowable for the zoning district. F. [New building widths.] New buildings shall be consistent with existing building widths, through one (1) of the following methods (See figure 4-3): 1. The new building shall not exceed the average width of existing buildings in the surrounding area; or 2. The new building shall provide a division of the facade into visible building increments that are no larger than the average width of existing buildings in the surrounding area. 4.01.05. Additional standards for the mixed-use zoning district. A. In addition to the dimensional standards for the MU zoning district set forth in subsection 2.01.05, development in the MU zoning district shall meet the standards set forth in subsection 4.01.05. B. Where nonresidential uses are proposed, shared parking shall be required. The standards for shared parking are set forth in subsection 8.02.08. C. Development parcels in the MU zoning district shall provide vehicular access to adjacent parcels by means of connected parking lots, shared driveways, cross-access easements, or other interparcel connections. (See subsection 8.01.04 regarding standards for these types of shared access.) D. Development may be proposed on a single parcel, or two (2) or more parcels. Where a single development is proposed that includes two (2) or more parcels, the development shall be under unified control and/or management. 1. The standards for setbacks in subsection 2.01.05 shall apply on the front, side, and rear of the development parcel. Setbacks or building separation on the interior of the development parcel shall be proposed by the applicant. Such internal setbacks or building separation shall be consistent with fire and building safety requirements. 2. The standards for buffers in section 5.02.00 shall apply on the perimeter of the development parcel. Buffers shall not be required between uses on the interior of the development parcel. This does not relieve the applicant from meeting all landscaping requirements that may apply to the total site or parking areas within the site. E. Development proposed within the MU zoning district shall be integrated. 1. For nonresidential uses: each use or building within a development shall be connected by direct and convenient sidewalks or pathways to provide pedestrian access from one use or building to another use or building. The walking distance between any two (2) uses shall not exceed 660 feet and shall be so stated on the final plat for the development. 2. Parking lots shall be connected and cross-access easements provided as set forth in section 8.02.08 unless topographic constraints exist to prevent such connections. 3. For a combination of residential and nonresidential uses: the residential portion of the site shall be connected by direct and convenient sidewalks or pathways to provide pedestrian or bicycle access from the residential development to the nonresidential development. The nonresidential portion of the site shall meet the connection standards in [subsection] E.1. above. F. Where residential uses are proposed within the same building as nonresidential uses, the residential uses shall be limited to upper floors. G. Residential dwellings that are not within the same building as a nonresidential use shall meet the appearance requirements applicable to commercial and industrial buildings in subsection 4.01.03. H. Development within the MU zoning district shall provide public spaces, subject to the following requirements: 1. An area equal to one (1) percent of the total floor area within the development shall be provided as public space. 2. The following types of spaces may be provided: transit stops, plazas, courtyards, atriums, pavilions, or other similar public spaces. 3. Public spaces shall be within view of a street or public area and accessible by pedestrians. I. Development within the MU zoning district shall provide open space, subject to the following requirements: 1. A minimum of five (5) percent of the total land area shall be devoted to open space. The required open space shall not be counted toward required landscaping, required buffers, stormwater management facilities, or required public space. 2. The following types of open spaces may be provided: parks, playgrounds, picnic grounds, playing fields or courts, trails for jogging or biking, or passive open space. 3. Open spaces shall be accessible to pedestrians and/or bicyclists. 4. The type and design of open space shall be consistent with the type of development within the mixed use area. Passive open spaces are appropriate as a means of protecting views and natural features. Playgrounds, fields, and courts are appropriate in or near residential developments. J. Parking areas are required within each MU zoning district. The locations of parking areas are encouraged, to be located in the side and rear yards where such parking areas can be partially or wholly screened by buildings from the public right-of-way. (See subsection 8.02.07 for parking lot design requirements.) K. Exterior lighting for parking areas and building security shall be shielded and directed to avoid direct illumination of adjacent properties, as measured at the property line. L. Containers for solid waste collection shall not be located within twenty-five (25) feet of residentially zoned properties. Solid waste collection areas shall be fully enclosed, except for a gate, by a solid wall, solid fence, or landscaped buffer not less than ten (10) feet in width. Where a buffer is proposed, it shall contain shrubs selected from the lists of "large screening shrubs" and "small shrubs" in subsection 5.01.02. Large shrubs shall be planted every eight (8) feet, on center. Small shrubs shall be planted in a double staggered row to form a hedge. M. For those developments regulated in accordance with the provision of subsection 4.05.06.A, the following is required in addition to all of the other requirements of section 4.01.05. 1. Purpose. The provision to develop a mixture of commercial and residential uses in accordance with subsection 4.05.06.A is established to provide development design criteria and standards for comprehensive and coordinated development of specific areas within the highway corridor overlay district as being appropriate for mixed-use development. This provision encourages site plans and building arrangements under a unified plan of development for residential and commercial uses for self-sufficient neighborhoods and to encourage and develop a sense of community. This provision is established to provide for a variety of development styles and community commercial services. This provision encourages development of residences in areas surrounding and adjoining commercial property. The residential areas will consist of quality housing constructed in compliance with high construction standards which focus on aesthetic appearance and co-existence with nearby commercial property. This provision will encourage development of live/work units which consist of multi-storied structures with commercial uses and/or living space. The commercial areas shall be composed principally of neighborhood and community related commercial uses requiring less than thirty thousand (30,000) square feet. The commercial areas shall be developed in a manner consistent with adjoining residential properties. This provision encourages pedestrian access to commercial properties from residences. Retail centers shall be designed to provide pedestrian access from all areas of residential development. The development benefits from better land utilization in the provision of roads, utilities, other infrastructure and overall site design. The development shall have direct ingress and egress from a road having a functional classification of collector or higher; otherwise, development is prohibited from developing under this section. All property shall be served by public water and sewer; otherwise, development is prohibited from developing under this section. 2. Uses. Those C-1 (neighborhood commercial) and C-2 (general commercial) uses that are not otherwise prohibited in the highway corridor overlay district shall be permitted provided that commercial uses shall not exceed thirty thousand (30,000) square feet per business and shall have no outside storage. Single-family development is permitted provided that the net density of the residential portion of the development shall not exceed the limitation established by the future land use map. All single-family homes shall have a minimum two-car garage and a minimum of two thousand five hundred (2,500) square foot of heated space. Townhome development is permitted provided that the net density of the residential portion of the development shall not exceed the limitation established by the future land use map. All townhomes shall have a minimum two-car garage and a minimum of two thousand (2,000) square feet of heated space. Mixed-use structures that include both commercial and apartment or condominium units (including live/work units) are encouraged. Apartment or condominium units shall be limited to Class-A modern, luxury, resort-style, interior corridor access only. The average heated square footage of the apartment or condominium units within the mixed-use building shall be a minimum of one thousand five hundred (1,500) square feet. Stand-alone apartment or condominium structures (without a commercial component) are prohibited, and duplexes are prohibited. All developments with a residential component shall include at least three (3) of the following amenities or equivalent meeting the approval of the planning and zoning department: • Pool with minimum two thousand (2,000) square foot clubhouse. • Minimum two thousand (2,000) square foot pavilion with fire pit and grilling area. • Dog park. • Pocket parks. • Walking trails. 3. Entrances. All developments shall have a grand-style monumental entrance comprised of a minimum of monument based signage, masonry columns, and boulevard entrances. 4.01.06. Additional standards for the interchange activity center zoning district. A. In addition to the dimensional standards for the IAC zoning district set forth in subsection 2.01.05, development in the IAC zoning district shall meet the standards set forth in subsection 4.01.06. B. Development may be proposed on a single parcel, or two (2) or more parcels. 1. Where a single development is proposed that includes two (2) or more parcels, the development shall be under unified control and management. 2. The standards for setbacks in subsection 2.01.05 shall apply on the front, side, and rear of the development parcel. Setbacks or building separation on the interior of the development parcel shall be proposed by the applicant. Such internal setbacks or building separation shall be consistent with fire and building safety requirements, as set forth in the applicable building and technical codes. (See subsection 1.07.06 for a list of codes adopted by reference.) 3. The standards for buffers in section 5.02.00 shall apply on the perimeter of the development parcel. Buffers shall not be required between uses on the interior of the development parcel. This does not relieve the applicant from meeting all landscaping requirements that may apply to the total site or parking areas within the site. 4. Multiple uses or buildings within the development site shall be connected by sidewalks or pedestrian pathways. 5. Shared parking shall be required and shall meet the standards of subsection 8.02.08. C. New curb cuts shall be minimized. New developments shall provide vehicular access to adjacent parcels by means of connected parking lots, shared driveways, cross-access easements, or other interparcel connections. (See subsection 8.01.04 for standards for these types of shared access.) D. Exterior lighting for parking areas and building security shall be shielded and directed to avoid direct illumination of adjacent properties. E. Containers for solid waste collection shall not be located within fifty (50) feet of residentially zoned properties. Solid waste collection areas shall be fully enclosed, except for a gate, by a solid wall, solid fence, or landscaped buffer not less than ten (10) feet in width. Where a buffer is proposed, it shall contain shrubs selected from the lists of "large screening shrubs" and "small shrubs" in subsection 5.01.02. Large shrubs shall be planted every eight (8) feet, on center. Small shrubs shall be planted in a double staggered row to form a hedge. F. Residential structures within the IAC zoning district shall be limited to multifamily buildings, such as apartments, town homes, row houses, or other attached dwellings. 4.01.07 Design standards for single-family dwellings within the RA, R-1, R-2, R-3, R-4, and R-5 zoning districts. All single-family dwellings, including mobile and manufactured homes shall meet the design standards set forth in subsections 4.01.07.A. through H. Mobile and Manufactured homes in the RMH zoning district shall meet the standards of the district and standards for manufactured home/mobile home parks set forth in subsection 4.03.16. A. The minimum width of the building shall exceed sixteen (16) feet. B. The minimum roof pitch shall be 4:12, with the exception of attached patio covers. The minimum roof pitch of an attached patio cover shall be as required by the current state minimum standard codes for construction as adopted by the Department of Community Affairs, along with their respective amendments. 1. Requests to vary from the minimum roof pitch requirement for properties located outside of a platted subdivision shall be handled administratively through the administrative waiver process. a. An appeal to the decision of the administrator shall be in accordance with Section 12.04.00 of the ULDC. 2. Requests to vary from the minimum roof pitch requirement for properties located within a platted subdivision shall be brought before the Board of Commissioners for a public hearing. The public hearing notice shall be in accordance with Section 12.03.00 of the ULDC. C. Roof materials shall include wood or cedar shakes, asphalt composition, wood shingles, concrete, fiberglass or metal tiles, slate, or built-up gravel materials. Other roof materials may be used where specifically approved by the building official. D. The dwelling shall be attached to a permanent foundation. The foundation shall be concrete or masonry blocks joined by mortar or both. E. Any building having its finished floor entirely above grade, except for a basement, as defined in the standard building codes, shall be enclosed by masonry blocks or bricks joined by mortar, or poured concrete walls having a height of at least eighteen (18) inches high and a minimum width of six (6) inches wide. F. The exterior siding material shall consist of wood, masonry, concrete, stucco, masonite, metal or vinyl lap or other materials of like appearance. Where metal or vinyl lap siding is used, the siding shall not have a shiny surface. Siding materials shall improve or reflect the existing character of the surrounding area. G. The building shall be constructed according to standards established either by the state minimum standard codes, the Standard Building Code, the National Manufactured Housing Construction and Safety Standards Act, or the State of Georgia Industrial Building Act. H. A compatibility review shall be conducted to verify that a proposed mobile or manufactured home meets the standards set forth in subsection 4.01.07. Requirements for review are set forth in subsection 12.02.08. 4.01.08. Compatibility standards. A. The manufactured home shall be substantially similar or superior in size, siding material, roof material, foundation, and general aesthetic appearance to site-built or other forms of housing which may exist or be permitted under this ULDC in the same zoning district or general area. B. All towing devices, wheels, axles, and hitches shall be removed from the manufactured home. C. At each exit door there shall be a landing that is a minimum of thirty-six (36) inches by thirty-six (36) inches. D. Windows and doors shall be similar in material, design, and appearance to windows and doors on site-built homes in the surrounding area. 4.01.09 Outdoor lighting standards. The intent of this ordinance is to preserve, protect, and enhance the lawful nighttime use and enjoyment of any and all property through the use of appropriate lighting practices and systems. Such individual fixtures and lighting systems are designed, constructed, and installed to control glare, minimize obtrusive light, conserve energy and resources while maintaining safety, security and productivity, and curtail the degradation of the nighttime visual environment. A. [Establishing lighting:] Lighting in all districts shall be established in such a way that no direct light is cast upon or adversely affects adjacent properties and roadways. This section shall not apply to lighting established by governmental authority within public rights-of-way. B. Submittal requirements: The applicant for any permit of work involving outdoor lighting fixtures governed by this section shall submit, as part of the site plan, evidence that the proposed work will comply with this article. The following information must be included for all nonresidential site plan submissions and all plans for uses ancillary to residential uses such as club houses, amenity areas, etc. 1. Location, type and height of all freestanding, building-mounted and canopy light fixtures, shall be shown on the site plan and building elevations. 2. Photometric grid overlaid on the proposed site plan indicating the overall light for intensity throughout the site (in footcandles). No certificate of occupancy or certificate of completion shall be issued until the photometric grid has been approved by the inspector or administrator. 3. Specifications and details for the type of fixture being proposed including the total lumen output, type of lamp and method of shielding. 4. Use of fixture proposed; and 5. Any other information deemed necessary by the administrator and/or building inspector. C. General provisions: The design and illumination standards of this ordinance shall apply to all exterior lighting sources and other light sources visible from the public right-of-way or adjacent parcels, except where specifically exempted herein. 1. Shielding: Exterior lighting shall be fully shielded and directed downward, and shall utilize full cutoff housings, louvers, glare shields, optics, reflectors or other measures to prevent off-site glare and minimize light pollution. 2. Intensity: The intensity of light within a site shall not exceed ten (10.0) footcandles within any site; however, the administrator or designee may permit a maximum intensity of twenty (20.0) footcandles provided that such lighting is otherwise in compliance with this ordinance and one (1.0) footcandle at any property line or street right-of-way line. Where the subject property abuts a residential district or existing residential use, the intensity shall not exceed one-half (0.5) footcandle at the property line. 3. Measurement: Light intensity levels shall be measured on the horizontal plane at grade level within the site, and on the vertical plane of any property line or street right-of-way line at a height of five (5) feet above grade level. 4. Decorative light fixtures: The administrator or designee may approve decorative light fixtures as an alternative to shielded fixtures, provided that such fixtures would enhance the aesthetics of the site and would not cause off-site glare or light pollution. 5. [Wall-mounted lights:] Wall-mounted lights shall be cut-off, down directional with a maximum of two hundred fifty (250) watts per fixture. The administrator may approve wall-mounted lights to up to four hundred (400) watts when there are unique limitations and conflicts associated with a site. D. Exemptions: The following are exempt from the lighting requirements of this section: 1. Roadway and airport lighting and lighting activated by motion sensor devices. 2. Temporary circus, fair, carnival, or civic events. 3. Construction or emergency lighting, provided such lighting is temporary and is discontinued immediately upon completion of the construction work or abatement of the emergency necessitating said lighting. 4. Temporary lighting. 5. Lighting associated with agricultural activities. 6. Athletic fields. 7. Swimming pools. 8. Holiday decorations. 9. Shielded pedestrian walkway lighting. 10. Residential lighting with no-offsite glare. 11. Street lights. 12. Other uses deemed reasonable by the administrator. (Ord. No. 12-02, 1-3-12; Ord. No. 12-16, § I, 10-15-12; Ord. No. 13-06, § I, 5-21-13; Ord. No. 14-02, § 1, 6-17-14; Ord. No. 21-03, 5-18-21; Ord. No. 22-07, § I, 9-7-22) Sec. 4.02.00. Site design standards for overlay districts. All overlay districts are applied over underlying zoning districts. Development shall comply with the use and design standards applicable to the underlying zoning district and the design standards required in the overlay district. In any situation where design standards conflict, the stricter standard shall be required. 4.02.01. Bruton Smith Parkway Overlay District (BSPOD). A. Generally. 1. The Bruton Smith Parkway Overlay District (BSPOD) is established as a corridor overlay district (COD). This section sets BSPOD regulations for the development of tracts and parcels of land located therein. This section provides for access management standards and aesthetic standards indicative of incremental growth and quality development. The standards contained herein compose an extension of orderly growth policies required to meet comprehensive plan objectives for Henry County. 2. The BSPOD lies within unincorporated Henry County. BSPOD regulations, as provisions of the Unified Land Development Code, shall be administered according to all sections of the same. All new development and redevelopment requiring a building permit must follow the BSPOD regulations. Internal renovations of properties that do not alter the exterior appearance of buildings are not required to seek approval under these regulations. The following parcels shall not be subject to the provisions of this section: a. Lots zoned RA (residential-agricultural) until such time as such lot is zoned to another zoning classification. b. Lots zoned single-family residence not located within a platted subdivision. c. Lots zoned single-family residence located within a subdivision with a final plat approved prior to the enactment of this section. 3. The provisions of this section apply to parcels in unincorporated Henry County abutting the realignment of that road now or formerly known as Richard Petty Boulevard as well as those abutting State Route 20 from Interstate 75 in the east to the Atlanta Motor Speedway (AMS) in the west and as shown on that certain map entitled "Bruton Smith Parkway Design District," Figure 4.1, Bruton Smith Parkway Overlay District Boundary Map, which map is adopted herewith and is an integral part of this section. a. Corridor district map. The map of the Bruton Smith Parkway Overlay District will be maintained by the county. The BSPOD map will overlay the official Henry County Zoning Map and said map is hereby incorporated herein and made a part of this section by reference. b. No changes in the boundaries of the BSPOD shall be authorized except by the board of commissioners. Dividing a lot will not change the designation of the divided land, except by board approval. B. Access management. BSPOD regulations set out herein shall apply to all subdivisions and projects requiring a land development permit where access is taken from a state or federal route or a road classified as a major or minor arterial or collector road in the Henry County Functional Road Plan. Access to any state or federal route shall comply with the traffic access requirements established by Henry County and the Georgia Department of TransUNIFIED LAND DEVELOPMENT CODE § 4.02.00 portation. Future State Route 20 right-of-way, including that of any State Route 20 extension, as determined by the Georgia Department of Transportation shall be preserved from development. Individual county standards shall apply unless a more restrictive conflicting standard is required by the Georgia Department of Transportation. 1. Required joint driveways, cross access drives, and pedestrian access shall be provided to allow circulation between parcels. 2. Cross access easements and pedestrian access shall be established along state or federal routes. Building sites having access to any state or federal route shall incorporate the following: a. Continuous interparcel connectivity extending the entire length of each block served to provide for driveway separation along any state or federal route of at least one thousand (1,000) feet of linear frontage and providing a two-way travel aisle width of a minimum of twenty-four (24) feet and other features as required herein. b. Stub-outs and other features indicating that abutting properties may be connected to provide cross access via a service drive. 3. All developments shall have access to a public right-of-way. Regardless of the minimum number of access points, minimum spacing requirements as described in subsection 4. (below) shall be maintained. The number of access points shall be as follows: Access Points Type of Development Minimum Number of Access Points Residential, under 60 units 1 Residential, 60—150 units 2 Residential, 151—300 3 Residential over 300 units 4 or more, as determined Nonresidential, less than 300 required parking spaces 1 Nonresidential, 300—999 required parking spaces 2 Nonresidential, 1,000 or more required parking spaces 3 or more, as determined 4. The separation of access points on any state or federal route shall be determined by the design speed of the road from which access is taken with the following minimum spacing requirements: Access Point Spacing Design Speed of Road Minimum Access Point Spacing Less than 35 mph 185 feet 36 to 45 mph 245 feet Greater than 45 mph 440 feet a. The distance between access points shall be measured from the centerline of the proposed driveway or public or private street to the centerline of the nearest existing adjacent driveway or public or private street. b. Driveway and public or private street spacing at intersections and corners shall provide required sight distance, response time, and permit required queuing space. c. No driveway shall be allowed within one hundred (100) feet of the centerline of an intersecting state or federal route, arterial, or collector road. d. Nothing within this section shall be construed to mean that a single parcel may have more than the number of approved access points. e. Nothing within this section shall be construed to eliminate all access to a parcel of land that was legally subdivided prior to the enactment of this section. 5. For access points along any state or federal route a deceleration lane, larger turning radius, traffic islands, and any other devices or designs may be required at the sole discretion of the development plan review department staff. 6. Deceleration lanes are required for entrances of subdivisions consisting of twenty (20) or more units as specified below: Deceleration Lanes Design Speed Deceleration Lanes Internal streets Not Required 55 mph or less 250 feet + 100 feet taper Greater than 55 mph 300 feet + 100 feet taper or more, as determined BRUTON SMITH PARKWAY DESIGN DIS.TRICT C. Signage. Signage shall comply with all ULDC sign regulations. Should regulations conflict, the more strict regulation shall govern. Interstate signs shall not be permitted. Ground signs shall be limited to monument-based signs. Base and sign structure shall be constructed of brick or stone consistent with the architecture and exterior treatment of the primary structure. No more than one (1) ground sign per frontage on a public right-of-way shall be permitted, and it shall not exceed eight (8) feet in height above grade for subdivisions and single occupant development or fifteen (15) feet in height above grade for multi-occupant developments. Any ground sign shall be a minimum of one (1) foot from the right-of-way and shall be no closer than ten (10) feet from the curb-line of a paved vehicular area. Wall signs shall be limited to no more than ten (10) percent of the square footage of the facade of the tenant space. Two (2) wall signs are allowed on corner unit of a strip center. If lighted, lettering shall be individually formed and lighted. No spreader bar signage shall be allowed except as required by the state fire marshal. Prohibited signs include, without limitation, exposed neon, portable, pennant, or any sign determined by the planning and zoning department to distract the traveling public. D. Transportation/infrastructure. 1. Underground utilities. All utilities except for major electronic transmission lines and substations are required to be placed underground. 2. Interparcel access. Interior roadways if constructed shall be continuous and aligned with existing, planned, or platted streets. At least one (1) stub-out shall be provided between all contiguous parcels where feasible. One (1) such stub-out shall be provided to the adjacent property for each eight hundred (800) feet of shared property line. 3. On-street parking. On-street parking is encouraged. The placement of on-street parking shall be subject to review, and approval shall be required. 4. Multiuse pathways. Multiuse pathways are required to connect to multiuse pathways or sidewalks that have been provided on adjacent parcels and do so without abrupt changes in grade or direction. They shall have a paved width of ten (10) feet. The grade of the pathways shall not exceed a grade of six (6) percent. Intersections with streets shall require striping, appropriate signage, and a five-foot curb flare with bollards placed six (6) feet apart to block unauthorized vehicles. Multiuse pathways shall be located along the sites frontage along State Route 20. 5. Sidewalks. Sidewalks are required to be provided on both sides of all interior roadways (public or private), and shall be a minimum of five (5) feet in width. Attractive, safe, and convenient pedestrian access from the sidewalk to the building frontage as well as other pedestrian connections to adjacent buildings within the same development shall be provided. Such pedestrian access shall minimize conflicts with automobiles by such means as walkways, ornamental pavers, striping, signs and painted crosswalks. E. Architectural design. Any accessories provided such as railings, benches, trash receptacles and/or bicycle racks shall complement the building design and style. 1. Building placement. For any parcel or lot, the front setback shall be fifty (50) feet. Development plans shall record the zoning designation of each adjoining parcel. The side setback from the property line of an adjoining parcel with a residential zoning designation shall be twenty (20) feet. The rear setback from the property line of an adjoining parcel with a residential zoning designation shall be forty (40) feet. 2. Residential design guidelines. a. Each subdivision shall provide at least one (1) entrance street. Entrance streets shall be designed as three-lane divided streets with a center median not less than eight (8) feet in width. b. Alleys where provided shall run continually through residential blocks. Alleys shall intersect streets no closer than one hundred fifty (150) feet from any street intersection. c. Architectural design of all residential buildings shall comply with the following performance guidelines: i. Architectural treatments of each building elevation shall be brick, stone or hard-coat stucco. Wood, wood shake or fiber cement-type siding may be used as architectural accents but may in no case make up more than fifty (50) percent of any elevation. The percentage of architectural accents shall be included on required elevation plans submitted to the building department for approval. ii. Roofs shall have a minimum of 5:12 pitch, with the exception of attached patio covers. The minimum roof pitch of an attached patio cover shall be as required by the current state minimum standard codes for construction as adopted by the Board of Community Affairs, along with their respective amendments. Roofing materials for pitched or mansard roofs shall be limited to the following: • Metal standing seam. • Tile, slate or stone. • Wood shake. • Architectural-style asphalt shingles. • Shingles with a slate, tile or metal appearance. iii. All mechanical, HVAC and like systems shall be screened from street level view (within three hundred (300) feet) on all sides by an opaque wall or fence constructed of brick, stucco, split-faced block or wood. 3. Commercial/retail design guidelines. a. Architectural design of all commercial/retail buildings shall comply with the following additional performance guidelines: i. Architectural treatments of each building elevation shall be brick, stone, hard-coat stucco, or glass. Cement fiber board may be used as an accent building material. ii. Within planned shopping centers, distinct architectural entry identity for individual tenants' entrances shall be provided for suites exceeding ten thousand (10,000) square feet of leasable area. iii. Walls visible from roadways or parking areas shall incorporate changes in building material/color or varying edifice detail such as trellises; false windows; recessed panels reminiscent of window, door, or colonnade openings; landscaping; or storefronts every one hundred fifty (150) linear feet. iv. Roof parapets when constructed shall be articulated to provide visual diversity. Parapets shall include articulations or architectural features at least every one hundred (100) linear feet. v. Building design shall include minimum one-foot deep cornices, extending along the entire front of buildings and the sides of buildings at least ten (10) feet. vi. Building design shall include a minimum one-foot high contrasting base, extending along the entire front of buildings and the sides of buildings at least ten (10) feet, excluding window and doors. vii. All mechanical, HVAC and like systems shall be screened from street level view (within three hundred (300) feet) on all sides by an opaque wall or fence constructed of brick, stucco, split-faced block or wood. 4. Industrial design regulations. a. Architectural design of all industrial buildings shall comply with the following performance guidelines: i. Contrasting accent colors (other than dark green or brick red) of any wall, awning or other feature shall be limited to no more than fifteen (15) percent of the total area of any elevation. The percentage of contrasting accent colors shall be included on required elevation plans submitted to the building department for approval. ii. Buildings shall incorporate live plant material growing immediately in front of or on the building. iii. Roofing materials for pitched or mansard roofs shall be limited to the following: • Metal standing seam. • Tile, slate or stone. • Wood shake. • Architectural-style shingles. iv. All mechanical, HVAC and like systems shall be screened from street level view (within three hundred (300) feet) on all sides by an opaque wall or fence constructed of brick, stucco, split-faced block or wood. F. Dumpster screening. Dumpsters visible from adjacent properties or public parking lots shall be screened from view on all four (4) sides. Screening shall consist of three (3) solid walls of brick or stone construction, at least six (6) feet in height, with one hundred (100) percent solid metal or wooden gates. G. Landscaping and buffers. 1. Planting strip. A ten-foot wide planting strip shall be provided along the perimeter of all commercial development. This strip shall be planted with approved ground cover and contain trees. Trees shall be a single species and planted at regular fifty-foot intervals. Trees shall not be planted within twenty-five (25) feet of the curb line of street intersections. All trees shall be a minimum two-inch caliper (dbh) at the time of planting. The height of the landscaping material shall be a minimum of five (5) feet at the time of planting. The planting strip requirement can be waived by the administrator if fifteen (15) percent of the site is landscaped. 2. Off-street surface parking lot planting requirements. Off-street surface parking lots which are required to contain more than twenty (20) parking spaces shall contain landscaping and plantings as follows: a. Trees shall be provided and maintained adjacent to, and in the interior portions of, parking lots in a ratio of one (1) tree for each seven (7) parking spaces. In addition, every parking space shall be within sixty (60) feet of the trunk of a tree. b. Deciduous trees shall be a three-inch caliper (dbh), and evergreen trees shall be at least six (6) feet in height at the time of planting. c. The minimum planting area or island for each canopy tree shall be at least ten (10) feet by twenty (20) feet. If shared with other trees, eighty (80) square feet for each additional tree shall be added. d. The minimum planting area or island for each understory tree shall be one hundred (100) square feet. If shared with other trees, forty (40) square feet for each additional tree shall be added. e. Trees shall be planted in areas surrounding the perimeter of the parking lot and/or shall be planted in planting areas or islands internal to the parking lot as approved. Trees may be planted and spaced singly or in groups. Each planting area or island shall not be less than four (4) feet in width in any direction. f. Ground areas shall be sodded and/or planted with groundcover species, and/or provided with other landscaping material, or any combination thereof. g. Paved or striped islands greater than fifty (50) square feet shall not be allowed. These areas shall contain landscape plantings. h. Landscaping and other features shall be maintained to ensure adequate sight distance within parking lots at all times. H. Lighting. 1. Street lighting. Any streetlights along public rights-of-way shall utilize decorative light poles/fixtures. Light sources shall be high-pressure sodium. Street lights shall be staggered, one hundred fifty (150) feet on-center. All street lighting shall be subject to review, and approval shall be required. The light fixture that shall be utilized is as follows: Fixture Head Pole Type (Streetlight) Max. Pole Height Cobra Head Fluted (Black) 40 feet 2. Parking lot lighting. Required lighting throughout all parking areas shall utilize decorative light poles/fixtures. Light sources shall be metal halide, not exceeding an average of 4.5 foot-candles of light output throughout the parking area. Other than pedestrian light fixtures that will be less than fourteen (14) feet tall, light fixtures shall be hooded. Lighting shall be directed to avoid intrusion on adjacent properties and away from adjacent thoroughfares. Light fixtures shall be as follows: Fixture Head Pole Type (Parking lot) Pole Type (Pedestrian) Box Head Fluted Black (50 ft. max.) Fluted Black 3. Multiuse pathway lighting. Lighting for pedestrians and bicyclists along any multiuse pathway segments shall be of an approved design, a maximum of fifteen (15) feet in height with average spacing not to exceed forty (40) feet apart. 4.02.02. Reserved. (Ord. No. 14-02, § 2, 6-17-14; Ord. No. 14-03, 6-17-14; Ord. No. 15-02, § I, 2-17-15; Ord. No. 18-06, § I, 11-27-18) Sec. 4.03.00. Supplemental standards for specific uses. (Check chapter 2 for districts and defined uses.) 4.03.01. Animal care facilities (kennels, animal hospitals, veterinary clinics, and stables). A. Animal care facilities, with the exception of stables and facilities for livestock are permissible in the RA zoning district with an approved conditional use and subject to the site design standards for the district. Stables and facilities for livestock are permissible in the RA zoning district and subject to the site design standards of subsection 4.03.01.G. B. Animal care facilities, with the exception of noncommercial kennels in the MU, C-2, C-3, IAC, and M-1 zoning districts are subject to the site design standards for the district and specific site design standards in this section. C. Design standards for an animal hospital or veterinary clinic in a freestanding building are shown in the following table: Table 4.03.01.C. Standards for Freestanding Animal Hospital or Veterinary Clinic Development Feature Standard Animals allowed Domestic pets, farm animals and livestock. Wild animals are prohibited Minimum setback from any residential zoning district for buildings 50 feet Minimum setback from any residential zoning district for outdoor runs 75 feet Building design Consistent with the design, materials, and color of buildings in the surrounding area Outdoor runs Drains connected to an approved sanitary facility; odor control required; pest control required Buffer requirements 1.5 times the buffer requirement of section 5.02.00 plus a fence or wall adjacent to any residentially zoned property Boarding Soundproofing required D. Design standards for an animal hospital or veterinary clinic in a shopping center are shown in the following table: Table 4.03.01.D. Standards for Animal Hospital or Veterinary Clinic in a Shopping Center. Development Feature Standard Animals allowed Domestic pets only; farm animals, livestock, and wild animals are prohibited Minimum building setback from any residential zoning district 50 feet Building design Soundproofing required; odorproofing required; pest control required Outdoor runs Prohibited Boarding Prohibited E. Design standards for commercial kennels are shown in the following table: Table 4.03.01.E. Standards for Commercial Kennels. Development Feature Standard Animals allowed Domestic pets only; farm animals, livestock, and wild animals are prohibited Development Feature Standard Minimum land area 2 acres in the RA zoning district; 10,890 sq. ft. in the MU zoning district; 32,670 sq. ft. on septic tank or 10,000 sq. ft. on public sewer in the C-2 and C-3 zoning districts; 32,670 sq. ft. in the IAC zoning district; 43,560 sq. ft. on septic tank and 30,000 sq. ft. on public sewer in M-1; and 43,560 sq. ft. in the M-2 zoning district Minimum setback from any residential zoning district for any buildings or structures 50 feet Minimum setback from any residential zoning district for outdoor runs 75 feet Outdoor runs Fencing required in addition to any fencing on the perimeter of the site; drains connected to an approved sanitary facility; odor-proofing required; pest control required; hours of operation limited to 7:00 a.m. until 7:00 p.m. Buffer requirements 1.5 times the buffer requirement of section 5.02.00, plus a fence or wall adjacent to any residentially zoned property Boarding Soundproofing required F. Design standards for noncommercial kennels are shown in the following table: Table 4.03.01(F). Standards for Noncommercial Kennels. Development Feature Standard Animals allowed Up to 10 Adult domestic pets only; farm animals, livestock, and wild animals are prohibited Minimum setback from any residential zoning district for any buildings or structures 50 feet Minimum setback from any residential zoning district for outdoor runs 50 feet Outdoor runs Fencing required in addition to any fencing on the perimeter of the site; drains connected to an approved sanitary facility G. Design standards for stables, including riding academies, barns, and other facilities for farm animals and livestock are shown in the following table: Table 4.03.01(G). Standards for Stables and Facilities for Livestock. Development Feature Standard Animals allowed Farm animals and livestock Limitations on zoning districts Allowable only in RA zoning district Minimum land area 3 acres Minimum setback from any adjacent residential zoning district for any buildings or structures 50 feet Minimum setback from any residential zoning district for outdoor tracks and exercise yards 100 feet Outdoor tracks and exercise yards Odor control required; pest control required Development Feature Standard Fences The parcel (3 or more acres) shall be fenced. The outdoor track and each exercise yard shall be separately fenced. 4.03.02. Cemeteries. A. Cemeteries are permissible in all zoning districts, subject to the site design standards of the district and the specific supplemental standards in this section. B. A cemetery may include one (1) or more of the following: a burial park for earth interments, a mausoleum for vault or crypt interments, and a columbarium. C. A cemetery may include a chapel or church when operated in conjunction with and within the boundaries of such cemetery. D. Site design requirements are as follows: Table 4.03.02(D). Standards for Cemeteries. Development Feature Standard Minimum land area Registered cemeteries (per state law) 10 acres With a structure requiring a building permit 2 acres Without a structure requiring a building permit 1 acre Minimum setbacks for structures, storage, materials, equipment, or interment lots Front yard 40 feet Side yard 20 feet Rear yard 20 feet Adjacent to a residentially zoned property 50 feet Lot dimensions Minimum road frontage 100 feet Minimum buffer requirements1 Front property line None Side and rear property lines Per section 5.02.00 Adjacent to state bodies of water 75 feet2 Access for existing cemeteries Easements for access are required in new subdivisions 1 The buffer shall be designed to achieve a minimum height of six (6) feet within three (3) years after installation. 2 The required buffer shall be along the banks of all state bodies of water as measured horizontally from the point where vegetation has been wrested by normal stream flow or wave action. E. Location requirements. 1. A cemetery shall not be located in a wetland, 100-year floodplain, floodway, or flood hazard area. 2. All new cemeteries must be located not less than one hundred fifty (150) feet from a drinking water well. 3. The cemetery shall be located below the elevation of known drinking water wells. F. [Off-street waiting.] Adequate off-street waiting space shall be provided for funeral processions so that no vehicle stands or waits in a dedicated right-of-way. G. [Access.] All cemetery access shall be provided from a county maintained roadway or state highway. The entrance and exits to the cemetery shall be only from the frontage street. H. [Mausoleums and columbaria.] Mausoleums and columbaria may be located only within the boundaries of approved cemeteries. Mausoleums and columbaria shall have facades of brick or stone. I. Review and approval procedures. 1. A cemetery shall meet the requirements of chapter 12 for application, review, and approval. Upon approval, a final plat of the cemetery shall be recorded. 2. A drainage plan must be submitted and approved by the development plan review department before cemetery approval may be granted. 3. The owner of a cemetery shall notify the county health department of the intent to build a cemetery and shall submit a letter from the county health department identifying the cemetery's location in relation to any known drinking water wells as part of the application for approval. 4.03.03. Centers for manufacturing, production, processing, or assembly. A. Purpose. Certain manufacturing, production, processing, or assembly uses are permissible in the M-1 and M-2 zoning districts, subject to the site design requirements of the zoning district. However, within this broad group of uses there are individual uses that are permissible within M-1 or M-2 only where supplemental site design standards are provided. This section sets forth those specific site design standards that are required in addition to the site design standards of the zoning district in which the use is proposed. B. [Supplemental standards.] Supplemental standards for asphalt and concrete batching plants, central mixing plants for cement, mortar, plaster, or housing materials; and food processing plants are provided in the following table: Table 4.03.03.B. Standards for Asphalt and Concrete Batching Plants, Central Mixing Plants and Food Processing. Development Feature Standard Minimum land area 2 acres Minimum building or structure setback from residentially zoned properties 100 feet Buffers 2.0 times the buffer requirements stated in Section 5.02.00 Vibration or electromagnetic interference Shall not be discernable on adjacent properties Loading docks Screened from view of adjacent properties and from the public right-of-way Outside storage Screened from view from adjacent properties and from the public right-of-way. Setback a minimum of 200 feet from any residentially zoned property Refuse and solid waste containers Enclosed, except for an access gate, and screened from view from adjacent properties and from the public right-of-way 4.03.04 Adult and child day care facilities. A. Applicability. The requirements of this section apply to child and adult day care facilities, nursery schools, and preschools. These facilities are permissible in the MU, OI, C-1, C-2, C-3 and IAC zoning districts. In addition, these facilities are permissible with an approved conditional use in the RA, M-1 and M-2 zoning districts. Further, child and adult day care facilities are permissible as a home occupation in all residential zoning districts. Non-home occupation facilities subject to the requirements of this section shall meet the site design standards of the zoning district and the supplemental standards set forth in this section. B. All facilities regulated in this section shall comply with state regulations and require applicable state licenses for operation. C. Home occupation day care facilities shall be limited to the provision of care and supervision to not more than six (6) children or six (6) adults and shall comply with the standards set forth in section 7.01.00. D. Non-home occupation child day care facilities, nursery schools, and preschools shall comply with the following standards: Table 4.03.04(D). Standards for Non-Home Occupation Child Day Care Centers, Nursery Schools, and Preschools. Development Feature Standard Minimum land area 1 acre, located on a thoroughfare having a classification greater than local as illustrated on the functional road plan Place of operation Freestanding structure, or Within a freestanding religious facility; see section 4.03.14(E), or Within a freestanding public or private school Outdoor play area Minimum of 200 square feet per child, based on the number of users at any one time, and Fully enclosed by a security chain-link fence, a minimum of four feet in height, or Adjacent to residentially zoned property Fully enclosed by a solid decorative fence, a minimum of four feet in height Indoor play area Minimum of 35 square feet per child E. Adult day care centers. Table 4.03.04(E). Standards for Adult Day Care Centers. Development Feature Standard Minimum land area 1 acre, located on a thoroughfare having a classification greater than local as illustrated on the functional road plan Place of operation Freestanding structure, or Within a freestanding religious facility; see section 4.03.14(E) 4.03.05. Electrical substations. A. Electrical substations are permissible in any zoning district, subject to the dimensional standards for the district and the supplemental standards set forth in this section. B. An electrical substation shall be fully enclosed, except for a gate, on all sides with a solid fence or a landscaped buffer that meets the following standards: Table 4.03.05(B). Standards for Electrical Substations Buffer requirement Standard Width 25 feet Number of trees 1 tree for each 25 linear feet of buffer Number of shrubs 1 large screening shrub for each 8 linear feet, plus continuous hedge consisting of double staggered rows of shrubs Plant materials Selected from list in section 5.02.01 4.03.06. Emergency response and public safety facilities. A. Emergency response facilities, such as fire stations, ambulance services, and police stations are permissible in any zoning district, subject to the dimensional standards for the district and the supplemental standards set forth in this section. B. Site design standards for emergency response facilities are as follows: Table 4.03.06(B). Standards for Emergency Response Facilities Development Feature Standard Minimum setback from residential zoning districts 100 feet Access requirements Paved road Buffers 1.5 times the buffer otherwise required by section 5.02.00 4.03.07. Establishments over 40,000 square feet (large-scale retail centers). A. Purpose. This section is intended to provide design standards for uses located in large-scale buildings. The purpose is to ensure the compatibility of large buildings and their associated impacts with the surrounding area, and to avoid large, undifferentiated wall surfaces. B. Applicability. Establishments over forty thousand (40,000) square feet shall comply with the design standards contained in this section, in addition to the site design standards of the underlying zoning district. The size threshold refers to an individual establishment and its associated outdoor areas used for display and storage. C. [Building design standards.] Building design shall meet the standards in the following table (See figure 4.2). Table 4.03.07(C) Building Design Standards for Establishments Over 40,000 Square Feet Development Feature Standard* Facades over 100 feet in length Provide wall projections or recesses a minimum of three feet in depth and a minimum of 20 contiguous feet long within each 100 feet of facade length. Arcades, display windows, entry areas, or awnings shall be provided along at least 60 percent of the facade. Repeating pattern of color, texture, or materials change is required. Roof and roof line Provide a change in height every 100 linear feet of building length. Parapets, mansard roofs, gable roofs, hip roofs, or dormers shall be used to conceal flat roofs and roof top equipment from public view Exterior building materials Brick, masonry, and/or wood; stucco to simulate brick, masonry or wood may be used; glass may be used in combination with brick, masonry, and/or wood Parking Shall not exceed 110% of the parking standard provided in section 8.02.04. At least 20% of the required parking shall be provided in pervious pavement, grass, gravel, turf block, or similar material. Structured parking is strongly encouraged. Development Feature Standard* Loading docks Screened from view from adjacent properties and from the public right-of-way and shall be located in the side or rear of the building or lot. Setback a minimum of 100 feet from any residentially zoned property Outside storage and displays Neither parking lots, nor areas immediately adjacent to the buildings other than the garden center uses shall be used for the sale of goods. Garden center goods shall be within areas enclosed by decorative fencing and be at least partially screened. Exceptions to this provision include seasonal holiday trees, seasonal sales of nursery supplies, and pumpkin sales. Screened from view from adjacent properties and from the public right-of-way. Setback a minimum of 100 feet from any residentially zoned property. In no instance shall outdoor display obstruct sidewalks or otherwise impede pedestrian movement to the entrance of the store. Refuse and solid waste containers Enclosed, except for an access gate, and screened from view from adjacent properties and from the public right-of-way. Seasonal sales (See section 7.03.00 regarding temporary uses) Shall not occupy any required parking spaces or parking lot aisles. Open space A minimum of 20 percent of the site shall be landscaped open space. * Architectural design shall be subject to approval by the architectural review committee. 4.03.08. Funeral homes, mortuaries, and/or crematoriums. A. Funeral homes and mortuaries, with or without crematoriums, are permissible in the OI, C-2, C-3, MU, and IAC zoning districts, subject to site design standards of the zoning district and the supplemental standards set forth in this section. B. Adequate off-street waiting space shall be provided for funeral processions so that no vehicle stands or waits in a dedicated right-of-way. A minimum off-street stacking distance of one hundred (100) feet shall be provided. 4.03.09. Gasoline service stations (with or without convenience stores). A. Gasoline service stations without a convenience store are permissible in the following zoning districts, subject to the site design standards for the district, and the specific site design standards in this section: C-1, C-2, C-2, MU, and IAC. B. Except as otherwise prohibited, gasoline service stations without a convenience store may include the following activities and uses: Sale of fuel, oil, lubricants, and similar products; minor automotive repair; sale of small automotive accessories; inspection stations for emissions; or car wash. Gasoline stations without a convenience store shall not include game rooms, game arcades, major automotive repair, body shops, paint shops, or paint booths. C. Design standards for gasoline stations without a convenience store are shown in the following table: Table 4.03.09(C). Standards for Gasoline Service Stations (without a convenience store) Development Feature Standard Minimum Setback Principal building and/or gas pumps and canopy, where side and rear lot lines abut residentially zoned property 40 feet Principal building, side and rear lot lines, abutting all other zoning districts 25 feet Access requirements for corner lot Access drives shall be a minimum of 20 feet from the intersection of street right-of-way lines Buffer, adjacent to residentially zoned property Includes a solid wall or solid fence not less than six feet in height in addition to the standards set forth in Section 5.02.00 Commercial vehicle parking Shall comply with Section 2.04.02 D. Gasoline service stations with a convenience store are permissible in the following zoning districts, subject to the stie design standards for the district, and the specific site design standards in this section: C-1, C-2, C-3, MU, and IAC. E. Except as otherwise prohibited, gasoline service stations with a convenience store may include the following activities and uses: Sale of fuel, oil, lubricants, and similar products; minor automotive repair, sale of minor automotive accessories; sale of food and sundries; convenience store; inspection stations for emissions; truck wash; or car wash. Gasoline service stations with a convenience store shall not include game rooms, game arcades, major automotive repair, body shops, paint shops, or paint booths. F. Design standards for gasoline service stations with a convenience store are shown in the following table: Table 4.03.09(F). Standards for Gasoline Service Stations (with a convenience store) Development Feature Standard Minimum Setback Principal building and/or gas pumps and canopy, where side and rear lot lines abut residentially zoned property 60 feet (where commercial vehicle spaces are provided); otherwise, 40 feet Principal building, side and rear lot lines, abutting all other zoning districts 40 feet Access requirements for corner lot Access drives shall be a minimum of 40 feet from the intersection of street right-of-way lines Buffer, adjacent to residentially zoned property 1.5 times the buffer otherwise required in Section 5.02.00 (where commercial vehicle spaces are provided, otherwise 40 feet) In addition, includes a solid wall or solid fence not less than six feet in height. Commercial vehicle parking Shall comply with Section 2.04.02 4.03.10. Golf courses. A. Golf courses are permissible in RA, R-1, R-2, R-3, R-4, R-5, RD, RM, RS, and MU zoning districts, subject to the standards of the district and the supplemental standards in this section. B. A golf course may be public or private and may include the following buildings and accessory uses: 1. A clubhouse with or without a pro shop, retail sales of golf supplies and accessories, and a restaurant or snack shop. 2. An equipment building for maintenance, minor repairs, and storage. Storage may include fertilizers, herbicides, pesticides or golf carts. 3. Driving range and/or putting greens. 4. Restroom facilities. C. The types of golf courses may be par three (3), executive, private, semiprivate or regulation. D. The following are site design standards for golf courses: Table 4.03.10(D) Standards for Golf Courses Development Feature Standard Minimum setback from residentially zoned property for: Bathrooms 10 feet All other buildings 100 feet Safety netting for driving ranges Required on the perimeter of the playing area abutting public streets and residentially zoned property. Minimum of 40 feet in height Outdoor lighting for driving range, tees, greens, and fairways Directed and shielded to avoid illumination of properties used or zoned for residential purposes. Exterior lighting shall be downcast of moderate brightness and shall not cause glare on any abutting property. Outdoor lighting shall be turned off not later than 10:00 p.m. Loudspeakers or paging systems Prohibited Outside storage and loading areas Fully screened from view from adjacent properties and from the public right-of-way Development Feature Standard Golf cart crossings Shall be plainly marked and located for safety of both the cart users and persons using sidewalks or streets that are crossed. 4.03.11. Commercial greenhouses and/or plant nurseries. A. Greenhouses and/or plant nurseries are permissible in the RA, C-2, and C-3 zoning districts subject to the site design standards of the district and the supplemental standards set forth in this section. B. Greenhouses and/or plant nurseries in the RA zoning district shall sell only plants grown on-site. C. The following are the site design requirements for greenhouses and plant nurseries: Table 4.03.11(C) Standards for Greenhouses and Plant Nurseries Development Feature Standard Minimum land area 1.25 acre Outdoor storage and loading areas Setback from residential properties a minimum of 75 feet. Fully screened, by opaque fence or solid wall, from any view from adjacent properties and the public right-of-way Storage of loose materials, such as topsoil, compost, mulch, gravel, and similar materials Fully enclosed by a solid fence or solid wall. Stockpiles of loose materials shall be limited in height to the height of the fence or wall. Buffer 1.5 times the buffer otherwise required 4.03.12. Hospitals. A. Hospitals are permitted in the OI, C-2, C-3, MU, and IAC zoning districts, subject to the site design standards of the district. Hospitals are permissible in the RA zoning district with an approved conditional use and shall comply with the site design standards of the RA district and the supplemental standards set forth in this section. B. The following are site design standards for hospitals: Table 4.03.12(B) Standards for Hospitals Development Feature Standard Minimum land area 5 acres Minimum side and rear yard setback 100 feet Emergency vehicle access Shall not face residentially zoned properties 4.03.13. Radio and television stations. (Reserved) 4.03.14. Mass assembly centers and grounds (fairgrounds, outdoor amusements, amphitheaters, convention centers, civic centers, rodeos, armories, churches and athletic fields). A. All fairgrounds, outdoor amusements, amphitheaters, civic centers, convention centers, rodeos and armories shall meet the site design requirements for zoning districts RA, MU, IAC, C-2, C-3, M-1 and M-2 in which they are located and the additional site design standards as set forth in this section. An approved conditional use is required in all aforementioned zoning districts. B. Fairgrounds and amphitheaters, where activities occur primarily out of doors, shall meet the following site design standards: Table 4.03.14(B). Standards for Fairgrounds and Amphitheaters. Development Feature Standard Minimum setback for buildings Abutting residential zoning districts 200 feet Abutting nonresidential zoning districts 100 feet Minimum setback for outdoor stage or performance area Abutting residential zoning districts 600 feet Abutting nonresidential zoning districts 200 feet Minimum setback for parking lots and access drives, when abutting residential zoning districts 200 feet Parking lot design Aisles may be paved; Spaces may be paved, grass, dirt, or gravel Minimum buffer Plus a wall with noise abatement features, 2.0 times the buffer specified in section 5.02.00 Lighting Exterior lighting shall be downcast of moderate brightness and shall not cause glare on any abutting property Loudspeakers or paging systems Designed, installed, and used such that they are in accordance with County Noise Ordinance Outside storage and loading areas Screened from view from adjacent properties and from the public right-of-way Setback a minimum of 200 feet from any residentially zoned property Refuse and solid waste containers Screened from view from adjacent properties and from the public right-of-way Setback a minimum of 100 feet from all property lines Sanitation facilities, temporary or permanent Screened from view from adjacent properties and from the public right-of-way Setback a minimum of 200 feet from all property lines Vibration or electromagnetic interference Shall not be discernable on adjacent properties C. Outdoor amusements include such activities as miniature golf, carnivals or midway rides, pony rides, climbing walls, tracks for go-carts and other similar vehicles, and other tourist-oriented rides and amusements. Temporary activities or special events that include outdoor amusements are regulated in section 7.03.03. 1. Outdoor amusements may be freestanding, or two (2) or more amusements may be combined in a unified development site. 2. Outdoor amusements may include accessory uses, such as snack shops or food stands, gift shops, ice cream stands, or similar uses, provided that such uses are not open to the general public without entrance to the outdoor amusement. 3. The site design standards for outdoor amusements are shown in the following table: Table 4.03.14(C) Standards for Outdoor Amusements Development Feature Standard Minimum land area 2 acres Minimum setback for buildings Abutting residential zoning districts 200 feet Abutting nonresidential zoning districts 100 feet Minimum setback for parking lots and access drives, when abutting residential zoning districts 100 feet Minimum buffer 1.5 times the buffer specified in section 5.02.00 plus a fence or wall Lighting Exterior lighting shall be downcast of moderate brightness and shall not cause glare on any abutting property Loudspeakers or paging systems Designed, installed, and used such that they are in accordance with County Noise Ordinance Outside storage and loading areas Screened from view from adjacent properties and from the public right-of-way Setback a minimum of 200 feet from any residentially zoned property Refuse and solid waste containers Screened from view from adjacent properties and from the public right-of-way Setback a minimum of 100 feet from all property lines Sanitation facilities, temporary or permanent Screened from view from adjacent properties and from the public right-of-way Setback a minimum of 100 feet from all property lines D. Convention centers, civic centers, centers for performing arts, and armories (where activities occur primarily indoors) shall meet the site design standards in the following table: Table 4.03.14(D) Standards for Convention, Civic and Performing Arts Centers and Armories Development Feature Standard Minimum land area 5 acres Minimum setback for buildings Abutting residential zoning districts 100 feet Abutting nonresidential zoning districts 50 feet Minimum setback for parking lots and access drives, when abutting residential zoning districts 100 feet Access management Traffic flow Designed to avoid residential and local streets Minimum buffer 1.5 times the buffer specified in section 5.02.00 Development Feature Standard Lighting Exterior lighting shall be downcast of moderate brightness and shall not cause glare on any abutting property Loudspeakers or paging systems Designed, installed, and used such that they are in accordance with County Noise Ordinance Outside storage and loading areas Fully screened from view from adjacent properties and the public right-of-way Setback a minimum of 100 feet from residentially zoned property Vibration or electromagnetic interference Shall not be discernable on adjacent properties E. Churches and similar religious facilities. Religious facilities, including churches and other places of worship, together with specified accessory uses and structures, are permissible in the MU, OI, C-1, C-2, C-3, and IAC zoning districts subject to the standards of the zoning district. An approved conditional use is required for churches and religious facilities within the M-1 and M-2 zoning districts, subject to the standards of the zoning district and in accordance with section 4.01.03, appearance standards for commercial and industrial buildings. Ancillary and accessory uses for churches and religious facilities are permitted within the M-1 and M-2 zoning districts, subject to supplemental standards. Religious facilities, including churches and other places of worship, together with specified accessory uses and structures, are permissible with an approved conditional use in the following zoning districts, subject to the standards of the district and the supplemental standards set forth in this section: RA, R-1, R-2, R-3, R-4, R-5, RS, RD, RM, and RMH. Table 4.03.14(E) Site Design Standards for Churches and Similar Religious Facilities Development Feature Standard Minimum site area, including structures and associated parking 2 acres Road frontage 200 feet Buffers (sides and rear) 20 feet Building materials Brick, stone, stucco, glass, cement fiberboard or masonry materials compatible in the surrounding area Building setbacks 50 feet from all property lines 1. Uses and activities other than worship shall be considered accessory uses and shall be clearly ancillary to the primary use. Such uses and activities shall be limited to: A. Religious instruction or similar instruction or study typically associated with the religion; B. Offices to support the establishment; C. Child or adult day care; D. Private academic school; E. A fellowship hall, with or without a kitchen (which may be known as a community center, activity hall, or life center); F. Recreation facilities, including athletic fields; G. Individual meeting spaces; and H. A parsonage. 2. All accessory uses are subject to the following requirements: A. (Reserved.) B. The facility housing the accessory use shall meet all local, state, or federal standards. C. The operator of the accessory use shall obtain any licenses required to conduct the accessory use. Any approval of the accessory use shall be contingent upon receipt of all licenses. D. Loudspeaker or paging systems shall be located to ensure that they cannot be heard at the property line of adjacent properties. E. All outdoor activities shall occur no earlier than 7:00 a.m. and no later than 10:00 p.m. F. Exterior lighting shall be downcast of moderate brightness and shall not cause glare on any abutting property. G. Outdoor play or activity areas shall be no closer than fifty (50) feet from any residential property line. 3. Child day care, adult day care, preschool, or child nursery uses are allowable accessory uses subject to the following standards: A. The total floor area allocated to the child day care, adult day care, preschool, or nursery uses shall not exceed fifty (50) percent of the total floor area on the site. The calculation of total floor area allocated to the uses shall be cumulative and shall include all child day care, adult day care, preschool, nursery facilities, and related mechanical and support facilities. B. An off-street drop-off area for persons served by the facility shall be provided. The entrance and vehicle drop-off points shall not be located on a street providing primary access to residences, unless such street is classified as a collector or arterial. 4. Private academic schools are allowable accessory uses subject to the following standards: A. The total floor area allocated to the school shall not exceed fifty (50) percent of the total floor area on the site. The calculation of total floor area allocated to the school shall include all components of the school: classrooms, school library, school offices, teacher work areas, and the like, including related mechanical and support facilities. B. Notwithstanding subsection 4.03.14.E.5.A., the total floor area allocated to the school may exceed twenty (20) percent of the total floor area on the site, provided that the area allocated to the school meets the requirements of section 4.03.22. C. The entrance and vehicle drop-off points for students shall not be located on a street providing primary access to residences, unless such street is classified as a collector or arterial. 5. A fellowship hall is an allowable accessory use, provided that the total floor area allocated to the fellowship hall, including related mechanical and support facilities, shall not exceed thirty-five (35) percent of the total floor area on the site. 6. One (1) residential dwelling unit is allowable to serve as a parsonage, subject to the following standards: A. A minimum lot area, within the parcel developed for religious uses and facilities, to be devoted to the dwelling unit ("parsonage lot") shall be eight thousand (8,000) square feet. The parsonage lot shall be used exclusively for the dwelling unit, and shall not include any primary or other accessory use allowable on the site. The parsonage lot shall not be used for any support activity to the primary or accessory uses, such as outdoor play areas, storage, or parking, other than as specifically provided in subsection 4.03.14.E.7.B. through F. and subsection 4.03.14.E.8. and 9., below. B. The maximum lot coverage for the parsonage lot shall be thirty-five (35) percent. C. Two (2) parking spaces shall be provided within the parsonage lot. D. The maximum building height on the parsonage lot shall be thirty-five (35) feet. E. The parsonage lot may contain children's outdoor play equipment, in a size and quantity typical of residential uses. F. The parsonage lot may contain a residential swimming pool, fully enclosed, and attached to the dwelling. 7. A specific parking plan shall be provided. This plan shall identify the principal use and each accessory use proposed on the site. The parking plan shall indicate the hours of operation and peak times of use (parking demand) for the primary use and each accessory use on the site. The parking standards for the principal use and each accessory use shall be identified, based upon ULDC requirements, set forth in section 8.02.00. The parking plan may propose reduced or shared parking, as set forth in section 8.02.08. The parking plan shall indicate areas designated for overflow parking during times of extraordinary use (such as festival or holiday periods). 8. For religious facilities that exceed ten thousand (10,000) square feet in total floor area, excluding the parsonage, if any, the minimum setback from any property line that is otherwise required shall increase five (5) feet for each two thousand (2,000) square feet, or portion thereof, over ten thousand (10,000) square feet. F. Athletic fields can be located in any zoning district and shall meet the site design standards in the following table: Table 4.03.14(F) Standards for Athletic Fields Development Feature Standard Minimum site area, including structures and associated parking 1 acre Road frontage 100 feet Buffers (sides and rear) 20 feet Building materials Brick, stone, stucco, glass, cement fiberboard or masonry materials compatible in the surrounding area Building setbacks 50 feet from all property lines Lighting Exterior lighting shall be downcast of moderate brightness and shall not cause glare on any abutting property Loudspeakers or paging systems Designed, installed, and used such that they are in accordance with County Noise Ordinance Parking lot design Aisles may be paved. Spaces may be paved, grass, dirt, or gravel 4.03.15. Mines and quarries. A. The development of natural resources, including the removal of minerals and natural materials, together with necessary buildings and machinery, is allowable in the M-2 zoning district, subject to the standards of sections 4.01.01 and 4.01.02 and the supplemental standards of this section. B. Where an existing quarry is proposed for extension or expansion beyond the property lines of the quarry area, such extension or expansion shall be considered as a new operation, subject to the standards set forth in this section. C. The area where mining or quarrying operations are conducted shall be fully enclosed with a fence or wall. 1. The fence or wall shall be located at least ten (10) feet from the edge of any excavation. 2. The fence or wall shall be designed and installed to ensure safety and security of the site, and to prevent entrance to the site by animals and unauthorized persons. D. Product piles, spoil piles, or other accumulations of by-products shall not exceed thirty-five (35) feet in height above the original contour of the site. E. Roads within the excavation site shall be surfaced with a dust-free material. F. A mining land use plan, conforming to the requirements of federal and state law, shall be required prior to approval of any mining or quarrying activity. G. Applications for approval of new mines or quarries or the expansion or extension of mines or quarries shall comply with the procedures set forth in chapter 12. Applications shall demonstrate compliance with all state and federal laws and regulations applicable to mines and quarries. 4.03.16. Mobile home or manufactured home parks. A. A mobile home or manufactured home subdivision shall comply with the dimensional standards set forth in tables 4.01.01(E) and 4.01.02(H), and with the subdivision design standards set forth in section 4.04.00. All mobile home or manufactured home developments that are not subdivisions shall be considered parks. B. A mobile home or manufactured home park ("park") is permissible in the RMH zoning district, and shall comply with the standards set forth in this section. C. A park shall be a unified development site. D. Certain accessory uses and structures may be contained in a park, provided such uses and structures are incidental to the principal use of the site for a park. The following standards are required for accessory uses and structures: Table 4.03.16(D). Standards for Accessory Uses in Manufactured Home Parks. Development Feature Standard Office and/or maintenance building Permissible Commercial and/or service establishments Located interior to the park Maximum of 3 percent of the land area Limited to residents of the park Home occupations Permissible, subject to the standards in section 7.01.00 Sales or repair of mobile homes Prohibited, except that the owner of an individual mobile home may offer that unit for sale Minimum setbacks for accessory structures From a federal or state highway 200 feet From the exterior boundary of the park 40 feet E. The site design standards for a park are set forth in the following table: Table 4.03.16(E) Site Design Standards for Manufactured Home Parks Development Feature Standard Minimum site area 25 acres, excluding floodplains and other land that is not suitable for development Site location Major arterial Minimum site width 200 feet Minimum recreation or open space area 10 percent of the gross site Lot identification A marker is required at each corner Lot location Abutting a paved street Minimum lot area 14,520 s.f. Minimum lot width (measured at pad location) 60 feet Minimum setbacks on lots Front yard 40 feet Side yard 10 feet Rear yard 20 feet From a street within the park 25 feet From a federal or state highway 200 feet From the exterior park boundary 40 feet Patio requirements Paved or all-weather material Minimum area 200 square feet Maximum height 35 feet Storage of boats, recreational vehicles, or other vehicles Required Fully enclosed by a fence Storage other than vehicles Fully contained within a building Buffer requirements Side and rear boundaries of the park 40 feet Front boundary, abutting public street 200 feet Buffer vegetation Evergreen to provide complete visual screen Standards for recreation or open space areas within parks 1. Recreation or open space areas may be one (1) contiguous tract or several tracts. 2. Individual tracts shall be no smaller than one-half (1 /2) acre. 3. Recreation areas shall be located for convenient access to all park residents. 4. Street open space shall not be included in the required recreation or open space area. 5. Up to twenty (20) percent of the required area may be located in the floodplain area. 6. Recreational parks shall be located on land suitable for park development and shall contain a sufficient amount of play equipment designed for school-age children. 7. If the park management fails to maintain open spaces, the county may provide this service and file a lien against the property owner. F. Standards applicable to manufactured homes and mobile homes within a park are set forth in the following table: Table 4.03.16(F) Standards for Manufactured and Mobile Homes Within Parks Development Feature Standard Manufactured home construction requirements Documented compliance with the National Manufactured Housing Construction and Safety Act Development Feature Standard Mobile home construction requirements Documented compliance with the National Mobile Home Construction and Safety Act Only homes built after June 15, 1976, shall be allowed Manufactured home installation requirements Compliance with Chapter 120-3-7 of the Rules and Regulations of the Office Commissioner of Insurance — Safety Division, State of Georgia or per the manufacturer requirements Additions Shall not encroach into required open spaces Building permits required Screening of undercarriage (skirting) Required, using approved construction materials Installed within 60 days of manufactured home set-up G. Structural requirements for manufactured homes in parks. 1. Each manufactured or mobile home unit shall be installed in compliance with the manufacturer installation requirements or with Chapter 120-3-7 of the Rules and Regulations of the Office of Commissioner of Insurance — Safety Fire Division. 2. The manufactured or mobile home unit shall be installed true and plumb. H. Requirements for utilities in a park. 1. Each park shall be served by central water, sanitary sewer, electricity, gas (if available), and a central television antenna system or cable. 2. All utilities shall be located underground. 3. Each manufactured or mobile home shall be connected with public water and sanitary sewer facilities which comply with county requirements. 4. An electrical outlet supplying both sixty (60) and one hundred fifty (150) amperes of service shall be provided for each lot. All such outlets shall be weather-proof, and installations shall meet the requirements of the National Electrical Code. I. Requirements for streets within a park. 1. Streets shall be a minimum of twenty-six (26) feet in width. 2. All private streets, driveways and pedestrian walkways within the mobile home park shall be lighted between sunset and sunrise with electric lights emitting light at an intensity of at least five thousand (5,000) lumens. 3. Light poles shall be no more than two hundred fifty (250) feet apart. J. Requirements for fire protection within a park. 1. Every park shall be equipped at all times with fire equipment in good working order and of such type, size, number, and location as to satisfy applicable fire regulations of Henry County. 2. No open fires or burning of leaves or other refuse shall be permitted within the boundaries of any park. K. Requirements for sanitation within a park. 1. The area around and underneath each mobile home unit shall be kept clean and free from collections of refuse, rubbish, glass bottles, or other unsightly material. 2. Garbage and refuse collection facilities shall be provided. Waste shall be removed from the premises and disposed of often enough to prevent creating a nuisance or health hazard and to insure that the garbage can shall not overflow. 4.03.17. Recreational vehicle parks. A. Recreational vehicle (RV) parks are permissible in the RA, C-3, and IAC zoning districts, subject to the site design standards of the zoning district and the supplemental standards of this section. B. Recreational vehicle parks may include motor homes, travel trailers, pop-up trailers, tents, and other similar vehicles. C. The condition of soils, groundwater level, drainage, and topography shall not create hazards to the property or the health or safety of the occupants. The site shall not be exposed to objectionable smoke, noise, odors, or other adverse influences and no portion subject to unpredictable and/or sudden flooding, subsidence, or erosion shall be used for any purpose which would expose persons or property to hazards. D. Accessory uses and structures permissible in the recreational vehicle park include management headquarters, recreational facilities, showers, coin-operated laundry facilities, and other uses and structures customarily incidental to operation of a recreational vehicle park. Standards for accessory uses are in the following table: Table 4.03.17(D) Standards for Accessory Uses in Recreational Vehicle Parks Development Feature Standard Minimum site area, including structures and associated parking 10 percent of gross area of park Use of accessory structures Limited to park tenants Storage of unoccupied units Fully enclosed by a solid fence, solid wall, or opaque buffer E. Site design standards for recreational vehicle parks are set forth in the following table: Table 4.03.17(E) Site Design Standards for Recreational Vehicle Parks Development Feature Standard Minimum site area 5 acres Maximum density 5 RV lots per gross acre Minimum lot width of entire site 300 feet Access Prohibited through residential zoning districts Minimum front yard setback for entire site 50 feet from public right-of-way Minimum lot width for individual lot(s) on the site 20 feet Minimum lot length for individual lot(s) on the site 40 feet Minimum usable open space 200 square feet per individual lot on the site Occupancy of individual lots Maximum of 30 days Development Feature Standard Buffers 1.5 times the buffer otherwise required by section 5.02.00 Internal street width 28 feet from edge to edge F. Garbage and refuse collection facilities shall be provided. 1. Each lot shall be provided with an approved metal garbage container with a tight-fitting cover. The container shall be kept in sanitary condition and shall be stored at least three (3) inches off the ground, preferably on a metal rack or hanger for such purpose. 2. Waste shall be removed from the premises and disposed of often enough to prevent creating a nuisance or health hazard and to insure that the garbage can shall not overflow. 4.03.18. Group homes, nursing homes, assisted living and hospice care facilities. A. Group homes, nursing homes, assisted living and hospice care facilities are permissible in the following zoning districts: RA with an approved conditional use and subject to the standards of the district and the supplemental standards set forth in this section. B. The following site design standards are required for care homes, group homes, nursing homes, assisted living and hospice care facilities: Table 4.03.18(B) Standards for Group Homes, Nursing Homes, Assisted Living Facilities and Hospice Care Facilities Development Feature Standard Minimum site area 2 acres (not in a subdivision) Minimum setbacks, side and rear yards 50 feet Place of operation Single-family home, freestanding structure, or within a religious facility Number of children or adults More than one Hours of operation Any time over 8 hours (24-hour supervision) Parking One standard off-street parking space per one bedroom shall be provided (See table 8.02.05) 4.03.19. Personal care homes. A. Personal care homes are permissible in all residential zoning districts and subject to the standards of the district and the supplemental standards in this section. An approved conditional use is required for all non-home occupation care homes, except in the RA zoning district a four (4) client personal care home is permitted without an approved conditional use. An approved conditional use is required for more than four (4) clients in the RA zoning district. B. Home occupation personal care homes shall be limited to the provision of care and supervision to not more than three (3) persons and shall comply with the standards set forth in section 7.01.00. C. A state license is required for all personal care homes in accordance with O.C.G.A. § 31-7-12. 4.03.20. Roadside produce stands. A. A roadside produce stand is permissible in the RA zoning district, subject to the site design standards of the district, and the standards of this section. B. Roadside stands are allowable for the sale of vegetables, fruit, produce, eggs, or other agricultural products grown on the premises. Agricultural products shall not include poultry or livestock. C. Roadside and produce stands shall meet the site design standards in the following table: Table 4.03.20(C) Standards for Roadside Produce Stands Development Feature Standard Maximum building area 500 square feet Building or structure setback 10 feet Parking Parking shall be provided out of the right-ofway Parking areas shall be paved, gravel, or other dust-free surface Outside storage of boxes, crates, pallets Fully screened from visibility from the rightof-way Exterior lighting Exterior lighting shall be downcast of moderate brightness and shall not cause glare on any abutting property 4.03.21. Salvage yards or junkyards and wrecker services (with storage area). A. Salvage yards and junkyards are permissible in the M-1 and M-2 zoning districts, subject to the standards of the district and the supplemental standards in this section. An approved conditional use is required for all salvage yards and junkyards. In addition, salvage yards shall be required to have minimum lot size of two (2) acres for properties zoned M-1 and one (1) acre for properties zoned M-2. B. The site design standards for salvage yards and junkyards are set forth in the following table: Table 4.03.21(B) Standards for Salvage Yards and Junkyards Development Feature Standard Minimum setback 200 feet from all abutting property lines Screening (fence) required Solid wall or solid fence Minimum height 6 feet Minimum setback 100 feet from all property lines Storage of salvaged or junk materials Shall not exceed the height of the fence or wall Buffers 40 feet on all property lines C. Sanitary landfills shall not be permitted. D. Wrecker services (with storage area) are permissible in the M-1 and M-2 zoning districts, subject to the standards of the district and the supplemental standards of this section. An approved conditional use is required in the aforementioned zoning districts. E. The site design standards for wrecker services (with storage area) are set forth in the following table: Table 4.03.21(E) Standards for Wrecker Services (with storage area) Development Feature Standard Minimum lot size 2 acres (if zoned M-1) 1 acre (if zoned M-2) Screening requirements for storage area Minimum height Solid wall or solid fence 6 feet Development Feature Standard Placement Behind the rear drip line of the office/ primary structure. Minimum buffer 10 feet wide for any portion of property adjacent to residential or commercially zoned property. Storage of vehicles Towed vehicles shall be stored within an enclosed secured area not accessible to the public. No wrecked vehicles shall be stacked within the storage area. Storage of nonbusiness related vehicles is prohibited. Storage area must be, at a minimum, gravel covered. Minimum size of office/primary structure 1,000 square feet, providing restroom facilities and reception area. Building materials Masonry front façade. Off-street parking requirements 1 space for each 10,000 square feet of site area or portion thereof, and 1 space for every 300 square feet of professional office space. All required off-street parking shall be located outside of any secured vehicle storage area. Driveway/entrance and public parking area outside of storage area shall be paved with a dust-free surface. Signage All ground signs must be monument based not to exceed 15 feet in height. 4.03.22. Schools, açademic, public or private. A. Public or private açademic schools are permissible in the following zoning districts: OI, C-1, C-2 and IAC, subject to the standards of the zoning district, and the supplemental standards of this section: RA, R-1, R-2, R-3, R-4, R-5, RS, RD, RM, RMH, and MU. B. The following site design standards are required: Table 4.03.22(B) Standards for Public and Private Schools Development Feature Standard Minimum site area 3 acres Minimum lot width 200 feet Buffers 20 feet or zoning district standards, whichever is greater Outdoor recreation areas Setback a minimum of 75 feet from any property zoned or used for residential purposes Fully enclosed by a solid decorative fence, a minimum of four feet in height Outdoor lighting Exterior lighting shall be downcast of moderate brightness and shall not cause glare on any abutting property Drop-off and pick-up areas Designed and located away from residential areas Separated from parking areas 4.03.23. Self-service storage facilities. A. Self-service storage facilities, also called mini-storage or self-storage, are permissible in the C-3, M-1, and M-2 zoning districts, subject to the standards of the zoning district and the supplemental standards set forth in this section. All new self-storage facilities shall be indoor storage designed to mirror class "A" commercial office space, and shall have architectural design elements consistent with Highway Corridor Overlay District. B. The following activities or uses are prohibited on the grounds or within the buildings of self-service storage facilities: 1. Wholesale sales; 2. Retail sales, including garage sales, or other commercial activities; 3. Manufacturing, fabrication, processing, or other industrial activity; 4. Service or repair of vehicles, engines, electronic equipment or similar activities; 5. Rehearsal or practice of musical instruments; 6. Residential and office uses. C. Notwithstanding the limitations described in subsection 4.03.23.B., above, the following activities may be conducted: 1. Rental of storage bays. 2. Truck rental business, limited to a maximum of twenty-five (25) percent of the gross site area. 3. Sales of boxes or goods related directly to the operation of a self-service storage facility. 4. Sales by the owner or manager of the facility of abandoned items for reclamation of rental costs. D. Except as specifically provided in this section, all property stored on the site shall be entirely within enclosed buildings. E. Storage of flammable liquids, highly combustible or explosive materials, or hazardous waste or chemicals is prohibited. F. As an accessory use, one (1) dwelling unit may be established for security personnel, management personnel, or the facility owner. G. The following site design requirements shall be met: Table 4.03.23(G) Site Design Standards for Self-Service Storage Facilities Development Feature Standard Minimum site area 2.5 acres Maximum site area 5.0 acres Minimum lot width 100 feet Minimum setbacks for buildings Front yard 75 feet Side yard 25 feet Rear yard 25 feet Buffer requirements, adjacent to: Residentially zoned districts 40 feet OI or C-1 30 feet C-2 15 feet Development Feature Standard MU, C-3, or IAC 10 feet M-1 or M-2 10 feet Interstate highway 75 feet Dumpsters and trash containers Fully screened from view from residentially zoned properties and public right-of-way Outdoor lighting Adjacent to residentially zoned districts Exterior lighting shall be downcast of moderate brightness and shall not cause glare on any abutting property Maximum height of 15 feet Loudspeakers and paging equipment Prohibited H. The following design standards are required for the self-service storage buildings: Table 4.03.23(H) Building Design Standards for Self-Service Storage Facilities Development Feature Standard Building separation (2 or more buildings on the site) 12 feet Overhead access doors Shall not be visible from residentially zoned property, commercially zoned property, or the public right-of-way Storage bays Minimum size 4 feet by 4 feet (16 s.f.) Maximum size 20 feet by 80 feet (1,600 s.f.) Maximum building height, including all roofmounted air conditioning and other equipment 35 feet Exterior façade Shall comply with section 4.05.06.H. Roof design Type of roof, roof line, and roofing materials shall be fully consistent with buildings in the surrounding area I. Outdoor (open) storage is permissible, subject to the following standards: Table 4.03.23(I) Standards for Outdoor Storage at Self-Service Storage Facilities Development Feature Standard Type of goods to be stored Dry stacking of boats when covered to provide screening from view Abandoned, wrecked, or junked vehicles are prohibited Maximum area devoted to outdoor storage 25 percent of building area of the site Screening Fully screened from view from adjacent residentially zoned districts, from adjacent office areas, and from public right-of-way Screening may be a solid fence, solid wall, other similar structure, or landscaping Development Feature Standard Fencing required Minimum of 6 feet in height Maximum of 8 feet in height Decorative wall or fence required, with brick, stone, masonry, wood, chain link, or similar material Fence location May be either in front of or behind the buffer Security Gate, equipped with alarm and keyless opening required J. Traffic circulation requirements. 1. Traffic lane widths shall be established to provide for the adequate circulation, safety, and accessibility of trucks, cars, and individuals who utilize dead storage in such facilities. 2. The minimum traffic lane width shall be twenty-five (25) feet. 3. The maximum traffic lane width shall be forty (40) feet. 4. Traffic flow patterns, directional signage, and painted land markings with arrows shall also be clearly marked. 5. In order to ensure appropriate access and circulation by emergency vehicles and equipment, the turning radii of the aisle ways shall be approved by the county DOT and the fire marshal at the time of preliminary plan review. 6. There shall be no aisle ways or other vehicular access ways located in the buffer area or within the designated rights-of-way. K. The following standards are required for landscaping: Table 4.03.23(K) Landscaping Standards for Self-Service Storage Facilities Development Feature Standard Location Inside the fenced area Designed, placed, and maintained so as not to interfere with traffic visibility Width 15 feet on all street frontages Side and rear yard landscaped areas maintained in natural state to the maximum extent possible Amount of landscaping 15 percent of the site Plant materials Selected from lists in section 5.01.04 Trees 1 medium or small tree per 20 linear feet Height at planting 8 feet, 1 shrub per 24 inches Hedges 24 inches in height at planting 4.03.24. (Reserved.) 4.03.25. Airstrips, airports and helicopters [heliports]. Airstrips, airports and helicopters [heliports] (other than private airstrips and helicopters [heliports] within a residential fly-in neighborhood) are permissible in the M-1 and M-2 zoning districts. Those properties zoned RA (Residential Agricultural) outside of a subdivision, shall be required to obtain a Conditional Use [permit] and meet the following minimum standards: 1. The minimum acreage shall be fifteen (15) acres. 2. An undisturbed vegetative buffer shall be provided along all property lines which abut property with a residential zoning classification, except where prohibited to provide access or utility easements. The purpose of the buffer shall be to screen sight or sound of activities from adjacent and nearby residential neighborhoods. The buffer shall be a minimum of one hundred feet (100') in width. Should the property lack existing vegetation, a detailed landscaped plan shall be submitted and approved by the Development Plan Review Department, prior to the submittal of a Conditional Use Application, and shall conform to the plant material requirements and specifications set forth in Section 5.02.04. Existing vegetation within the buffer area should be preserved and enhanced where insufficient to provide adequate screening, but not in excess of that which is required under Section 5.02.00. 3. The landing strip/runway shall not be paved. The use of permeable or pervious pavement materials shall be allowed. 4. The private airstrips, airports and helicopters [heliports] shall adhere to all applicable laws and regulations of the Georgia Department of Transportation (GDOT) and Federal Aviation Administration (FAA). 5. No commercial activities shall be allowed or permissible with any approved Conditional Use. The following uses are prohibited: flight instruction, aircraft storage (other than hangars for use by the property owner), aircraft maintenance (will be permissible as long as it's for use by the property owner), aircraft fueling (other than for use by the property owner), and other similar commercial airport activities. 6. Only one (1) airstrip per Conditional Use shall be allowed. 7. A maximum of two (2) airplane hangars may be allowed even in the absence of a primary structure to any approved Conditional Use. Any hangars in excess of two (2) shall be required to obtain separate approval from the Board of Commissioners, by the filing of a separate application. 8. All hangars constructed shall be required to obtain a permit and approval from the Building Department and shall comply with any and all development and building regulations and standards. 4.03.26. Livestock processing and feedlots. Livestock processing and feedlots shall meet applicable state and federal standards for confinement feeding operations. A buffer one hundred (100) feet in width is required on all side and rear property lines. 4.03.27. Lodges and event facilities. A. Lodges and event facilities are permissible in the MU, OI, C-1, C-2, C-3 and IAC zoning districts, subject to the site design standards for that district. Lodges and event facilities are permissible with an approved conditional use within the M-1 and M-2 zoning districts, subject to the standards of the zoning district and in accordance with section 4.01.03, appearance standards for commercial and industrial buildings. An approved conditional use is also required within the RA zoning district, subject to the supplemental standards set forth in this section. B. Functions including luncheons, banquets, parties, weddings, meetings, charitable fundraising, commercial or advertising activities, or other gatherings for direct or indirect compensation are permissible. C. The following site design standards are required for lodges and event facilities: Table 4.03.27(C) Standards for Lodges and Event Facilities Development Feature Standard Minimum site area 3 acres Minimum lot width 200 feet Outdoor lighting Exterior lighting shall be downcast of moderate brightness and shall not cause glare on any abutting property Drop-off and pick-up areas Designed and located away from residential areas Separated from parking areas 4.03.28. Bed and breakfast facility (not in a subdivision). The regulations below are intended to allow for a more efficient use of large, older homes in residential areas if the neighborhood character is reserved to maintain both the residential neighborhood experience and the bed and breakfast experience. These regulations enable owners to maintain large residential structures in a manner which keeps them primarily in residential uses and provides an alternative form of lodging for visitors who prefer a residential setting. An approved conditional use is required for all bed and breakfast facilities within the RA zoning district. A. The house must be at least ten (10) years old before a bed and breakfast facility is allowed. The individual or family who operate the facility must occupy the house as their primary residence. B. Bed and breakfast facility may have nonresident employees for such activities as booking rooms and food preparation. Hired services for normal maintenance, repair and care of the residence such as yard maintenance are also permitted. C. The following functions are permissible: luncheons, banquets, parties, weddings, meetings, charitable fundraising, commercial or advertising activities, or other gatherings for direct or indirect compensation. D. The following site design standards are required for bed and breakfast facilities (not in a subdivision): Table 4.03.28(D) Standards for Bed and Breakfast Facilities Development Feature Standard Maximum number of bedrooms 6 Maximum floor area of primary structure 50 percent Outdoor lighting Exterior lighting shall be downcast of moderate brightness and shall not cause glare on any abutting property Drop-off and pick-up areas Designed and located away from residential areas Separated from parking areas 4.03.29. Boarding and rooming houses. A. Boarding or rooming houses are permissible in the following zoning districts RA with an approved conditional use, OI, C-1, C-2, and C-3 and subject to the standards of the district and the supplemental standards set forth in this section. B. The following site design standards are required for boarding and rooming house facilities: Table 4.03.29(B) Standards for Boarding and Rooming Houses Development Feature Standard Minimum site area 2 acres (not in a subdivision) Minimum setbacks Side and rear yards 50 feet Place of operation Freestanding structure, or within a religious facility (see section 4.03.18) Number of adults More than three (3) Parking One (1) standard off-street parking space per one (1) bedroom shall be provided (see table 8.02.05) 4.03.30. Senior adult housing. The purpose of this section is to determine where age-restricted adult housing may be located and to provide minimum standards. The intent of this section is to encourage age-appropriate housing for persons with mobility, sensory, and cognitive limitations. Though these regulations require that over-all developments feature a measure of accessibility, full accessibility is encouraged. Accessibility is defined by the Georgia Accessibility Code as amended, and any age-restricted adult housing development must meet the same standards required by Georgia Accessibility Code 120-3-20-.54 in order to be considered fully accessible. Senior adult housing may be allowed in these zoning districts as a supplemental use: RA, R-1, R-2, R-3, R-4, R-5, RS, RD, RM, and MU provided that at minimum the following restrictions apply. Final plats and all required construction documents shall include a notation specifying "Age-Restricted Adult Housing: Shall Follow Section 4.03.30" A. Unit type allowed: 1. Only single-family detached units may be allowed in RA, R-1, R-2, R-3, R-4, R-5, and RS districts; 2. Only two-family units may be allowed in RD district; 3. Only multifamily units may be allowed in RM district. B. The development shall have a minimum of twenty (20) dwelling units. C. The maximum net density shall meet the future land use plan requirements. D. At least forty (40) percent of the gross site area shall be open space. The open space shall provide amenities such as pathways, seating areas, and recreation areas for residents. The open space shall be protective of natural features. E. At least one (1) on-site community building or interior community space shall be provided which contains a minimum of: 1. Twenty (20) square feet of heated floor area per dwelling unit for the first ninety nine (99) units with a minimum of five hundred (500) square feet, and 2. Ten (10) square feet of heated floor area per additional dwelling unit. F. For phased development; open space, recreational facilities, and other accessory facilities shall be provided in each phase to meet the requirements as stated herein of the residents of each phase. The developer shall provide a schedule for the installation of facilities at the time of the first permit approval. G. At the time of the first permit application, the developer shall establish how the age restrictions will be implemented and maintained over time. If the development is anything other than a rental community under single ownership, a common entity such as a condominium association or a homeowners association shall be established to maintain and enforce the age restrictions in addition to the county enforcement of zoning regulations. H. All open space, common areas, and related improvements shall be fully accessible and shall be managed and maintained by the owner of the development or a common entity such as a condominium association, or a homeowners association. I. Any structure within the development may be fully accessible; however, the minimum standards of this section shall be met. The development shall incorporate universal design features as follows. The application shall include descriptions of the universal design features of proposed dwellings to demonstrate their appropriateness for the age-restricted population. The material submitted shall indicate how universal design features will be used to make individual dwellings adaptable to persons with mobility, sensory, or otherwise functional limitations; and how the design will provide accessible routes between parking areas, sidewalks, front door of the dwelling units, and common areas. These routes shall be a minimum of ten (10) feet, allowing mobility-enhancing devices to meet and pass safely. 1. "No-step" (maximum vertical floor level change of one-quarter (1 /4) inch, except where a tapered threshold is used which has a maximum height of one-half (1 /2) inch) access to the front door entrance to all dwelling units and community buildings is required. If a no-step front entrance is not feasible, an alternate no-step walkway to the front floor may be approved. 2. A minimum thirty-six-inch wide front door with exterior lighting at the entrance is required. Exterior doors shall be provided with an artificial light source located in the immediate vicinity of the exterior door. The illumination of the exterior light shall be controlled from inside the dwelling except for lights that are continuously illuminated or automatically controlled. 3. All interior doorways must have a minimum of thirty-two-inch clear width in the open position — typically a thirty-six-inch door. 4. A thirty-six-inch fully accessible route must connect throughout the floor served by the front door of the dwelling unit. The maximum vertical floor level change is one-quarter (1 /4) inch, except where a tapered threshold is used which has a maximum height of one-half (1 /2) inch. 5. A complete living area including, but not limited to, kitchen, master bedroom, and bathroom shall be located on the floor served by the front door of the dwelling unit. 6. Lever handles are required on all interior and exterior doors. 7. Clear floor space of thirty (30) inches by forty-eight (48) inches shall be provided and centered on each appliance and fixture in the kitchen. Floor space can overlap. 8. Walls shall be reinforced (blocked) to allow for the later installation of grab bars around the toilet, tub, and shower stall; and of wall-hung bench shower seat. 9. Maneuvering space shall be provided within the bathroom to permit a person using a mobility aid to enter the room, close the door, and reopen the door with a clear floor space of thirty (30) inches by forty-eight (48) inches. Clear floor space of thirty (30) inches by forty-eight (48) inches shall be provided and centered on each fixture in the bathroom. Floor space can overlap. 10. Wall-mounted electrical outlets, light switches, and environmental controls shall be mounted for a reaching range of a minimum of fifteen (15) inches to a maximum of forty-eight (48) inches above the floor. Such wall-mounted devices shall be of a contrasting color with the wall. 4.03.31. Industrialized and modular buildings. A. Modular and industrialized buildings within nonresidential zoning districts: OI, C-1, C-2, C-3, MU, M-1 and M-2 are permissible subject to the standards of the district and the supplemental standards set forth in this section, and must receive architectural review approval from the architectural review committee. B. Industrialized and modular buildings shall not be utilized for residing in or any other residential purpose. C. The following site design standards are required for industrialized and modular buildings in all nonresidential zoning districts. Table 4.03.31(C). Standards for Industrialized and Modular Buildings. Development Feature Standard Building materials - decorative facing (where facing on a public street) Brick, stone, stucco, masonry, wood or any combination thereof, including glass; aesthetically pleasing facade Shall be maintained on portions of the building which face on all public streets Window treatments Consistant with decorative facade design, considering materials and color Screened from public right-of-way Mechanical equipment, electric meter and service components, and similar utility devices (ground level, wall/roof-mounted) Screening Techniques Ground level Landscaping sufficient to block the view from public rights-of-way Brick, wood or masonry, etc. Building materials to be the same as the predominant exterior of the principal building on the site Required entrance to building Where street level retail uses have sidewalk frontage in addition to any other access that may be provided to the building Entrance/exit driveways Shall be paved with asphalt, concrete, or pavers 4.03.32. Adult entertainment establishments. A. An adult entertainment establishment shall only be allowed in designated areas within the M-1 (light-manufacturing) zoning district, as listed below and depicted in figure 4.7: Adult Entertainment Development Areas, Unincorporated Henry County, GA, and shall be subject to the site design standards of the M-1 zoning district, unless otherwise stated in the M-1 supplemental standards (section 4.03.32). B. Adult entertainment establishments may only be located on: 1. The south side of Highway 155, within one (1) mile of the Exit 216 Interchange, as measured from the traffic signal of each respective off ramp, or 2. Any M-1 zoned parcel located on the west side of Business Center Drive, north of the Norfolk Southern Railroad line. C. In addition to meeting the requirements of all other applicable code provisions, including, but not limited to, the zoning code, the following standards apply to adult entertainment establishments (where the provisions of this section conflict with other provisions of the Code of Henry County, the most stringent provisions shall apply): 1. Buildings and structures established in connection with an adult entertainment facility shall be separated at least forty (40) feet from the building and structure of any other business establishment, and a minimum of forty (40) feet from all property lines. 2. No adult entertainment establishment shall be located in any strip shopping center, mall, or other group structures; and 3. Adult entertainment establishments must be placed in a separate building on their own lots. 4. No adult entertainment establishments may be located within three thousand (3,000) feet of any parcel of land containing another adult entertainment establishment. D. For the purpose of this section, distance shall be by straight line, airline measurement from property line to property line, using the closest points on the property lines of the parcels of land involved. The term parcel as applied to this section shall mean any quantity of land capable of being described by location and boundary, designated and used or to be used as a unit. 4.03.32.1. Pawn shops. A. Pawn shops are permissible in the following zoning districts: C-2, C-3, and IAC and are subject to the supplemental standards set forth in this section: 1. Pawn shop licenses shall be limited to one (1) per twenty-one thousand, one hundred eighty-two (21,182) population. 2. Pawn shops shall not be [located] within one thousand (1,000) feet of a similar use. 3. No application for license to do business as a pawn shop, shall be considered or approved or a license issued where the total number of pawn shop licenses issued and in effect at the time of such application numbers at least one (1) for each twenty-one thousand, one hundred eighty-two (21,182) residents according to the latest officially and finally published annual population estimates by the Atlanta Regional Commission (ARC). 4. If, during this period, applications are received which exceed the number of newly available licenses, there shall be held a lottery, administered by the Henry County Business License Department, to determine the order in which applications shall be processed. Thereafter, the applications shall be processed in the order reflected in the results of the lottery. Once the proceeding of applications has resulted in the issuance of licenses up to the limit contained in this chapter, the remaining applications shall be returned to the applicants, unprocessed. B. The enforcement of the total number of pawnshops permitted in Henry County shall be maintained by the Henry County Business License Department in accordance with the process outlined in the licenses and taxation requirements in chapter 3-3, article VI of the Henry County Code of Ordinances. 4.03.33. Private membership recreational facilities (not in a subdivision). A. It is the intent of this section to provide citizens with large residential properties the opportunity to operate types of businesses that are compatible within larger tracts of land. A private membership recreational activity is defined as a facility open only to members and guests of the private organization operating the facility. B. Private membership recreational facilities are permitted in all residential zoning districts outside of a platted subdivision with an approved Conditional Use subject to the standards of the zoning district and the supplemental standards of this section. The permitted uses are outdoor activities that include swimming, court sports, archery and similar outdoor uses. Prohibited uses include commercial recreation activities wherein the principal use is an indoor activity consisting of exercise and/or training rooms, equipment, etc. The regulations provided are to protect, maintain and preserve the agricultural and/or rural character of the area by not creating a nuisance in exceeding traffic, smoke, noise, dust or be a fire hazard. C. The following site design standards are required: Table 4.03.32(C). Standards for Private Membership Recreational Facilities. Development Feature Standard Minimum site area 10 acres (outside of a subdivision) Minimum lot width 400 feet Minimum setback from any residential zoning district for any buildings or structures 100 feet Maximum accessory building height 25 feet Access requirements Paved collector road Buffers (sides and rear) 20 feet Hours of operation 7:00 a.m. to 8:00 p.m. Parking Aisles may be paved Spaces may be paved, grass, dirt, or gravel D. The zoning advisory board may require additional requirements and restrictions as conditions of approval, such as, but not limited to, more restrictive hours of operation, number of classes per day and/or students per session. 4.03.34. Small box discount store. To avoid over-concentration, a small box discount store must be separated from another small box discount store within or outside the zoning jurisdiction of Henry County by a minimum distance of twenty-six thousand four hundred (26,400) feet. The required separation distance must be measured in a straight line from the nearest point on the lot line of the property occupied by a small box discount store to the nearest point on a lot line of the other property occupied by a small box discount store. 4.03.35 Automobile wash establishment. To avoid over-concentration, an automobile wash establishment (as a primary use) shall be separated from all other automobile wash establishments either within or outside the zoning jurisdiction of Henry County by a minimum distance of five thousand, two hundred and eighty feet (5,280) feet. The separation distance shall be measured utilizing parcel boundaries as the center point at which the minimum separation distance shall extend in all directions. It shall be prohibited for any such minimum separation distance measurements to overlap. All automobile washes are required to meet the architectural standards of the highway corridor overlay district (ULDC, subsection 4.05.06.H.) and must receive approval from the Henry County Architectural Review Committee. 4.03.36. Vineyards with or without wineries. A. Vineyards are permissible in the RA zoning district (not within a subdivision) subject to the site design standards for that district. Vineyards with Wineries are permissible with an approved conditional use within the RA zoning districts, subject to the standards of the zoning district and in accordance with section 4.01.03, appearance standards for commercial buildings, and subject to the supplemental standards set forth in this section. B. Functions for vineyards with wineries may include the following; 1. Allowance of special events with a special event permit. 2. Alcoholic beverage sales. a. Sales of flights of individual one and one-half (1.5) ounce servings of different wines of any other Georgia farm winery for consumption on premises; b. Sales by the glass for consumption on premises of: (1) Wine produced from grapes, berries or fruits grown on site; (2) Wine of any other winery; (3) Distilled spirits and malt beverages are expressly prohibited. c. Retail sales in closed packages for consumption off premises of: (1) Wine produced from grapes, berries or fruits grown on site; (2) Wine of any other winery. 3. Sales of pre-prepared cold meat, cheese and bread platters typically associated with wine tasting; 4. Install a full-service kitchen intended to support special events; a. Full-service restaurants are prohibited. 5. Patron operating hours and activities (operation of winery tours, events, tastings, etc.) shall be allowed Wednesday through Sunday between the hours of 10:00 a.m. and 8:00 p.m. without a special event permit. 6. The use of outdoor speakers. (When granted, such use must conform to provisions provided by the Henry County Noise Ordinance 3-17-40.) C. Vineyards with wineries shall meet all requirements for commercial developments as per Chapter 8.00.00 of the ULDC. D. The following site design standards are required for vineyards with or without wineries: Table 4.03.36(D) Standards for Vineyards with Wineries Development Feature Standard Minimum site area 15 acres for vineyards with wineries Minimum harvesting agricultural area 5 acres for vineyards with wineries Minimum lot width 500 feet Minimum road frontage 175 feet Minimum setback from any residential zoning district for buildings 100 feet Buffer requirements There shall be a minimum 100-foot undisturbed or enhanced buffer along the perimeter of the property, except where access is required Building design Brick, stone, stucco, glass, cement fiberboard, or masonry materials meeting the architectural review approval of planning and zoning, and building and plan review departments Outdoor lighting Exterior lighting shall be downcast of moderate brightness and shall not cause glare on any abutting property Parking, drop-off and pick-up areas Designed and located away from residential areas Separated from parking areas. Screened from view of adjacent properties and from the public right-of-way Outside storage Screened from view from adjacent properties and from the public right-of-way. Setback a minimum of 100 feet from any residentially zoned property Development Feature Standard Refuse and solid waste containers Enclosed, except for an access gate, and screened from view from adjacent properties and from the public right-of-way. Setback a minimum of 100 feet from any residentially zoned property Loudspeakers/intercom paging systems Prohibited Outdoor speakers Must conform to provisions provided by the Henry County Noise Ordinance § 3-17-40 Transportation requirements Henry County DOT shall determine whether the development shall meet commercial road improvement standards at the time of development plan review Fencing requirements A six-foot solid privacy fence is required along entrances that are within 175 feet of another structure on adjacent properties Access requirements Paved and dust-free driveways are required when within 175 feet of another structure on adjacent properties 4.03.37. Animal sanctuary and rehabilitation facilities. A. Animal sanctuary and rehabilitation facilities shall be permissible within the RA (residential agricultural) zoning district, excluding subdivisions, subject to the site design standards for that district. Such facilities may be permitted only through an approved conditional use in accordance with section 11.05.00 of the ULDC and the appearance standards of section 4.01.03 for commercial buildings, as well as the supplemental standards set forth in this section. Notwithstanding the provisions of section 11.05.0 or any other section delegating authority to the zoning advisory board, all applications for an animal sanctuary and rehabilitation facility shall be reviewed by the zoning advisory board for recommendation only and shall require final consideration and action by the Henry County Board of Commissioners. B. Minimum requirements include: 1. Permitting. All facilities must maintain valid Georgis Department of Natural Resources wildlife rehabilitation or special use permit, as applicable, in addition to any federal permits required. 2. Inspections. Ongoing animal control inspections and periodic check-ins shall be required to ensure continued compliance regarding domestic animals. 3. Design standards. Facilities shall provide secure enclosures, adequate veterinary care facilities, and must comply with noise and environmental requirement under county Code. 4. Fencing requirements. A solid six-foot privacy perimeter fence shall be installed and maintained along all property boundaries outside of the public right-of-way. 5. [Additional requirements.] Animal sanctuaries and rehabilitation facilities shall meet all requirements for commercial developments as per chapter 8.00.00 of the ULDC. 6. Soundproofing requirements. All animal housing, boarding, or rehabilitation structures shall be constructed with soundproofing measures sufficient to prevent noise from creating a nuisance to adjoining properties. At minimum, facilities shall incorporate insulated walls, acoustically rated doors/windows where applicable, and design techniques that limit noise transmission beyond property boundaries. Compliance shall be verified through plan review and may be subject to on-site inspection. C. The following site design standards are required for animal sanctuary and rehabilitation facilities: Table 4.03.37(C) Standards for Animal Sanctuary and Rehabilitation Facilities Development Feature Standard Minimum site area 5 acres Minimum setback for administrative buildings 75 feet from any public right-of-way Minimum setback for animal housing/structures 100 feet from any public right-of-way and all property lines Minimum road frontage 300 feet Buffer requirements There shall be a minimum 100-foot (100') undisturbed or enhanced buffer along the perimeter of the property, except where access is required Outdoor runs Fencing required in addition to any fencing on the perimeter of the site; drains connected to an approved sanitary facility; odor-proofing required; pest control required; hours of operation limited to 7:00 a.m. until 7:00 p.m. Outdoor lighting Exterior lighting shall be downcast of moderate brightness and shall not cause glare on any abutting property Outside storage Screened from view from adjacent properties and from the public right-of-way. Setback a minimum 100 feet from any residentially zoned property. (Ord. No. 10-20, § I(9, 10), 6-15-10, Ord. No. 10-12, § I, 10-18-10; Ord. No. 10-14, § I, 10-18-10; Ord. No. 10-07, § I, 7-19-10; Ord. No. 11-04, § I, 7-19-11; Ord. No. 11-09, § I, 12-19-11; Ord. No. 12-04, § I, 2-7-12; Ord. No. 12-05, § I, 2-7-12; Ord. No. 12-10, §§ II, III, 5-1-12; Res. No. 13-05, 4-16-13; Ord. No. 15-05, § I, 7-7-15; Ord. No. 20-04, § II, 5-5-20; Ord. No. 22-02, §§ II, III, 3-1-22; Ord. No. 22-04, 6-7-22; Ord. No. 22-08, § I, 9-8-22; Ord. No. 23-04, § II, 4-18-23; Ord. No. 23-07, § III, 6-6-23; Ord. No. 25-10, § III, 10-21-25) Sec. 4.04.00. Conventional subdivision design standards. 4.04.01. Generally. A. The purposes of subdivision design standards are: 1. To provide for safe and efficient traffic circulation by development of a coordinated street system in relation to major streets, adjoining subdivisions, and public facilities; 2. To achieve individual lots of reasonable utility and livability; 3. To provide for the acceptance of land for public rights-of-way; 4. To provide for the installation and construction of utilities, streets, stormwater management facilities, and other public improvements essential to service land being subdivided; 5. To assure that public improvements will be constructed according to safe and durable standards; 6. To enable the dedication or reservation of land for public schools, parks, and other public purposes; 7. To assure that development will occur within an environmentally compatible setting and free of flood hazards; 8. To provide for the subdivision of larger tracts into smaller parcels of land; and 9. To establish the procedure for submittal, approval, and recording of subdivision plats within Henry County. B. The standards for design and layout of conventional subdivisions are contained in section 4.04.00. The standards for design and installation of public improvements and infrastructure for subdivisions and all other developments are contained in chapter 8. C. Alternative designs for subdivisions. At the discretion of the property owner and applicant, subdivision design may be proposed in compliance with alternative design standards. Clustering, through the application of conservation subdivision standards, is allowed. Design standards for these and other alternative arrangements are set forth in chapter 6. D. General requirements for subdivision design and layout. All subdivision design shall conform to the requirements of the zoning district in which the land is located. In addition, subdivisions which are proposed to contain commercial or industrial uses shall be designed to ensure consistency with the requirements for commercial buildings as set forth in section 4.01.03. 4.04.02. Major and minor subdivisions and lot divisions. A. Approval required. 1. No person shall subdivide or rearrange a lot line of any lot or parcel of land, grade or modify the contours of the land, install streets, install utilities, or make other improvements to the land without complying with the provisions of section 4.04.00. 2. No building permits shall be issued and no public improvements or services shall be authorized or installed in any unapproved subdivision. 3. Procedures for application, review, and approval of preliminary and final plats, and acceptance of public improvements, are set forth in chapter 12 of this ULDC. B. Minor subdivisions shall be the following: 1. The minor subdivision shall total a minimum of 18 acres. 2. Minor subdivisions shall be final platted meeting the requirements of subsection 12.02.03.C. 3. The replat, lot line adjustment, or rearrangement of lots in a minor subdivision which has been final platted shall not create additional lots. 4. Subdivisions requiring the installation of streets, utilities, or other public improvements and infrastructure shall not be approved as minor subdivisions. 5. Flag lots shall have a minimum of 60 feet of road frontage per lot as measured at the right-of-way. 6. Minor subdivisions shall only be approved for the following: a. Subdivisions zoned RA (residential agricultural) located within an area designated on the future land use map as rural residential. b. Subdivisions with a minimum lot size of three acres. c. Subdivisions with a minimum lot width of 200 feet. 7. Minor subdivisions shall not be required to be located on a road meeting the minimum requirements of its functional road classification; unimproved (gravel) roads shall be acceptable. 8. Notwithstanding any requirements to the contrary, a minor subdivision shall not be considered a "development" for the purpose of requiring tie-in with the public water system or the public sewer system. C. Subdivisions that are not minor subdivisions or lot divisions as defined herein are major subdivisions. D. Lot divisions as defined herein are exempted from the requirements specific to major subdivisions, but shall conform to all of the applicable requirements of the ULDC, including, but not limited to, minimum lot size requirements for the applicable zoning district. Any flag lots shall have a minimum of sixty (60) feet of road frontage per lot as measured at the right-of-way. The administrator (or their representative) shall have the authority to approve lot divisions. No building permit shall be issued for a tract of land created as the result of a lot division without it being approved. E. Periodic lot divisions. Notwithstanding anything to the contrary in this ULDC, any parcel may be subdivided into no more than five (5) tracts every five (5) years without regard to the requirement for paved roads and without the necessity of submitting development plans for review and approval. For the purposes of this Code section, the term "parcel" shall mean and refer to tracts or parcels of land that are identified by the Henry County Tax Parcel Map, prepared and maintained by the Henry County Tax Assessor's Office, which map is incorporated herein by this reference. 4.04.03. General design standards for major subdivisions. A. General requirements for public improvements and infrastructure are set forth in this section. Technical standards for the design and construction of improvements are set forth in chapter 8. B. Subdivision entrance signs. Signs are permissible on the ground to identify the name and entrance of a residential, commercial, or industrial subdivision pursuant to the standards for signs, set forth in section 7.04.00. C. General requirements for potable water system. Water mains properly connected with the county water supply system or with an alternate supply system approved by the county health department shall be constructed in such a manner so as to adequately serve all lots shown on the subdivision plat for both residential use and fire protection. All materials, labor, equipment, and other items related to construction of the water distribution system shall be provided in accordance with policies and specifications of the Henry County Water and Sewerage Authority. D. General requirements for public sewer system. When the subdivision is located within the service area of a public sewerage system, sanitary sewers shall be installed to serve all lots with connection to the public system. Where sanitary sewer service is not feasible or available, all lots without connection to the public system shall be developed with a private on-site sewage disposal system approved by the Henry County Health Department, consistent with the minimum lot area requirements of section 4.01.01. E. General requirements for utilities. The subdivider shall make the necessary arrangements with the appropriate utility companies for the installation of utilities to assure that all lots have adequate gas, electrical and telephone communication services. F. General requirements for public lands. Where a site within a tract of land proposed for a subdivision is determined to be necessary for a public park, school, fire station, water or sewage treatment plant, water reservoir, public works yard, or other public facility, the necessary land area shall be reserved or dedicated to the appropriate county authority having jurisdiction over the operation and maintenance of the proposed facility. The preliminary and final plats for the subdivision shall show these sites as being reserved or dedicated. 4.04.04. Design standards for blocks and lots. A. Subdivision blocks shall have sufficient width to provide for two (2) tiers of lots of appropriate depth and length. The length, widths, and shapes of block, shall be determined with regard to: 1. Dimensional requirements for lots, as set forth in section 4.01.01; 2. Provision of adequate building sites suitable to special needs of the type of use contemplated; 3. Convenient access, circulation, control, and safety of street traffic; and 4. Topographic condition. B. Blocks shall be not less than five hundred (500) feet or more than one thousand two hundred (1,200) feet in length, except where topographic or other conditions of the site make such dimensions impractical. C. Mid-block pedestrian easements: For blocks over eight hundred (800) feet in length, one (1) public crosswalk of not less than ten (10) feet wide near the center and entirely across the full width of the block shall be required, in order to provide access to schools, playgrounds, shopping centers, transportation, and other community facilities. D. Insofar as practical, side lot lines shall be at right angles to straight lines or radial to curved street right-of-way lines. Side lot lines shall be in line with cross drainpipes under streets where they are located. E. Through lots or double frontage lots shall be prohibited except where essential to provide separation of residential development from major traffic arterials or to overcome specific disadvantages of topography and orientation of the property to be subdivided. Access to through lots or double frontage lots shall be from the lower classification street. F. Flag lots shall be prohibited in subdivisions unless topographic conditions (certified by a professional engineer), or the shape and orientation of the property to be subdivided make the inclusion of some flag lots necessary. 1. Flag lots are intended only to provide use of the rear portion of the extremely deep tracts of land for residential purposes. 2. Where it is necessary to design flag lots, no more than five (5) percent of the lots in a subdivision shall be flag lots. 3. The street frontage for a flag lot shall be at least fifty (50) percent of the lot width required for the zoning district in which the subdivision is located. 4. Front setbacks for flag lots shall be measured from the first widest part of the lot. No structures shall be built on the access strip that provides access from the building site to the street. G. Easements. 1. All lots within a subdivision shall provide easements for stormwater drainage and detention systems for future sanitary sewer installations, and for gas, electric, and telephone utilities five (5) feet from the ROW line. 2. Rear lot line easements. Easements along all rear lot lines shall be a minimum of twenty (20) feet wide. Ten (10) feet shall be provided on the final plat from each adjoining lot. Wider easements may be required by the water and sewerage authority depending on the size, location, and depth of proposed or existing sewers. 3. Side lot easements. Easements along side lot lines shall be a minimum of twenty (20) feet wide, ten (10) feet along each adjoining lot. Wider easements may be required by the water and sewerage authority depending on the size and depth of proposed or existing sewers. 4. Easements along streams and drainageways. Where a subdivision is traversed by a watercourse, drainageway, channel or stream, there shall be provided a stormwater drainage easement and sanitary sewer easement or drainage easement or drainage right-of-way along each side of the watercourse for the purpose of widening, deepening, relocating, improving, or protecting such easement. The easement, an undisturbed buffer, shall not be less than twenty-five (25) feet wide. A wider easement may be required for large streams and drainageways and for future sanitary sewer installations. 5. Stormwater detention facility easements. All stormwater detention facilities shall be accessible from a public street by a minimum twenty (20) feet wide easement and there shall be an easement for the detention facility including a minimum of twenty (20) feet around the outside perimeter of the facility. 6. All easements shall be shown on final plats. H. Minimum lot area and easements. Proposed subdivision lots which are traversed by utility easements for gas, electric, telephone, and, water and sewer utilities shall contain the minimum buildable area defined by the zoning district, exclusive or outside of areas occupied by these easements. Illustrations of Design Concepts and Requirements: 4.04.05. Design standards for multifamily developments. The intent of this section is to provide aesthetic standards for exterior architectural design for all new multifamily residential developments. A. Variations. Administrative waivers permit a practice that is not consistent with a specific provision of this section, but is justified by its intent or purpose, or by hardship. The administrator or their designee shall have the authority to approve or disapprove administratively a request for an administrative waiver in accordance with section 11.03.00, administrative waiver, in addition to granting relief from the following: 1. Development standards. 2. Architectural standards. 3. Site planning and amenities. 4. Landscape and signage. B. townhome units and developments. To address the increasing density of units, the monotony of such developments, and life safety requirements involved with such concentrated developments, the standards below shall be applicable to all new townhome units and developments. The standards as described in this section shall apply to all townhome developments, regardless of the zoning district which the units and/or development is located. If there is a conflict between this section and any other code section within the ULDC, the Henry County Planning and Zoning Department Director is authorized to determine the appropriate applicability and interpretation. 1. Definitions. a. Townhouse: One (1) of a series of three (3) or more attached dwelling units on separate lots which are separated from each other by a coincidental property line and party wall partitions. The structure must meet all front, rear and side yard setback requirements in the zoning district in which it is located, except for the coincidental property line and wall. Each dwelling unit must be separately metered for all utilities, have access to a public street and the coincidental property line and wall must be fire-rated and extend from the foundation or ground (whichever is lower) to the roof decking of the structure. Each dwelling unit shall contain rooms for living, sleeping, toilet facilities and one (1) kitchen. 2. Development standards. a. All townhomes shall comply with the following minimum requirements: i. Minimum lot area shall be dependent on the zoning district development standards found in section 2.01.00 for the overall development. ii. Minimum lot width: Twenty-four (24) feet per dwelling unit for those with front entry garage and twenty (20) feet for feet per dwelling unit for those with rear entry garages. iii. Minimum setbacks: 1. Front yard setback: Twenty (20) feet for front entry townhomes; ten (10) feet for rear entry townhomes. 2. Side yard setback: Ten (10) feet or building separation of twenty (20) feet. 3. Rear yard setback: Ten (10) feet for front entry townhomes; twenty (20) feet for rear entry townhomes. iv. Minimum square footage: One thousand two hundred (1,200) square feet of heated floor space. v. Townhomes shall have a two-car garage. Rear alley access shall be a minimum of twelve (12) feet in width and shall meet Henry County Department of Transportation (HCDOT) and Henry County Fire Department (HCFD) standards and requirements when rear entry garages are provided. vi. All dwelling units, including rear entry units, shall be located on a public or private right-of-way meeting HCDOT and HCFD standards and requirements. vii. The owner/developer shall coordinate with utility providers to determine utility placement along street corridor as well as placement of services. This may determine the need to avoid placing trees in front of the townhomes near driveways for front entry dwelling units. Developers shall ensure all utility placement and services are acceptable to all utility providers and coordinate with the HCDOT. b. The administrator or their designee shall provide final approval for all elevations and site plans before any permits are issued. 3. Architectural standards. Unless otherwise approved by the board of commissioners at the time of zoning action, the following architectural standards shall apply: a. At least one-third (!) of the exterior front and rear façade of each dwelling unit shall be constructed of ornamental brick or stone and shall include a minimum three-foot masonry water table on all sides; the remainder of the front façade shall consist of a combination of two (2) or more of the following materials: brick, stone, cementitious fiberboard products, or board and batten, depending on the style/theme of the development. b. All end units shall consist of a combination of two (2) or more of the following materials: brick, stone, cementitious fiberboard products, and/or board and batten with a maximum of one-third (!) percent cementitious products permitted. c. No vinyl materials shall be permitted; including in the eaves and soffits. All eaves shall be at least one (1) foot in depth. d. Decorative gables, vents and dormers shall be required. e. No roof line shall be shared by more than two (2) individual units in a row of townhomes and shall be accomplished by height offsets of at least twenty-four (24) inches. f. Minimum roof pitch of 4/12 required; low slope roofs permitted subject to administrative waiver approval by the Henry County Planning and Zoning Department Director, or their designee. g. Adjoining dwelling units shall be constructed with staggered or offset front elevations by a minimum of one (1) foot. h. Adjoining dwelling units shall have differentiation in architecture for windows, entries, façades, and shall be constructed of complimentary building materials. i. There shall be no more than six (6) units in a row. Elevations may only be replicated once within a single unit set. j. All yards shall be sodded with exception of landscaped and buffer areas, including corner lots. k. The developer/builder shall be responsible for notating the percentage breakdown of materials on each building plan submitted for review and will be verified by the Henry County Building and Plan Review Department. 4. Site planning and amenities. a. All rental townhome developments shall be gated. Gates shall be maintained and monitored at the developer/owner's expense. b. All new townhome developments shall install underground utilities and implement decorative pedestrian lights/streetlights consistent with the requirements of the Highway Corridor Overlay District, as per section 4.05.00. c. All townhome developments shall provide guest parking throughout the development at a rate of one (1) parking space per every four (4) units. Guest parking shall not be located in alleyways. Guest parking shall meet all HCDOT standards and requirements. d. There shall be in-ground and permanent trash receptacles distributed throughout the development, maintained and monitored at the developer/owner's expense, including along walking trails. e. A townhome development of fifty (50) units or fewer shall provide a minimum of the following: i. Children's playground(s) and a variety of pocket parks and dog parks with benches distributed throughout the development. f. A townhome development of fifty-one (51) to one hundred (100) units shall provide a minimum of the following: i. Children's playground(s) and a variety of pocket parks and dog parks with benches distributed throughout the development. ii. One thousand (1,000) square feet cabana with electric/natural gas fire pit and grilling areas. g. A townhome development in excess of one hundred (100) units shall provide a minimum of the following: i. Children's playground(s) and a variety of pocket parks and dog parks with benches distributed throughout the development. ii. One thousand five hundred (1,500) square feet clubhouse with fire pit and grilling areas. iii. Resort style pool. iv. Fitness facility, and/or sports recreation facilities. h. There shall be paved walking trails throughout the development connecting to residential areas, amenity areas, and sidewalks. Walking trails shall not be installed within any buffer areas. There shall be paved resting/meeting areas with benches located throughout and outside of the walking trail path. i. The developer/owner shall place a centralized covered mailbox unit, constructed in an architectural style consistent with that of the residential units it serves, with a drive thru outside of the public right-of-way for those homes that will not be served individually by the United States Postal Service. The mailbox unit shall be landscaped with shrubs and ground cover plant material meeting the standards of chapter 5. C. Horizontal multifamily. 1. Definitions. a. Horizontal multifamily apartment: A residential development which provides for the clustering or grouping of attached and/or detached apartment units on a singular lot with an undivided ownership interest of the common areas of land and its appurtenances. b. Horizontal multifamily condominium: A residential development which provides for the clustering or grouping of dwelling units, attached or detached, with each unit owned in fee simple title, on a multi-unit property with an undivided ownership interest in common with other owners of the common areas of land and its appurtenances. 2. Development standards. a. All developments shall comply with the following minimum requirements: i. Minimum lot area shall be dependent on the zoning district development standards found in section 2.01.00 for the overall development. ii. Minimum lot area per unit: Four thousand seven hundred fifty (4,750) square feet. iii. Minimum lot width: Forty-five (45) feet. iv. Minimum setbacks: 1. Front setback: Twenty (20) feet. 2. Side yard setback: Five (5) feet or building separation of ten (10) feet. 3. Rear yard setback: Twenty (20) feet. v. Minimum square footage: One thousand two hundred (1,200) square feet of heated floor space. vi. All dwelling units shall have a two-car garage. Rear alley access shall be a minimum of twelve (12) feet of width and shall meet Henry County Department of Transportation (HCDOT) and Henry County Fire Department (HCFD) standards and requirements when rear entry garages are provided. vii. All dwelling units, including rear entry units, shall be located on a public or private right-of-way meeting HCDOT and HCFD standards and requirements. viii. The owner/developer shall coordinate with utility providers to determine utility placement along street corridor as well as placement of services. This may determine the need to avoid placing trees in front of the horizontal multifamily near driveways for front entry dwelling units. Developers shall ensure all utility placement and services are acceptable to all utility providers and coordinate with the HCDOT. b. The administrator or their designee shall provide final approval for all elevations and site plans before any permits are issued. 3. Architectural standards. Unless otherwise approved by the board of commissioners at the time of zoning action, the following architectural standards shall apply: a. At least one-third (!) of the exterior front and rear façade of each dwelling unit shall be constructed of ornamental brick or stone and shall include a minimum three-foot masonry water table on all sides; the remainder of the front façade shall consist of a combination of two (2) or more of the following materials: brick, stone, cementitious fiberboard products, or board and batten, depending on the style/theme of the development. b. The owner/developer shall be responsible for notating the percentage breakdown of bedroom units on each building plan submitted for review and will be verified by the Henry County Building and Plan Review Department. c. Decorative gables, vents and dormers shall be required. d. Minimum roof pitch of 4/12 required; low slope roofs permitted subject to administrative waiver approval by the Henry County Planning and Zoning Department Director, or their designee. e. Adjacent dwellings shall have differentiation in architecture for windows, entries, facades, and shall be constructed of complimentary building materials. f. There shall be no more than six (6) attached units in a cluster. Elevations may only be replicated once within a single unit set. g. All yards shall be sodded with exception of landscaped and buffer areas, including corner lots. h. The developer/builder shall be responsible for notating the percentage breakdown of materials on each building plan submitted for review and will be verified by Henry County Building and Plan Review Department. 4. Site planning and amenities. a. All rental horizontal multifamily developments shall be gated. Gates shall be maintained and monitored at the developer/owner's expense. b. All developments shall install underground utilities and implement decorative pedestrian lights/streetlights consistent with the requirements of the Highway Corridor Overlay District, as per section 4.05.00. c. All developments shall provide guest parking throughout the development at a rate of one (1) parking space per every four (4) units. Guest parking shall not be located in alleyways. Guest parking shall meet all HCDOT standards and requirements. d. There shall be in-ground and permanent trash receptacles distributed throughout the development, maintained and monitored at the developer/owner's expense, including along walking trails. e. A development of fifty (50) units or fewer shall provide a minimum of the following: i. Children's playground(s) and a variety of pocket parks and dog parks with benches distributed throughout the development. f. A development of fifty-one (51) to one hundred (100) units shall provide a minimum of the following: i. Children's playground(s) and a variety of pocket parks and dog parks with benches distributed throughout the development. ii. One thousand (1,000) square feet cabana with electric/natural gas fire pit and grilling areas. g. A development in excess of one hundred (100) units shall provide a minimum of the following: i. Children's playground(s) and a variety of pocket parks and dog parks with benches distributed throughout the development. ii. One thousand five hundred (1,500) square feet clubhouse with fire pit and grilling areas. iii. Resort style pool. iv. Fitness facility and/or sports recreation facilities. h. There shall be paved walking trails throughout the development connecting to residential areas, amenity areas, and sidewalks. Walking trails shall not be installed within any buffer areas. There shall be paved resting/meeting areas with benches located throughout and outside of the walking trail path. i. The developer/owner shall place a centralized covered mailbox unit, constructed in an architectural style consistent with that of the residential units it serves, with a drive thru outside of the public right-of-way for those homes that will not be served individually by the United States Postal Service. The mailbox unit shall be landscaped with shrubs and ground cover plant material meeting the standards of chapter 5 of the ULDC. D. Apartments/condominiums. 1. Definitions. a. Apartment: a room or suite of rooms, with sleeping, bathroom, and kitchen accommodations, designed and used as a residence, physically separated from and located in a building containing a number of such rooms/suites of rooms, designed for occupancy by families living independently of each other and not owned in a fee simple title. i. Studio apartment: An apartment unit containing only one (1) habitable room. b. Condominium: The ownership in fee simple title of a single unity in a multi-unit structure and an undivided ownership interest, in common with other owners of the common elements of the structure, including the common areas of land and its appurtenances. 2. Development standards. a. All apartment/condominium developments shall comply with the following minimum requirements: i. Studio apartment/condominium units: Minimum four hundred fifty (450) square feet of heated square footage. ii. One-bedroom apartment/condominium: Minimum six hundred (600) square feet of heated square footage. iii. Two-bedroom apartment/condominium: Minimum nine hundred (900) square feet of heated square footage. iv. Three-bedroom apartment/condominium: Minimum one thousand two hundred (1,200) square feet of heated square footage. v. Four-bedroom apartment/condominium: Minimum one thousand five hundred (1,500) square feet of heated square footage. b. The administrator or their designee shall provide final approval for all elevations and site plans before any permits are issued. 3. Architectural standards. Unless otherwise approved by the board of commissioners at the time of zoning action, the following architectural standards shall apply: a. The exterior finish of all elevations for all new structures shall be constructed of brick, stone, and/or with a maximum of thirty-five (35) percent cementitious fiberboard products per façade. There shall be a minimum three-foot masonry water table on all sides. b. No vinyl materials permitted; including in the eaves and soffits. c. A minimum roof pitch of 4/12 required; low slope roofs permitted subject to administrative waiver approval by the Henry County Planning and Zoning Department Director, or their designee. d. There shall be a minimum of four (4) offsets on at least two (2) sides for each individual apartment/condominium building. e. The owner/developer shall be responsible for notating the percentage breakdown of bedroom units on each building plan submitted for review and will be verified by the Henry County Building and Plan Review Department. f. All new apartment/condominium developments' air conditioning units and HVAC systems shall be thoroughly screened from view from the public right-of-way and adjacent properties by utilizing walls, fencing, roof elements, or landscaping. g. All apartment/condominium development shall be interior access only. 4. Site planning and amenities. a. All apartment/condominium developments shall be gated. Gates shall be maintained and monitored at the developer/owner's expense. b. All apartment developments are required to install underground utilities and implement decorative pedestrian lights/streetlights consistent with the requirements of the highway corridor overlay district, as per section 4.05.00. c. All apartment/condominium developments shall have a minimum of two (2) entrances meeting all Building and Fire/Life Safety codes. d. There shall be security cameras throughout the development and shall be registered with the Henry County RTCC (Real Time Crime Center). e. Parking requirements for apartment/condominium communities shall be as follows: i. One (1) space per studio unit. ii. One and one-half (1.5) spaces per one- to two-bedroom unit. iii. Two (2) spaces per three- to four-bedroom unit. f. Dumpsters and trash receptacles. i. Dumpsters shall be located where they are not visible from adjacent residentially zoned properties and shall be adequately screened from view from all other adjacent properties and streets. ii. Dumpsters shall be fully enclosed either within a building, by a solid brick or stone wall at least six (6) feet in height, or a landscaped buffer not less than ten (10) feet in width. iii. Dumpsters shall be set back a minimum of five (5) feet from all property lines and outside any buffers/landscape areas. iv. Dumpsters shall be placed on concrete pads of sufficient size and strength to support the weight of service vehicles. v. There shall be in-ground and permanent trash receptacles distributed throughout the development, maintained and monitored at the developer/owner's expense, including along walking trails. g. A centralized amenity area shall be provided and shall consist of, at a minimum, the following: i. A minimum one thousand (1,000) square feet cabana or one thousand five hundred (1,500) square foot clubhouse; and fire pit and grilling areas. ii. A resort style pool. iii. Fitness facility and/or sports recreation facilities. iv. Children's playground(s) with benches. v. Dog park(s). h. There shall be paved walking trails throughout the development connecting to residential areas, amenity areas, and sidewalks. Walking trails shall not be installed within any buffer areas. There shall be paved resting/meeting areas with benches located throughout and outside of the walking trail path. i. The developer/owner shall place a centralized covered mailbox unit, constructed in an architectural style consistent with that of the residential units it serves, with a drive thru outside of the public right-of-way for those homes that will not be served individually by the United States Postal Service. The mailbox unit shall be landscaped with shrubs and ground cover plant material meeting the standards of chapter 5 of the ULDC. E. Landscape and sign standards. 1. A minimum fifty-foot-wide enhanced landscape strip and/or adequate undisturbed buffer shall be maintained along all exterior streets (not to prohibit access to the site). The landscape strip and/or buffer shall be planted with a combination of shrubs and trees where vegetation is disturbed, or non-existent, meeting the requirements listed in chapter 5 of the ULDC. The landscape strip and/or buffer shall be subject to planning and zoning approval prior to the issuance of a land disturbance permit. 2. Except as provided in this subsection, signage shall comply with the regulations in chapter 7 of the ULDC, and/or section 4.05.00, where applicable. Ground signs and entrance signs shall be monument based, with bases constructed of brick or stone with accents consistent with the architecture and exterior composition of the development. The location for ground signs and entrance signs shall be approved as part of the development plan. Plans for the development shall include the location and ownership responsibility for all signs. All signs shall comply with all other requirements per the ULDC and shall obtain approved permits before installation. 3. For any multifamily development located on MU (mixed use) zoned property, a master sign plan shall receive planning and zoning department approval prior to, and included on, development plans, per section 7.04.00. 4. Stormwater management facilities shall meet the standards of section 8.04.00 of the ULDC. 5. All driveways, access easements, emergency access easements shall be paved and dust free. 6. Except as provided in this subsection, landscaping standards shall comply with the regulations of chapter 5 of the ULDC. Each development shall submit a substantial landscaping and buffer plan at the time of development plan submittal. Necessary screening and privacy vegetation shall be reviewed by the Henry County Planning and Zoning and Building and Plan Review Departments. The plan reviewer(s) shall be authorized to require the modification of proposed landscape strip and/or buffers in instances where the intent of this code has not been met. (Ord. No. 16-01, § I, 7-19-16; Ord. No. 22-03, §§ I—III, 5-3-22; Ord. No. 23-08, § II, 6-20-23) Sec. 4.05.00. Highway corridor overlay district. 4.05.01. Purpose of article. A. Purpose. The purpose of the Henry County Highway Corridor Overlay District is: 1. To promote the general health, safety, and welfare of the community where residents and visitors can live, work, eat, and play. 2. To promote economic development by diversifying the employment base for a stronger Henry County. 3. To improve public health and provide safe and efficient movement within the overlay district by promoting development patterns that encourage physical activity such as walking and bicycling. 4. To encourage a balanced mix of retail, professional, residential, civic, entertainment, and cultural uses. 5. To improve the efficient operation of traffic around Henry County. 6. To provide accessible, sufficient parking in an unobtrusive manner. 7. To create an attractive gateway that is aesthetically appealing and environmentally responsible. 8. To encourage innovative development projects that set standards for landscaping, open space, community design, and public amenities. 9. To establish consistent and harmonious design standards for public improvements and private property development within the overlay district so as to unify the distinctive visual quality of Henry County. B. Definitions. As used in this section, unless specifically stated otherwise, the following terms shall be defined as indicated. Words used in this section but not defined herein shall be as defined by appendix A. Where any definition herein conflicts with a definition in appendix A, the definition contained herein shall prevail. 1. Administrator: Director of the Henry County Planning and Zoning Department or their designee. 2. Architectural review committee (ARC): A panel of Henry County staff which consists of the planning and zoning, building, environmental compliance/plan review and transportation departments. 3. Civic use: "Social, institutional, or infrastructure-related activities; social, cultural, or religious assembly" as established in table 2.03.03, and hospitals. 4. Commercial use: A term collectivity defining retail, office, and lodging uses. 5. Existing street: A public street that is open, under construction, or completely funded, or approved at the date of application for review under this section. 6. Front: To place an element, such as a building, along the front setback. 7. Front yard: In addition to the definition established in appendix A, all yards abutting a street shall meet the setback requirement for front yards. 8. Industrial use: "Industrial use, manufacturing, and waste-related activities" as established in table 2.03.03. 9. Lodging use: Premises available for daily and weekly renting of bedrooms, including motels and hotels. 10. Mixed-use building: A building containing at least two (2) different uses. 11. Occupiable space: Covered and conditioned building area utilized for any use except parking, storage, or mechanical features. 12. Office use: "Offices activities" as established in table 2.03.03 and medical and dental offices and related services. 13. Overlay district: Henry County Highway Corridor Overlay District. 14. Retail use: "Shopping, business, or trade activities" and "restaurants-type activity" as established in table 2.03.03 and fitness clubs, spaces, and gyms. 15. Residential use: "Residential activities" as established in chapter 2, table 2.03.02. 16. Sidewalk area: An area improved for walking along an existing street, primary grid, or secondary grid that begins at the street curb, or edge of pavement if no curb exists, and consists of a contiguous and continuous landscape zone and pedestrian zone. a. Sidewalk landscape zone: The paved or unpaved portion of the sidewalk area adjacent to the street and reserved for trees, groundcover, and street furniture including, waste receptacles, traffic signs, newspaper boxes, bicycle racks and similar elements in a manner that does not obstruct pedestrian access or motorist visibility. b. Sidewalk pedestrian zone: The paved portion of the sidewalk area reserved for pedestrian passage and unobstructed by any permanent objects to a height of eight (8) feet above the paved surface. The pedestrian zone shall be adjacent to the landscape zone and shall have a consistent cross-slope not exceeding two (2) percent. 17. Use: A land use or function of classification category. C. Variations. There shall be two (2) types of variations from the requirements of this district: administrative waivers and variances. Whether a variation requires an administrative waiver or a variance shall be determined by the administrator. 1. Administrative waivers permit a practice that is not consistent with a specific provision of this section, but is justified by its intent or purpose, or by hardship. The administrator or their designee shall have the authority to approve or disapprove administratively a request for an administrative waiver in accordance with section 11.03.00, administrative waiver, in addition to granting relief from the following: a. Site planning. b. Development standards. c. Sidewalks and streets. d. Frontages. e. Architecture. 2. Variances permit a practice that is not consistent with a provision nor the purpose of this section. Variances shall be granted only in accordance with section 11.02.00, variances. D. Procedural requirements. 1. Procedural requirements shall adhere to section 12.02.00. F. Site planning. All sites. 1. Notwithstanding, the requirements of section 5.02.00, buffer requirements, there are no minimum buffers within this district other than the stream buffer protection requirements, according to section 3.03.00. Where this district abuts an area not within it, the requirements of section 5.02.00 shall apply. 2. The requirements of section 8.01.04 shall apply to all sites regarding joint access driveways and cross access easements. 3. The requirements of section 3.04.00 shall apply to all sites regarding watershed protection areas. 4. Open space areas should be delineated on each conceptual plan, which shall receive approval from the building and plan review department. 4.05.02. Boundaries. This ordinance section applies to land parcels of record within unincorporated Henry County as depicted on exhibit "A" which is attached hereto and incorporated herein by reference. These boundaries are further depicted on the Henry County official zoning map adopted as amended on the date of adoption of this ordinance, which is attached hereto as exhibit "B" and incorporated herein by reference. The Henry County Highway Corridor overlay district boundaries include all unincorporated parcels of land abutting Highway 138 East and West, Highway 155 North and South, Highway 20 East and West (excluding Bruton Smith Overlay District), Highway 81 East and West, Highway 42 North and South, Jonesboro Road, Jodeco Road, Eagles Landing Parkway, Hudson Bridge Road, East Lake Parkway, East Lake Road (between Highway 155 and Highway 20), Fairview Road, East Atlanta Road, West Village Parkway, Anvil Block Road, West Panola Road, Panola Road, Flakes Mill Road, North Henry Boulevard, Highway 19/41, and the Henry County Airport. All state routes and associated rights-of-way are within the jurisdiction of the Georgia Department of Transportation (GDOT) and any improvements within these respective rights-of-way are subject to GDOT. This Henry County Corridor Overlay District Boundaries also includes the Henry County Airport. All property contained within any parcel subject to this ordinance section on the date of adoption of this ordinance shall continue to be subject to this ordinance, even if the parcel is subdivided in the future. 4.05.03. Effect of highway corridor overlay district provisions. A. Application. This overlay district is supplemental to the underlying zoning district classifications established in the Henry County Unified Land Development Code governing all properties and approvals within this overlay district. The provisions of this ordinance section shall be overlaid upon and shall be imposed in addition to said underlying zoning regulations and other Henry County ordinances. The planning and zoning director or their designee is authorized to promulgate and enforce such rules, regulations, guidelines, and standards as may be reasonably necessary or desirable to give effect to the provisions of this ordinance section. B. Relationship to underlying zoning district standards and other provisions of unified land development code. In any case where the standards and requirements of the overlay district conflict with those of the base-zoning district or with other provisions of the unified land development code, the standards and requirements of the overlay district shall govern. C. Exceptions. The provisions of this ordinance section shall not apply to the following: 1. Completion of work subject to preliminary plats, site development plans, construction plans, building permits, or interior finish permits approved prior to the effective date of adoption of this ordinance section for those parcels not previously covered within the highway overlay district. 2. Improvements and additions that are made to a single-family residence previously permitted and built on a lot of record prior to enactment of this ordinance section for those parcels not previously covered within the overlay district. 3. Construction of a single-family dwelling on an existing lot of record within a single-family residential subdivision with final plat approved prior to enactment of this ordinance section, for those parcels not previously covered within the overlay district, provided that the new construction shall be of a similar floor area, materials and design as the single-family dwellings on adjacent lots in the same subdivision. 4. Rehabilitation, restoration, repair of a nonresidential structure, interior renovations or interior finishes within an existing structure, or addition to an existing nonresidential structure that was permitted prior to the enactment of this ordinance section for those parcels not previously covered within the highway corridor overlay district shall not be subject to the provisions of the highway corridor overlay district, provided that such construction is on a lot of record. 5. Development of a conventional single-family residential subdivision on property zoned RA (residential-agricultural) at the time of permit approval. D. Nonconforming uses. 1. Within the overlay, there may exist lots, structures, or uses of both land and structures which were lawful prior to the adoption of this ordinance, but which would be prohibited, regulated, or restricted under the terms of this ordinance as adopted or subsequently amended. Nonconforming lots, uses, and structures may continue in their nonconforming status with the limitations and/or requirements of section 11.01.00, "nonconforming lots, structures, and uses" of the ULDC. 2. Vested/grandfathered nonconforming uses. To avoid undue hardship, the lawful but nonconforming use of any structure or land at the time of the enactment of this overlay or any subsequent amendment may be continued even though the use does not conform to the provisions of this overlay, except that the nonconforming use: a. Shall not be changed to another nonconforming use. b. Shall not be re-established after abandonment or removal from the property for more than fifteen (15) days in the case of a nonconforming manufactured home, or its abandonment for six (6) months or more for all other uses, unless the premises are under a continuing lease but are unoccupied by the nonconforming use, regardless of the intent of the owner or occupier to resume the nonconforming use. c. Shall not be extended to occupy any area of land not contained within the current lot of record. d. Shall not be extended into any new building or structure unless such new building or structure is connected to existing buildings or structures and is contained wholly within the land currently utilized for the nonconforming use; however, where a new building or structure is not to be attached to an existing building or structure, the nonconforming use may be extended into such a new building [or] structure provided that any such new building or structure has a coverage area which does not exceed three (3) percent of the total square footage of the lot and is contained wholly within the land currently utilized for the nonconforming use. e. If an existing use was lawfully established in a zoning district that is subsequently amended to require conditional use approval for such use, the existing use shall not require a conditional use permit. f. Any intended but not yet existing nonconforming use for which a vested right was acquired prior to the adoption of this overlay or the adoption of an amendment to it shall be prohibited unless such intended nonconforming use for which a vested right was acquired is actually commenced within one (1) year of the adoption of this overlay district or the adoption of an amendment to it, regardless of the intent or expectation to commence or abandon such nonconforming use. 3. Notwithstanding anything to the contrary herein, the vested/grandfathered status created herein may be transferred and assigned to a new owner of the real property to which such rights apply, provided, however, that the new owner, in order to avail himself of such rights, must put the property to the vested/grandfathered use within six (6) months of the date of the sale of the real property. E. Building plan application. 1. All building plans submitted pursuant to an application for a building permit should clearly indicate all of the proposed building materials and colors for each façade as described in ordinance section. 2. The plans should clearly show the location and calculate the amount/percentages of all building materials per façade. 3. Groups of buildings on the same parcel of land may be reviewed and permitted as a single project rather than individual buildings. 4.05.04. Network standards. A. Access management standards. 1. Connectivity. Within all nonresidential or multifamily developments or any single-family residential development of five (5) or more acres, the following standards shall apply unless a variance is sought and obtained from the zoning advisory board pursuant to chapter 11 due to unusual topography or environmental constraints such as major streams and rivers that create a severe and unique hardship: a. No local street may be longer than six hundred (600) feet without an intersection with another local through street. Cul-de-sac streets shall not count as through streets. b. Continuous pedestrian walkways shall be provided to connect building entrances to required ten-foot wide sidewalks along street frontage. c. A cul-de-sac street that ends within two hundred (200) feet of the right-of-way of an adjacent collector or arterial street shall provide a five-foot wide sidewalk in a ten-foot wide easement connecting the sidewalk on the cul-de-sac to the sidewalk on the adjacent collector or arterial street. d. Dead-end streets, including cul-de-sac streets, shall not exceed three hundred (300) feet in length and shall not serve more than thirty (30) dwelling units. 2. Vehicular access points. Minimum number of driveways or streets required per table 4.05.04.A.2 below. Table 4.05.04.A.2: Minimum Vehicular Access Points Type of Development Minimum Number of Vehicular Access Points to Public Streets provided that the minimum separation standards are met per ULDC Section 8.01.03.D.3. Nonresidential, less than 50 required parking spaces 1 Nonresidential, 50—299 required parking spaces 2 Nonresidential, 300—999 required parking spaces 3 Nonresidential, 1,000 or more required parking spaces 4 or more 3. Utilization and provision of connections to and from adjacent developments and developable parcels. a. All development plans shall incorporate and continue all sub-arterial streets stubbed to the boundary of the development plan by previously approved development plans or existing development. b. All development plans shall provide for future public street connections to adjacent developable parcels by providing a local street connection spaced at intervals not to exceed six hundred (600) feet along each development plan boundary that abuts potentially developable or redevelopable land. 4. Interparcel access. For developments along an arterial or collector street, except where a variance is sought and obtained from the zoning advisory board pursuant to chapter 11 because of topographic or other site-specific constraints that create a unique and severe hardship, compatible developments, as determined by the planning director, shall provide a network of nonresidential access streets that meet the following: a. Access streets shall be constructed for a commercial or multifamily residential development that abuts another commercial or multifamily residential development, whether existing or planned. The development of the site shall incorporate the following: i. Continuous nonresidential access street, where necessary to connect adjacent parcels along the thoroughfare. ii. Driveway aprons, stub-outs and other design features to indicate that abutting properties may be connected to provide cross access. b. New commercial or multifamily property that abuts a planned, new or existing multifamily residential property shall provide for a five-foot wide sidewalk connecting the two (2) uses. c. New multifamily residential development that abuts a planned, new or existing commercial property shall provide for a five-foot wide sidewalk connecting the two (2) uses. 5. Driveways. Driveway connections to public streets shall be consistent with the following standards: a. Driveway connections shall not be permitted within the controlled access zone of an intersection. b. Outparcels with less than two hundred (200) feet of road frontage are restricted to internal access only. c. Driveways that enter a major thoroughfare at traffic signals must have at least two (2) outbound lanes (one (1) for each turning direction) of at least eleven (11) feet in width, and one (1) inbound lane with a maximum width of eleven (11) feet. All lanes shall align with respective lanes on the opposite side of the intersection. d. No residentially developed property may have a curb cut in excess of thirty (30) feet in width, and no nonresidential property may have a curb cut in excess of forty (40) feet without approval of the Henry County Department of Transportation Director. e. Except for single-family and two-family residences, driveway grades shall conform to the requirements of the Georgia Department of Transportation Regulations for Driveway and Encroachment Control. f. Except where driveways are on opposite sides of a raised median, commercial or industrial driveways, or public roads, on opposite sides of a street shall either directly align or have offsets per ULDC section 8.01.03.D.3., as measured between the extended centerlines of such driveways. Along county roads, where property frontage width is such that the minimum offsets cannot be met, or intersection sight distance cannot be met with a driveway location that meets or exceeds the minimum spacing requirement, the Henry County DOT Director may allow placement of a driveway with a lesser offset distance. Where lack of frontage does not provide for the minimum spacing, the driveway may be required to be a joint use driveway with the adjoining owner. g. Whenever possible, driveways on undivided arterials, collector streets, or local streets should align with driveways (if any) on the opposite side of such street. h. On a divided arterial street that includes a median, driveways should align with median breaks whenever possible. Driveways not meeting this standard shall be limited to right turn access and right turn egress. i. Driveway throat length. The length of a driveway or "throat length" for a commercial or office development shall be designed in accordance with the vehicle storage required for entering and exiting vehicles to prevent vehicles from backing into the flow of traffic on the public street or causing unsafe conflicts with on-site vehicle circulation. The throat lengths specified in table 4.05.04.A.5 are generally acceptable guidelines intended for the major entrance driveway of a commercial development. Table 4.05.04.A.5: Driveway Length for Commercial Centers Commercial Center Total Gross Floor Area Length of Principal Driveway* Under 25,000 square feet 50 feet—60 feet 25,000—50,000 square feet 60 feet—85 feet 51,000—100,000 square feet 85 feet—135 feet 101,000—150,000 square feet 135 feet—180 feet 151,000—200,000 square feet 180 feet—200 feet Over 200,000 square feet 200 feet or more Note: * For driveways that allow right turns only the throat length may be reduced by one-third (). 6. Deceleration lanes. a. A major driveway entering a street classified as a collector or above with a regulated arterial speed thirty-five (35) miles per hour or greater shall be required to provide a deceleration lane consistent with the standards set in chapter 8. b. An acceleration or deceleration lane that would begin or end within seventy-five (75) feet of another driveway or intersecting street shall be lengthened so that it connects with the adjacent street or driveway. 7. Crosswalks. a. All intersections on streets posted at twenty-five (25) mph or less shall contain crosswalks that connect to sidewalks in all quadrants. For streets posted at over twenty-five (25) mph, crosswalks shall be placed when determined as warranted by engineering study by a professional traffic operations engineer and such studies are subject to Henry County DOT's review and approval. b. Crosswalks shall be either demarcated with high-reflectivity thermoplastic paint or brick pavers, as determined by Henry County DOT. B. Parking requirements. Off-street parking shall be required as in chapter 8 of the Henry County Unified Land Development Code, except as provided in this subsection: 1. Maximum number of parking spaces. The maximum number of parking spaces that may be constructed on impervious surfaces shall be no more than one hundred twenty-five (125) percent of the minimum number of required parking spaces. Parking spaces in excess of one hundred five (105) percent shall be constructed on pervious surfaces recommended in paragraph 3.b. of this subsection. 2. Pedestrian circulation. Parking areas shall be designed to facilitate safe and convenient use by pedestrians. Commercial and multifamily developments shall provide designated pedestrian pathways or sidewalks connecting the front entrance of the principal building to the sidewalk along the abutting street, including marked crosswalks across interior driveways. 3. Paving materials for parking lots. a. All parking areas shall be paved with asphalt, concrete, or pervious materials approved by the Henry County Department of Transportation Director. b. Pervious paving. Recommended pervious paving materials include those described in the current edition of the Georgia Stormwater Management Manual as the porous concrete or modular porous paver systems under the limited application stormwater structural controls. c. Paving areas shall be of sufficient size and strength to support the weight of service vehicles. 4. Landscaped strip to screen parking lots and loading areas. a. Where a parking lot or loading area for a commercial, industrial, or institutional use is located adjacent to the public right-of-way, it shall be screened from the public right-of-way consistent with chapter 5 of the Henry County Unified Land Development Code. b. Setbacks for screening areas facing the highway corridor overlay district shall be based on future right-of-way consistent with chapter 8 Henry County DOT guidelines. 4.05.05. Public improvement standards. Public rights-of-way (new and existing streets/roads) within the highway corridor overlay district shall be improved in accordance with the following standards: A. Street standards. Public rights-of-way located within the highway corridor overlay district shall be classified by type (i.e. arterial, collector, local, or nonresidential access) by the Henry County Department of Transportation and shall be consistent with section 4.05.03 design guidelines as follows: 1. Arterial: a. Forty-five (45) mph design speed. b. Minimum one hundred twenty-foot right-of-way. c. Ten-foot (minimum) wide landscaped strip. d. Ten-foot (minimum) wide sidewalk. e. Pedestrian lights are required in landscaped strip. f. Street trees are required in landscaped strip. g. The location of required public improvements in the GDOT right-of-way is subject to GDOT permit approval. Any required public improvement not meeting GDOT permit approval is required to be located outside of planned right-of-way. 2. Collector: a. Thirty-five (35) mph design speed. b. Minimum eighty-foot right-of-way. c. Depending on adjacent land use, lanes shall conform to one (1) of the following two (2) options: i. Two (2) travel lanes at twelve (12) feet with center turn lane at fourteen (14) feet in commercial areas. ii. Two (2) travel lanes at twelve (12) feet with turn lane at intersection provided between intersections for planned developments or residential areas. d. Twenty-four-inch wide curb and gutter. e. Eight-foot (minimum) wide landscaped strip along outside curb. f. Eight-foot (minimum) wide sidewalk outside landscaped strip. g. Pedestrian lights are required in landscaped strip. On roads posted at thirty (30) mph or greater, pedestrian lights shall be placed per chapter 5 of the GDOT Design Policy Manual. h. Street trees are required in landscaped strip. On roads posted at thirty (30) mph or greater, street trees shall be placed per chapter 5 of the GDOT Design Policy Manual and the GDOT Policy for Landscaping. 3. Local streets: (See section 8.07.00, figure 8.8.) a. Twenty-five (25) mph design speed. b. Minimum fifty-foot right-of-way. c. Two (2) travel lanes at eleven (11) feet each. d. Twenty-four-inch wide curb and gutter. e. Seven-foot (minimum) wide landscaped strip along outside curb. f. Five-foot (minimum) wide sidewalk outside landscaped strip. g. Pedestrian lights are required in landscaped strip. h. Street trees are required in landscaped strip. 4. Nonresidential access street: a. Twenty-five (25) mph design speed. b. Minimum fifty-foot right-of-way. c. Two (2) travel lanes at eleven (11) feet each. d. Eighteen-inch wide curb and gutter, twenty-four (24) inches if public right-of-way. e. Five-foot (minimum) wide landscaped strip along outside curb, eight-foot if public right-of-way. f. Eight-foot (minimum) wide sidewalk outside landscaped strip. g. Street trees are required in landscaped strip. 5. Underground utilities are required for all street frontages: Upon written application pursuant to chapter 11, an exception may be granted by the zoning advisory board in cases where, due to unique topography or the presence of rock, the installation of underground utilities would present a severe and unique hardship. B. Street trees. Subject to Henry County DOT's review and approval, canopy trees shall be provided in street rights-of-way including medians and required landscaped strips adjacent to all streets. For roadways/streets either classified as collector or above, or posted at thirty (30) mph or greater, the tree types, sizes, and lateral offset to trees are to be governed by chapter 5 of the GDOT Design Policy Manual and the GDOT Policy for Landscaping. Trees and vegetation shall be located such that such vegetation shall not be located within the required sight lines necessary for intersection sight distance based on the road's posted speed limit. 1. Appropriate street tree species include the following: a. Large trees—Average spacing forty (40) feet on center: • Sawtooth Oak • Gingko (Variety: President, Autumn Gold, male gender) • Princeton Elm • Chinese Elm (varieties Allee, Athena, Drake, Bosque) • Bald Cypress (variety: Shawnee Brave) • Zelkova (variety Green Vase or Village Green) • Northern Red Oak • Trident Maple b. Small trees—Average spacing twenty (20) feet on center: • Crepe Myrtle • Saucer Magnolia (variety: Butterflies) • Chinese Fringe Tree • Golden Rain Tree • Texas Redbud (Cercis reniformis) • Kousa Dogwood • Washington Hawthorn "Princeton Sentry" • Zelkova (variety: Wires) 2. No more than twenty-five (25) (or twenty-five (25) percent of the total number, whichever is greater) of the trees installed may be of any one (1) genus. 3. No more than twenty-five (25) percent of the street trees used in a single development shall be of the small tree species, unless limited by roadway classification or posted speed limit that affect tree type placement. 4. Pedestrian lights meeting the standard of section 4.05.06.G may be considered when spacing street trees to allow forty (40) feet of separation between pedestrian lights and large trees, and twenty (20) feet of separation between pedestrian lights and small trees. C. Improvement guarantees. At the option of Henry County, the developer may be required to provide to the county financial security to guarantee the installation of project improvements required in this ordinance section. The developer's financial guarantee may be any of the following: 1. An escrow of funds with the county; 2. An escrow of funds with a bank upon which the county can draw; 3. An irrevocable letter of credit or commitment upon which the county can draw; 4. A performance bond for the benefit of the county upon which the county can collect; and 5. Any other form of guarantee approved by the board of commissioners that will satisfy the objectives of this subsection. The guarantee shall be in an amount sufficient to secure the full costs, as determined by the Henry County Department of Transportation Director, of the construction cost of the improvements, based on the most recent edition of Georgia Department of Transportation "Item Means Summary" or other comparable standardized cost estimation procedure. 4.05.06. Property development standards. A. Additional uses. Parcels zoned for commercial uses shall be allowed to be developed with a mixture of commercial and residential uses according to the development standards of section 4.01.05 provided the future land use map provides a maximum density for the subject parcel. B. Prohibited uses. 1. Self-service storage facilities and mini-warehouses. 2. Warehousing and distribution not currently zoned for these uses (M-1 or M-2), as of adoption of this ordinance section. 3. Salvage, junk, wrecking, recycling, waste, and scrap yards. 4. Adult bookstore. 5. Sexually oriented businesses or establishments. 6. Pawnshop or loan brokers, other than mortgage loan brokers. 7. Rooming and boarding houses. 8. Automotive repair and maintenance, used vehicle sales as principal use, except car washes (car washes must be the principal use and be located within a commercial structure). C. Ground floor area limitation. New commercial buildings may not exceed one hundred fifty thousand (150,000) gross square feet in ground floor area. New commercial buildings greater than one hundred fifty thousand (150,000) gross square feet must obtain conditional use approval. In determining whether to grant an increase in ground floor size beyond one hundred fifty thousand (150,000) square feet, the zoning advisory board shall consider the following factors, in addition to those listed in chapter 11: 1. The building site will provide convenient inter-connections with adjacent uses and properties that serve both pedestrians and automobiles. 2. The floor area of the proposed building is the smallest feasible to serve the function of the proposed use. 3. The architectural design of the building reduces the perceived size of the building by appropriate articulations and variations in the massing, façade, roofline, materials, colors, and textures of the building exterior. 4. The building and site meets or exceeds all other standards set forth in this ordinance section and by the Henry County Unified Land Development Code. D. Lot standards. 1. Minimum lot size shall be as follows: a. For outparcels or stand-alone commercial projects: One (1) acre. b. For commercial lots within a common development with shared parking and interconnectivity: One-half () acre. 2. Minimum commercial lot frontage: One hundred seventy-five (175) feet along an arterial. 3. Nonresidential lots shall be generally rectangular with a ratio of depth to frontage not greater than 4:1. 4. Residential subdivisions shall comply with one (1) of the following two (2) requirements: a. Reverse-fronting lots are required for residential subdivisions along streets classified as arterials or collectors, subject to subparagraph b. below. Reverse-fronting residential lots shall be platted with a landscaped access easement restricting vehicular access placed adjacent to the public right-of-way. Such easement shall be a minimum of twenty (20) feet in depth and include one (1) of the following: i. A continuous four-foot-high solid wall constructed entirely of brick or stone masonry. ii. A four-foot-high fence constructed of a combination of brick or stone masonry pillars with iron pickets. iii. A vegetated strip of canopy trees, shrubs, and groundcover that provide a full landscape buffer. b. If a residential lot is separated from the arterial or collector street by a minimum twenty-foot-wide landscaped strip and a residential street, a residential lot may face an arterial or a collector street. E. Environmental controls. 1. Stormwater management design shall comply in all respects with the current edition of the Georgia Stormwater Management Manual and ULDC. 2. Parking lot landscaping. Parking areas shall incorporate landscaped areas as required in chapter 5. Such landscaped areas shall cover at least twelve (12) percent of the parking area. F. Dumpsters. 1. Location. a. Dumpsters and trash receptacles shall be located where they are not visible from adjacent residentially zoned properties and shall be adequately screened from view from all other adjacent properties and streets. b. Dumpsters shall be enclosed either within a building or out of sight from public streets or located outside to the rear of the principal building. c. Dumpsters shall be set back a minimum of five (5) feet from all property lines. If a buffer is required on the subject property line, the dumpster shall not be located within the buffer. 2. Pad. a. Dumpsters shall be placed on concrete pads of sufficient size and strength to support the weight of service vehicles. b. Restaurants and other food service establishments shall place dumpsters on concrete pads that are designed to slope into a drain that is equipped with a grease trap. G. Lighting. 1. Parking lot, sidewalk, and building illumination. a. Lighting shall be designed to prevent light spillover on to adjacent properties. All lighting shall be fully shielded, have recessed luminaries, downcast, or be cut-off luminary fixtures mounted in such a manner that the cone of light is directed downward and does not cross any property line of the site. b. Only incandescent, florescent, metal halide, low-pressure sodium, LED, or color corrected, high-pressure sodium may be used. The same type of lighting must be used for the same or similar types of lighting on any one (1) site. c. Pedestrian lights shall be consistent with table 4.05.06.G.1 and chapter 8. d. Pedestrian light average spacing shall not exceed 120 feet. e. Parking light fixtures shall be the box head type, shall have a maximum height of thirty-five (35) feet, and shall employ a fluted pole. All parking light fixtures and poles shall be black. f. Individual pedestrian lights shall be maintained in good order and shall be illuminated between dusk and dawn each night. Table 4.05.06.G.1: Lighting Specifications Pedestrian Light Parking Light Height 15 feet 35 feet Color Black Black Pole Type Fluted Fluted Fixture Type Unspecified Box Head Shielding Semi-cutoff, cutoff, or full-cutoff Full-cutoff Spacing 120 feet Unspecified 2. Security lighting restrictions. a. Full cutoff luminaries shall be used for all security lighting. b. The number of luminaires remaining on for security lighting shall not exceed one-fourth () the total number of each type of luminaire number by four (4), any remainder is counted as a whole number. 3. Drive-under canopies and pump islands at fueling stations. The luminaire shall be recessed into the canopy ceiling so that the bottom of the luminaire does not extend below the ceiling. H. Architectural standards. The following design guidelines and standards apply to all newly constructed buildings used for commercial, industrial, or residential purposes. 1. General architectural requirements. a. The use of a common palette of building materials should be maintained for building façades to create a consistent and traditional architectural identity. Traditional architecture shall include, for example, the use of brick, pitched roofs, low-profile signage, and subdued colors. For large commercial/retail buildings and multifamily buildings, variations in façade, roofline and depth should be provided to lend the appearance of multitenant occupancy. All design and construction shall be subject to architectural review by the county or its designated architect to ensure adherence with this subsection K and the structures of traditional architecture. b. All ground or roof-mounted mechanical, HVAC, and like systems shall be screened from public street view (within three hundred (300) feet) on all sides by an opaque wall or fence made of brick, stucco, split face block, or landscaping. c. For all commercial buildings, roof-mounted mechanical, HVAC, and like systems shall be screened from public street view (within three hundred (300) feet) on all sides by a raised parapet or pitched roof along the edge of the roofline. d. Contrasting accent colors on any single façade shall be limited to no more than ten (10) percent of the total wall area for any single façade. e. Materials otherwise not permitted, may be used for an accent provided that a contrasting materials accent on any single façade shall be limited to no more than ten (10) percent of the total wall area for any single façade. f. Permanent mounted exterior neon lights shall not be allowed. g. Buildings that are located on outparcels and all accessory buildings shall be constructed of materials complementing the principal building with which they are associated. h. Back-lit awnings, roof-mounted lights, and/or roof mounted flag poles are not permitted. Satellite dishes shall be located and painted to blend with the background as much as practical. 2. Building materials. Table 4.05.06.H.2 and this subsection outlines allowed building materials that are may be used and combined to create a consistent, attractive, interesting and long-lasting building design: Table 4.05.06.H.2: Allowed Building Materials Brick Stone Glass Tilt/PreCast Stucco Concrete Blocks CMU/ Split-Face Block Cementitious FiberBoard Metal Tile Yes Yes Yes No* Max. 40% per façade No Max. 10% per façade No** No No * Allowed for industrial buildings. ** Allowed for residential buildings. Buildings must have a minimum 4:12 roof pitch. a. Allowed building materials. i. Brick, except that brick veneers that are intended to simulate brick exteriors are not acceptable; ii. Stone. Natural stone such as, but not limited to, granite, limestone, acid marble are allowed building materials. Terra cotta and/or cast stone, which simulate natural stone, are also acceptable. Painted stone is not allowed; iii. Split-face block/concrete masonry unit (CMU) is restricted to ten (10) percent of the surface area of the façade; iv. Tilt/architectural pre-cast concrete permitted for industrial developments only; v. Stucco is restricted to forty (40) percent of the surface area of a façade; vi. Natural wood and/or cementitious fiberboard siding are allowed only for residential buildings; vii. Glass; viii. Exposed concrete block, metal, and tile are not allowed as building materials on a façade. b. Ratios and amounts of allowed building materials. i. Accent/trim exterior building material. Small amounts of building materials such as wood, tile, etc., may be used to enhance the façade of the building or for decorative elements, but should not exceed ten (10) percent of total wall area per façade. ii. Façade calculations. With the exception of accent/trim materials, there shall be no more than two (2) primary building materials used. When stucco is used as a building material for a façade, it is restricted to 40 percent of the total. The allowed façade materials shall not apply to entry doors and/or roll-up doors. c. [Calculation.] The amount of permitted material shall be calculated using the gross square footage of wall area per façade. For example, a building has a front façade with a gross façade area of one thousand two hundred (1,200) square feet with four hundred (400) square feet consisting of windows and doors. Begin with one thousand two hundred (1,200) square feet for required building material calculations. A wall area of one thousand two hundred (1,200) square feet shall have no more than four hundred eighty (480) square feet of stucco on the front façade [e.g. 1,200 square feet × 40 percent = 480 square feet]. The balance shall be brick or other allowed material. Trim or accent material may account for up to ten (10) percent or one hundred twenty (120) square feet. 3. Roof requirements. Materials for pitched roofs shall be limited to architectural dimensional grade asphalt shingles, natural slate, natural terra cotta, natural wood shake, copper or factory finished sheet metal. a. Gabled/hipped roofs. All one-story buildings less than ten thousand (10,000) gross square feet must have a gabled/hipped roof (between 4:12 and 12:12). b. [Alternative.] If a gabled/hipped roof is not possible, a combination of flat roof and gabled/hipped roof is required. Provide a gabled/hipped roof on front and side of the building to screen view of any flat roof. Create arcades, porches, and other features with pitched roof. c. Flat roofs. Building materials for flat roofs shall meet local codes. Exposed metal flashing shall be copper or factory finished sheet metal. If factory finished metal flashing is used, such as standing seam, the color must be subdued to blend with other materials or of a color to simulate weathered copper or bronze. All buildings with flat roofs should include parapet articulation on the front façade(s) of such building. There shall be roof articulations/offsets at a minimum of one (1) per each one hundred twenty-five (125) linear feet of length by a change in the top line of the parapet. Additional articulation may occur at any lesser distance. If the front façade is less than one hundred twenty-five (125) linear feet of length, then a minimum of one (1) roof articulation must occur. d. Other. Drive under canopies may have flat roof with vertical or factory formed facing of finished sheet metal or other material meeting the requirements of Section 4.05.06.H.2. 4. Arcade/structural canopy for retail use. For any multitenant commercial development, a covered arcade/structural canopy shall be provided along the front façade of the building. Arcades are covered walkways connected to the principal building. They should be a minimum of five (5) feet in width and designed to provide covered areas for relief from the weather. Different arcade/structural canopy designs may be used for each individual tenant/business within a multitenant commercial development provided that they blend aesthetically with the front façade of the building and has the approval of the building owner and the planning director. 5. Street orientation. Principal building entrances shall be oriented to public streets. 6. Building height. Unlimited for new development. 7. Building massing and modulation. The massing of building façades longer than one hundred fifty (150) feet that are approximately parallel to the right-of-way and oriented to a public street shall be modulated to increase visual interest, as follows: a. Building façades that are less than five hundred (500) feet long shall be modulated at intervals no greater than one hundred (100) feet in length. b. Building façades that are more than five hundred (500) feet long shall be modulated with intervals no greater than twenty (20) percent of the length of the façade. 8. Minimum area. No nonresidential building shall have less than two thousand (2,000) square feet of heated floor space. 9. Minimum cornice height. Building design shall include minimum one-foot high contrasting cornices along the entire front façade of buildings and extending for a distance of at least ten (10) feet along the sides of buildings. 10. Minimum high-contrasting base. Building designs shall include a minimum two-foot high contrasting base, along the entire front façade of buildings and extending for a distance of at least ten (10) feet along the sides of buildings. 11. Satellite dish antennae. No satellite dishes shall be permitted within view from public streets. 12. Off-street loading areas. Off-street loading areas shall be located in the rear of buildings and screened from view from adjacent property or streets. I. Signage. Except as provided in this subsection, signage shall comply with the regulations in section 7.04.00 of the Henry County Unified Land Development Code. 1. Ground signs and entrance signs shall be limited to a monument based signs with the monument base extending to the height and full width of the bottom of the signable area. The sign structure shall be constructed of materials consistent with the architecture and exterior treatment of the building. 2. The maximum sign area of any ground sign, inclusive of any border and trim, but excluding the base, apron, supports and other structural members shall be: a. Ground signs on lots zoned commercial or industrial, including shared signs, on lots with more than one (1) tenant shall be no greater than fifty (50) square feet in sign area. b. Ground signs on lots zoned commercial or industrial with one (1) tenant shall be no greater than thirty-two (32) square feet in sign area. c. Ground signs on lots zoned O-I shall be no greater than thirty-two (32) square feet of sign area. d. Ground signs for single business premises shall be no greater than thirty-two (32) square feet in sign area. 3. Sign illumination. a. Automatic changeable copy signs and neon signs are prohibited. b. Signs may be illuminated internally, subject to ULDC requirements. LED is acceptable. External lighting fixtures are acceptable provided that fixtures are directed downward and away from streets and adjacent property and public streets. All lighting shall be fully shielded, have recessed luminaries, or be full cut-off luminary fixtures. (Ord. No. 17-04, § I, 3-21-17; Ord. No. 18-06, § I, 11-27-18; Ord. No. 20-06, § I, 11-14-20; Ord. No. 22-04, 6-7-22; Ord. No. 22-08, § II, 9-8-22) CHAPTER 5. LANDSCAPING, BUFFERS, AND TREE PROTECTION Sec. 5.00.00. Generally. 5.00.01. Purpose. A. The purpose of this chapter is to provide requirements for the landscaping and buffering of developments and for the protection of existing trees in all zoning districts, in order to enrich the urbanized and natural environment of Henry County. B. General requirements for landscaping a development site are set forth in section 5.01.00. Requirements for landscaped buffers are set forth in section 5.02.00. Requirements for the protection of trees are set forth in section 5.03.00. C. It is the intent of the county to reduce the adverse visual, environmental, and aesthetic effects of development in order to: 1. Minimize the rate of stormwater runoff; 2. Maximize the capability of groundwater recharge in urban or suburban areas; 3. Increase air filtration and the removal of particulate and gaseous pollutants through plant materials; 4. Provide shade and noise attenuation; 5. Filter and reduce the glare of headlights and reflected sunlight from parked automobiles onto the public street rights-of-way and adjacent properties; 6. Improve the appearance of parking areas and vehicular surface areas; and 7. Minimize the visual blight created by large expanses of paved surface area. 5.00.02. Applicability and provision of landscape plans.. A. The requirements of chapter 5 shall apply to all properties to be used, developed, or redeveloped within the county, except as may specifically be exempted in subsection 5.00.02.C., below. B. In order to demonstrate compliance with the requirements of this chapter, a landscaping plan shall be submitted with applications for development approval for all development subject to these standards. The requirements and procedures for submittal, review, and approval of all applications are set forth in chapter 12. C. The following types of development are exempt from the requirements to provide a landscaping plan: 1. Single-family dwellings; 2. Duplex buildings; and 3. Applications for accessory uses, accessory structures, or temporary uses. 5.00.03. Maintenance requirements. A. All landscaped areas shall be maintained to ensure that plant materials are healthy and thrive. Any diseased or dead plant materials shall be replaced as soon as reasonably possible based on the growing season, but not later than six (6) months following identification of the need for replacement. B. Necessary trimming and maintenance shall be performed to maintain the health of the plant materials, to provide an aesthetically pleasing appearance, and to assure that the landscaped and buffer areas serve the intended purpose. Sec. 5.01.00. Landscaping requirements. 5.01.01. Landscape standards for nonresidential development. A. Required landscaped areas, including general landscaping, parking lot landscaping, perimeter landscaping, and buffer areas shall not be disturbed by grading, property improvements, or construction activities, except where necessary to prevent a nuisance, or to thin natural growth which is too dense to permit normal growth, or to remove diseased, misshapen, or dangerous and decayed timbers. B. All landscaped areas, including general landscaping, parking lot landscaping, perimeter landscaping, and buffer areas, shall utilize existing natural vegetation in an undisturbed state provided that the existing vegetation is appropriate for inclusion. C. A minimum of twelve (12) percent of the total buildable area in any parcel shall be devoted to landscaping. D. The requirement to provide landscaping is in addition to any buffers as required in section 5.02.00. E. The site design standards for landscaping are shown in the following table: Table 5.01.01(E) Site Design Standards for Nonresidential Landscaping Location of Landscaping Number of Plants Type of Plants Front yard setback 1 tree per 40 linear feet of frontage Full coverage of pervious areas 50 percent large trees Grass or ground cover Side yard setback 1 tree per 25 linear feet of frontage Full coverage of pervious areas 50 percent large trees Grass or ground cover Rear yard setback 1 tree per 25 linear feet of frontage Full coverage of pervious areas Grass or ground cover 5.01.02. Residential landscape standards. A. Prior to the issuance of a certificate of occupancy, any parcel of land for which a building permit has been requested shall have preserved or planted trees, meeting the following standards: 1. The minimum dbh is one and one-half (11 /2) inches. 2. A minimum of seventy-five (75) percent of planted trees shall be hardwoods. 3. All recorded lots within a subdivision shall have planted or preserved the required number of trees according to the zoning district, as set forth in subsection 5.01.02.B. 4. Requirements for planting or preserving trees are in addition to requirements for landscaping and buffer areas but can be included in the landscaping and/or buffer areas. B. Tree planting requirements. Table 5.01.02(B) Tree Planting Requirements Zoning District Number of Trees Planted or Preserved First acre Each additional 1 /4 acre RA, R-1 10 2 R-2 7 2 RM, RMH 10 2 R-3, R-4, R-5, RD, RS 4 trees per parcel C. Standards for subdivision entrances. For each subdivision entrance sign located on private property, there shall be a minimum of one (1) large tree, one (1) medium or small tree, and five (5) shrubs. The type, size, and location of these plant materials shall conform to the specifications set forth in section 5.01.04. Plant materials shall not be located to interfere with the clear visibility requirements of section 8.01.07. 5.01.03. Landscape requirements for parking lots. A. Perimeter landscaping for parking lots. A minimum of a ten-foot wide strip of land, located between the property line and a parking lot shall be landscaped. Width of sidewalks shall not be included within the ten-foot wide front setback perimeter landscape area. B. Interior landscaping. 1. Parking lots with twenty (20) or more parking spaces shall provide interior landscaping. 2. Interior planting areas may be located in tree islands, at the end of parking bays, or between rows of parking spaces. Planting areas may also be located within driveway medians, provided the median is a minimum of ten (10) feet wide. 3. There shall be one (1) tree required for each two hundred fifty (250) square feet of internal landscape areas. 4. Parking lots shall be designed so that no more than twelve (12) parking spaces occur in an unbroken row. 5. Landscape islands, peninsulas, or medians shall conform to the planting area specifications set forth in subsection 5.01.04.E. 6. Vehicle stops or curbing shall be used to ensure that vehicles do not overhang required landscaped areas. 5.01.04. Landscape plant material standards. A. Trees for landscaped and buffer areas shall be selected from Table 5.01.04(A). Where the planting area is within a power line easement, small trees shall be selected. (Plants noted with * are preferred for buffers; recommended trees for all landscaping and reforestation are noted with #) Large Trees (Also called shade trees or canopy trees; height at maturity 35 or more feet) Medium Trees (Also called under story trees; height at maturity 25 to 35 feet) Small Trees (Also called under story trees; height at maturity less than 25 feet) # Willow Oak Mountain Silverbell Japanese Maple # Sugar Maple Saucer Magnolia Star Magnolia # Scarlet Oak # Sourwood # Japanese Dogwood # Red Maple Weeping Cherry # Flowering Dogwood English Oak # Leyland Cypress # Crape Myrtle # Bald Cypress Yoshino Cherry # Eastern Redbud # Schumard Oak # Golden Rain Tree # Wax Myrtle # Dawn Redwood Kwansan Cherry Amur Maple # White Oak Mountain Ash *# Yaupon Holly Chinese Elm Redmond Linden Crabapple Darlington Oak Yellowwood # Sweetbay Magnolia Littleleaf Linden *# American Holly # Service Berry Gingko (male only) # Pistachio Bradford Pear Japanese Black Pine Japanese Cedar *# Cherry Laurel # Tulip Poplar * Arizona Cypress Japanese Katsura Tree *# Virginia Pine # London Plane-Tree * Eastern Red Cedar (Sycamore) # River Birch Japanese Pagoda # Fosters Holly American Beech Japanese Zelkova # Southern Magnolia Deodar Cedar Sequoia Large Trees (Also called shade trees or canopy trees; height at maturity 35 or more feet) Medium Trees (Also called under story trees; height at maturity 25 to 35 feet) Small Trees (Also called under story trees; height at maturity less than 25 feet) # Loblolly Pine # Sawtooth Oak # Red Oak # Blackgum or Tupelo # Black Walnut # Sweetgum B. Shrubs to be installed in landscaped or buffer areas shall be selected from the following list: Table 5.01.04(B) Landscape Materials — Shrubs Large Screening Shrubs Small Shrubs (Height at maturity is approximately 36 inches) American Holly Warty Barberry Forsythia Dwarf Burford Holly Dwarf Burning Bush Burford Holly Dwarf Chinese Holly Spirea (all varieties) Osmanthus Japanese Holly Viburnum Nellie R. Stevens Holly Dwarf Yaupon Holly Oakleaf Hydrangea Thorny Eleagnus Mugo Pine Japanese Flowering Quince Savannah Holly Juniper Weigela Hetz Juniper Oregonholly Grape Azalea Ligustrum Nandina Flowering Jasmine Arborvitae Dwarf Nandina Winter Jasmine Russian Olive Leatherleaf Vinburnum Chinese Privet Eastern Red Cedar Winter Honeysuckle Chinese Witchhazel * Northern Bayberry * Cleyera * Pittosporum * Euonymus * Japan Yew * Japanese Privet * Red Tip * California Privet * European Privet C. Grass and ground cover shall be selected from the following list: Table 5.01.04(C) Landscape Plant Materials — Grass and Ground Cover Grass Ground Cover Fescue * Shore Juniper Bermuda English Ivy (shade) Centipede * Periwinkle (shade) Zoysia Purpleleaf Wintercreeper Dwarf Roses Aaronsbeard St. Johnswort * Evergreen Candytuft (border) Rockyspray Cotoneaster Lily-Turf Willowleaf Cotoneaster Creeping Lilyturf (shade) Grass Ground Cover Pachysandra (shade) Hybrid Daylily Ornamental Grasses * Liriope D. All plant materials shall meet the following general requirements: 1. All plant material shall be nursery grown, number 1 grade, and installed according to accepted planting procedures. 2. All plant materials shall meet current American Association of Nurseryman Standards. E. Plant materials shall meet the following specifications for size and location: 5.01.04(E) Plant Material Specifications Plant Size at Planting Maximum Spacing Large trees 2 inches, dbh 40 feet apart, on center Medium and small trees — single trunk 1 inch, dbh 25 feet apart, on center Medium and small trees — multiple trunks 5 feet in height 25 feet apart, on center Large screening shrubs 4 feet in height 5 feet apart, on center Shrubs 18 inches in height 24 inches apart, on center Ground cover Installed in a manner that presents a finished appearance and complete coverage Grass Sodded, sprigged, plugged, or seeded, except that solid sod shall be used in drainage swales or other areas subject to erosion. Lawn grasses shall be planted so as to achieve complete coverage within 2 calendar years from the time of planting. F. Where both large and medium/small trees are planted, they shall be planted in a double staggered row, alternating large and medium/small trees. G. Spacing requirements for trees shall include consideration of trees planted on abutting properties. Trees may be grouped, so long as a sufficient planting area is provided as set forth in paragraph I., below. H. Trees shall be planted to avoid septic tanks and drain fields. I. Planting areas shall meet the following specifications: 1. A planting area of one hundred twenty-five (125) square feet shall be required for each medium or large tree. 2. A planting area of ninety (90) square feet shall be required for each small tree. 3. The minimum dimension of any side of a planting area shall be ten (10) feet. J. Notwithstanding the above, street trees shall be shown on a development landscape plan. Sec. 5.02.00. Buffer requirements. 5.02.01. Purpose and intent. The intent of these requirements shall be to enhance the visual and aesthetic appearance of the county. The purpose of these buffer requirements is to: A. Provide space definition and landscape continuity within the built environment; B. Provide screening and relief from traffic, noise, heat, glare, odor, and the spread of dust and debris; C. Reduce the impact of development on the drainage system and reduce flooding; D. Provide for a sense of privacy; E. Provide for reduction or elimination of incompatibility; F. Reduce the visual impact of unsightly aspects of adjacent development; and G. Provide for the separation of spaces. 5.02.02. Location, measurement, and design of buffers. A. Buffers shall be located on the outer perimeter of a lot or parcel, extending to the lot or parcel boundary line. Buffers shall not occupy any portion of an existing, dedicated, or reserved public or private street, or right-of-way. B. Buffer width is normally measured from the property line; however, design variations are allowed. Average width shall be measured at the two (2) end points of the buffer and two (2) additional points which are each approximately one-third (1 /3) of the total linear distance from the end point. C. The buffer shall be designed to avoid or minimize plantings within drainage, utility, or other easements. D. Buffers shall be designed taking into consideration the site's soils conditions, topography, and natural resources. Native vegetation shall be used for landscaping and buffering unless the applicant demonstrates that the use of non-native, drought-resistant plants would best serve the site. E. Buffers shall be established by the owner of the proposed development site. F. Buffers shall be maintained by the property owner. 5.02.03. Buffer area standards. Table 5.02.03 Buffer Area Standards Proposed Land Use Adjacent Zoning District Minimum Buffer Area Office Institutional Commercial Industrial Mixed use areas RA, R-1, R-2, R-3, R-4, R-5, RS 40 feet Commercial Industrial Mixed use area RD, RMH, RM 30 feet Proposed Land Use Adjacent Zoning District Minimum Buffer Area Manufactured home parks Duplex development Multifamily development RA, R-1, R-2, R-3, R-4, R-5. RS 20 feet All other situations 20 feet 5.02.04. Plant materials in buffers. A. Buffers required for nonresidential uses: Buffers shall be planted with a combination of plant materials. B. Existing plants within the designated buffer area shall not be removed, unless the plants are dead or diseased. Where the administrator determines the existing buffer to be inadequate the following plant materials are required for each fifty (50) linear feet of buffer: 1. One (1) large tree. 2. Two (2) medium or small trees. 3. Ten (10) screening shrubs. C. Buffers for residential uses: The following plant materials are required for each fifty (50) linear feet of buffer: 1. One (1) large tree. 2. Two (2) medium or small trees. 3. Ten (10) screening shrubs. D. Buffer areas shall meet the standards for landscape plant materials set forth in section 5.01.04. Sec. 5.03.00. Tree and vegetation protection. 5.03.01. Purpose. The purpose of this section is to provide for the protection, conservation, and replacement of trees and landscaping in order to improve the urbanized and natural environment of Henry County. It is the policy of Henry County to minimize the removal of trees on development sites and, upon proper site completion, achieve replacement of trees by uniform standards set forth in this section. 5.03.02. Applicability. A. The terms and provisions of this section and the standards set forth shall apply to: 1. Individuals engaged in any activity, private and/or governmental, on real property which requires the issuance of a land disturbance permit within the county according to subsections 12.02.06.F—H. 2. Individuals engaged in the building and/or development of single-family homes or subdivisions, multifamily and manufactured home developments, and all nonresidential uses. 3. Owners of individual properties more than five (5) acres in size and which are not part of a platted subdivision. B. Nothing in this section shall be construed to allow the removal of any tree or vegetation in a required stream buffer, watershed buffer, buffer adjacent to waters of the state, or other undisturbed or planted buffer located for protection of natural resources, except where such removal has been specifically authorized as set forth in this ULDC. 5.03.03. Specific requirements for timber lands. A. Land that is used for silviculture shall comply with the requirements of subsection 5.03.03.B. or subsection 5.03.03.C., below. B. Land that is declared silviculture shall be exempt from the requirements for tree protection provided that the following conditions are met: 1. A certificate from the tax assessor indicating agricultural preference; 2. A forest management plan, demonstrating compliance with the erosion control standards set forth in section 8.05.00; and 3. A commitment to follow the Georgia Forestry Commission's "Best Management Practices" as set forth in paragraph E., below. C. Land that has been designated silviculture may subsequently be developed, provided that a development plan has been prepared and approved by the administrator prior to any clearing, grading, clear-cutting, or other land disturbance. The purpose of the development plan is to ensure that cutting or harvesting of trees occurs in such a manner as to avoid the practice called "clear-cutting" prior to any subsequent development. D. Prior to clearing, harvesting, or cutting trees, or any grading or land disturbance, a combined timbering and logging permit shall be obtained from the county, according to procedures set forth in subsection 12.02.06.H. The development plan shall include a forest management plan for the timberlands site. The management plan shall demonstrate compliance with erosion control standards set forth in section 8.05.00, protection of soil and water resources, and compliance with best management practices. E. Georgia Forestry Commission's "best management practices" (BMPs) include, but are not limited to: 1. Analyze and plan site preparation, taking into account all aspects of streamside management zones. 2. Avoid the cutting of roads or trails unless absolutely necessary. If roads/trails are necessary, do not locate them on ridge-tops and avoid use of soft roads/trails during wet ground conditions. 3. Avoid harrowing, root raking, or bulldozing. 4. When forestry activities are completed for a particular period of time, temporary access roads shall be retired. This includes reshaping, mulching, and seeding, in combination with water bars. 5. Leave logging debris on exposed soil, dry washes, and at points of concentrated drainage from skid trails and road. Do not pile debris in live or wet-weather streams. 6. Do not service logging equipment where it will have an impact on soil or water quality. 7. Skidding on steep slopes shall be done on a gradual grade rather than straight up the slope and skidding shall be alternated between several skidding trails to minimize soil exposure and disturbance. F. In addition to the BMPs set forth above and by the Georgia Forestry Commission, the property owner shall not conduct any other land disturbing activities for a period of three (3) years after the completion of such forestry practices. (See subsection 8.05.01.A.6.) 5.03.04. Exemptions. The following situations are exempt from the provisions of section 5.03.00. A. Individual homeowners within platted subdivisions. The exemption does not include an exemption from requirements for protective buffers along streams, creeks, and reservoirs as set forth in chapter 3. B. All properties for which a covenant has been established with the Henry County Board of Tax Assessors, pursuant to O.C.G.A. §§ 48-5-7.1 and 48-5-7.4, shall be exempt from the terms of this appendix so long as such covenant has not been breached and/or remains in effect. C. The following situations within all residential districts shall also be exempted: 1. Where the addition to a principal structure will constitute structural and exterior changes to the home. 2. Where the construction of an accessory structure(s) and/or uses including, but not limited to, swimming pools and tennis courts, is permitted, including an accessory residential living facility (a.k.a. guest quarters). 3. The removal of diseased, deceased, infested or dying trees, or living pine trees or other trees which may pose a danger to an existing or proposed home, or other structure. 4. Mass grading is allowed for lots ten thousand eight hundred ninety (10,890) square feet or smaller. 5.03.05. Requirements in all zoning districts. A. Residential development plans that propose the mass grading and/or clear-cutting of properties and/or parcels of land which are five (5) acres in size or greater, except as noted in subsection 5.03.04(C), shall be required to implement a master drainage plan and on-site preservation practices in an effort to preserve water quality, as detailed in subsections 12.02.02(3) and 3.03.05(3), respectively. As to each such development, only so much land area shall be cleared as is necessary for the development and construction of roadways, utilities, and amenity areas (i.e., parking lots for clubhouses, pool areas, tennis courts, etc.), and to accomplish the master grading and associated master drainage plan. B. Mass grading and clear cutting of any lot in a residential subdivision are prohibited, except as noted in subsection 5.03.04(C), unless a master grading/drainage plan has been approved for the site. On such lots, land area shall be cleared only as is necessary for purposes of the proper development of said lot. Clearing shall be limited to the specific development and an area not to exceed ten (10) feet from the specific development, including areas for: 1. The placement of the individual home; 2. The placement of driveways and sidewalks; 3. The placement of utilities and detention ponds; 4. The placement of septic systems; 5. The placement of roads; 6. The placement of decks and patios; and 7. Proper drainage as required by the county. 5.03.06. Protection of trees during construction. Methods and standards for tree protection shall be required as follows: A. Trees identified to be preserved and/or planted, and being counted as credit for meeting the requirements of section 5.03.00, shall have a valid, recognizable method of tree-protection (tree-save) marking or delineation installed at the critical root zones. B. No person engaged in the construction of any structure(s) or improvement(s) shall encroach on a designated tree-save/critical root zone area with heavy machinery or the storage of heavy building materials. C. During construction, a tree save area must be designated around any trees that are to remain at the end of construction. Desirable trees should be identified and a physical barrier set up around the tree or group of trees. This barrier can consist of a four-foot high orange safety fence, wide plastic caution tape, a simple fence made of lumber, or other appropriate methods that can identify the noninvasive drip line area. D. The barrier should be placed beyond the drip zone (critical root zone) and should prevent the stockpiling of soil or building materials, dumping cleaning solvents, or parking vehicles or equipment within this barricaded area. (Ord. No. 17-17, § I, 12-5-17) CHAPTER 6. ALTERNATIVE SITE DESIGN STANDARDS Sec. 6.00.00. Generally. 6.00.01. Purpose. Flexibility, creativity, and innovation in design are often limited through applying conventional standards. It is the intent of the county to expand the opportunities for property owners and developers to achieve creative and/or innovative site designs. Alternative site design standards are provided in this chapter for a variety of situations. 6.00.02. Applicability. A. At the discretion of the property owner, the site design standards set forth in sections 6.01.00 and 6.02.00 may be applied to the design, construction, and use of property. The property owner may choose to design and develop a parcel according to the standards set forth herein. B. Proposals to design and develop land according to one (1) of the alternative situations described in this chapter shall conform in all respects to the alternative design standards applicable to the situation that is chosen by the property owner. C. An applicant shall select either conventional standards or alternative standards, but not both. Conventional standards and alternative standards shall not apply in the development of a parcel; only one (1) set of standards shall be used in the design and development of a site. D. Future modifications, extensions, or expansions to a site designed according to alternative design standards in this chapter shall also comply with the alternative design standards. Sec. 6.01.00. Alternative design standards. 6.01.01. Green infrastructure and low impact development. 1. A predesign meeting with county staff is required to review preliminary designs involving the green infrastructure and low impact development items listed below. County staff, including the stormwater quality and pollution prevention department director and/or designee, will evaluate proposed design options on a case-by-case basis to determine potential impacts to safety considerations and adjacent properties, practicability, compliance with local, state, and federal regulations and rules, etc. Site designs utilizing green infrastructure/low impact development must be approved by the stormwater quality and pollution prevention department director and/or designee during the predesign stages of site plan development. It is the responsibility of the property owner, developer, contractor, agent, operator, etc. (those responsible for day-to-day operational control of project plans and specifications to ensure compliance) to have such approvals prior to advancing with site design strategies or applying for necessary permits from the county or other municipalities, agencies, etc. 2. The county will consider design options including, but not limited to, the following items: A. Site preservation and conservation considerations (i.e. greenspace, extended buffering of aquatic resource areas and features, mature canopy and/or preferred vegetative community preservation, reduced impervious surface footprint, avoidance of soil disturbance to steep slopes, etc.), especially in those areas where native vegetation and/or highly productive soils are present; B. Redevelopment sites, where proposed post-construction conditions would result in runoff water quality and/or other environmental improvements to the existing condition of the site; C. Use of pervious/permeable material(s) for parking areas and private roadways under twenty-five (25) mph; D. Use of pervious/permeable material(s) for driveways, consistent with current Georgia Stormwater Management Manual specifications; E. Use of bio-retention islands and/or other green practices which accomplish increased on-site infiltration; F. Implementation of rain gardens, rain barrels, and/or other rain collection practices, so long as such practices are constructed and maintained in accordance with other applicable ordinances; G. Collection of roof stormwater drainage and/or discharge into undisturbed, appropriate pervious areas, as determined by a certified soil scientist, environmental scientist, geologist, or other appropriate professional; H. Tree saves, native species planting, extended vegetated buffers, and other practices that increase post-development shading; I. Parking lot size reduction/use of parking decks, consistent with current Georgia Stormwater Management Manual specifications; J. Landscaped/bioretention islands in roadways and/or cul-de-sacs; K. Reduction of residential driveway widths; 3. Additional and further guidance on alternative green infrastructure and low impact development design considerations is provided in the most current Georgia Stormwater Management Manual. As required, Henry County has adopted the most current Georgia Stormwater Management Manual for guidance and implementation of green infrastructure and low impact development site designs. 6.01.02. Traditional neighborhood development (TND). (Reserved) 6.01.03. Rural neighborhood commercial (RNC). (Reserved) 6.01.04. Transit-oriented design (TOD). (Reserved) (Ord. No. 17-17, § I, 12-5-17) Sec. 6.02.00. Alternative subdivision design standards. 6.02.01. Conservation subdivision development (CSD). An approved conditional use subject to section 11.05.00 of this ULDC shall be required for all conservation subdivisions. A. Purposes. 1. To provide for the preservation of greenspace as a nonstructural stormwater runoff and watershed protection measure. 2. To provide a residential zoning district that permits flexibility of design in order to promote environmentally sensitive and efficient uses of the land. 3. To preserve in perpetuity unique or sensitive natural resources such as groundwater, floodplains, wetlands, streams, steep slopes, woodlands and wildlife habitat. 4. To permit clustering of houses and structures on less environmentally sensitive soils which will reduce the amount of infrastructure, including paved surfaces and utility easements, necessary for residential development. 5. To reduce erosion and sedimentation by minimizing land disturbance and removal of vegetation in residential development. 6. To promote interconnected greenways and corridors throughout the community. 7. To promote contiguous greenspace with adjacent jurisdictions. 8. To encourage interaction in the community by clustering houses and orienting them closer to the street, providing public gathering places and encouraging use of parks and community facilities as focal points in the neighborhood. 9. To encourage street designs that reduces traffic speeds and reliance on main arteries. 10. To promote construction of convenient landscaped walking trails and bike paths both within the subdivision and connected to neighboring communities, businesses, and facilities to reduce reliance on automobiles. 11. To conserve scenic views and reduce perceived density by maximizing the number of houses with direct access to and view of open space. 12. To preserve important historic and archaeological sites. B. General regulations. 1. Applicability of regulations. The conservation subdivision is available in the following zoning districts: RA, R-1, R-2, R-3, R-4, R-5, MU, and IAC zoning districts. The applicant shall comply with all other provisions of the zoning code and all other applicable laws, except those that are incompatible with the provisions contained herein. 2. Ownership of development site. The tract of land to be subdivided may be held in single and separate ownership or in multiple ownerships. If held in multiple ownerships, however, the site shall be developed according to a single plan with common authority and common responsibility. 3. Housing density determination. The maximum number of lots in a conservation subdivision shall be determined using the following yield plan method: Yield plan: The maximum number of lots is based on a conventional subdivision design plan, prepared by the applicant, in which the tract of land is subdivided in a manner intended to yield the highest number of lots possible. The plan does not have to meet formal requirements for a site design plan, but the design must be capable of being constructed given site features and all applicable regulations. The following shall not be included in the net acreage of the parcel: a. Slopes over twenty-five (25) percent of at least five thousand (5,000) square feet contiguous area; b. The 100-year floodplain; c. Bodies of open water over five thousand (5,000) square feet contiguous area; d. Wetlands that meet the definition of the Army Corps of Engineers pursuant to the Clean Water Act; or e. Anticipated right-of-way needs for roads and utilities. C. Conservation subdivision development standards. Table 6.02.01(C) CSD Dimensional Standards Utilizing Sewerage Services Utilizing Septic Systems Minimum tract size 20 acres 20 acres Minimum lot size 10,890 square feet 32,670 square feet Minimum front yard setback 25 feet 40 feet Minimum side yard setback 10 feet 15 feet Minimum rear yard setback 20 feet 40 feet Minimum lot width 60 feet 100 feet Minimum access easement to open space 10 feet 10 feet Minimum open space area required 40% of the gross land area 40% of the gross land area D. Design options. 1. Multiple pod design: The subject property is divided into individual pods connected by the open space areas. A density bonus will be permitted when more than forty (40) percent of the total acreage of the project is designated as permanent, protected open space. For each additional whole acre greater than forty (40) percent, additional lots or units may be developed as follows: a. Additional lots allowed per multiple pod design for each acre of protected open space greater than forty (40) percent are as follows: Current Zoning District Number of Lots RA, R-1 1 R-2, R-3 2 R-4, R-5, MU, IAC 3 b. The number of bonus lots shall be counted in addition to the number of lots calculated using the conventional subdivision design plan (yield plan). c. The distance between residential pods shall be a minimum of two hundred (200) feet. d. A one hundred-foot undisturbed buffer shall be maintained along all exterior streets (not to prohibit access to the site) and a twenty-foot undisturbed buffer along the perimeter of the remainder of the property where a multiple pod design option is utilized. e. If timber on the property has been cut within the last five (5) years or if the property is partially wooded and partially open or entirely open, the above required buffers in the wooded area shall be undisturbed and buffers in the wooded area shall be undisturbed and buffers in the open or timbered areas shall be enhanced with a planted vegetative buffer. Said vegetative buffer shall consist of a minimum of four (4) rows of trees planted with twenty-foot separation between trees and staggered so as to provide a vegetative screen. Three-quarters (3 /4) of the trees must be large screening trees as outlined in subsection 5-01-04.A., of the ULDC, and the remainder shall be made up of large, medium or small trees. f. A landscaping plan shall be submitted to the development plan review department for review and approval. 2. Single pod design: The lots are located in one (1) pod on the subject property surrounded by the open space area. a. A one hundred-foot undisturbed buffer shall be maintained along all exterior streets (not to prohibit access to the site) and a fifty-foot undisturbed buffer along the perimeter of the remainder of the property where a single pod design option is utilized. b. If timber on the property has been cut within the last five (5) years or if the property is partially wooded and partially open or entirely open, the above required buffers in the wooded area shall be undisturbed and buffers in the wooded area shall be undisturbed and buffers in the open or timbered areas shall be enhanced with a planted vegetative buffer. Said vegetative buffer shall consist of a minimum of four (4) rows of trees planted with twenty-foot separation between trees and staggered so as to provide a vegetative screen. Three-quarters (3 /4) of the trees must be large screening trees as outlined in subsection 5-01-04.A., of the ULDC, and the remainder shall be made up of large, medium or small trees. c. A landscaping plan shall be submitted to the development plan review department for review and approval. E. Application requirements. 1. Site analysis map required. Concurrent with the submission of a site concept plan, the applicant shall prepare and submit a site analysis map. The purpose of the site analysis map is to ensure that the important site features have been adequately identified prior to the creation of the site design, and that the proposed open space will meet the requirements of this chapter. The preliminary site plan shall include the following features: a. Property boundaries; b. All streams, rivers, lakes, wetlands and other hydrologic features; c. Topographic contours of no less than ten-foot intervals; d. All primary and secondary conservation area labeled by type, as described in the "open space" section of 6-02-01; e. General vegetation characteristics; f. General soil types; g. The planned location of protected open space; h. Existing roads and structures; and i. Potential connections with existing greenspace and trails. 2. Open space management plan required. An open space management plan, as described in the "Open Space" Section of 6-02-01, shall be prepared and submitted at the time of application. 3. Instrument of permanent protection required. An instrument of permanent protection, such as a conservation easement or permanent restrictive covenant and as described in the "open space" section of 6-02-01, shall be recorded on the open space concurrent with the issuance of a land disturbance permit. 4. Other requirements. The application shall adhere to all other applicable requirements of the zoning district and the subdivision ordinance. F. Open space. 1. Open space within a conservation subdivision is the portion of the conservation subdivision that has been set aside for permanent protection. Activities within the open space are restricted in perpetuity through the use of an approved legal instrument. 2. Standards to determine open space. a. The minimum restricted open space shall comprise at least forty (40) percent of the gross tract area. b. The following are considered primary conservation areas and are required to be included within the open space, unless the applicant demonstrates that this provision would constitute an unusual hardship and be counter to the purposes of this chapter. The primary conservation areas shall be illustrated on the applicant's plat. i. The regulatory 100-year floodplain; ii. Buffer zones of at least seventy-five (75) feet width along all perennial and intermittent streams; iii. Slopes above twenty-five (25) percent of at least five thousand (5,000) square feet contiguous area; iv. Wetlands that meet the definition used by the Army Corps of Engineers pursuant to the Clean Water Act; v. Populations of endangered or threatened species, or habitat for such species; and vi. Archaeological sites, cemeteries and burial grounds. c. The following are considered secondary conservation areas and may be included within the open space area. The secondary conservation areas shall be illustrated on the applicant's plat. i. Important historic sites; ii. Existing healthy, native forests of at least one (1) acre contiguous area; iii. Individual existing healthy trees greater than eight (8) inches caliper, as measured from their outermost drip line; iv. Other significant natural features and scenic viewsheds such as ridge lines, peaks and rock outcroppings, particularly those that can be seen from public roads; v. Prime agricultural lands of at least five (5) acres contiguous area; and vi. Existing trails that connect the tract to neighboring areas. d. Aboveground utility rights-of-way and publicly owned land may be included within the protected open space but cannot be counted towards the forty (40) percent minimum area requirement (exception: historic structures and existing trails may be counted). e. At least fifty (50) percent of the open space shall be in a contiguous tract. The open space should adjoin any neighboring areas of open space, other protected areas, and nonprotected natural areas that would be candidates for inclusion as part of a future area of protected open space. f. The open space shall be directly accessible to the largest practicable number of lots within the subdivision. Nonadjoining lots shall be provided with safe, convenient access to the open space. 3. Permitted uses of open space. Uses of open space may include the following: a. Conservation of natural, archaeological or historical resources; b. Meadows, woodlands, wetlands, wildlife corridors, game preserves, or similar conservation-oriented areas; c. Walking or bicycle trails, provided they are constructed of porous paving materials; d. Passive recreation areas; e. Active recreation areas, provided that they are limited to no more than ten (10) percent of the total open space and are not located within primary conservation areas. Active recreation areas may include impervious surfaces. Active recreation areas in excess of this limit must be located outside of the protected open space; f. Agriculture, horticulture, silviculture or pasture uses, provided that all applicable best management practices are used to minimize environmental impacts, and such activities are not conducted within primary conservation areas; g. Nonstructural stormwater management practices; h. Easements for drainage, access, and underground utility lines; or i. Other conservation-oriented uses compatible with the purposes of this appendix. 4. Prohibited uses of open space. a. Golf courses; b. Roads, parking lots and impervious surfaces, except as specifically authorized in the previous sections; c. Agricultural and forestry activities not conducted according to accepted best management practices; and d. Other activities as determined by the applicant and recorded on the legal instrument providing for permanent protection. 5. Ownership and management of open space. a. Ownership of open space. The applicant must identify the owner of the open space who is responsible for maintaining the open space and facilities located thereon. If a homeowners' association is the owner, membership in the association shall be mandatory and automatic for all homeowners of the subdivision and their successors. If a homeowners' association is the owner, the homeowners' association shall have lien authority to ensure the collection of dues from all members. The responsibility for maintaining the open space and any facilities located thereon shall be borne by the owner. b. Management plan. Applicant shall submit a plan for management of open space and common facilities ("plan") that: i. Allocates responsibility and guidelines for the maintenance and operation of the open space and any facilities located thereon, including provisions for ongoing maintenance and for long-term capital improvements; ii. Estimates the costs and staffing requirements needed for maintenance and operation of, and insurance for, the open space and outlines the means by which such funding will be obtained or provided; iii. Provides that any changes to the plan be approved by the board of commissioners; and iv. Provides for enforcement of the plan. c. In the event the party responsible for maintenance of the open space fails to maintain all or any portion in reasonable order and condition, Henry County may assume responsibility for its maintenance and may enter the premises and take corrective action, including the provision of extended maintenance. The costs of such maintenance may be charged to the owner, homeowners' association, or to the individual property owners that make up the homeowners' association, and may include administrative costs and penalties. Such costs shall become a lien on all subdivision properties. 6. Legal instrument for permanent protection. The open space shall be protected in perpetuity by a binding legal instrument that is recorded with the deed. The instrument shall be one (1) of the following: a. A permanent conservation easement in favor of either: i. A land trust or similar conservation-oriented nonprofit organization with legal authority to accept such easements. The organization shall be bona fide and in perpetual existence and the conveyance instruments shall contain an appropriate provision for retransfer in functions; or the event the organization becomes unable to carry out its [duties]; ii. A governmental entity with an interest in pursuing goals compatible with the purposes of this chapter. If the entity accepting the easement is not Henry County, then a third right of enforcement favoring Henry County shall be included in the easement; b. A permanent restrictive covenant for conservation purposes in favor of a governmental entity; or c. An equivalent legal tool that provides permanent protection, if approved by Henry County. The instrument for permanent protection shall include clear restrictions on the use of the open space. These restrictions shall include all restriction contained in this article, as well as any further restrictions the applicant chooses to place on the use of the open space. 6.02.02. Residential fly-in neighborhoods (RFN). A. Generally. 1. The intent of this section is to permit flexibility of design in order to allow the design and development of subdivisions that accommodate residences with aircraft hangars and private landing strips or private airports. 2. The two (2) existing RFNs, Mallard's Landing and Kitty Hawk, are not subject to the standards of [section] 6.02.02. The two (2) RFNs shall be allowed to continue to develop according to the approved plats. 3. Residential fly-in neighborhoods (RFN) are alternatives to conventional subdivisions. The procedures for applications, preparation of preliminary and final plats, and design and installation of improvements are the same for RFN subdivisions and conventional subdivisions. Procedures for application, review, and approval of preliminary and final plats, and acceptance of public improvements, are set forth in chapter 12. 4. A legal entity shall be created to be responsible for ownership and maintenance of any common space. See section 12.02.07 regarding the standards for a plan for the management of open space and common facilities. 5. RFN subdivisions shall only be located in the RA zoning district. B. The minimum area of a RFN subdivision shall be sixty (60) acres. C. A RFN subdivision shall meet the following requirements: 1. Uses and activities may include the following: a. Runway(s), taxiways, parking ramps, and hangars for the use of individual homeowners and their invited guests for the parking and storing of aircraft. b. Residential dwellings, not to exceed the density of the zoning district in which the RFN subdivision is located. c. Noncommercial fuel facilities for the not-for-profit use of homeowners and guests, provided the facility is properly permitted to meet health and safety standards. Such facilities shall be located in a common area and be maintained by a homeowners' association. d. Accessory structures shall not exceed the total square feet of the principle structure. 2. The following uses are prohibited: a. Any uses not specifically listed in [paragraph] C.1., above that may otherwise be associated with the operation of an airport, including, but not limited to, flight instruction, aircraft storage (other than hangars for use by homeowners), aircraft maintenance, aircraft fueling (other than the provision of limited fuel facilities for homeowners), and other similar airport activities. b. Any commercial, business, or other use not specifically permissible in the zoning district. c. Structures in the approach zone exceeding the height limits established by the FAA (Advisory Circular 150). 3. Any private airport or landing strip allowed by this ULDC shall be compatible with the established character of the surrounding neighborhood. Development of the RFN subdivision shall be of a scale and intensity that shall not result in an adverse impact on residential uses in the surrounding neighborhood. 4. All land needed for the private airport or landing strip approach zone(s) shall be part of the common ownership of the airport and shall not be privately owned by individuals other than the owner of the airport. Land within the approach zone(s) shall not be platted into separate parcels apart from the parcel on which the airport or landing strip is located. 5. A buffer shall be provided at the boundary of the approach zone, and may be required to include noise abatement features, vegetation, walls, or berms. The purpose of the buffer shall be to screen sight or sound of airport activities from adjacent and nearby residential neighborhoods. The buffer shall be a minimum of forty (40) feet in width, and shall conform to the plant material requirements and specifications set forth in section 5.02.04. However, two (2) small trees may be substituted for each required large tree in order to avoid encroachment in any approach zones. 6. Design standards for the airport, landing strip, and associated uses: a. The airport shall demonstrate compliance with applicable laws and regulations of the Georgia Department of Transportation and the Federal Aviation Administration. b. Airports and landing strips in RFN subdivisions shall not be lighted for night operations. 7. Design standards for lots and blocks: a. RFN subdivisions are not required to comply with the design and layout standards for conventional subdivision lots and blocks in section 4.04.05. The standards for design and layout of lots shall comply with [subparagraphs] 7.b. through 7.d., below. b. RFN subdivision lots shall meet the minimum lot area and lot width standards for the zoning district. In addition, lot area shall be sufficient to accommodate any proposed private hangars on the same lot as the principal structure (dwelling unit) in full compliance with the setback requirements in subsection 4.01.02.H. c. Lots may be located to allow direct access from the lot to the landing strip or taxiway. d. Lots may be designed according to conventional subdivision design standards, with hangars located in a common area to provide access to the landing strip or taxiway. e. All requirements regarding access, infrastructure and improvements, signs, landscaping, and natural resource protection shall be met in the design and development of a RFN subdivision. Sec. 6.03.00. Standards for a planned development (PD). (Reserved) Sec. 6.04.00. Transfer of development rights (TDR). (Reserved) CHAPTER 7. STANDARDS FOR ACCESSORY AND TEMPORARY USES Sec. 7.00.00. Generally. The provisions of chapter 7 apply to accessory uses, accessory structures, and temporary uses. Home occupations are considered accessory uses to residential development. Standards for home occupations are set forth in section 7.01.00. Standards pertaining to accessory structures are set forth in section 7.02.00. Standards for temporary structures and uses are set for in section 7.03.00. Standards for signs, which may be either accessory structures, or the principal use on a parcel, are provided in section 7.04.00. Standards for wireless communication facilities, which may be located on a lot or parcel with a principal use, or which may be the principal use, are provided in section 7.05.00. Sec. 7.01.00. Home occupations. 7.01.01. Generally. A. A home occupation is permissible in a lawfully established dwelling unit in any residential zoning district. Home occupations shall meet the standards set forth in this section. B. The following and similar uses shall be considered home occupations: 1. Office for professionals, such as attorneys, drafters, realtors, insurance agents, engineers, architects, and other consultants; 2. Instruction or teaching, such as academic tutoring, performing arts, or fine arts; 3. Administrative or clerical support services, such as transcription, court reporters, stenographers, notary republic, or addressing services; 4. Personal services, such as beauty or barber shop, manicurists, dress-making or tailoring; 5. Pet grooming; 6. Child day care or nursery school for six (6) or fewer children; 7. Adult day care for six (6) or fewer adults; 8. Personal care home for three (3) or fewer persons; 9. Medical practitioner (excluding veterinarians); 10. Manufacturers' and internet sales representative; 11. Studios for artists, or photographers; C. Agricultural activities associated with the raising of crops and farm animals on properties over three (3) acres in size shall not be subject to the requirements for home occupations. D. Activities not listed are prohibited as home occupations. E. Home occupations may employ up to two (2) persons, who work on the premises, but who do not reside in the dwelling located on the premises, satisfying the following criteria: 1. Must be located within the RA (residential-agricultural) zoning district, outside of a subdivision. 2. Must adhere to all other applicable standards for home occupations, set forth in sections 7.01.01, 7.01.02, 7.01.03, and 7.01.04. 7.01.02. Standards for all home occupations. A. All home occupations shall obtain a business license from Henry County. B. Employees of the home occupation not meeting the requirements outlined in section 7.01.01.E. shall be limited to the residents of the dwelling. At least one (1) member residing on the premises must be the primary operator of the business. C. The home occupation shall be clearly incidental to the residential use of the dwelling. 1. The use of the dwelling for a home occupation shall not change the residential character of the building. 2. No internal or external alterations which are inconsistent with the residential use or character of the dwelling shall be permitted. D. Products for sale or use in the home occupation shall not be visible from the street. E. Use of a dwelling for a home occupation shall not exceed twenty-five (25) percent of the total square footage of one (1) floor, except for personal care homes and adult or child day care. 1. Floor plans shall be provided to reflect the dimensions of the entire floor and room which will be utilized for the home occupation. Each floor plan shall be drawn to scale. F. The home occupation shall not constitute a nuisance to the surrounding neighborhood. G. Outside storage of materials used in connection with a home occupation is prohibited. H. A home occupation shall not use or be located in an accessory building. I. Only passenger vehicles shall be used in connection with the operation or management of a home occupation. J. No business shall be conducted between the hours of 8:00 p.m. and 7:00 a.m. 7.01.03. Standards for specific home occupations. A. Instruction shall be limited to two (2) students at any one (1) given time. B. Beauty shops, barber shops, manicurists, pet grooming and similar services shall be limited to two (2) chairs or stations and one (1) shampoo chair or station. There shall be no more than two (2) clients on the property at any one (1) given time. C. Personal care homes and adult or child day care facilities shall provide an approved state license prior to the issuance of a county business license. 7.01.04. Specific standards for agricultural home occupations in the RA zoning district. A. Agricultural product sales shall be allowable in the RA zoning district, provided that the lot or parcel is not part of a subdivision. B. Notwithstanding the provisions in section 7.01.02 above, agricultural products grown on the premises in the RA zoning districts may be visible from the street. C. Only agricultural products produced on the premises may be sold on the premises. D. Trucks and vehicles other than passenger vehicles may be used in connection with the operation of an agricultural home occupation. E. An accessory building may be used in connection with an agricultural home occupation, subject to compliance with the following standards: 1. The accessory building shall maintain a residential appearance. 2. No automotive painting, body work, salvage, major automotive or heavy equipment repairs are to be conducted. 3. No machinery or equipment shall be used which generates noise detectable outside the accessory structure. (Ord. No. 10-17, § I, 11-2-10) Sec. 7.02.00. Accessory structures. 7.02.01. Generally. A. It is the intent of this section to regulate the installation, configuration, and use of accessory structures. Regulation is necessary in order to ensure that accessory structures are compatible with the surrounding neighborhood and are consistent with the character and intent of the zoning district in which the accessory structures are located. B. Permissible accessory uses and structures are identified in Table 2.03.04. C. Accessory structures shall be on the same lot and subordinate to the principal use or structure. D. Standards for specific accessory structures are set forth in sections 7.02.02 through 7.02.07. All accessory structures shall comply with the standards set forth below: 1. Accessory structures shall be located within the side or rear yard, unless otherwise provided in sections 7.02.02 through 7.02.07 and except for buildings in RA zoning districts where the lots are a minimum of three (3) acres in area and are not part of a platted subdivision can be located in the front yard; 2. Accessory structures shall not be erected on a lot prior to the construction of the principal structure, except for the agricultural purpose storage buildings in RA zoning districts where the lots are a minimum of three (3) acres in area and are not part of a platted subdivision; 3. Accessory structures shall be included in all calculations for impervious surface ratio or lot coverage standards and for stormwater management standards; 4. Accessory structures, other than fences located in compliance with the requirements of section 7.02.04, shall not be located within any required buffer or landscaping area, parking lot, protected resource area, or stormwater management area; 5. Accessory structures located in any residential zoning district shall not be used for any type of commercial operation, except as provided in section 7.01.04; 6. Accessory structures shall not be used as a dwelling unit, except as provided in section 7.02.02 which sets forth standards for accessory dwellings; 7. Accessory structures shall comply with the dimensional standards set forth in the following table: Table 7.02.01(D) Dimensional Standards for Accessory Structures Design Feature Standard Setbacks From side and rear property lines 10 feet From corner lots See section 4.01.02.D From recorded easements for drainage, sanitary sewer, and other utilities Prohibited within easements Maximum height: Agricultural support structures, barns, and silos None Within platted subdivisions in RA 25 feet Airplane hangars 35 feet All other RA developments 35 feet All other districts 25 feet Separation from principal building 10 feet Maximum floor area On parcels, greater than one acre and located in the RA zoning district outside of a subdivision No limitation In RA subdivisions 50% of heated space All other zoning districts 50% of the heated floor space of the primary dwelling 7.02.02. Accessory dwellings (guest houses, caretaker houses). A. Accessory dwellings include basement apartments, garage apartments, caretaker or other employee quarters, guest houses, and other accessory dwellings. B. Accessory dwellings shall not be used as rental property. C. Accessory dwellings are permissible within the principal dwelling or as a freestanding dwelling in the following zoning districts: RA, R-1, R-2, R-3, R-4, R-5 and RS. Accessory dwellings are permissible within the following zoning districts as freestanding dwelling units: M-1 and M-2. D. Accessory dwellings contained within a principal dwelling in the RA, R-1, R-2, R-3, R-4, R-5 or RS zoning districts shall comply with the following standards: 1. There shall be no more than one (1) accessory dwelling in a principal dwelling unit. 2. One (1) additional parking space shall be provided to serve the accessory dwelling. 3. The accessory dwelling shall comply with all building and health code standards. E. Freestanding accessory dwellings in the RA, R-1, R-2, and R-3 zoning districts shall comply with the following standards: 1. There shall be no more than one (1) freestanding accessory dwelling unit per residential lot. 2. The accessory dwelling unit may be located on the second floor over a detached garage or may be a separate structure. 3. The accessory dwelling shall be located within the side or rear yard except in the RA zoning districts where the lots are a minimum of three (3) acres in area and are not part of a platted subdivision the accessory dwelling can be located in the front yard. 4. Accessory structures shall comply with minimum setbacks set forth in [section] 2.01.02. 5. The residential lot shall comply with the minimum lot area standards set forth in Table 2.01.01, except that in no case shall an accessory dwelling unit be located on a lot with less than eighteen thousand (18,000) square feet of lot area if the property is served by county sewer; lots must be thirty thousand (30,000) square feet if utilizing an on-site sewage management system. 6. One (1) additional parking space shall be provided to serve the accessory dwelling unit. F. Freestanding accessory dwellings in the M-1 and M-2 zoning districts shall comply with the following standards: 1. There shall be no more than one (1) accessory dwelling unit per development site; 2. The accessory dwelling shall be intended for use by a caretaker or security person for the industrial development; and 3. The accessory dwelling shall not exceed one thousand five hundred (1,500) square feet in floor area. 7.02.03. Fall-out shelters. A. Fall-out shelters are permitted as an accessory use in any zoning district. B. Shelters shall be maintained so as not to become a hazard or blight to the community. C. One (1) fall-out shelter shall be permissible per lot. D. A fall-out shelter shall comply with the setback requirements pertaining to the zoning district. E. A joint shelter may be constructed to serve two (2) adjacent lots with an administrative waiver (see section 11.03.00). 7.02.04. Fences and walls. A. Location of fences and walls. 1. Fences and walls may be located on or inside property lines. 2. Setback requirements applicable to buildings shall not prohibit or restrict any necessary retaining wall, below ground foundation, or fence which shall be necessary for the proper development of a site as required by the county. 3. Fences and walls shall be located to avoid interference with the required clear visibility area designated in section 8.01.07. 4. Fences and walls shall not obstruct, hinder, or impede the movement of pedestrian and vehicular traffic, and shall not present a nuisance, danger, or hazard to the general public. 5. Fences and walls do not require a building permit, with the exception of walls exceeding four (4) feet in height. B. Types of fences. Table 7.02.04(B) Types of Fences. Fence Type RA R-1, R-2, R-3, R-4, R-5, RS, RD, RM, RMH MU, OI, C-1, C-2, C-3, IAC, M-1, M-2 Within subdivisions Not within a subdivision Decorative: wood, stone, masonry, wrought iron Permitted* Side and rear yards only Permitted* Permitted Chain link Permitted* Side and rear yards only Permitted* Permitted Barbed wire Permitted Prohibited Side and rear yards only; limited to top of the fence or wall Limited to top of the fence or wall Welded or hog wire Permitted Prohibited Side and rear yards only Prohibited adjacent to residential zoning districts Electric See section 7.02.04.C Prohibited Side and rear yard only: See section 7.02.04.C Permitted: See section 7.02.04.C * All requests for a fence in the front yard shall be handled administratively, based on a justification and/or hardship. The request will be evaluated by the Architectural Review Committee. C. Electrical fencing shall meet the following standards: 1. Electrical fencing shall be permissible only on residential lots that are not within a platted subdivision; 2. Electrical fencing shall be limited to the side and rear yard, except on parcels that have more then three (3) acres and are not within a platted subdivision, which may have electric fencing anywhere on the property; 3. Signs are required to provide a warning of the type of fence and the voltage of the fence; 4. Warning signs in residential zoning districts shall be placed at each corner of an electrical fence; 5. Warning signs in nonresidential zoning districts shall be placed fifteen (15) feet apart along the entire fence; and 6. Warning signs shall not exceed four (4) square feet in area. D. Height standards. 1. Heights of fences shall be measured from ground level at the base of the fence to the topmost part of the fence. 2. Table of height standards. Table 7.02.04(D)(2). Height Standards for Fences. Zoning District Maximum Height RA, R-1, R-2, R-3, R-4, R-5, RS, RD, RM, RMH Front yard 6 feet Side and rear yard 8 feet MU, C-1, C-2, C-3, IAC, M-1, M-2 8 feet 7.02.05. Outside storage. A. Outside storage involving machinery and equipment, service areas for vehicles in need of major service or repair, materials for construction or distribution is permissible only in the C-3, M-1, and M-2 zoning districts. B. Outside storage involving machinery and equipment is permissible only in the RA zoning district (not within a subdivision) on a minimum lot size of two (2.0) acres, where the machinery or equipment is not visible from the public right-of-way. C. Outside storage shall be located within a rear yard or side yard. D. Outside storage shall be fully concealed with a solid fence, in addition to any buffer requirements set forth in section 5.02.00. E. Outside storage of parts and materials, service areas, refuse, or work activity areas shall be maintained in a neat and orderly manner. F. Materials shall not be stored within any required buffer area. 7.02.06. Satellite dish antennas. A. Residential satellite dish antennas shall be permitted as an accessory use only in rear and side yards unless it can be documented that reception is impaired by such a location. 7.02.07. Swimming pools and pool enclosures. A. Swimming pools, accessory to residences, shall be constructed in accordance with the Swimming Pool Code as adopted by Henry County and shall be approved by the Environmental Health Department prior to obtaining a building permit. B. All residential accessory swimming pools shall meet the following standards: 1. A swimming pool shall comply with minimum side and rear yard requirements for accessory structures. Setbacks for accessory swimming pools shall be measured from the decking or closed part of the pool structure to the property line. 2. A pool shall be enclosed by a security fence of not less than four (4) feet in height from ground level. All above ground pools which are greater than four (4) feet in height shall not be required to be enclosed by a fence, but the entrance to such pool shall be restricted with a gate. A gate shall be installed at all entrances to any deck structure attached to such pool and/or at all ladder structures accessing such pool. 3. All gates attached to such security fences shall contain self-closing positive latch devices to ensure the pool is enclosed and secure at all times. 4. The required security fence shall be installed prior to occupancy and/or any use of the swimming pool. 5. No ladders shall be affixed to a pool for purposes of entry or exit while self-closing positive latch entrance gates are open. 6. All security fences shall be installed with a solid and permanent foundation, which shall include fastening such materials a minimum of one (1) foot into the ground. 7. A security fence may include decorative materials, such as brick, wrought iron, stone, wood, or masonry. C. Any constructed or prefabricated pool used other than in conjunction with a private single-family residence shall be deemed a public swimming pool. 1. Public pools, including, but not limited to, those constructed and operated by a public agency, or as part of a multiple-family residential development, a subdivision association, a two-family residential development, a condominium association or a private club shall be enclosed by a security fence of not less than five (5) feet in height. 2. Security fences shall be transparent and shall not include privacy fences or fences that obstruct the view of the pool from the outside. 3. Security fencing and gates shall comply with the standards in subsection 7.02.07.B., above. 4. Swimming pools shall comply with the standard setback requirements within its zoning district. 7.02.08. Employee support facilities in the OI, C-1, C-2, C-3, IAC, M-1, and M-2 zoning districts. A. The following facilities may be allowed to serve employees of the establishment: Child day care facilities; cafeteria, restaurant, coffee shop, deli, or dining room; newsstand; fitness center or similar recreation facility; and banks. B. The facility shall be an integral part of a permitted principal use. It shall be located, oriented, and designed to serve the employees of the principal use. C. Employee support facilities may be located within the principal building on the site, and shall meet the following standards: 1. Any individual facility listed in paragraph A., above shall be limited to ten (10) percent of the total floor area of the principal building(s) on the site. 2. The cumulative total floor area for all employee support facilities shall not exceed twenty-five (25) percent of the total floor area of the principal building(s) on the site. D. Employee support facilities may be located in an accessory structure, and shall meet the following standards: 1. The accessory structure shall meet the standards in subsections 7.02.01.D.1 through 4. 2. Employee support facilities may be combined within one (1) accessory building. No more than two (2) accessory buildings shall be permissible for purposes of locating employee support facilities. 3. Accessory buildings to contain employee support facilities may share the parking lot serving the principal building, provided that the accessory building is no more than six hundred sixty (660) feet from the principal building. E. Signs to identify employee support facilities shall be limited to wall signs, not to exceed four (4) square feet in sign area, or directional signs, not to exceed two (2) square feet in sign area. F. Employee support facilities shall not indicate availability to the public through signage, advertising, or other methods to attract the general public. (Ord. No. 10-20, § I(11), 6-15-10; Ord. No. 12-23, § I, 7-17-12; Ord. No. 14-05, § I, 2-4-14) Sec. 7.03.00. Temporary structures and uses. This section provides for temporary structures and uses during construction and for temporary uses and structures during special events. 7.03.01. Temporary structures and uses during construction. A temporary building or use in connection with a construction project or land subdivision development shall be permitted on the land of the project during the construction period. The following standards shall be met by temporary uses established during construction or land subdivision: A. A building permit shall be required as set forth in appendix B [of this ULDC]; B. Timeframe to utilize temporary structure. 1. Temporary structures related to a subdivision development shall be removed when eighty (80) percent of all lots are occupied by completed homes or within four (4) years of the issuance of the permit, whichever occurs first. 2. The Henry County Building Official or his/her authorized designee, upon written request by the owner including the reason for the request and an updated account of completed houses within the subdivision, may issue a one-time, one (1) year extension of completion time for cause beyond the original compliance/completion period, in accordance with section 7.03.01.B.1. Approval will be based upon, but not limited to, current maintenance and aesthetics of the temporary structure and property, and verification that all required erosion control measures are in place. Applicants shall apply for the one-time extension within thirty (30) business days of the expired date of the temporary structure permit. Granted or denied extensions of compliance/ completion period shall be in writing and signed by the building official or his authorized designee, within ten (10) business days. All extension approvals will be subject to a fifty-dollar renewal fee. Permission for a greater extension of time beyond the one[-year] period may be granted only by the Henry County Board of Commissioners in regular public session. An application to appear before the board of commissioners shall be on forms provided by the Henry County Building Department and shall be accompanied by a fee of three hundred dollars ($300.00). C. Temporary offices may be located on a construction site to be used for administrative functions during construction. Temporary construction offices may have the name of the construction company printed on a permanently affixed sign on the outside of the building. Such sign shall be a maximum of four (4) feet by eight (8) feet. In addition, the proposed construction building shall meet tie-down requirements for mobile structures, and have a contract for sewage pump-out. Construction buildings shall be removed within thirty (30) days of completion of the construction site for which they are permitted; D. On-site outdoor storage of equipment and construction materials shall be allowed during the period of construction; E. Portable toilet facilities shall be allowed; F. Construction and demolition debris dumpsters are allowable and are not required to be screened; G. A temporary office which meets parking, handicapped and landscape requirements shall be allowed. A temporary office may be used for sales functions or sales offices, allowing for the sale, resale, or marketing of dwellings, structures, or property within the development in which it is located, or adjacent developments under the same control; and H. On-site temporary use of structures and equipment for the building of roads, public utilities, and government projects shall be allowed. 7.03.02. Portable or mobile restaurants and food services, temporary outdoor sales (transient merchant), and sidewalk sales. A. Applicability. Mobile food services, portable restaurants, temporary outdoor sales, and sidewalk sales are permissible in the following zoning districts MU, C-1, C-2, C-3, IAC, M-1, M-2. Portable restaurants shall be inspected and approved by the Henry County Environmental Health Department prior to obtaining a business license. All structures pertaining to this section shall remain portable. These temporary uses are permissible on vacant lots or on lots containing a business in accordance with the standards of this section. B. The applicant shall have written permission of the property owner and all business owners on the lot to conduct retail sales. C. The applicant shall possess a valid occupational license. D. No temporary use shall be located within: 1. The public right-of-way; 2. Any required setback area, including required parking area, or required buffer area; 3. Any driveway or access way, or in such a manner as to block a driveway or access way; or 4. Any designated fire lane or in such a manner as to block a fire lane; E. Transient merchants shall provide parking spaces: 1. Parking spaces shall be provided in addition to any required parking serving an established use on the lot. 2. One (1) additional parking space shall be provided for every two hundred (200) square feet of display area. 3. Handicapped parking and access shall be provided according to section 8.02.06. F. Roadside vendor signs shall only be permitted according to subsection 12.02.06.C., regarding temporary signs. G. Certificate of organization from the Secretary of State of Georgia shall be required. H. Electrical service from the primary structure only. Separate service is not allowed. 7.03.03. Special events. Special events may include carnivals, fairs, festivals, seasonal sales, or other periodic events of a temporary nature. (Specific requirements for special events involving a seating capacity of at least ten thousand (10,000) persons are contained in the Henry County Code of Ordinances, section 3-15-1.) Such events are typically outdoors. A. The following standards apply to carnivals, fairs, festivals, and similar events and activities: 1. A permit is required according to the procedures set forth in section 12.02.06 subject to state regulations and the county fire code; 2. The applicant shall ensure the provision of adequate sanitation facilities, sewage disposal, garbage and refuse disposal, potable water supply, and food service during the special event; 3. The site shall have floodlighting for the special event and parking areas, if any activities are to be offered during darkness. Lighting shall be shielded and directed to avoid direct illumination of adjacent properties; 4. The site shall have adequate parking facilities. Parking may be on-site or off-site. Where off-site parking is provided, there shall be adequate plans for transporting or conducting patrons from the parking facilities to the special event area; 5. The applicant shall provide an adequate plan for traffic control and security in and around the special event area; and 6. All stages, booths, tents, scaffoldings, or structures of any nature on, under, or within which persons may congregate, shall conform to applicable building, health, and other construction codes. B. The following standards apply to seasonal sales: 1. A temporary use permit is required according to the procedures set forth in section 12.02.06. 2. The area devoted to seasonal sales shall not be located on any designated setbacks, buffers, parking spaces, parking lot aisles, driveways, fire lanes, or other traffic circulation areas. 3. Goods, tents, equipment, or materials used for the seasonal sales activity shall not be located within any right-of-way. 4. Designated parking spaces shall be provided to support the seasonal sales activity. 5. The applicant shall ensure the provision of adequate garbage and refuse disposal. 6. The applicant shall demonstrate conformance with all applicable building, health, and other federal, state, or local laws. (Ord. No. 10-13, § I, 10-18-10) Sec. 7.04.00. Signs. 7.04.01. Purpose. The purpose of the sign regulations set forth in section 7.04.00 are as follows: A. A comprehensive regulation is necessary because of the current burgeoning growth in Henry County and because a major interstate highway runs through the center of the county and attracts signs that are unrelated to business uses inside the county, leading to poor aesthetics and dropping property values. B. To ensure that the county remains an attractive residential area as well as a viable commercial area, it is necessary to maintain a visually satisfying environment. A plethora of signs of a certain size and nature, no matter how tasteful, can have an undesirable effect upon traffic safety and the well being of the entire community. The county is more likely to attract commercial enterprises and permanent residents if it improves and maintains its appearance. County residents will ultimately benefit from enhanced retail and commercial environments and improvements in the quality of life as a result of these regulations. It is a rational desire of the community, and most specifically of those who live therein from day to day, to plan their physical surroundings in such a way that unsightliness is minimized. C. Further, the county has an obligation and a right to protect the rights of adjoining landowners to adequate light and air, to promote desirable living conditions and sustain stability of neighborhoods, to protect property against blight and deprivation, and to encourage the most appropriate use of land, buildings and other structures throughout the county. D. Accordingly, in consideration of the county's rights and obligations to promote traffic safety, to preserve property values, to provide for the convenience and enjoyment of public travel, to eliminate annoyance to travelers, to attract tourists, residents and industry, to serve the public health, safety and morals, to advance the general prosperity of the community, and to serve the general welfare, the board of commissioners hereby imposes the regulation of signs contained in this section. E. The board of commissioners finds that signs provide an important medium through which individuals and entities may convey a variety of noncommercial and commercial messages. However, left completely unregulated, signs can become a threat to public safety as well as a traffic hazard. Such signs may also constitute an aesthetic nuisance and be a detriment to property values and the county's public welfare. The board of commissioners intends by enacting this section to: 1. Balance the rights of individuals and entities to convey their message through signs and the right of the public to be protected against the unrestricted proliferation of signs; 2. Protect the public health, safety, welfare, and aesthetics of the county; 3. Reduce traffic and pedestrian hazards; 4. Maintain the historical image of the county; 5. Protect property values by minimizing the potentially adverse effects and visual blight caused by signs; 6. Promote economic development; and 7. Ensure the fair and consistent enforcement of sign regulations. 7.04.02. Procedures. Procedures for sign permits and temporary sign permits are set forth in chapter 12. Procedures regarding nonconforming signs are set forth in chapter 11. 7.04.03. Construction standards; all signs. A. Building code compliance. All signs shall be constructed and maintained in accordance with the provisions of the county building code. B. Materials required. All signs for which a permit is required by this ULDC, except those covered by section 7.04.05 of this ULDC and temporary signs, shall be constructed of noncombustible material. C. Reflectors. Reflectors and lights shall be permitted on ground signs, roof signs, and wall signs; provided, however, that the reflectors and lights shall be provided with proper glass lenses so that no light creates a hazardous or dangerous condition. D. Internal illumination. The illumination of internally illuminated signs shall not exceed twenty (20) foot-candles of incandescent light measured at a distance of ten (10) feet from such structure. E. External illumination. Externally illuminated signs shall be lighted so that no lights are positioned in such a manner that light glares or shines into the eyes of motorists or pedestrians so as to create a hazardous or dangerous condition. Additionally, illuminated devices (on- and off-premises) shall be placed and shielded so that light from the sign itself will not directly cast into any residential district, [or] sleeping rooms in any district. F. Other code compliance. All building, construction, setback, zoning or other relevant codes excluding permitting (other than that provided elsewhere herein) shall be applicable to the location, construction and siting of signs and shall be read in harmony with this ULDC. 7.04.04. Sign setbacks and restrictions. A. All signs shall be required to be located within the required property lines, and shall not be permitted to extend beyond the property line into the right-of-way, easements or adjacent property. The location of signs shall not interfere with the view of a traffic signal or traffic vision in accordance with other county standards. B. Where the charts in section 7.04.10 make reference to this subsection, in order to erect a second sign a use shall have frontage on two (2) publicly dedicated streets when each street includes an existing legal curb cut or where property has both frontage on a publicly dedicated street and frontage along an interstate highway. In addition, there shall be a minimum lot area of one (1) acre to permit a second such sign to be erected. In those instances where one (1) of the street frontages is on a street serving a residential subdivision, a second sign shall be prohibited. 7.04.05. Prohibited signs. It shall be unlawful for any person to erect flashing signs, or aerial view signs in the county. 7.04.06. Exemptions. A. The following signs are exempt from the permitting requirements of this ULDC; provided, however, that such signs shall be subject to all other provisions of this ULDC: 1. Wall signs: One (1) square foot and smaller. 2. Stake signs: Eight (8) square feet and smaller. 3. Memorial signs or tablets, names of buildings, and dates of erection when cut into any masonry surface or when constructed of bronze or other noncombustible materials. 4. Any temporary sign that has less than or equal to thirty-two (32) square feet of maximum signable area per side, which sign is posted, erected or constructed during the period commencing upon the date which is ninety (90) days prior to the date of any primary election, general election or run-off election and ending twenty (20) days following the date on which the primary election or run-off election is conducted (such a period of time is hereinafter referred to as the "permit exempt season"). Unless permitted elsewhere in this article, no sign shall remain posted, erected or constructed after the conclusion of the permit exempt season unless all requirements of section 12.02.06 and all other requirements of this article have been and remain satisfied. 5. Temporary ground or wall signs signifying the grand opening of an establishment, that are erected for a maximum of fifteen (15) days. A signed affidavit and photo, with sign dimensions must be submitted to the planning and zoning department, prior to erecting a sign. B. The following signs are exempt from all provisions of this ULDC: 1. Signs that are not visible from any public right-of-way or any adjacent property; 2. Directional signs used to move consumers through a lot; 3. Temporary signs required to be posted by federal law, state law or by the ULDC; and 4. Decals affixed to or signs painted on equipment, fuel pumps or other types of vending equipment used for dispensing retail products, provided that such decals or signs have a signable area not exceeding four (4) square feet on any single piece of equipment. 7.04.07. Special limitations. In addition to the limitations set forth in the other sections of this ULDC, the following limitations shall apply to these specific types of signs: A. Wall signs. No wall sign shall cover wholly or partially any wall opening, nor project beyond the ends or top of the wall to which it is attached. Signs on the walls of a building (including signs attached flat against the wall, painted wall signs and projected signs) shall meet the following requirements: 1. Wall signs attached flat against a wall may extend not more than twenty-four (24) inches from the wall. 2. Signs attached at an angle to a wall may extend outward from the wall of a building not more than five (5) feet. B. Roof signs. 1. Setback from roof edge. No roof sign shall be erected or maintained within five (5) feet of the outside wall toward which the sign faces. 2. Prohibited obstructions. No roof sign shall be placed on the roof of any building or structure in such manner as to prevent free passage from one (1) part of the roof to any other part thereof or interfere with openings in the roof. 3. Not more than one (1) roof sign structure off-premises or on-premises may be erected on the roof of any one (1) building. No roof sign structure shall extend more than twenty-five (25) feet above the elevation of the roof. C. Projecting signs. 1. No projecting sign may be placed over streets, alleys, or ways available for vehicular traffic. 2. All projecting signs shall be installed at a ninety-degree angle to the building facade. D. Temporary signs. 1. Temporary signs are subject to the permitting process as described in this ULDC. Permits for temporary signs are valid for one hundred and twenty (120) days from the date the permit is issued, except for banners placed in county parks, which shall be removed within seventy-two (72) hours after placement on the lot. Stake signs are exempt from the application and permitting process. 2. All temporary signs shall be securely installed, and shall meet all applicable safety standards as prescribed by the building code, electrical code, or as promulgated by the board of commissioners. 3. Temporary subdivision signs, not exceeding thirty-two (32) square feet in area announcing a land subdivision development, are permitted on the premises of the land subdivision. Such signs shall be spaced no less than three hundred (300) feet apart. All signs shall be removed when seventy-five (75) percent of the lots are conveyed. 4. Sites that are under construction are permitted to have one (1) nonilluminated sign not to exceed thirty-two (32) square feet in area, displaying the name of the building, contractors, the architects, the engineers, the owners, and the financial agencies. Such signs shall be removed from the site within thirty (30) days after the completion of the project. 5. If any temporary sign is erected or maintained in such a manner so as to be in violation of this ULDC or any other ordinance or law of the county, the code enforcement department may give written notice to the owner thereof and to the owner of the property and premises upon which the sign is located that the sign shall be removed within three (3) days. If the sign is not thereafter removed, the board of commissioners may cause its removal and impose the cost of the removal as a lien upon the property upon which the sign sits. E. Awning signs. 1. Awning signs shall be painted or installed directly on the valances of the awning. 2. Awning signs shall not have lettering or graphics exceeding ten (10) inches in height. 3. No awning sign may be internally illuminated. 4. The signable area of any awning sign shall not exceed ten (10) percent of the surface area of the awning. F. Entrance sign and subdivision signs. All entrance and subdivision signs shall be placed on private property and may not be placed in the right-of-way. Exception: A sign may be placed in the right-of-way in a center median if it meets the following. 1. The sign has two (2) faces; 2. The location has been approved in writing by the Henry County Department of Transportation; and 3. The applicant agrees to be responsible for maintenance and repair of the entrance sign and ensures that the existence of the entrance sign is documented on the final plat for the development. G. Flags. 1. In ground. A flag may be flown from a metal pole permanently placed in the ground. The flag flying from such pole shall not exceed three (3) feet in width and five (5) feet in length and the pole shall not exceed twenty (20) feet in height on a residentially zoned property. In a commercial or industrial zoned property the flag flying from such pole shall not exceed nine (9) feet in width and fifteen (15) feet in length and the pole shall not exceed thirty-five (35) feet in height or fifty (50) feet in height when located within five hundred (500) feet of an interstate highway. 2. Projecting. A flag may be flown from a metal or wooden pole attached to a bracket projecting from the side of a building or door frame. The pole shall not exceed six (6) feet in length, nor one (1) inch in diameter. The flag flying from such pole shall not exceed three (3) feet in width and five (5) feet in length. Additionally, the flag displayed in such manner shall not impede pedestrian or vehicular traffic. 3. Hanging. A flag may be hung in either the primary facade or secondary facade of a property appropriately zoned under this ULDC. The flag shall count against the percentage of window signage permitted for the zoned property as delineated in section 7.04.10. 4. Limit. Only three (3) flags (either ground, projecting or hanging) shall be flown or displayed on each property. The flag shall count against the allocation of the ground, projecting or window signage permitted for each property in section 7.04.10. H. Banners in county parks. 1. In accordance with subsection 7.04.07.A, county sponsored or operated events shall be exempt from sign regulation. 2. Banners shall be considered temporary signs as defined in appendix A of this ULDC. 3. In addition to the special limitations found in subsection 7.04.06.D. of this ULDC, banners placed in county parks shall be further regulated as follows: a. Banners in the county's parks can be displayed for no more than seventy-two (72) hours; b. No person shall be permitted to display more than one (1) banner on the premises, and only one (1) banner shall be displayed on the premises at any given time; c. Each person is responsible for erecting and removing its banner; d. No banner shall be any larger than sixty (60) square feet; and e. All banners shall be attached to poles provided by the county, and no banner shall at any time be attached to trees within the park. I. Home occupation signs. 1. One (1) nonilluminated wall sign not exceeding two (2) square feet in area is permitted on the premises of a home occupation(s) in addition to a stake sign meeting the requirements of section 7.04.06.A.2. 2. For those premises of a home occupation(s) zoned RA (residential-agricultural) located outside of a subdivision platted with internal streets and containing a minimum of one (1) acre and one hundred (100) feet of road frontage, one (1) nonilluminated ground sign not to exceed sixteen (16) square feet in area with a maximum height of six (6) feet is permitted provided that all the requirements of section 12.02.06 have been and remain satisfied. 7.04.08. Special requirements for all signs. A. County property. All lots, buildings, structures or property owned or operated by Henry County shall be exempt from all requirements of this ULDC. No sign shall be placed in the public right-of-way, unless such sign was in place and subject to removal based upon county initiated action. In such instance the county may allow the owner to obtain a sign permit to replace the removed sign, one (1) foot outside of the clear zone and under conditions and stipulations required by the zoning administrator/public works director or their respective designee. However, in no event shall the replacement sign be enlarged or increased in number (i.e. no additional sign) or a different structure/character than the permitted original sign. The owner shall be required to complete and permit a new sign application, but all fees shall be waived. B. All signs shall be placed upon a lot. No sign may be placed on any lot, which lot does not meet the minimum requirements of this ULDC. C. Obstruction to doors, windows, or fire escapes. No sign shall be erected, relocated, or maintained so as to prevent free ingress to, or egress from, any door, window, or fire escape; nor shall any sign be attached to any stand pipe or fire escape. D. Sign not to constitute traffic hazard. No sign or other advertising structure as regulated by this ULDC shall be erected at the intersection of any streets in such a manner as to obstruct free and clear vision from vehicles thereupon; or be placed at any location where, by reason of the position, shape, or color, it may interfere with, obstruct the view of, or be confused with, any authorized traffic sign, signal, or device; or make use of the words STOP, DANGER, or any other word, phrase, symbol, or character in such manner as to interfere with, mislead, or confuse motorists. E. Posting on trees, poles, etc. No sign shall be allowed to be tacked, painted, posted, marked, or otherwise affixed on trees, utility poles, or other similar structures, or on rocks, the ground itself, or other natural features. Except for temporary pennants or streamers located in commercial shopping center parking lots. F. No posting on supports. No message or advertisement may be displayed on any portion of the structural supports of any sign. G. Maintenance. All signs regulated by this ULDC shall be kept clean, neatly painted, and free from all electrical and mechanical hazards, including, but not limited to, faulty wiring and loose connections, and the premises surrounding the signs shall be maintained by the owner in a sanitary and inoffensive condition, free and clear of all weeds, rubbish, and debris. H. Special situations. Those developments which include at least one (1) building of three (3) stories or more may be permitted to have a wall sign not exceeding one hundred (100) square feet per primary and secondary facade on such buildings three (3) stories or more. The sign allowance provided under this subsection shall be exempt from the aggregate signage allowed per lot. I. No simulation of public signal. No sign shall be erected which simulates an official traffic control, warning sign or public service signal. 7.04.09. Special requirements by zoning classification. (See section 7.04.10, tables of sign standards, for additional requirements.) A. Entrance signs, subdivision signs, and signs on properties with a conditional use permit utilized for religious facilities may be illuminated. B. In any MU zoning district, in addition to those limitations found in section 7.04.10 of this ULDC, the following requirements shall be observed: 1. A uniform design scheme of signs shall be established for the development as a whole and/or for each building in the development and approved as part of the development plan. Decals may be allowed provided they do not exceed four (4) inches in width and twelve (12) inches in length or forty-eight (48) square inches in size. 2. Plans for the development shall include detailed descriptions of all signs, including but not limited to, size, height, location, type, colors, and materials to be used, lighting and ownership responsibility. 3. Plans for signs shall undergo the same review and approval process as is required of other aspects of the development; provided that the board of commissioners may make no modification of these regulations which would permit a sign otherwise prohibited under this ULDC. 4. All signs shall be designed, erected, and maintained in accordance with an approved plan. 5. In addition to the signage allowed in section 7.04.10, each individual unit with a store front may have one (1) wall sign with signable area not to exceed one (1) square foot for each horizontal linear foot of store front. C. A master sign plan shall be submitted for multiple-occupancy developments/subdivisions within zoning districts MU, IAC, RS, C-1, C-2, C-3, M-1, M-2 that are five (5.0) acres or more in area. The master sign plan shall establish standards and criteria for all signs in the complex, which require permits and shall address, at a minimum, the following: 1. Proposed sign locations; 2. Approved materials and colors; 3. Type of illumination, including fixture specifications and wattage; 4. Design of freestanding and wall sign structures; 5. Size and quantity; 6. Uniform standards for non-business signage, including directional and informational signs; and 7. Identification of delivery. Approval by the administrator or designee shall apply only to the architectural elements, uniformity of size, color and placement of the master sign plan. The review by the administrator shall not address the content of any sign within the master sign plan. All applications for sign permits for signage within a multiple-occupancy development/ subdivision shall comply to the master sign plan. It shall be the responsibility of the owner or leasing agent of the property to provide the occupant with a copy of the approved master sign plan. Any signage for new businesses within the existing projects shall comply with the provisions of this ULDC. 7.04.10. Tables of sign standards. In addition to all other regulations in this ULDC, all signs shall conform with the requirements of the tables contained in this section. A. Lots zoned RA, R-1, R-2, R-3, R-4, R-5, RS, RD, and RMH (Where a residence is on the lot). Table 7.04.10(A). Residential Lot Sign Standards (Where a residence is on the lot). Ground Sign Projecting Sign Temporary Sign Roof Sign Entrance Sign Subdivision Sign Window Sign Maximum height (from finished grade) Prohibited Prohibited Prohibited Prohibited Prohibited 8' Prohibited Maximum width Maximum square feet of signable area 32; 18 if internal Maximum number of signs 2 stake signs only 2 per subdivision entrance Required minimum setback from right-ofway 1' 1' Required minimum setback from electrical transmission lines 10' Note: Wall signs are prohibited where a residence is on the lot, with the exception of home occupations which are allowed a maximum 2-square foot plaque on the premises. B. Lots zoned RA, R-1, R-2, R-3, R-4, R-5, RS, RD, and RMH (Where no residence is on the lot). Table 7.04.10(B). Residential Lot Sign Standards (Where a nonresidential use is on the lot). Ground Sign Projecting Sign Wall Sign Temporary Sign Roof Sign Entrance Sign Subdivision Sign Window Sign Maximum height (from finished grade) 12' 10' 10' above eave Prohibited 8' Maximum width 10' 10' 8' Building width Maximum square feet of signable area 1 square foot per building frontage foot up to 120 square feet 50 2 square feet per building frontage foot up to 200 square feet 32 200 32; 18 if internal 10% of the primary facade and secondary facade window space Maximum number allowed 1, except 2 if permitted by section 7.04.04.B 1 per primary facade and 1 per secondary facade 1 per primary facade and 1 per secondary facade 1, except stake signs (2) 1 per primary facade and 1 per secondary facade 1 Required minimum setback from right-ofway 1' 1' 1' Ground Sign Projecting Sign Wall Sign Temporary Sign Roof Sign Entrance Sign Subdivision Sign Window Sign Required minimum setback from electrical transmission lines 10' 10' 10' 10' 10' Maximum projection from building 6' 8' Note: In addition to those regulations set forth in the above table, no person may maintain any sign or signs on a lot zoned RA, R-1, R-2, R-3, R-4, R-5, RS, RD, and RMH (where no residence is on the lot) so that the aggregate signable area exceeds three hundred (300) square feet, regardless of the construction, placement or type of sign or signs. C. Lots zoned RM. Table 7.04.10(C). Multifamily Lot Sign Standards. Ground Sign Projecting Sign Wall Sign Temporary Sign Roof Sign Entrance Sign Subdivision Sign Window Sign Maximum height (from finished grade) Prohibited Prohibited Prohibited 10' Prohibited 8' Prohibited Prohibited Maximum width 8' Maximum square feet of signable area 32 32 Maximum number of signs 1 stake sign for each individual residential unit 2 per entrance Required minimum setback from right-ofway 1' 1' Required minimum setback from electrical transmission lines 10' 10' D. Lots zoned C-1, C-2, C-3, and IAC (multiple businesses per lot or business subdivision). Table 7.04.10(D). Commercial Lot Sign Standards (Multiple businesses). Ground Sign Projecting Sign Wall Sign Temporary Sign Roof Sign Entrance Sign Subdivision Sign Window Sign Maximum height 20' or 50' if within 500' of I-75 or I-675 10' 10' above eave 8' Prohibited Maximum width 15' 10' 8' Building width 8' Maximum square feet of signable area 1 square foot per building frontage foot up to 400 square feet 50 15% per tenant space building wall frontage 32 15% per tenant space building wall frontage above which the sign is placed, with a maximum of 200 square feet 32 10% of the primary facade and secondary facade window space respectively Maximum number allowed 1, except 2 if permitted by Section 7.04.04.B 1 per primary facade and 1 per secondary facade 1, provided that combined total square feet does not exceed the maximum square feet allowed 1, except stake signs (3) 1, provided that combined total sq. ft. does not exceed the maximum square feet allowed 1 per entrance Ground Sign Projecting Sign Wall Sign Temporary Sign Roof Sign Entrance Sign Subdivision Sign Window Sign Required minimum setback of right-of-way 1' 1' 1' Required minimum setback from electrical transmission 10' 10' 10' 10' 10' Max projection from building 6' Note: In addition to those regulations set forth in the above chart, no person may maintain any sign or signs on a lot zoned C-1, C-2, C-3, or IAC so that the aggregate signable area exceeds five hundred (500) square feet, regardless of the construction, placement or type of sign or signs. (Interstate signs, see section 7.04.12.) * Ground signs shall not be permitted on nonresidential lots where there is no structure. E. Lots zoned C-1, C-2, C-3, and IAC (single business per lot). 7.04.10(E). Commercial Lot Sign Standards (Single business). Ground Sign Projecting Sign Wall Sign Temporary Sign Roof Sign Entrance Sign Subdivision Sign Window Sign Maximum height 15'; or 50' if within 500' of I-75 or I-675 10' 10' above eave Prohibited Prohibited Maximum width 15' 10' 8' Building width Maximum square feet of signable area 1 square foot per building frontage foot up to 200 square feet 50 15% per tenant space building wall frontage 32 15% per tenant space building wall frontage above which the sign is placed, with maximum of 200 square feet 10% of the primary facade and secondary facade window space respectively Maximum number allowed 1, except 2 if permitted by section 7.04.04.B 1 per primary facade and 1 per secondary facade. 3, provided that combined total square feet does not exceed the maximum square feet allowed 3, provided that combined total square feet does not exceed the maximum square feet allowed 1, except stake signs (3) 3, provided that combined total square feet does not exceed the maximum square feet allowed Required minimum setback from right-ofway 1' 1' Required minimum setback from electrical transmission lines 10' 10' 10' 10' Maximum projection from building 6' Note: In addition to those regulations set forth in the above chart, no person may maintain any sign or signs on a lot zoned C-1, C-2, or C-3 so that the aggregate signable area exceeds three hundred (300) square feet, regardless of the construction, placement or type of sign or signs. (Interstate signs, see section 7.04.12.) * Ground signs shall not be permitted on nonresidential lots where there is no structure. F. Lots zoned M-1 and M-2 (Multiple businesses per lot). Table 7.04.10(F). Industrial Lot Sign Standards (Multiple businesses). Ground Sign Projecting Sign Wall Sign Temporary Sign Roof Sign Entrance Sign Subdivision Sign Window Sign Maximum height 20' 10' 10' above eave 8' Prohibited Maximum width 15' 10' 8' Building width Maximum square feet of signable area 1 square foot per building frontage foot up to 300 square feet 50 15% per tenant space wall frontage 32 200 100 10% of the facade window space Maximum number allowed 1 per primary facade and 1 per secondary facade 1, except stake signs (3) 1 per primary facade and 1 per secondary facade 1 per entrance Required minimum setback from right-ofway 1' 1' 1' Required minimum setback from electrical transmission lines 10' 10' 10' 10' 10' Maximum projection from building 6' Note: In addition to those regulations set forth in the above chart, no person may maintain any sign or signs on a lot zoned M-1 or M-2 so that the aggregate signable area exceeds five hundred (500) square feet, regardless of the construction, placement or type of sign or signs. (Interstate signs, see section 7.04.12.) * Ground signs shall not be permitted on nonresidential lots where there is no structure. G. Lots zoned M-1 and M-2 (Single business per lot). Table 7.04.10(G). Industrial Lot Sign Standards (Single business). Ground Sign Projecting Sign Wall Sign Temporary Sign Roof Sign Window Sign Maximum height 15' 10' 10' above eave Maximum width 15' 10' 8' Building width Maximum square feet of signable area 1 square foot per building frontage foot up to 100 square feet 50 15% per tenant space building wall frontage 32 15% per tenant space building wall frontage above which the sign is placed, with a maximum of 200 square feet 10% of the facade window space Maximum number allowed 1, 2 if permitted per Section 7.04.04(B) 1 per primary facade and 1 per secondary facade 3, provided that combined total square feet does not exceed the maximum square feet allowed 1, except stake signs (3) 3, provided that combined total square feet does not exceed the maximum square feet allowed Required minimum setback from rightof-way 1' 1' Required minimum setback from electrical transmission lines 10' 10' 10' 10' Max projection from building 6' Note: In addition to those regulations set forth in the above chart, no person may maintain any sign or signs on a lot zoned M-1 or M-2 so that the aggregate signable area exceeds three hundred (300) square feet, regardless of the construction, placement or type of sign or signs, interstate signs, see section 7.04.12. Entrance and subdivision signs are prohibited. * Ground signs shall not be permitted on nonresidential lots where there is no structure. H. Lots zoned MU and OI. The board of commissioners may further reduce the amount of signage where necessary to avoid conflict with the architectural design or physical features of the building. Table 7.04.10(H). OI zoning district and Lot Sign Standards within MU. Ground Sign Projecting Sign Wall Sign Temporary Sign Window Sign Awning Sign Maximum height 12' Wall height 10' 1' Maximum width 8' Wall width 8' Maximum square feet of signable area primary facade 200 square feet 10 square feet The lesser of 10% of the wall area or 200 square feet 32 10% of the facade window area 10% of a window space Maximum square feet of signable area secondary facade 200 square feet 10 square feet The lesser of 10% of the wall area or 50 square feet 10% of the facade window area 10% of a window space Maximum number of signs 2 per primary facade; 1 per secondary facade 2 per primary facade; 1 per secondary facade 1 per primary facade and 1 per secondary facade 1, except stake signs (3) 1 per window 2 Required minimum setback from rightof-way 1' 1' 1' Required minimum setback from electrical transmission lines 10' 10' 10' Maximum projection from building Lesser of 4 feet or 1 /3 of the sidewalk width Note: Entrance, roof and subdivision signs are prohibited for the OI zoning district and Lot Sign Standards within MU. * Ground signs shall not be permitted on nonresidential lots where there is no structure. 7.04.11. Unsafe and unlawful signs. A. If the administrator or designee shall find that any sign regulated herein is unsafe or unstable, or is a menace to the public health or safety, or is abandoned, or is maintained in a dilapidated condition, or has been constructed or erected or is being maintained in violation of the provisions of this ULDC, the administrator or designee shall notify the applicant, owner, or occupant of the property on which the sign is located by certified mail of such violation. Said notice shall include a brief and complete statement of the violations to be remedied. If the applicant, owner, or occupant of the property where the sign is located cannot be located, notice shall be given by the administrator or designee by affixing the notice to the sign or to the building on which the sign is erected. B. If the applicant or property owner fails to remove or alter the structure so as to comply with the standards herein set forth within ten (10) days after such notice, the permit for such sign shall be revoked and the applicant or property owner shall be subject to the penalties set forth in section 12.07.00. C. In any case in which a sign is an immediate threat to the physical safety of persons or adjoining property, the administrator or designee may cause such structure to be removed summarily and without notice and cause the cost of same to be placed as a lien on the property upon which the sign sits. 7.04.12. Signs along interstate highways. A. Section 7.04.12 shall apply to all signs visible from I-75 or I-675 and located within the following area: One thousand two hundred (1,200) feet long beginning five hundred (500) feet from the point where the pavement widens on the main traveled way to accommodate the longest entrance or exit ramp along I-75 and I-675. (See figure 7.1 interstate highway sign locations.) B. No new sign shall be erected unless it is in compliance with the regulations of this section. Signs shall be constructed of durable materials, maintained in good condition, and not permitted to become dilapidated. C. Nonconforming signs. Any legally erected sign which would become nonconforming as a result of this section may be allowed to remain until purchased by the GDOT provided that the sign meets the requirements of state laws, rules and regulations governing such signs or the sign can be replaced with a sign that would meet the provisions of this ULDC and any state laws, rules and regulations governing such signs. D. New signs. New signs shall meet the following requirements: 1. The outside measurement of all new signs shall not exceed fourteen (14) feet in height and forty-eight (48) feet in length, with or without trim, except that existing factory manufactured metal signs, now located within the 1,200-foot zones set out previously and if holding a conforming state permit on December 7, 1982, are considered to be conforming with respect to size requirements until such time as the sign is moved, enlarged, raised or otherwise physically altered with respect to dimensions or changes from its present configuration or sign type; 2. A fall zone area shall be provided equal to half the height of the supporting structure for the sign away from all residential dwelling units; 3. Only one (1) sign shall be allowed to face the same direction per location. This allows back-to-back sign, but prohibits two (2) signs (side-by-side or stacked atop one another) facing the same direction; 4. Sign locations shall be no less than five hundred (500) feet apart measuring from the two (2) closest points; 5. Sign structures shall be no less than ten (10) feet from any property or right-of-way line; and 6. Three (3) signs shall be allowed per quadrant of an interchange adjacent to the Interstate. This will allow a maximum of twelve (12) signs per interchange. These signs shall be within an area zoned commercial or industrial as specified in state law. 7. Sign erection at historic area locations is prohibited. No sign shall by placed in or obstruct the view of an area of designated historic interest. (Ord. No. 10-16, § I, 10-18-10; Ord. No. 10-20, § I(12—16), 6-15-10; Ord. No. 11-01, § I, 4-4-11; Ord. No. 11-07, § I, 12-5-11; Ord. No. 14-01, § I, 1-9-14; Ord. No. 17-07, 5-2-17) Sec. 7.05.00. Wireless communication facilities (WCF). 7.05.01. Purpose. It is the purpose of these wireless telecommunication regulations to ensure that residents and businesses in Henry County have reliable access to wireless facility networks and state of the art communications services, while also ensuring that this objective is achieved in a fashion that preserves the character of the community, and is accomplished according to Henry County's zoning, planning, and design standards. The Telecommunications Act of 1996 preserved, with certain limitation, local government land use and zoning authority concerning the placement, construction, and modification of wireless communication facilities. Henry County recognizes that facilitating the development of wireless service technology can be an economic development asset to Henry County and a significant benefit to its residents. To accomplish the above-stated objectives and to ensure that the placement, construction, or modification of wireless telecommunication facilities complies with all applicable federal laws, and is consistent with Henry County's land use policies, Henry County is adopting comprehensive wireless communications regulations. These regulations are designed to meet the following: A. Promote the health, safety, and general welfare of the public by regulating the siting of and establishing development standards for WCFs and related equipment; B. Encourage the location of WCFs in nonresidential areas; C. Encourage the location of WCFs on existing structures, including utility poles, signs, water towers, buildings, and other WCFs where feasible; D. Encourage collocation and site sharing of new and existing WCFs; E. Facilitate the use of public property and structures for WCFs; F. Locate telecommunications support structures and antennas in areas where adverse impacts on the community are minimized; UNIFIED LAND DEVELOPMENT CODE § 7.05.00 SIGHS J 1~~1-1 -~------1--·1_,_J~· l----"----~------Exis-ting_RfW __ --f-----f--1-'~ Figure 7.1 Interstate Highway Sign Locations Existing B/W MIIIIMUM 500' AP.All G. Encourage design and construction of support structures and antennas to harmonize the visual impact of support structures and antennas with the existing natural and/or built environment; and H. Encourage the siting of small cell technology consistent with the design and aesthetics of the existing streetscape. Small Cell Technology is defined as (1) individual small cell wireless antennas; or (2) networks of spatially separated small cell wireless antenna nodes connected to a common source via transport medium that provides wireless service within a geographic area. 7.05.02. Applicability. The regulations set forth in section 7.05.00 apply to all wireless communication facilities, except as enumerated below: A. Antennas or support structures located on property owned, leased, or otherwise controlled by the county or one (1) of its agencies, divisions, or entities, with an approved license or lease authorizing such antenna or support structure. B. Small cell technology located in the right-of-way (ROW) adjacent to nonresidential zoning districts and not exceeding seventy (70) feet in height including antenna, lightning rod, etc.) provided that such facilities shall comply with the requirements of section 7.05.03.F as well as the requirements for utilities in the right-of-way including those of section 3-4-451. C. Ordinary maintenance of existing telecommunications facilities and support structures, as defined herein. D. Any support structure, or the installation of any antenna, that is under thirty-five (35) feet in height and is owned and operated by a federally licensed amateur radio operator or is used exclusively for receive-only antennas. E. A temporary, commercial WCF, upon the declaration of emergency by federal, state, or local government, or determination of public necessity by the county, and approval by the county manager, provided that such WCF complies with all federal and state requirements. The exemption may continue up to one hundred twenty (120) days after the duration of the state of emergency with the approval of the county manager. 7.05.03. Administrative approval for WCFs. A. Minor modifications of existing WCFs shall be permitted in any zoning district after administrative approval in accordance with the standards set forth in section 7.05.04. B. Concealed attached or non-concealed attached WCFs and collocations shall be permitted in any zoning district after administrative approval in accordance with the standards set forth in section 7.05.04. C. Support structures, antennas, and/or antenna arrays for AM/FM/TV/HDTV broadcasting transmission facilities that are licensed by the FCC are permitted in any zoning district after administrative approval. D. Monopoles or attached WCFs located in utility easements or right-of-way shall be permitted in any zoning district after administrative approval in accordance with the standards set forth in this ULDC, provided that: 1. The utility easement or right-of-way shall be a minimum of one hundred (100) feet in width. 2. The easement or right-of-way shall contain overhead utility transmission and/or distribution structures that are eighty (80) feet or greater in height. 3. The height of the monopole may not exceed by more than thirty (30) feet the height of existing utility support structures. 4. Monopoles and its accessory equipment shall be set back a minimum of fifteen (15) feet from all boundaries of the easement or in accordance with clear zone requirements as established by the Henry County Department of Transportation for structures located within the right-of-way. 5. Poles that use the structure of a utility tower for support are permitted under this section. Such poles may extend up to twenty (20) feet above the height of the utility tower. E. Support structure replacement. Support structure replacements are permitted in any zoning district after administrative approval in accordance with the standards set forth in section 7.05.04, and without regard to the requirements of sections 7.05.05 through 7.05.09, provided that: 1. The support structure replacement is located within eight hundred fifty (850) feet of the existing WCF, irrespective of whether the support structure replacement and the existing support structure are on the same parcel. 2. If the support structure replacement will be located on a different parcel from the existing support structure, then the underlying zoning district and the Future Land Use Map designation of the parcel on which the replacement WCF is to be located shall be the same or more intense than the zoning district and Future Land Use Map designation of the parcel on which the existing WCF is located. 3. If the existing support structure is nonconforming, the applicant demonstrates that the proposed support structure replacement will mitigate the nonconformity. This demonstration shall meet at least two (2) of the following factors: A. Change of design that achieves a more preferred design (for example, from a lattice-style to a monopole-style support structure or a nonconcealed to a concealed support structure); B. At least a ten-percent height reduction; C. From a lighted support structure to a non-lighted support structure; and D. Exceeding the current wireless code requirements for setbacks on all sides. 4. The existing support structure that is being replaced shall be removed within one hundred twenty (120) days after the support structure replacement is completely constructed and operational. F. Additional requirements. 1. Wireless communication facilities in the public right-of-way are to be located outside of the clear zone as per AASHTO Roadside Design Guide as determined by HCDOT. 2. The permittee of approval to install wireless communication facilities in the public right-of-way is to abandon or relocate the wireless communication facilities at its sole expense if required to do so by a government agency requiring relocation. Access to private property from the public right-of-way shall take precedence over the use of the public right-of-way for a utility facility/support structure. Should the location of a utility facility/ support structure prevent all access to a lot of record, that utility facility/support structure shall be removed or relocated by the utility facility/support structure owner at its sole expense within the same timeframe as otherwise required by section 3-5-451(c). 3. The wireless communication facility permittee shall be a member of the GA 811, One Call Center, and shall be required to mark any underground facilities that the utility has when a locate request is made (or respond to the GA 811 call center that they have no conflicts if that is applicable). The marking shall be done within the industry standard timeframe when locate requests are made. 4. Wireless communication facilities in the public right-of-way shall be required to meet the requirements of section 12.02.13 to provide a removal bond. 5. The zoning administrator shall require any modification without limitation to reduce potential hazards within the fall zone of a wireless communication facility in the public right-of-way. 6. Wireless communications facilities in the public right-of-way as well as associated conduit (pipes or tubes) shall be required to be a dark color/material meeting the same color requirement for streetlights in the same district in which the facility is located. 7. Wireless communications facilities in the public right-of-way shall be located no closer than a distance equal to the height of the utility facility to be permitted from another utility facility in the public right-of-way unless the facility shares the support structure. 8. Wireless communications facilities in the public right-of-way shall be required to obtain an approved utility permit. Applicants shall be required to provide the latitude and longitude of the proposed location of the utility facility. Permittees shall provide before and after photos of the work site to demonstrate site conditions. In the event that there is remaining damage to or deterioration of the conditions of the right-of-way after the installation of the utility facility, the indemnity bond or other acceptable security may be used to correct the situation as permitted by law including section 3-5-451(a). 7.05.04. Administrative review process. A. All administrative review applications must contain the following: 1. Administrative review application form signed by the applicant. 2. All application requirements outlined in section 12.02.06.D. with the exception of Parts 14 through 18. 3. Administrative review application fee as outlined on the department's most recently adopted fee schedule, and in accordance with O.C.G.A. 36-66B-7. B. Procedure. 1. There shall be a pre-application meeting. The purpose of the pre-application meeting will be to address issues that will help to expedite the review and permitting process. 2. Within thirty (30) calendar days of the date an administrative review application is filed, the administrator shall determine if it is a complete application, and if it determines the application is not a complete application, notify the applicant in writing of any information required to complete such application. If additional information is required to complete the application, the time required by the applicant to provide such information shall not be counted toward the thirty-calendar day review period set forth. Information requested to complete the application may only include the documents, information, and fees specifically enumerated in the county's existing wireless telecommunications regulations, ordinance, and forms pertaining to the location, construction, collocation, modification, or operation of wireless facilities. 3. Once the application is complete, the administrator will issue a written decision granting or denying the request within thirty (30) days unless an extension of time is agreed to by the applicant. Failure to issue a written decision with thirty (30) days shall constitute an approval of the application. 4. Should the administrator deny the application; the administrator shall provide written justification for the denial. The denial must be based on substantial evidence of inconsistencies between the application and the ULDC. 5. The appeal of any decision of the administrator approving, approving with conditions, or denying an application or deeming an application incomplete, shall be in accordance with section 12.04.00 of this ULDC, except as set forth in subsection 6, below. 6. Additional procedures for support structure replacements. A. The administrator shall provide notice of receipt of an application for support structure replacement in accordance with the provisions of ULDC section 12.03.04, except that the notices shall be mailed within fifteen (15) calendar days from the administrator's receipt of a complete application. B. After making a decision with respect to an application for a replacement tower or monopole, the administrator shall have ten (10) calendar days to post a sign on the subject property which reflects the decision of the administrator and includes the deadline for taking an appeal of the decision. Aggrieved person(s) shall have fifteen (15) calendar days from the posting of the sign to appeal the administrator's decision by filing an appeal to the zoning advisory board. A person shall be considered aggrieved for purposes of this section only if said person or said person's property was the subject of the action appealed from, or said person has a substantial interest in the action appealed from that is in danger of suffering special damage or injury not common to all property owners similarly situated. 7.05.05. Administrative waiver. The administrator shall have the power to reduce specific site design and development standards of this ULDC where the intent of the ULDC can be achieved and equal performance obtained by granting a waiver of standards. The authority to grant a waiver shall be limited to the following: A. A reduction in the minimum width of utility easement or right-of-way provided the following standards are met: 1. Clear zone requirements, as reviewed and approved by the Henry County Department of Transportation (DOT). B. A reduction in the minimum height of existing overhead utility transmission and/or distribution structures, provided the following standards are met: 1. The proposed WCF is within a twenty-percent height variance of existing overhead utility transmission and/or distribution structures. 7.05.06. WCF applications (non-administrative approval). A. Telecommunication facilities and support structures not permitted by administrative approval shall be permitted upon the granting of a conditional use from the zoning advisory board in accordance with the standards set forth in the ULDC. B. WCF applications shall contain the following: 1. Conditional use application form signed by the applicant. 2. All documents required by section 12.02.06.D. 3. WCF conditional use application fee as outlined on the department's most recently adopted fee schedule, and in accordance with O.C.G.A 36-66B-7. C. Procedure. Procedures for conditional use applications are outlined in section 11.05.00 of the ULDC. D. Timing; application completeness. 1. Within one hundred fifty (150) calendar days of the date a conditional use application is filed, unless another date is specified in a written agreement between the administrator and the applicant, the zoning advisory board shall: A. Make its final decision to approve or disapprove the application; and B. Advise the applicant in writing of it final decision. 2. Within thirty (30) calendar days of the date a conditional use application is filed, the administrator shall determine if it is a complete application, and if it determines the application is not a complete application, notify the applicant in writing of any information required to complete such application. To the extent additional information is required to complete the application, the time required by the applicant to provide such information shall not be counted toward the calendar day review period set forth in subsection 1, above. Information requested to complete the application may only include the documents, information, and fees specifically enumerated in the county's existing wireless telecommunication regulations, ordinances, and forms pertaining to the location, construction, collocation, modification, or operation of wireless facilities. 7.05.07. Siting hierarchy. A. Siting of WCFs shall be in accordance with the following hierarchy of facility alternatives, ranked from highest to lowest preference as follows: 1. Concealed attached. 2. Collocations o existing WCFs. 3. Non-concealed attached. 4. Concealed freestanding. 5. Non-concealed freestanding monopole. 7.05.08. Evidence of need report. For all conditional use applications for WCFs, a report certified by a radio frequency engineer shall be provided that demonstrates the need for the WCF at the proposed location. The following information shall be provided with the report: A. Identification of efforts to comply with the facility and location hierarchy in section 7.05.07. If a concealed freestanding or nonconcealed freestanding WCF is proposed, the applicant must demonstrate that existing facilities or the mitigation of existing facilities within the applicant's geographic search area (GSA) cannot be reasonably made to accommodate the applicant's need because: 1. There are no existing WCFs in the GSA that meet the applicant's engineering requirements, and why. 2. The existing WCFs, buildings and structures in the GSA are not of sufficient height and cannot be increased in height to meet the applicant's engineering requirements. 3. The existing WCFs, buildings and structures in the GSA do not have sufficient structural strength and cannot be structurally improved to support the applicant's proposed WCF and related equipment. Such information shall be certified by a Georgia-licensed professional engineer. 4. There are other limiting factors that render existing WCFs in the GSA unsuitable. B. A written report demonstrating applicant's meaningful efforts to secure shared use alternative buildings or other structures within the county. The applicant shall provide: 1. A list of all existing structures that are potential alternatives to the proposed location. 2. A written explanation why the alternatives considered were either unacceptable or infeasible due to technical or physical reasons. 3. Copies of written requests and responses for shared use, along with any letters of rejection stating the reason for rejection. C. For all WCFs proposed in a residential district, a written report demonstrating applicant's meaningful efforts to secure alternative sites in nonresidential areas. The applicant shall provide: 1. A list of all alternative sites that are potential alternatives to the proposed location. 2. A written explanation why the alternatives considered were either unacceptable or infeasible due to technical or physical reasons. 3. Copies of written requests and responses for shared use, along with any letters of rejection stating the reason for rejection. D. Graphics to be provided shall include: 1. A map of the GSA to include the location of the proposed WCF and all existing WCFs (including those not owned by the applicant). The exact location (in longitude and latitude, to degrees, minutes and seconds to the nearest tenth), including the height of the WCFs, and height, type and number of existing antennas shall be provided. 2. A map of the GSA and all existing structures that are potential alternatives to the proposed monopole. 3. A color plot demonstrating the existing coverage of all WCFs owned and proposed by the applicant within the GSA. 4. Additional maps and calculations as may be deemed necessary by the administrator to prove need for the proposed WCF. 7.05.09. Visual impact assessment. All conditional use applications for WCFs shall furnish a visual impact assessment. All or a portion of the analysis shall be performed for administrative approval when, in the opinion of the administrator, the proposed type of WCF and its location requires additional assessment (i.e., within a residential district, recognized historic area, or scenic vista/ landscape). The analysis shall include: A. Line-of-sight analysis. The applicant shall provide a line-of-sight analysis, including elevation views of the proposed facility. The analysis shall include a description of natural and manmade features that affect the buffering of the potential visual impact of the structure. B. Photo simulations. The applicant shall provide photo-simulated post-construction renderings of the completed proposed support structure, equipment compound and/or equipment cabinets, ancillary structures, and landscaping, if any, from locations determined at the pre-application conference. 1. The views shall incorporate before and after scenarios, a scaled color image of the proposed type of facility, an aerial map with the location of the selected views, and a description of the technical approach used to create the photo simulations. The simulations shall include a minimum of four (4) vantage points (north, south, east, and west). 2. At the pre-application meeting, the applicant may be required to provide other pictorial representations from other viewpoints, including, but not limited to, state highways and other major roads, state and local parks; other public lands; historic districts; preserves and historic sites normally open to the public, and from any other location where the site is visible to a large number of visitors, travelers or residents. 7.05.10. Development standards. WCFs are allowed in all zoning districts, subject to the limitations set forth in this article. To ensure compatibility with surrounding land uses, protect public safety and natural, cultural and scenic resources and preserve and enhance the character of neighborhoods, all WCFs subject to section 7.05.00 shall be located, developed and operated in compliance with the following: A. Design. 1. Attached WCFs shall have both antenna and supporting electrical and mechanical equipment that are of a neutral color identical to, or closely compatible with, the color of the supporting structure so as to make the antenna and related equipment as visually unobtrusive as possible. 2. Monopoles shall consist of a galvanized steel finish that, subject to any applicable standards of the FAA, shall be painted a neutral color, so as to reduce visual obtrusiveness. The design of the accessory equipment compound shall, to the extent possible, use materials, colors, textures, screening, and landscaping that will blend to the natural setting and built environment. New wireless facilities that are not concealed or attached shall be monopoles except when providers can document and demonstrate need for the design to be a tower. 3. Monopoles shall be subject to the following: A. Monopoles shall be designed to accommodate at least three (3) telecommunications providers. B. The compound area surrounding the monopole must be of sufficient size to accommodate accessory equipment for at least three (3) telecommunications providers. C. Unless otherwise required by the Federal Communications Commission, or the Federal Aviation Administration, monopoles shall have a galvanized silver or gray finish. 4. Concealed telecommunications support structures shall be designed to accommodate the collocation of other antennas whenever economically and technically feasible or aesthetically appropriate, as determined by the zoning advisory board. 5. Upon request of an applicant, the zoning advisory board may waive the requirement that new support structures accommodate the collocation of other service providers if it finds that collocation at the site is not essential to the public interest, or that the construction of a shorter support structure with fewer antennas will promote community compatibility. B. Aesthetics. 1. Lighting and marking. Attached WCFs or WCF support structures shall not be lighted or marked unless required by the Federal Communications Commission, or the Federal Aviation Administration (FAA) or other governmental entity. 2. Attached WCFs or WCF support structures shall contain a sign no larger than four (4) square feet in order to provide adequate notification to persons in the immediate area of the presence of an antenna that has transmission capabilities and shall contain the name(s) of the owner(s) and operator(s) of the antenna(s) as well as emergency phone number(s). The sign shall be on the equipment shelter or cabinet of the applicant and be visible from the access point of the site and must identify the equipment owner of the shelter or cabinet. The sign shall not be lighted, unless applicable law, rule or regulation requires lighting. Commercial advertising is strictly prohibited. C. Landscaping and buffer requirements. 1. Attached WCFs or WCF support structures shall be landscaped in accordance with the landscape requirements contained in sections 5.00.00 through 5.03.00 of the Henry County ULDC, except for additional requirements stated herein. 2. Landscaping and buffer requirements for attached WCFs or WCF support structures can be waived by the administrator where the WCF applicant makes other means of screening the support structure base and adjacent equipment faculties (i.e., opaque fencing, etc.) and if the applicant otherwise demonstrates consistency with the purposes and intent of this ordinance. 3. Existing mature tree growth and natural land forms on the site shall be preserved to the extent feasible; provided, however, that vegetation that causes interference with the antennas or inhibits access to the equipment facility may be trimmed. 4. Existing vegetation on site may be used in lieu of required landscaping where approved by the administrator. 5. Additional landscaping and buffer requirements: A. The perimeter of concealed and non-concealed freestanding WCFs shall be at least fifteen (15) feet in width for landscaping and include the following: 1. A row of evergreen trees a minimum of ten (10) feet in height at the time of planting with a minimum two-inch caliper, spaced a maximum of twelve (12) feet apart and a row of evergreen shrubs a minimum of two (2) feet tall at the time of planting, planted four (4) feet on center. 2. Within a year of planting, the trees and shrubs shall achieve eighty (80) percent opacity of the security barrier and/or equipment enclosure. Existing trees and vegetation may be used as an alternative or in combination with new plantings to achieve the opacity requirement subject to approval of the administrator. An easement may be required to ensure that vegetation remains intact. 6. Maintenance. It will be the responsibility of the owner/tenant to keep all landscaping material (as part of the landscaped area) free from disease and properly maintained in order to fulfill the purpose for which it was established. The owners of the property, and any tenant on the property where buffers and landscaping are required, shall be jointly and severally responsible for the maintenance of all landscaping materials. Such maintenance shall include all actions necessary to keep the buffer and landscape areas free from litter and debris, to keep plantings healthy, and to keep planting areas neat in appearance. Any vegetation that constitutes part of the buffer or landscaping shall be replaced in the event it dies. D. Setbacks. 1. Attached WCFs. Attached WCFs are exempt from the setback standards of this section but are not exempt from the setbacks for the zoning districts in which they are located. 2. Towers and monopoles. Towers and monopoles shall meet the following setbacks: A. From all property lines a distance equal to their height. B. Residential dwellings. From all off-site residential dwellings, a distance equal to the height plus ten (10) percent. There shall be no setback requirement from dwellings located on the same parcel as the proposed tower or monopole. C. Unless otherwise stated herein, all accessory equipment shall be setback from all property lines in accordance with the minimum setback requirements in the underlying zoning district. D. The zoning advisory board and the administrator may reduce or waive the setback requirements of subsection A. or B., above upon the request of the applicant if: 1. The tower or monopole will be less visible as a result of the diminished setback; or 2. The applicant demonstrates, by virtue of a letter or report from a licensed engineer, that the structural design or characteristics of the tower or monopole mitigate the need for the full setback. E. Height. 1. Attached WCFs. Attached WCFs shall not add more than twenty (20) feet in height to the existing building or structure to which it is attached. 2. WCFs with support structures. A. In any residential-agricultural zoning district (RA), the maximum height for a WCF shall be one hundred and fifty (150) feet. B. In all single-family residential (R-1, R-2, R-3, R4, R5) and two-family residential (RD) zoning districts the maximum height for a WCF shall be seventy-five (75) feet. C. In all multiple-family residential (RM), mobile home development (RMH), and residential suburban (RS) zoning districts, the maximum height for a WCF shall be ninety (90) feet. D. In any office and institutional zoning district (OI), the maximum height shall be one hundred and twenty (120) feet. E. In any neighborhood commercial (C-1), mixed-use (MU), and interchange activity center (IAC) zoning districts the maximum height shall be one hundred and twenty (120) feet. F. In any general commercial zoning district (C-2), the maximum height of a WCF shall be one hundred and fifty (150) feet. G. In any heavy commercial zoning district (C-3), the maximum height of a WCF shall be one hundred and eighty (180) feet. H. In any light manufacturing zoning district (M-1), the maximum height of a WCF shall be one hundred and ninety (190) feet. I. In any heavy manufacturing zoning district (M-2), the maximum height of a WCF shall be two hundred (200) feet. F. [Accessory equipment.] Accessory equipment, including any buildings, cabinets or shelters, shall be used only to house equipment and other supplies in support of the operation of the telecommunication facility or support structure. Any equipment not used in direct support of such operation shall not be stored on the site. 1. An equipment building, shelter or cabinet must not exceed five hundred and sixty (560) square feet and twelve (12) feet in height, including the support structure for the equipment building. A. Exception to size restriction. A single equipment building or shelter may exceed five hundred and sixty (560) square feet, if it: is located at ground level; is used by more than one (1) telecommunication provider; and does not exceed one thousand five hundred (1,500) square feet. B. Exception to height restriction. Upon the applicant's request, the zoning advisory board may waive the height restriction to allow for the stacking of equipment on top of each other. The zoning advisory board must find that there is a practical necessity for the stacking of the equipment and that any resulting impact on adjoining properties is minimal or may be minimized by the requiring of appropriate screening. 2. If the accessory equipment is at ground level in a residential zone, the zoning advisory board may require that the building or shelter be faced with brick or other suitable material on all sides. In the situation of stacked equipment buildings, additional screening/landscaping measures may be required by the zoning advisory board. G. Separation requirements. 1. Freestanding wireless communication facilities located within residential zoning districts shall not be located within one (1) mile of another freestanding wireless communication facility. 2. Except as stated in section 7.05.09.G.1., there shall be no separation requirement for wireless communication facilities. 7.05.11. Adherence to state and/or federal rules and regulations. A. All administrative approvals and conditional use approvals shall adhere to, and comply with, all applicable rules, regulations, standards, and provisions of any state or federal agency, including, but not limited to, the FAA and the FCC. Specifically included in this requirement are any rules and regulations regarding height, lighting, security, electrical and RF emission standards. B. To the extent that applicable rules, regulations, standards, and provisions of any state or federal agency, including, but not limited to, the FAA and the FCC, and specifically including any rules and regulations regarding height, lighting, and security are changed and/or are modified, then the holder of such an administrative approval or WCF conditional use shall conform the WCF to the applicable changed and/or modified rule, regulation, standard, or provision within a maximum of twenty-four (24) months of the effective date of the applicable changed and/or modified rule, regulation, standard, or provision, or sooner as may be required by the issuing entity. 7.05.12. Environmental standards. The following standards shall apply: A. Freestanding WCFs shall not be located in wetlands or wetlands buffers, whether federal or state designated. B. Freestanding WCFs shall not generate noise in excess of sixty (60) db at ground level at the property line. C. Attached WCFs shall not generate noise in excess of sixty (60) db at ground level at the base of a habitable building closest to or part of the facility. 7.05.13. Removal of wireless telecommunications facilities. A. The county may determine that the health, safety, and welfare interests of the county warrant and require the removal of a WCF under the following circumstances: 1. If it has been abandoned. A WCF has been abandoned if it has not been used as a telecommunications facility for a period of six (6) months or more; 2. If it has fallen into such a state of disrepair that it creates a health or safety hazard; 3. If it has been located, constructed, or modified without first obtaining, or in a manner not authorized by, the required building permit, or any other necessary authorization. B. If the county makes such a determination as noted in subsection (a) of this section, then the county attorney shall notify the holder of the WCF building permit within forty-eight (48) hours that said WCF is to be removed. C. The holder of the WCF building permit, or its successors or assigns, shall dismantle and remove such WCF, and all associated structures and facilities, from the site and restore the site to as close to its original condition as is possible, such restoration being limited only by physical or commercial impracticability, within ninety (90) days of receipt of written notice from the county. D. If the WCF is not removed or substantial progress has not been made to remove the WCF within ninety (90) days after the permit holder has received notice, then the county may order officials or representatives of the county to remove the WCF at the sole expense of the owner or WCF building permit holder. E. If, the county removes, or causes to be removed, a WCF, and the owner of the WCF does not claim and remove it from the site to a lawful location within ten (10) days, then the county may take steps to declare the WCF abandoned, and sell it and their components. F. Notwithstanding anything in this section to the contrary, the county may approve a temporary use permit/agreement for the WCF, for no more ninety (90) days, for the purpose of preparing a suitable plan for removal, conversion, or relocation of the affected WCF by the holder of the WCF building permit, subject to the approval of the county. An agreement to such plan shall be executed by the holder of the WCF building permit and the county. If such a plan is not developed, approved and executed within the ninety-day time period, then the county may take possession of and dispose of the affected WCF in the manner provided in this section. 7.05.14. Prohibited conditions of approval. In regulating the placement or construction of any new wireless facility or wireless support structure, the administrator, the board or the zoning advisory board shall not: A. Condition the approval of any application for a new wireless support structure on a requirement that a modification or collocation to such structure be subject to a review that is inconsistent with the requirements of O.C.G.A. 36-66B-4; B. Require the removal of existing wireless support structures or wireless facilities as a condition to approval or an application for a new wireless facility or wireless support structure unless such existing wireless support facility is abandoned and owned by the applicant; or C. Require the applicant to place an antenna or other wireless communications equipment on publicly owned land or on a privately owned water tank, building or electric transmission tower as an alternative to the location proposed by the applicant. 7.05.15. Conflict with other laws. Where this ordinance differs or conflicts with other laws, rules and regulations, unless the right to do so is preempted or prohibited by the county, state or federal government, this ordinance shall apply. (Ord. No. 09-07, 11-17-09; Ord. No. 14-06, § I(exh. A), 11-4-14; Ord. No. 17-13, 5-16-17) CHAPTER 8. INFRASTRUCTURE IMPROVEMENTS Sec. 8.00.00. Generally. The purpose of this chapter is to establish standards and requirements for the provision of infrastructure by all development. This chapter contains requirements for the transportation system, set forth in section 8.01.00, including streets, sidewalks, streetlights, and clear visibility at intersections. Requirements for off-street parking and loading and the design of parking lots and loading areas are set forth in section 8.02.00. Requirements for utilities are set forth in section 8.03.00. Sec. 8.01.00. Transportation system standards. 8.01.01. Generally. A. No person shall do any paving work, or any other related or similar roadwork, on, or adjacent to, a county road without a permit. B. All transportation system design, street design, and construction for nonlocal roadways shall comply with Georgia Department of Transportation (GDOT) requirements. The latest edition of the GDOT manual, "Standard Specifications, Construction of Roads and Bridges," shall apply. C. Where conflict arises between GDOT standards and this section concerning non-local roadways the stricter standard shall apply. Design of local roadways shall be governed by the policies as stated within the ULDC; however, construction methods/practices of said roadways shall be governed by the stricter of the GDOT standards and the ULDC. D. All materials, equipment, labor and other matters related to street construction shall be provided by the applicant. The following is a summary of the improvements required: 1. All streets, roads, and alleys shall be graded to their full width right-of-way by the applicant so that the pavements and sidewalks, when installed in the future, can be constructed on the same level plane. The preparation of the right-of-way before grading is started and the construction of cuts and fills shall be accomplished according to the specifications of the county (see subsections 8.01.05.I. and K. 2. Three (3) copies of an as-built subgrade centerline profile shall be submitted to the county. The profile shall include both proposed and as-built centerline elevations at every even station. No curb and gutter or waterlines shall be installed prior to subgrade approval. 3. An adequate drainage system, including necessary curb, pipes, culverts, headwalls, intersectional drains, drop inlets, bridges, swale ditches, and detention areas, shall be provided for the proper drainage of all surface water. The drainage system shall be designed by a registered professional engineer, licensed in the State of Georgia. 4. After preparation of the subgrade the roadbed shall have base material and paving applied according to county specifications (see subsections 8.01.05.I. and K. E. Roadways may be created by: 1. Dedication; 2. Prescription; 3. Express grant of an easement; 4. Deed; 5. Special statutory proceeding; or 6. Condemnation. F. County roadways classification: 1. Private road. a. A private road is a roadway that is created by an easement from a landowner to a certain individual or individuals and the use of said road can be controlled by the parties to the easement. b. Only one (1) building permit shall be issued by a private easement roadway. c. A private roadway shall not be maintained by the county. 2. Public road. a. A paved public roadway is a roadway where the general public has acquired an implied easement for a roadway over the property of others by virtue of the unobstructed use of said roadway for a sufficient length of time to establish a public easement over the roadway. Public roadways are roadways over which the public has the right to travel, but have not been accepted by the board of commissioners as county roads and the county assumes no responsibility to maintain said roadways. b. An unpaved public roadway with rights-of-way of sixty (60) feet or greater is used for the general public purpose and is maintained by the county consistent with the maintenance policy developed by the Henry County Department of Transportation (county DOT). c. An unpaved public roadway with deeded rights-of-way of fifty (50) feet or greater but less than sixty (60) feet is used for the general public purpose and was deeded to the county at a time when a fifty-foot right-of-way was sufficient according to the ordinances in effect in the county at the time of acceptance. These roadways shall be maintained by the county consistent with the maintenance policy developed by the county DOT and in accordance with deeded rights-of-way. d. An unpaved public roadway with rights-of-way less than sixty (60) feet is used for the general public purpose and is maintained by the county in accordance with the maintenance policy developed by the county DOT, but shall not be maintained to the same standard as roads categorized in subsection 8.01.01.E. hereof, because of insufficient rights-of-way. These roads shall be upgraded to subsection 8.01.01.E. as rights-of-way of sixty (60) feet or greater and deeded to Henry County by adjoining landowners. 3. County road. A county roadway is one that has been acquired by dedication, prescription, by the express grant of easement, by deed, by statutory proceedings, or by condemnation, and further has been accepted by the board of county commissioners and designated as a "county road" and the county has assumed the responsibility to maintain said road for the general public. G. Upon compliance with all of the provisions of the ULDC, building permits may be issued for building on public roads upon the applicant signing a "statement of understanding" that said roadway is a public road and that the county assumes no responsibility for the maintenance of said road until such time as it becomes feasible and advisable to accept said roadway as a "county road." The county at such time shall accept said road as a county road provided that the property owners along said road convey a right-or-way to the county conveying the minimum width required by the county. H. Upon compliance with the provisions of this ULDC, building permits may be issued on county roads. 8.01.02. Traffic impact studies (TIS). A. Purpose and intent. Understanding the demands placed on the county's transportation network by development is an important dimension of assessing the overall impacts of development. All development generates traffic, and it may generate enough traffic to create congestion and thus require the community to invest more capital funds into the transportation network in the form of new roads, traffic signals and intersection improvements. Traffic congestion results in a number of problems, including economic costs due to delayed travel times, air pollution and accidents. By requiring traffic impact studies for proposed developments meeting certain thresholds, the county will be better able to determine the transportation demands of development proposals and provide for reduction of adverse impacts on the transportation system. B. Objectives. The county finds that requiring a traffic impact study for proposed developments that meet certain thresholds will help to achieve the following objectives: (a) To foster and support the coordinated and comprehensive transportation plan. (b) Provide transportation investments that reinforce the land use plans and development vision of the county. (c) Forecast additional traffic associated with new development, based on accepted practices. (d) Determine the improvements that are necessary to accommodate the new development. (e) Allow the county government to assess the impacts that a proposed development may have and assist the county government in making decisions regarding development proposals. (f) Help to ensure safe and reasonable traffic conditions on streets after the development is complete. (g) Reduce the negative impacts created by developments by helping to ensure that the transportation network can accommodate the development. (h) Protect the substantial public investment in the street system. (i) Provide information relevant to comprehensive planning, transportation planning, future transit planning and the provision of programs and facilities for traffic safety, road improvements, transportation demand management, pedestrian access and other transportation system considerations. C. Thresholds of applicability. A traffic impact study shall be required for all developments that are expected to generate more than one hundred (100) new trips during an a.m. or p.m. peak hour or more than seven hundred fifty (750) new trips in an average day or involves the construction of fifty thousand (50,000) square feet or greater of nonresidential building space, in single or multiple phases. Those developments of regional impact (DRIs) which require DRI evaluation as a result of zoning action (rezoning, comprehensive plan amendment, variance, conditional use, and/or modification) are exempt from the aforementioned criteria. All DRIs which have not been evaluated as a DRI at the time of zoning action, but that meet or exceed the threshold(s) established by the Georgia Department of Community Affairs (DCA) and the Atlanta Regional Commissioner (ARC) to require evaluation as a DRI at the time of permitting or other non-zoning action related evaluation or review, shall comply with Section 8.01.02(C) of the ULDC. All DRIs shall adhere to the guidelines set forth by DCA. The traffic study shall be prepared in accordance with industry accepted standards, including at a minimum, level of service impacts for adjacent roadways and intersections and a mitigation package to address the cumulative effects from the project's impact. Said applicant shall be also required to coordinate and fund any recommended mitigation measures limited to project related improvements with applicable federal, state and local agencies including the Georgia Regional Transportation Authority (GRTA) and the ARC. The determination of a traffic study shall be made during the zoning request stage, during the phase in which a site plan is submitted for a land disturbance permit, or at such time any other non-zoning action or administrative request is made. Traffic impact studies shall be required for submittal at such time a land disturbance permit or other development permit is applied for, or at such time any other non-zoning action or administrative request is made and shall not be required during the zoning process. (a) A traffic impact study shall be required for all DRIs which have not been evaluated as a DRI at the time of zoning action, but that meet or exceed the threshold(s) established DCA and ARC to require evaluation as a DRI at the time of permitting or other non-zoning action related evaluation or review. All DRIs shall adhere to the guidelines set forth by DCA. (b) The traffic impact study shall meet all applicable ARC and GRTA standards and shall be prepared in accordance with industry accepted standards, including at a minimum, level of service impacts for adjacent roadways and intersections and a mitigation package to address the cumulative effects from the project's impact. Said applicant shall be also required to coordinate and fund any recommended mitigation measures limited to project related improvements with applicable federal, state and local agencies including GRTA and the ARC. (c) The traffic impact study completed as part of the DRI review process may be utilized to meet the requirements of this code section. (d) No development permit or any non-zoning action administrative approval, including, but not limited to, administrative waiver requests, Master Sign Plan approvals, or zoning verification forms, shall be granted or approved until the DRI review has been completed and a Notice of Decision (NOD) has been granted by GRTA. (e) Any and all project related improvements recommended within the GRTA NOD Attachment A shall be the responsibility of the owner/developer. (f) No Certificate of Occupancy (CO) shall be granted until all project related improvements recommended within the GRTA NOD Attachment A applicable to the proposed development have been completed meeting all applicable Henry County Department of Transportation (HCDOT), Georgia Department of Transportation (GDOT), and/or SPLOST standards. D. Exemptions. (a) A traffic impact study is not required if a development proposal is initiated by the county. (b) A development proposal may be exempted from the traffic impact study requirement by the director of transportation planning, if a prior traffic impact study for the subject property has been submitted to the county and determined to fulfill the impact study requirement based on existing road conditions. (c) Any development of regional impact (DRI) that complies with the rules of the Georgia Department of Community Affairs (DCA), including the Atlanta Regional Commission (ARC) and Georgia Regional Transportation Authority (GRTA), which have been evaluated as a DRI at the time of zoning action, shall be exempt from this ordinance. (1) Any DRI that complies with the rules of the DCA, including the ARC and GRTA, which have not been evaluated as a DRI at the time of zoning, but that meet or exceed the threshold(s) to require evaluation as a DRI at the time of permitting or other non-zoning action related evaluation or review, shall comply with Section 8.01.02(C) of the ULDC. (d) A traffic impact study will not be required by the county for those developments with frontage and access along a state route. E. Trip generation data. The source for trip generation rates for the purposes of this ordinance shall be "Trip Generation" published by the Institute of Transportation Engineers (ITE), most recent edition, unless otherwise approved by the director of transportation planning. Determinations of whether this ordinance applies shall be made based on application of data from ITE Trip Generation, which may change from time to time, or as otherwise approved by the director of transportation planning. F. Determination of applicability. At the time a development proposal is filed, or during any pre-application meeting for zoning proposal, exclusive of variances and modifications to a zoning condition, the transportation planning director or his/her designee shall determine whether a traffic impact study shall be required according to this section. The planning and zoning and development plan review directors shall submit a proposed concept plan including proposed land uses to the transportation planning department. In order for a calculation to be made on the expected trip generation of the proposed development and compare it to the thresholds specified in this section to determine whether a traffic impact study is required. Applicants for development proposals shall provide sufficient information about the development proposal (e.g., number of dwelling units, square footage of buildings, number of employees, land area of the development, etc.) for the transportation planning department to apply professionally accepted trip generation rates to the proposed development. The planning and zoning director shall not accept a development proposal for processing unless it contains the data on the proposed development necessary to apply available trip generation rates. The transportation planning director shall issue a letter of determination to the departments of planning and zoning and development plan review within five (5) business days, should it be determined that a traffic impact study is warranted. All traffic studies shall be required to be submitted before the issuance of any development permits, including, but not limited to, a land disturbance, clearing and grading, building permit and/or development permit. G. Cases where data are not available. In the event that information submitted by the applicant of the development proposal is sufficient to calculate the trip generation that would be expected to result from the proposed development, but trip generation rates or other data are not available or in sufficient quantity of studies to make a determination of applicability under the terms of this section, the following shall apply: (a) The planning and zoning and/or development plan review department director and the director of transportation planning shall coordinate with each other to determine if: (1) Professionally acceptable trip generation rates applicable to the subject development exist from other reputable sources, such as the Journal of the Institute of Transportation Engineers; (2) Other trip generation studies of similar developments are available; or (3) Professionally acceptable trip generation rates for one (1) or more similar land uses can be used in making the determination of applicability. If the director of transportation planning is able to provide such information and determines it is professionally reputable, then the planning and zoning and/or development plan review department directors shall use said data as may be interpreted by the director of transportation to make the determination of applicability. The directors shall have no more than ten (10) working days to comply with the provisions of this paragraph, when it applies. (b) In the event the director of transportation planning pursuant to paragraph (a) of this section, the director of transportation planning shall notify the department that initiated the review to notify the applicant in writing that professionally accepted trip generation rates are not available for purposes of making a determination of applicability. (c) Upon receipt of notice described in paragraph (b) of this section, the applicant for a development proposal shall have thirty (30) days to have a qualified professional prepare and submit a peak-hour trip generation study as defined by this ordinance. H. Specifications for peak-hour trip generation studies. (a) Discounting of pass-by trips. The peak-hour trip generation study may subtract from the empirical data on actual vehicle trips those trips that are reasonably considered to be "pass-by" trips as defined by this ordinance, using professionally accepted assumptions about the percent of pass-by trips approved by the director of transportation planning. (b) Reduction for internal trips in multiuse or mixed use developments. In calculating the new trips generated from a proposed development containing multiple uses or mixed uses, a qualified professional with the approval of the director of transportation planning may apply a percentage reduction to the total vehicle trips shown in any peak hour trip generation study to account for internal trips, as defined in this ordinance, so as to account for (discount) the number of internal trips reasonably expected to occur in such multiuse or mixed use development. Said reduction shall not exceed twenty-four (24) percent of total trips generated. I. Study scope meeting. Once it is determined that a traffic impact study is required, a scoping meeting must be held with the developer or his or her consultant and the appropriate representatives of the county. It will be the responsibility of the developer or his or her consultant to initiate this meeting. The purpose of this meeting is to discuss the availability of site specific information concerning the development, available forecasts of traffic volumes, and to ensure the applicant understands the content requirements for traffic impact studies. J. Required contents of a traffic impact study. A traffic impact study must evaluate the adequacy of the existing transportation system to serve the proposed development and determine the expected effects of the proposed development on the transportation system. The traffic impact study must provide adequate information for county staff to evaluate the development proposal and, when appropriate, recommend conditions of approval. The qualified professional preparing the traffic impact study is encouraged to coordinate preparation with local staff and staff from other jurisdictions, as appropriate, to ensure that all necessary components are included in the traffic impact study and to reduce revision and review time. In order to be reviewed, the traffic impact study must include the following minimum components: (a) Title page. A title page listing the name of the proposed development and its location. (b) Table of contents. A table of contents outlining the study shall be provided. (c) Certification. The study shall be signed and stamped by a qualified professional. (d) Executive summary. An executive summary, discussing the development, the major findings of the analysis and any recommendations made by the qualified professional. (e) Vicinity map. A vicinity map showing the location of the proposed project in relation to the transportation system of the area. (f) Study area map. A map of the traffic impact study area. For purposes of this ordinance, the traffic impact study area shall be determined according to trip generation rates as follows. In the event there is a difference as a result of applying peak and total trips, the more restrictive requirement (larger study area) shall apply. Table 08.01.02: Study Area Size Requirements Peak Hour Trips Generated Daily Trips Generated Distance From Perimeter of Proposed Development Along Roads 100—150 750—1,500 mile 151—500 1,501—5,000 1 mile 501—1,000 5,001—10,000 2 miles 1,001 or more 10,001 or more 3 miles (g) Inventory of transportation facilities in the study area. A description of transportation facilities in the study area, including roadway names, locations and functional classifications, intersection lane configurations and traffic control (including signal timing), existing rights-of-way, transit routes and stops (if any), pedestrian and bicycle facilities and planned transportation system improvements. An existing lane configuration sketch shall be submitted for all roadways and intersections within the study area. (h) Site plan and development data. A complete description of the proposed development, including a site plan, with the best available information as to the nature and size of each proposed use and the proposed location and traffic control of all proposed access points, including the distance from all proposed access points to adjacent accesses and/or streets, including those across a street right-of-way from the subject development. (i) Existing traffic volumes. Peak and total daily traffic volumes on all arterial, collector and local streets within the study area. Traffic counts should be no more than one (1) year old when the report is prepared. Traffic counts between one (1) and three (3) years old may be used if factored to the current year. Traffic counts older than three (3) years will not be accepted. Utilizing available data from an industry accepted source, i.e., Georgia Department of Transportation, Henry County Department of Transportation, Atlanta Regional Commission. (j) Facility performance. Existing performance of the transportation system, including levels of service (LOS) and volume/capacity ratios (V/C) for all intersections and road segments, as appropriate, within the study area. Identification of any project related improvements necessary to mitigate the impact on the level of service (LOS) for the abutting roadways and unsignalized/signalized intersection resultant from the trips generated by the proposal. (k) Trip generation. Complete trip generation figures for all aspects of the proposed development. The source for trip generation rates shall be "Trip Generation" published by the Institute of Transportation Engineers (ITE), most recent edition, unless otherwise approved by the director of transportation planning. If phased development is proposed, the study shall include projections for the year that each phase of the development is planned to be complete. The traffic impact study shall also include trip generation data for any pending and approved developments that would affect the study area. The county staff shall facilitate the review of applicable files by a qualified professional to determine the names and development characteristics of pending and approved developments in the study area. (l) Trip distribution and assignment. Trip distribution for the proposed development. For developments expected to generate more than thirty (30) truck trips per day, the study shall include separate trip distribution figures for trucks. (m) Forecast traffic volumes without the development. Forecast traffic volumes without the development, on all arterial, collector and local roads within the study area, in the year that the proposed development is planned to commence, and in the horizon year. Qualified professionals should consult county transportation staff for information to determine the most appropriate sources or methods of determining future traffic volumes. If phased development is proposed, the traffic impact study shall include projections for the year that each phase of the development is planned to be complete. (n) Forecast performance without the development. Forecast performance, including levels of service (LOS) and volume/capacity (V/C) ratios of the transportation system without the development in the year that each phase is planned to be complete and in the horizon year. (o) Forecast traffic volumes with the development. Forecast traffic volumes with the development, on all arterial, collector and local roads within the study area, in the year that the proposed development is planned to commence and in the horizon year. (p) Forecast performance with the development. Forecast performance, including levels of service (LOS) and volume/capacity (V/C) ratios of the transportation system with the development in the year that each phase is planned to be complete and in the horizon year. (q) Sight distance. A safety analysis of the site accesses and an assessment whether adequate sight distances are provided at driveways and streets abutting the development. (r) Operational characteristics. Analysis of prevailing operating speeds, if significantly different than speed limits, right and left turn lane warrants, queue lengths, acceleration and deceleration lanes including lengths and tapers, throat lengths, channelization, and other characteristics of the site accesses, which exist and may be needed, as appropriate. The traffic impact study shall address whether driveways and intersections are located and spaced safely and designed to accommodate expected traffic volumes and maneuvers. The operational characteristics analysis shall also evaluate the turning and traveling characteristics of the vehicles that will be using the proposed development and the adequacy of the geometrics of the existing and proposed roadway (public and/or private) configurations to accommodate these characteristics. (s) On-site circulation. The traffic impact study shall address whether on-site vehicular and pedestrian circulation and parking layouts are safe and efficient. (t) Significant impacts. Analysis as appropriate of any potential adverse or controversial effects of the proposed development on the transportation system in the area. Examples of possible effects include, but are not limited to, infiltration of nonresidential traffic into residential neighborhoods, traffic noise, creation of potential for traffic violations, conflicting turning movements with other driveways, any new pedestrian or bicycle transportation needs arising from the development, etc. (u) Mitigation measures and costs. Listing of all intersections and road segments that are forecasted to be level of service "E" and "F" in the horizon year, or if phased, in the years that each phase is planned to be complete, and an identification and description of specific mitigation measures including signal, turn lane, or other warrant analyses as appropriate and necessary to bring these intersections and road segments into compliance with a level of service "C" or other county adopted level of service for said road segment or intersection. Should the proposed development reduce the level of service, mitigation factors must be included and will be included as a condition of final plat approval. If roadway improvements are needed, the study shall show a drawing at an engineering scale of one (1) inch equals twenty (20) feet for all recommended lane configurations. If signalization is warranted by the traffic signal warrants outlined in the Manual on Uniform Traffic Control Devices (MUTCD), a warrant analysis shall also be conducted as a part of the traffic impact study. If a traffic signal is warranted, the warrant package in the study shall show a drawing at an engineering scale of one (1) inch equals twenty (20) feet detailing the signal design and phasing plans. The estimated cost associated with implementing all such mitigation measures shall be provided in the traffic impact study. The traffic impact study may take into account any city/county/state-approved roadway, traffic signalization and other improvements in determining mitigation measures and providing recommendations. (v) Alternative transportation. Alternative transportation (sidewalk, bicycle, transit) needed as a result of the study, shall be identified. (w) References. A listing of all technical documents and resources cited or consulted in preparing the traffic impact study. (x) Technical appendix. Relevant technical information, including, but not limited to: copies of raw traffic count data used in the analysis, calculation sheets and/or computer software output for all LOS and V/C calculations in the analysis, and warrant worksheets for signals, turn lanes, signal phasing, etc. used in the analysis. K. Additional technical specifications. The director of transportation planning is further authorized to promulgate and require the use of additional technical specifications for conducting traffic impact studies, which shall be consistent with analysis methods included in the most recent Highway Capacity Manual, Manual on Uniform Traffic Control Devices, and/or Traffic Access and Impact Studies for Site Development: A Recommended Practice (Washington, DC: Institute of Transportation Engineers, 1991), as may be amended or republished from time-to-time. L. Costs and fees. The county assumes no liability for any costs or time delays (either direct or consequential) associated with the preparation and review of traffic impact studies. There shall be no application review fee for a traffic impact study. M. Submittal and review of study. The applicant for the proposed development or the qualified professional shall submit one (1) electronic copy of the traffic impact study and technical appendix, three (3) paper copies of the traffic impact study and one (1) paper copy of the technical appendix to the development plan review director. The development plan review director shall transmit the electronic copy, two (2) paper copies of the traffic impact study and the paper copy of the technical appendix to the director of transportation planning, who may at his or her discretion submit copies of the report to applicable review agencies which may include the Georgia Department of Transportation, the Georgia Regional Transportation Authority, an adjacent local jurisdiction and/or metropolitan planning organization or regional development center. Within ten (10) working days of receipt of a traffic impact study, the director of transportation shall review all calculations and analyses and determine if they are complete, reasonable, understandable, consistent and fully explained. The conclusions presented in the traffic impact study shall be consistent with and supported by the data, calculations and analyses in the report. Calculations, graphs, tables, data and/or analysis results that are contrary to good common sense or not consistent with and supported by the data will not be accepted. In such events, the director of transportation shall return the traffic impact study to the development applicant for correction. N. Recommendations for mitigation of impacts. Within fifteen (15) working days of receipt of a completed traffic impact study, the departments of transportation and transportation planning shall complete his or her review of the study and submit to the development plan review department director or his/her designee all recommendations for mitigation measures as stated in the traffic impact study and include any interpretations or recommended conditions of approving the development proposal that will mitigate traffic impacts of the proposed development. O. Determination of project and system improvements. Upon receipt of the recommendations of the director of transportation planning with regard to the traffic impacts of the development proposal, the transportation planning director and department of transportation engineering staff will determine which mitigation measures constitute project improvements and/or system improvements. The director of transportation planning, with the assistance of the planning and zoning service division director and public works division director will as necessary determine the proportion of the cost of such improvement(s) that can reasonably be attributed to the development as a project or system improvement. P. Conditions of development approval for project improvements. upon the determination of project improvements needed to mitigate the traffic impacts of the development proposal as provided in section 08.02.17 of this Code, the development plan review director and/or assigned staff member shall require as part of the final development plans that the mitigation measures and roadway improvements be by the developer as conditions of approval of the development proposal. Q. System improvements. The transportation planning director shall include system improvement recommendations in the conditions for approval of the development plan. In the case of system improvements, the applicant shall have the following options: (a) The applicant may voluntarily agree to pay for the cost of providing the system improvements, or a pro-rated share of the cost of said system improvements that are reasonably attributed to the subject development, as determined by the county. (b) If the mitigation measure is a system improvement listed in the county's comprehensive transportation plan or SPLOST Program transportation project list, then the applicant may agree to install the system improvement and the county may agree to provide a credit or partial credit for the improvement. (c) The county may subsequently use the traffic impact study for future long range transportation planning efforts and may consider the recommendations of the traffic impact study in a future update of its transportation system plan, capital improvement plan and/or the capital improvement element of the comprehensive plan. (d) The county may find that the proposed development will provide substantial adverse impacts on the transportation system. Mitigation measures may be necessary, if the county is unable to provide adequate transportation facilities within a reasonable amount of time after the impacts of said development would occur. The board of commissioners may reduce the development density or intensity of the development so that the adverse impacts of the development proposal do not degrade transportation facilities below adopted level of service standards. A phasing of the development may be required in a manner that adequate public facilities will be provided publicly or privately, or in cases where such alternatives do not address the adverse impacts, then an application for a development proposal may be denied. R. Appeal. An applicant for a development proposal may appeal a decision of the director of transportation planning or the planning and zoning director in the administration and interpretation of this ordinance to the board of commissioners in accordance with section 12.04.00. 8.01.03. Access requirements. A. Requirements for connection to existing street system. 1. All proposed development shall provide a street system that is connected to the existing or planned street system as shown in the comprehensive plan and comprehensive transportation plan. All proposed streets shall be continuous and in alignment with existing, planned or platted streets. 2. Proposed streets shall be extended to the boundary lines of the tract to be developed or subdivided, unless prevented by topography or other physical conditions. 3. Whenever there exists adjoining the tract to be subdivided a dedicated or platted half-width street or alley, the other half-width shall be platted. B. Frontage on a state highway or arterial street. 1. When a tract fronts on a state highway, major arterial, or minor arterial street, a frontage street may be required for access to individual lots. 2. All residential lots in a subdivision shall take direct access only from within the subdivision. 3. Any access to a state highway shall be consistent with the requirements of the GDOT. C. No approval shall be granted for a subdivision, or subsequent phase or addition to an existing subdivision, unless the property is served by a paved county road, with right-of-way sufficient to meet the requirements of subsection 8.01.05.I. D. Specific access requirements for developments. 1. Emergency vehicle access shall be provided to all lots within a subdivision. 2. In order to ensure emergency vehicle access, every subdivision with more than fifty (50) lots shall have at least two (2) continuously open points of ingress/egress from the existing street system. 3. Access points, whether private commercial/industrial drives or county roadways, shall line up directly across from one another when possible. For driveways/roadways that require an offset, the spacing between drives/roadways, whether on the same side or opposite side of the intersecting roadway shall be required to have the minimum centerline to centerline spacing: Thirty (30) mph or less ! one hundred twenty-five (125) feet, thirty-five (35) mph ! one hundred fifty (150) feet, forty (40) mph ! one hundred eighty-five (185) feet, forty-five (45) mph ! two hundred thirty (230) feet, fifty (50) mph two hundred seventy-five (275) feet, fifty-five (55) mph ! three hundred fifty (350) feet. For intersecting roadways that are not classified as collector or above and have posted speed limits thirty (30) mph or less, private commercial/industrial driveways may be allowed to have a reduced offset requirement at HCDOT's discretion. (Source: GDOT Regulations for Driveway and Encroachment Control). 4. Where a subdivision is providing two (2) or more connections to the existing street system pursuant to subsection 8.01.03.D.2., the requirement for two (2) points of ingress/egress is met. The requirement for access shall not be satisfied by a stub-out to a future, planned, or platted street that has not been constructed. 5. A subdivision on a single, dead-end street, containing twenty (20) or fewer lots shall not be required to provide two (2) points of ingress/egress as otherwise required in paragraph D.2., above. 6. Where a subdivision is allowed one (1) point of access pursuant to subsection 8.01.03.D.2., that entrance street shall be designed with a three (3) lane divided entrance street, as shown in Figure 8.3. The right turn lane shall be required to have a seventy-five-foot radius to provide needed lateral separation between two (2) cars exiting at the same time. E. Limitations on residential curb cuts. Within any residential zoning district (see subsection 8.01.03.D.3. for other driveway spacing requirements) where the lowering or cutting away of any curbs for purposes of ingress and egress is required, such curb cut shall be subject to the following provisions: 1. Any parcel of property with frontage of less than one hundred (100) feet on any one (1) street shall be allowed only one (1) combined entrance and exit. 2. Any parcel of property with frontage of one hundred (100) feet to 200 feet on any one (1) street shall be allowed no more than two (2) combined entrances and exits. 3. Any parcel of property with frontage of more than two hundred (200) feet on any one (1) street shall be permitted additional entrances or exits after showing of actual requirements of convenience and necessity and upon approval of the HCDOT. 4. At street intersections, no curb cut shall be located within fifty (50) feet of the intersections of two (2) curb lines or such lines extended, or within fifteen (15) feet of the intersection of two (2) property lines extended. When a culvert is required it shall receive approval from the county DOT. 5. The distance between any two (2) curb cuts on the same side of the street and located on one (1) property shall be not less than ten (10) feet. Curb cut distance shall be measured between the points of tangency of the curb return radii and the established curb line of the abutting street. 6. All driveways shall be constructed so as to be at least two (2) feet from any property line. 7. The maximum width of any driveway shall not exceed forty (40) feet measured at the right-of-way line. 8. The maximum width of any curb cut including curb returns shall not exceed fifty (50) feet. 9. The sum of the two (2) curb return radii for any one (1) curb cut shall not exceed fifteen (15) feet. 8.01.04. Joint access driveways and cross access easements. Joint access driveways and cross access easements shall be required in corridor overlay districts, interchange activity center zoning districts, and rural neighborhood commercial development areas according to the following provisions: A. Adjacent commercial or office properties shall provide a cross access drive and pedestrian access to allow circulation between sites through a system of joint use driveways and cross access easements as shown in Figure 8.4. The design of the joint or cross access area shall incorporate the following: 1. A continuous service drive or cross access corridor extending the entire length of each block served to provide for driveway separation; 2. Stub-outs and other design features to make it visually obvious that the abutting properties may be tied in to provide cross-access via a service drive; and 3. Sufficient separation between side street access to the property and the major road to ensure safety. B. In order to ensure continuous availability of access to all properties, all property owners shall: 1. Record an easement with the deed allowing cross access to and from other properties served by the joint use driveways and cross access or service drive; 2. Record an agreement with the deed that remaining access rights along the thoroughfare shall be dedicated to the county and pre-existing driveways shall be closed and eliminated after construction of the joint-use driveways; and 3. Record a joint maintenance agreement with the deed defining maintenance responsibilities of property owners. 8.01.05. Design and construction standards for streets. A. Location. 1. The location, arrangement, extent, width, and grade of all streets shall conform to the comprehensive plan and the transportation system plan, and shall be considered in relation to existing and planned streets, topographical conditions, public safety and convenience, and proposed use of land to be served by the streets. The layout of a subdivision shall conform to the requirements and design principles described in this ULDC. 2. The location of all streets and roads shall conform to the comprehensive plan and the transportation system plan. Provision shall be made in developments for the construction of streets at locations shown in the comprehensive plan and transportation system plan. 3. Whenever a tract to be subdivided includes any part of a major arterial, minor arterial, major collector, or minor collector street designated on the comprehensive plan or transportation system plan, such part of said street shall be installed by the applicant in the location and at the full width indicated by the functional classification for right-of-way and pavement widths indicated in this ULDC. B. Design and construction standards for curb and gutter. 1. Curbs shall be required in all residential subdivisions. 2. Curbs shall be required for streets in commercial and industrial subdivisions. 3. Curbs in all subdivisions shall be L-back curbs twenty-four (24) inches in overall width, six (6) inches thick, and shall have an eighteen (18) inch gutter. Rollback curbs may be installed in the R-3, R-4 or R-5 zoning districts. 4. Curb and gutter immediately adjacent to the major travel lane along roadways with a posted speed limit of forty (40) miles per hour or forty-five (45) miles per hour shall be L-back curbs thirty (30) inches in overall width, six (6) inches thick, and shall have a twenty-four (24) inch gutter. The curb and gutter shall be per GDOT Standard 9032B. 5. All curbs shall be constructed of Portland cement concrete. 6. Curbs shall be designed to provide handicapped access at street intersections, wherever sidewalks are constructed. C. Street grade standards. 1. Grades on major and minor arterials shall not exceed five (5) percent and grades on local residential streets shall not exceed twelve (12) percent. 2. All changes in grade shall be connected by vertical curves which adhere to the design criteria as set forth by the more restrictive of the 1990 or 2004 AASHTO Guide, A Policy on Geometric Design of Highways and Streets. D. [Radius of horizontal curves.] The radius of horizontal curves on local residential streets within a subdivision shall be no less than two hundred (200) feet. The horizontal radius for collector and arterial streets or any streets with a design speed of more than twenty-five (25) miles per hour shall comply with the latest version of the American Association of State Highway and Transportation Officials (AASHTO) standards. The radius of horizontal curves on local commercial and industrial streets within a subdivision shall be no less than three hundred (300) feet. E. Street intersection standards. 1. Street intersections shall be as nearly at right angles as possible. 2. In residential subdivisions no intersection shall be at an angle of less than eighty (80) degrees or more than one hundred (100) degrees. 3. Street intersections in commercial and industrial subdivisions shall be at an angle of not less than ninety (90) degrees, if at all possible. At HCDOT's discretion, street intersection angle may be allowed to be between eighty (80) degrees and one hundred (100) degrees. 4. The minimum curb radius at street intersections shall not be less than twenty-five (25) feet in residential subdivisions. For streets/roadways to have a dual lane exit, the exit curb radius shall not be less than seventy-five (75) feet. Where a county collector or an arterial roadway intersects with another county collector or arterial roadway the minimum radii at the intersection shall be fifty (50) feet. 5. The minimum curb radius of street intersections for industrial and commercial subdivisions shall be fifty (50) feet. For commercial/industrial streets/roadways to have a dual lane exit, the exit curb radius shall not be less than seventy-five (75) feet. 6. Pedestrian ramps shall be designed for all intersections in accordance with standard drawings for subdivisions and residential developments designed to include sidewalks and shall meet the minimum standards in of the Georgia Accessibility Code, Chapter 120-3-20 of The Rules and Regulations of The Georgia Safety Fire Commissioner. The curb shall be de-pressed to accommodate future installations at the same time as the curb. 7. Interior subdivision street intersections shall have a minimum centerline offset of at least one hundred twenty-five (125) feet when not aligned directly across from one another. See subsection 8.01.03.D.3 for requirements of intersection offsets on roadways with posted speed limits over thirty (30) mph. F. [Minimum tangent lengths.] The minimum tangent lengths on roadways with superelevation shall be governed by the minimum runoff and runout lengths necessary to adequately transition the superelevation rates required for the curvature based on the design speed and maximum allowable superelevation rate of the roadway. Design speeds, typical sections of roadway, maximum superelevation rates, and other roadway design items are to be set by HCDOT on an individual roadway basis. The minimum tangent lengths on commercial and industrial subdivision streets is one hundred (100) feet. G. [Dead end street.] Local streets designed to have one (1) end permanently closed and not connected with any existing street, proposed future street, or not intended to extend to the property line of an adjacent tract, shall be no longer than seven (7) times the lot width required by the underlying zoning district, unless necessary due to the topographic or other physical conditions of the property. 1. Permanent residential dead-end streets shall be joined by a cul-de-sac with a paved turnaround having an outside diameter of eighty (80) feet (40-foot radius) and a right-of-way of at least one hundred ten (110) feet diameter. Dead-end streets designed to be permanent and that exceed more than eight hundred (800) feet in length may be required to have a cul-de-sac turn around midway between the entrance intersection and the end of the street to provide maneuvering for emergency vehicles, when the dead-end street is the only street in a subdivision. 2. Stub streets which are intended to provide access for future development within a tract of land or adjacent tracts shall be required to have a temporary turnaround area having a diameter of at least eighty (80) feet, consisting of six (6) inches of graded aggregate base. 3. For subdivisions with a temporary turnaround, it shall be required of the applicant to provide a letter of credit equal to the cost of permanent cul-de-sac construction, in accordance with the standards of section 12.02.13. H. [Alleys.] Alleys may be provided at the rear of lots in residential, commercial, and industrial subdivisions. I. Right-of-way and pavement width standards. Table 8.01.05. Right-of-way and Pavement Width Standards Street Type Minimum Required Right-of-Way (feet) Required Pavement Width (feet) With curbs Without curbs Major arterial 100* 52—53† 48* Minor arterial 80* 28—29† 24* Collector 80* 28—29† 24* Local street Residential 50 26 Prohibited Industrial 60 30 Prohibited Commercial 60 28 Prohibited Cul-de-sac Residential 110 80 Prohibited Commercial/industrial 150 110 Prohibited Alleys 0 20 20 * The county DOT may require additional right-of-way and pavement widths in specific situations. Roadways with medians and/or additional laneage will require extra right-of-way and pavement widths. † Roadways with posted speed limits of forty (40) mph or forty-five (45) mph will require thirty-inch curb and gutter. J. Additional street system requirements for major subdivisions or commercial/industrial development. 1. Private streets are permissible and shall meet and adhere to all county standards. Every subdivision with private streets shall have a mandatory homeowners' association. 2. Subdivisions that adjoin existing streets shall dedicate additional right-of-way if needed to meet the minimum street right-of-way requirements. 3. Half streets shall be prohibited except where essential to the reasonable development of the subdivision. 4. Where it is determined to be practical to require the dedication of the additional half when adjoining property is subdivided, the other half of the street shall be platted to create a full width right-of-way serving the adjoining tracts of land. 5. Any subdivision or development which has an entrance onto a state highway, major arterial, minor arterial, or collector county road shall provide lanes for deceleration, ingress, and egress. Design requirements of the GDOT shall be met on state roads and design requirements of the county DOT shall be met on county roads. 6. Any subdivision or development which has an entrance onto a major arterial, minor arterial, or collector roadway shall be required to design and construct a left turn lane improvement if the criteria is met as stipulated in Chapter 4 of the GDOT Regulation for Driveway and Encroachment Control. The developer will also be responsible for acquisition of right-of-way as well as for the relocation of utilities. 7. The names of proposed streets shall not duplicate existing street names, irrespective of the use of the word street, avenue, boulevard, drive, place, court, etc., in the naming of the street. K. [No parking.] No parking areas shall be established for the use of fire equipment and emergency vehicles to ensure access to the premises in cases of emergency. Said areas shall be marked "Fire Lane-No Parking." The fire lane areas shall comply with provisions of the Henry County Code of Public Safety. 8.01.06. Construction requirements for residential, industrial, and commercial subdivision streets. The grading, base, and pavement for street construction shall be as follows: A. Grading. All streets shall be graded to the elevations shown on the approved construction plans. 1. The contractor may begin clearing and grubbing the project after: a. A development permit has been issued by the county; b. A pre-construction conference has been held, the division director or designee duly notified; and c. All required silt and erosion control measures have been installed and approved. 2. Clearing and grubbing. a. All trees, stumps, logs, roots, grass, weeds, poles, and other objectionable matter shall be cleared and grubbed from within the construction limits of the project. b. A thirty-foot undisturbed buffer shall be maintained on all property lines prior to submission of construction plans. c. No rubbish or other material resulting from the clearing and grubbing of the roadway shall be buried at the site. d. If burning is permitted, all burn pits shall be located outside of the roadway construction limits. After burning, the pit shall be cleared out. A county inspection is required prior to backfilling and must be shown on the final plat. 3. Excavation. a. All grading operations shall be planned and executed by the contractor in such a manner as to provide suitable subgrade material for the roadway with the top twelve (12) inches compacted to one hundred (100) percent maximum dry density, ninety-five (95) percent below the top. b. In areas where the material in place is not suitable for subgrades, these areas shall be undercut a minimum of twelve (12) inches and backfilled with suitable material. c. All rock and boulders in the roadbed shall be excavated and the space backfilled to the correct grade with suitable material. d. Any stones, broken rock, or boulders resulting from the grading of the roadway may not be placed in any roadway fill area except when approved by the division director or designee and then under his supervision. e. During the construction of the roadway on a day-to-day basis, the roadbed edges shall be kept lower than the center and the grading shall be done so that the surfaces of the excavated areas and fill shall be kept reasonably smooth and well drained. Adequate surface ditches shall be cut at the tops of cut slopes, extending to each end of the cuts in order to carry the water from the side hill. Side ditches or gutters emptying from cuts to fill areas shall be turned outward so as to prevent erosion of the fill slopes. 4. Placement of fill. a. Fill construction shall not begin until all clearing and grubbing of the fill area has been completed. b. All depressions in the ground shall be filled level with the adjacent surface using suitable material and compacted to the approximate density of the surrounding soil before placement of the fill is begun. c. The entire area upon which fill is to be placed shall be plowed, scarified, and finely broken up to a depth of a minimum of six (6) inches. d. Before the placement of fill material is begun, all loosened soil shall be compacted the approximate density of the underlying soil. e. Where a depth of fill and surfacing is three (3) feet or less, the original ground shall be compacted a minimum twelve (12) inches deep to at least ninety-five (95) percent of the maximum laboratory dry density as determined from representative samples of the material being compacted. f. In areas where layers of organic or other unstable materials exist, the existing ground shall be excavated, for the full width of the fill area, to an underlying stable material. The subgrade thus created shall then be compacted to the approximate density of the underlying material. g. All fill material shall be deposited and spread in uniform horizontal layers, not more than six (6) inches thick, for the full width of the fill area, and these layers shall be kept uniform by the use of graders, bulldozers or other approved equipment. h. Each layer shall be compacted within the range of optimum moisture content necessary to achieve the compaction required. Material containing too much water shall be dried to the correct moisture content. If the material is too dry, water shall be added and uniformly mixed with the soil before it is compacted. i. Fills shall be compacted to at least ninety-five (95) percent of the maximum dry density to within the top twelve (12) inches of the fill. The top twelve (12) inches of the fill shall be compacted to at least one hundred (100) percent of the maximum dry density. j. The entire roadbed shall be scarified and compacted with a sheep's foot or other approved rollers. k. While the work is in progress, contractor shall maintain the surface in a manner so that the excavation, fills, subgrade, base course, and ditches always present a smooth and even surface. l. The contractor shall have available on the job at all times at least one (1) motor patrol grader with adequate power to blade and maintain the roadbed. Suitable scarifiers shall also be available for use whenever necessary. 5. Final finishing of roadway. a. After all excavation has been completed and all fills have been placed, the entire road bed surface shall be finally shaped with a grading machine supplemented with hand work whenever required, to secure a smooth surface and uniform cross-section. b. Slopes of cuts and fills shall also be carefully shaped to the true section specified. c. When final shaping is finished, the road surface shall conform accurately to the line, grade and cross section shown of plans, and no roots, sod, grass, stones, or other unsuitable material shall remain in the top twelve (12) inches of the finished roadbed. d. All ditches and drains shall be opened to effectively drain the roadway. B. Placement of curb and gutter. 1. After sanitary sewer lines have been installed, all storm drainage in place, and the final finishing of the roadway has been approved by the division director or designee, and the centerline profile has been approved, the installation of the concrete curb and gutter may begin. 2. All concrete curb and gutter shall be in accordance with Standard Drawing 3.7.1, available from the county or the county website at www.co.henry.ga.us. 3. Any curb and gutter which does not conform to a true section, texture, line, and grade shall be removed and replaced as directed by the division director or designee. 4. Water lines shall be installed after installation of the curb and gutter. C. Subgrade. 1. Before placing any pavement base the entire surface of the subgrade shall be plowed, harrowed, and mixed to a depth of at least six (6) inches. If a subgrade stabilization material is required it shall be incorporated into the subgrade at this time. 2. After the material has been thoroughly mixed the subgrade shall be brought into a proper line and grade and compacted to one hundred (100) percent of maximum dry density just prior to placing the base material. 3. The centerline profile shall conform to the established elevations with an acceptable tolerance of one-half (1 /2) inch. 4. The acceptance crown tolerance shall be one-half (1 /2) inch. D. Base construction. 1. The division director or designee shall be notified twenty-four (24) hours prior to the placing of any base material. 2. The division director or designee may authorize the placing of the base material after all equipment necessary for the proper construction of road base is on the project and the subgrade has been brought to the proper line, grade and crown, and compacted to the required density. 3. The division director or designee shall check the completed base course after the base material has been placed and compacted to the required density. All areas found to be deficient shall be marked and corrected before any asphalt pavement is placed. Areas where the crown is found to exceed that which is specified or the exposed edge of the concrete gutter is less than the minimum depth required, shall be reshaped and rolled to obtain the required cross-section. 4. After the compacted material has been approved, field tests shall be taken by the field contractor and development inspector, or by a professional engineer as directed by the division director or designee to determine the thickness of the constructed base course. Tests shall be taken at four hundred (400) feet intervals alternating between each lane and center of roadway. Measurements shall be taken per GDT-42, Method of Test for Measurement of Thickness of Bases and Subbases. Areas found to be deficient in thickness shall be corrected as directed by the division director or designee. No asphalt course shall be placed until deficiencies in base have been adequately addressed. 5. A copy of all delivery tickets for the graded aggregate base material shall be furnished prior to placing any asphaltic concrete paving material. A shortage in the base material used shall require that the asphaltic concrete surface course thickness be increased. 6. All work and materials shall be in accordance with the pertinent Graded Aggregate Construction sections of the Georgia Department of Transportation "Standard Specifications," latest edition. E. Soil cement. 1. A soil cement base may be used to improve the subgrade, but shall not be used as a substitute for base construction. F. Paving. 1. The contractor shall begin the construction of the asphaltic concrete pavement upon approval of the road base by the division director or designee. 2. All asphaltic concrete material and construction shall be in accordance with the "hot mix asphaltic concrete construction" sections of the Georgia Department of Transportation "Standard Specifications," latest edition. 3. The division director or designee shall check the cross section of the finished pavement. Any area found to be deficient shall be marked and a record of deficiencies made by the division director or designee. 4. If, in the opinion of the division director or designee, the extent of deficiencies will impair the performance of the pavement, he shall direct that an overlay of a minimum thickness of one (1) inch be placed before the roadway is opened to traffic. 5. A copy of the delivery tickets for the asphaltic concrete material used shall be furnished to the division director or designee at the time of completion of the work. If the delivery tickets indicate a shortage in the material used from the quantity estimated the division director or designee may require a minimum one (1) inch overlay of the streets. 6. As mentioned in subsection 8.01.06.D.4, the GAB (Base) thickness is to be measured and accepted by the county prior to placement of any asphalt course. The applicant shall have core tests made to verify the thickness and compaction of the two-inch asphalt pavement course. The minimum core diameter shall be such that compaction of the sample can be determined in the lab and subsequent data supplied to the division director or designee. The compaction of the course shall be required to meet GDOT specifications per the asphalt mix placed. If a two (2) course asphalt section is required, the cores for the binder layer shall be cut, reviewed, and approved by the division director or designee prior to placement of the topping lift. Also, in the event that a two (2) course asphalt section is required, the cores for the topping lift, if between one and one-half (11 /2) inch and one and one-quarter (11 /4) inch in thickness, shall be made to determine the thickness only. All cores shall be made on four hundred (400) feet intervals, alternating between each lane and center of roadway. If these cores indicate a deficiency in thickness or compaction of the asphalt pavement, an overlay shall be required when the following deficiencies occur: a. When the number of cores deficient in thickness within the allowable one-quarter (1 /4) of an inch tolerance, or deficient in compaction, exceeds thirty-five (35) percent of the total cores taken on one (1) street. b. When two (2) or more consecutive tests show a deficiency of more than one-quarter ( /4) of an inch allowable tolerance or a deficiency in compaction. When a core shows a deficiency in excess of the allowable tolerance or compaction additional cores shall be taken to delineate the area of the deficient thickness/compaction. 7. The applicant shall correct any deficiency with an overlay extending a minimum of one hundred fifty (150) feet beyond the outer limits of the deficient area for the full width of the street. Smooth, neat joints shall be saw cut normal to the roadway for full depth of asphalt pavement, removing the original pavement for a minimum of ten (10) feet at each end of the overlay. The thickness of the overlay shall be determined by the depth of the deficient area and shall not be less than one and one-quarter (11 /4) inch in compacted thickness. The type of material used in the overlay shall be specified by the division director or designee. G. Shoulder and drainage improvements. After the paving has been inspected and approved, the pavement edges or behind the curb and gutter shall be backfilled and compacted and the ditches and back slopes properly graded, shaped, seeded and mulched. An eighty (80) percent stand of grass shall be obtained. All swales and ditches excavated below required depth shall be backfilled and compacted to ninety-five (95) percent of maximum dry density. H. [Compliance with minimum standards.] Road design and construction for residential subdivisions shall comply with the minimum standards shown below in subection 8.01.06.I. Acceleration and deceleration lane construction shall comply with the standards set forth in subsection 8.01.06.K. For roadways with more than one hundred fifty (150) lots of contributing traffic a pavement design is to be done and submitted to HCDOT for review. The GDOT Asphalt Pavement Design program is an accepted method for the pavement design submittal for roadways with more than one hundred fifty (150) lots of contributing traffic. I. Table of residential subdivision street construction standards. Table 8.01.06(I). Residential Subdivision Street Roadway Standards Roadway Standards Specifications Surface topping (plant mix) for roadways with 1 to 40 lots contributing traffic 2-inch 12.5 mm superpave mix with hydrated lime (Level 1), 220 pounds per square yard Surface topping (plant mix) for roadways with 41 to 100 lots contributing traffic 11 /4-inch 9.5 mm superpave mix with hydrated lime (Level 1), 137.5 pounds per square yard Surface topping (plant mix) for roadways with 101 to 150 lots contributing traffic 11 /2 inch 12.5 mm superpave mix with hydrated lime (Level 1), 165 pounds per square yard Tack coat 0.04—0.06 GAL/Square yard Asphalt (binder course) for roadways with 41 to 150 lots contributing traffic 2-inch 12.5 mm superpave mix or 19 mm superpave mix with hydrated lime (Level 1), 220 pounds per square yard Add in "prime application" section to table 0.20—0.25 GAL/Square yard Roadway Standards Specifications Curbs/shoulder and ditch construction 24-inch × 6-inch concrete "L" back curb 18-inch gutter; 6 inches high, 6-inch curb width Base construction 6-inch base (graded aggregate); 100 percent dry density compaction Subgrade Top 12-inch subgrade compacted to 100 percent dry density Street width 26 feet back of curb to back of curb Asphalt pavement width 22 feet Street grade 12 percent maximum on subdivision streets; 4 percent maximum grade at intersections - 100 feet from curb line Turnaround area 40 feet radius cul-de-sac pavement; 110 feet diameter Intersections 25 feet pavement radius at intersection within subdivision; 25 feet pavement radius required where intersecting existing county or state roads. 75 [feet] exit curb radius when designing a dual lane exit. Right-of-way 50 feet right-of-way minimum for local streets (additional right-of-way and/or slope easements may be required for cut and fill areas); 110 feet diameter right-of-way for cul-de-sac. A 5-foot utility easement is required along all street right-of-way Fill areas and back slopes 2:1 maximum slope allowed (2:1 or flatter) Storm sewers and cross drains See section 8.01.12 and 8.01.13 for pipe specifications and minimum requirements for pipe types listed. Pipe location and size approved by development plan review and stormwater management. Grassed areas Shall comply with section 8.05.00 Core testing Core samples shall be taken as directed (at applicant's expense) to determine thickness of base and pavement. See sections 8.01.06.D.4 and 8.01.06.F.6. Letter of credit or bond 3-year maintenance letter of credit or bond on all improvements within public right-of-way (streets, sidewalks, storm sewer, catch basins, cross drains) and stormwater detention facilities. On phased developments, certain sections may require a renewed letter of credit or bond if used for construction access to newer phases (see section 12.02.13). J. [Design and construction requirements.] The design and construction requirements for subdivision developments for industrial, commercial, or office use and urban streets which are to be county arterial roads shall: 1. Be required to have concrete curb and gutter along each side in accordance with Henry County Construction Standard No. 3.7.1. 2. Comply with the minimum standards shown below in subsection 8.01.06.K. K. Table of industrial, commercial, and office subdivision street construction standards. Table 8.01.06(K). Industrial, Commercial, and Office Subdivision Street Construction Standards Roadway Standards Specifications Surface topping plant mix 11 /2-inch 12.5 mm superpave mix with hydrated lime (Level 1) asphalt topping, 165 pounds per square yard Tack coat 0.04 — 0.06 GAL/YD Binder (office and commercial) 3-inch 19 mm superpave mix with hydrated lime (Level 1) - 330 pounds per square yard Roadway Standards Specifications Binder (industrial) 4-inch 25 mm superpave mix with hydrated lime (Level 1), 440 pounds per square yard or 2 2-inch lifts of 19 mm superpave mix with hydrated lime (Level 1), 220 pounds per square yard, per lift. Curb and gutter required 24 × 6-inch concrete "L" back curb; 18-inch gutter; 6-inch high; 6-inch curb width. Base construction (office and commercial) 8-inch base (graded aggregate), compacted to 100 percent maximum dry density. Base construction (industrial) 10-inch base (graded aggregate), compacted to 100 percent maximum dry density. To be on decel/accel also for industrial. Street width (office and commercial) 28 feet back of curb to back of curb. Street width (industrial) 30 feet back of curb to back of curb. Asphalt pavement width (office and commercial) 24 feet. Asphalt pavement width (industrial) 26 feet. Street grade 8 percent maximum on industrial/commercial streets; 2 percent maximum grade at intersections; 100 feet from curb line. Turnaround area 55 feet radius cul-de-sac pavement; 110 feet diameter. Intersections 50 feet pavement radius at intersections; 50 feet straight section from curved streets required; 75 [feet] exit curb radius when designing a dual lane exit. Driveway entrances GDOT specifications Right-of-way 60 feet right-of-way minimum; additional right-of-way or slope easement may be required for cut and fill areas; 150 feet diameter right-of-way for cul-de-sac. A 5-foot utility easement is required along all street right-ofway. Fill areas and back slopes 2:1 maximum slope allowed. Storm sewers and cross drains See sections 8.01.12 and 8.01.13 for pipe specifications and minimum requirements for pipe types listed. Pipe location and size approved by development plan review and stormwater management. Grassed areas Shall comply with the erosion and sedimentation control requirements set forth in section 8.05.00. Core testing Core samples shall be taken as directed (at applicant's expense) to determine thickness of base and pavement. See subsections 8.01.06.D.4. and 8.01.06.F.6. Maintenance letter of credit or bond 3-year maintenance letter of credit or bond on all improvements within public right-of-way (streets, sidewalks, storm sewer, catch basins, cross drains) and stormwater detention facilities. On phased developments, certain sections may require a renewed letter of credit or bond if used for construction access to newer phases (see section 12.02.13). 8.01.07. Improvements to existing streets and rights-of-way for residential, commercial and/or industrial developments. A. Existing unpaved road. Any unpaved road upon which a development has frontage and access shall be widened and paved, according to the functional class of the road, as set forth in subsection 8.01.05.I. along the frontage* of the development to the nearest intersection with a paved county road. The minimum right-of-way required according to subsection 8.01.05.I. shall be dedicated along the entire frontage of the development back to the nearest intersection in which the roadway is to be improved. In addition to the design, construction, and right-of-way acquisition, the developer shall also be responsible for relocation of utilities. Where a development has frontage, but does not provide access to an unpaved road, the developer shall preserve right-of-way along the development's frontage for future improvements to the roadway. * - In instances where improving a roadway to the limits of the frontage causes for an undesirable termination point for the improved roadway (i.e., alignment issues, topographic issues, etc.) the improvement shall be required to be further extended in order to provide for an acceptable tie-in to the existing roadway. B. Existing paved road. For any existing paved two (2) lane county road upon which a development has frontage and access that is less than twenty (20) feet in width and classified as a local roadway, or less than twenty-two (22) feet in width and classified as a collector roadway or greater, the roadway shall be widened relative to county specifications (see section 8.01.05.I. and tables 8.01.06.I. and K.) along the limits of the site's frontage. Widening of the roadway shall include improvements to the shoulder, ditch, and back-slope to meet county DOT Standards. Depending on the condition of the existing roadway (PACE's score of less than seventy (70)), there may be requirements for additional improvements to the overall roadway width along the site's frontage, such as improvements to the typical pavement section and resurfacing. For any roadway less than nineteen (19) feet in width, the roadway shall be required to be widened, possible typical pavement section improvement, placement of shoulder, ditch, and slopes to meet county DOT standards and resurfacing along the site's frontage, as well as outside of the site frontage limits up to the nearest roadway meeting Henry County standards as determined by the county DOT. The minimum right-of-way required according to section 8.01.05(I) shall be dedicated along the entire frontage of the development. 8.01.08. Visibility at intersections. A. Corner lots. On corner lots within all zoning districts, no fence, shrubbery or other obstruction shall be placed within the sight line triangles that blocks or disrupts the line of sight based on a driver eye height of three and one-half (3.5) feet located fourteen (14) feet from edge of travel lane (when there is a deceleration lane, the driver eye shall be located fourteen (14) feet from edge of decel lane) and an object height of three and one-half (3.5) feet located in the center of each respective lane. The minimum distances required are shown in Table 8.01.08(B)(2). However, streetsigns, streetlights, mailboxes, or similar shall be permitted within the sight line triangles (see Figure 8.5 below). B. Intersection sight distance for all streets. 1. Curb cuts shall be placed so as to provide for the minimum intersection sight distance based on the intersecting road's posted speed limit. The intersection sight distance is measured using a driver-eye height of three and one-half (3.5) feet and an object height of three and five-tenths (3.5) feet with the driver eye being located fourteen (14) feet beyond the edge of the travel lane (when there is a deceleration lane, the driver eye shall be located fourteen (14) feet from edge of decel lane) and an object height of three and one-half (3.5) feet located in the center of each respective oncoming lane. 2. Table of minimum intersection sight distances relative to design speed posted on streets are: Table 8.01.08(B). Intersection Sight Distance for 2-lane Roadway Speed (MPH) 25 30 35 40 45 50 55 Stopping sight distance 280 335 390 445 500 555 610 Source: 1990 AASHTO Guide, A Policy on Geometric Design of Highways and Streets. C. Stopping sight distance for all streets. 1. Minimum street centerline stopping sight distance shall be designed relative to the design speed of the street and shall be measured above the street centerline using a driver eye height of three and one-half (3.5) feet and an object height of six (6) inches. 2. Table of minimum centerline stopping sight distances relative to design speed posted on streets are: Table 8.01.08(C). Stopping Sight Distance Speed (MPH) 0—25 30 35 40 45 50 55 Centerline sight distance (stopping distance in feet) 150 200 225 275 325 400 450 Minimum crest curve "k" value (1990 AASHTO) 20 30 40 60 80 110 150 Minimum sag curve "k" value (2004 AASHTO) 26 37 49 64 79 96 115 Source: 1990 and 2004 AASHTO Guide, A Policy on Geometric Design of Highways and Streets. As info concerning the above minimum crest "k" values, where there is an intersecting street on or near the vertical curve, the minimum "k" value may not provide for the minimum intersection sight distance requirement. If this is the case, the "k" value for the crest curve will need to be increased in order to obtain the minimum intersection sight distance required. 8.01.09. Pedestrian access and facilities requirements. A. Sidewalks shall be at least four (4) feet in width and four (4) inches in thickness and shall be constructed of Portland cement concrete. Sidewalks shall be installed no closer than two (2) feet to the back of curb line and shall not be constructed over any underground gas, electric, communications, or water and sewer utilities. Sidewalks and curbs, at street intersections, shall be designed to permit handicapped access (see construction standard detail for location of sidewalks). Sidewalks shall be required on both sides of streets within all commercial, industrial or residential subdivisions and all mixed use developments. B. Sidewalks shall be installed by the builder on lots upon which a dwelling is being constructed before the issuance of a certificate of occupancy. All sidewalks along common areas, including pond lots, amenity areas, open space, and lots containing existing homes or lots that are unbuildable, shall be installed by the developer before the end of the three-year maintenance period. After the three-year maintenance period has expired, any broken curbing and sidewalk will be repaired by the builder before a certificate of occupancy is issued. C. Twelve (12) months from the completion of at least ninety (90) percent of the dwellings in any subdivision, or phase of any subdivision, Henry County reserves the right to install sidewalks along any areas not yet containing sidewalks. The cost of construction and installation shall be repaid to Henry County via a lien placed on the adjacent property upon which the sidewalk fronts. D. The provisions established in this section may be applied to any project currently under review or under bond as of the date of adoption of this Code. 8.01.10. Street names and signs requirements. A. Street names. 1. All proposed street names within the county for new roads or roads within commercial, industrial, or residential subdivisions shall be approved by the division director or designee during the preliminary plat review process or prior to recording of the road and its right-of-way deed. 2. Any request to change the name of an existing road shall be submitted to the division director or designee for review and approval, with the board of commissioners having final approval of the change. B. Street signs. 1. The county DOT shall determine the need and location of street signs within a subdivision. The location of the street signs shall be determined during the review of the preliminary plat. 2. The county's standard steel street posts or wooden four-inch by four-inch posts with horizontal reflectorized street name plates with four-inch letters shall be furnished and installed by county DOT. 3. The cost of street signs and their installation shall be paid by the applicant at a fee determined by the county DOT. All funds collected for these signs shall be deposited into the county general fund account. 4. The required fee shall be paid by the applicant when submittal of a final plat is made to the county. 5. The request for an invoice and the ordering of signs shall come from the division director or designee to the county DOT. 8.01.11. Streetlight and pedestrian light requirements. A. In order to ensure adequate illumination of public rights-of-way and promote safety and security, The American National Standard Practice for Roadway Lighting of the Illumination Engineering Society (RP-8-00), as approved by the American National Standards Institute (1993), as from time to time amended, is hereby adopted as the standard for the installation and operation of lighting in the county. At a minimum, the provision of pedestrian lights shall be required as per section 4.05.06.G.1. B. Approval of lighting plan. 1. A lighting plan, which may be prepared by the streetlight provider, shall be provided to the division director or designee for the erection, construction, or installation of streetlight and/or pedestrian light fixtures or equipment upon which the illumination thereof falls upon public rights-of-way. This shall include security lights of all kinds and nature. The lighting plan shall illustrate the illumination provided by pedestrian lights. The overlap of pedestrian light illumination and streetlight illumination shall be minimized to such an extent that streetlights may not be required at all in areas where pedestrian lights, meeting the equivalent requirements of section 4.05.06.G.1 provide the required illumination without streetlights. 2. Lighting plans shall be submitted with the final plat and any additions. 3. Plans shall demonstrate how the proposed lighting meets the standards of this section and include a drawing showing the exact location of streetlights. 4. No lighting shall be installed or operated without approval of the division director or designee. C. Streetlight and pedestrian light fixtures or equipment shall be erected, constructed, or installed by the applicant in such a manner to ensure that the lateral light distribution which causes a glare does not inhibit the users of the rights-of-way from safely traversing and using the rights-of-way. D. Streetlight and pedestrian light district requirements for new development. 1. Streetlights shall be provided in new subdivisions, except in the RA and R-1 zoning districts, where new streets are required to be dedicated to the county or which allow lot access to existing county streets. Pedestrian lights shall be provided as required in section 4.05.05. 2. The developer of residential subdivisions shall install streetlights and pedestrian lights with underground wiring. It shall be the responsibility of the applicant to coordinate the installation of the streetlights and pedestrian lights with the appropriate utility and the county consistent with the standards contained in this ULDC. 3. Each property owner shall be assessed a rate based on the total cost of annual lighting charge within the district divided by the number of properties within the district. Unit cost of lighting fixture charges shall be based on fees provided by electric utility companies of both overhead and underground installation. 4. The rates or charges for lighting service shall constitute assessments on the property so served. Those assessments shall be added to tax bills at the end of each year and shall constitute a lien upon the property. Said lien shall have the same priority as tax assessments and an execution may issue for the purpose of enforcing the lien including foreclosure and/or judicial sale. E. Streetlight and pedestrian light district requirements in existing residential development. 1. Individuals owning real property in an existing residential area desiring to install streetlights and/or pedestrian lights may apply with the county to establish a streetlight and pedestrian light district. 2. The application shall be supported by a petition signed by property owners representing more than fifty-one (51) percent of the property owners in the district which is sought to be established. 3. Upon receipt of a complete streetlight application, the division director or designee will contact the utility provider to request a layout, price, and contract, if necessary, for the streetlights. For pedestrian lights, the proposed layout prepared by an engineer licensed in the State of Georgia, the fixture specifications, the unit price, and the contract, if necessary, shall be provided as part of a complete streetlight and pedestrian light district application. F. Up to three (3) additional streetlights or pedestrian lights may be added to an existing street light district by the division director or designee. If four (4) or more additional streetlights or pedestrian lights are required, the request must follow the procedure in section 8.01.11.E.2. above. 8.01.12. Drainage standards for streets—Placement, location, and design. A. The size, length, and location of all surface drainage pipe or structures shall be shown on all preliminary plats. All storm drain pipes or culverts carrying stormwater from the street and adjacent property or through lots in the subdivision shall be extended to ten (10) feet from the rear property line. Stormwater shall be released into a channel or swale without causing scouring, erosion, or resulting in sedimentation of the receiving channel. The outlet channel shall include structural and vegetative measures to assure nonerosive velocities of stormwater. B. Installations, backfilling, and compaction around drainage pipes shall be in accordance with GDOT specifications. All pipes shall have a minimum cover of eighteen (18) inches from the bottom of the road base, and head walls or inlet basins constructed at the ends of the pipes. C. The design of drainage structures shall be based on recognized hydrological formulae. D. Piped collection systems for public streets (catch basins, inlets, cross drains, longitudinal piping), shall be designed for the 50-year storm. E. Road culverts, which carry live streams, shall be RCP and off-site drainage shall be designed for the 100-year storm and the developer's engineer is to provide a no-rise certification letter. F. Cross drain pipes within the public rights-of-way shall be designed and constructed at or near a ninety-degree angle with the roadway centerline. Where a slight skew is necessary, the pipe shall be placed within an eighty- to one-hundred-degree angle with the roadway centerline. G. Longitudinal pipes along a curved section of roadway shall be located on the inside of the curve to avoid pipe beneath the roadway footprint. In the event that the longitudinal pipe needs to be along the outside of the curve the pipe shall be wholly located outside the limits of the curb and gutter by use of additional junction boxes. For pipe at a cul-de-sac location, all pipe shall be wholly located outside of the footprint of the curb and gutter that encircles the cul-de-sac. 8.01.13. Drainage standard for streets—Materials and installation. A. Standard specifications. 1. All of the materials, methods of the construction, and workmanship for the work covered in reference to stormwater conveyance facility construction shall conform to the most recent Standard Specifications of the Georgia Department of Transportation (Georgia DOT). 2. Allowable pipe material for all applications in drainage easements and public street rights-of-way, except as specified below, are aluminum-coated (Type 2) corrugated steel pipe (ASP), corrugated aluminum alloy pipe, smooth-lined corrugated polyethylene pipe (HDPE), or reinforced concrete pipe (RCP). Usage is summarized in the table below titled pipe material alternatives. Allowable pipe materials are indicated by an "X" in the Table 8.01.13. 3. For roads constructed with public funds, either wholly or in part, or roads classified as major thoroughfares, materials which meet the Georgia DOT design standards shall be used unless an alternative is specifically approved by the Henry County Department of Transportation. 4. Only reinforced concrete pipe (RCP) shall be used for all dams nine (9) feet or more in height with an impounding capacity of twenty (20) acre-feet or more unless the Georgia Safe Dams Program requires another material. 5. Reinforced concrete pipe (RCP) shall be used under non-local roads when the ADT is greater than fifteen thousand (15,000) vehicles per day (vpd). Reinforced concrete pipe (RCP) or smooth-lined corrugated high density polyethylene (HDPE) pipe shall be used under nonlocal roads when the ADT is less than fifteen thousand (15,000) vpd. The public works division may approve an alternative pipe material. B. Minimum pipe and pipe coating requirements. The type of pipe material used shall be in accordance with subsection 8.01.13.A, standard specifications. 1. Reinforced concrete pipe shall be in not less than eight-foot joint lengths. All joints shall be bell and spigot type, with a rubber gasket conforming to ASTM C-443. Pipe shall be manufactured in accordance with AASHTO M-170 and/or ASTM C-76. Class of pipe and wall thickness shall be in accordance with 1030-D, Georgia DOT specification, Table No. 1. 2. Aluminum-coated (Type 2) steel pipe shall comply with AASHTO M-274 for the coating and AASHTO M-36 for the pipe fabrication. Aluminum alloy pipe shall comply with AASHTO M-196 for material and fabrication. 3. See the standard drawings for the minimum acceptable combinations of gages, diameters, and corrugation configurations for corrugated aluminum alloy pipe and pipe arches, and for corrugated aluminum-coated steel pipe and pipe arches. 4. Each end of each pipe section, to be joined by a coupling band, shall have a minimum of two (2) annular corrugations. Coupling bands shall be so constructed to lap on an equal portion of each of the pipe sections to be joined. The connecting bands shall have a minimum of two (2) annular corrugations and fully engage, over the entire pipe periphery, one (1) corrugation on each pipe. Bands shall be fabricated from the same material as the pipe. The minimum band gauges for aluminum pipe and aluminized pipe shall be as specified in AASHTO M-196, Section 19, and AASHTO M-36, Section 9, respectively. 5. Gaskets may be required as determined by the county in the field, and shall be either sleeve type or O-ring type and shall meet the requirements for gaskets as specified in AASHTO M-36, Section 9.3. C. [Structural plate drainage structures.] Structural plate drainage structures shall conform to the following specifications: 1. Corrugated aluminum alloy structural plate pipe, pipe arches and arches shall consist of aluminum plates and galvanized bolts and nuts of the size, shape and thickness as shown on the approved plans. These structures shall conform to the requirements of AASHTO M-219. D. Smooth interior corrugated polyethylene pipe. 1. This specification applies to high density polyethylene corrugated pipe with an integrally formed smooth interior (HDPE). HDPE pipe manufacturers shall be approved by the public works division. 2. This pipe shall conform to the requirements of AASHTO M-294, Type S. 3. Joints shall be as recommended by the manufacturer and approved by the county. Connections shall create a soil tight joint at a minimum and shall use a rubber gasket, which conforms to ASTM F-477. 4. Installation shall be in accordance with ASTM Recommended Practice D2321, AASHTO Section 30, or as specified by the county. Certification from the manufacturer that the product was manufactured, tested, and supplied in accordance with this specification shall be furnished to the county upon request. Table 8.01.13 — Allowable Pipe Use Pipe Type Reinforced Concrete Pipe Metal Pipe Plastic Pipe Aluminized Type 2 Steel Polymer Precoat Steel Aluminum Alloy Corrugated Polyethylene Smoothed Lined High Density Polyethylene Type "S" Specifications (See note 1) ASTM C76, AASHTO M170 ASTM A760, A929; AASHTO M36, M274 ASTM A742, A762; AASHTO M36, M245, M246 ASTM B744, B745; AASHTO M196, M197, GDT17 AASHTO M252 ASTM F-2306; AASHTO M294 (see note 2) Minimum thickness/ class Per GDOT Std 1030D Per GDOT Std 1030D Per GDOT Std 1030D Per GDOT Std 1030D AASHTO M252 AASHTO M294 Type Installation Longitudinal X X X X X Cross drains on road w/over 15,000 ADT Cross drain <10 percent slope X Cross drain > 10 percent slope Check w/HCDOT concerning pipe type to be used when x-drain > 10 percent and ADT > 15,000 Cross drains on nonlocal road w/less than 15,000 ADT Cross drain <10 percent slope XX Cross drain > 10 percent slope X Cross drains on local road (s/d road) w/less than 15,000 ADT Cross drain < 10 percent slope XX XX Cross drain > 10 percent slope XX X Lateral systems X X X X X Slope drain X X X X Perforated underdrain X X X X X Dams H > 9 feet and V > 20 Ac-Ft X Perennial streams X X Minimum allowable design velocity 2.5 fps 2.5 fps 2.5 fps 2.5 fps — 2.5 fps Type Installation Reinforced concrete pipe Aluminized type 2 Steel Polymer precoat steel Aluminum alloy Corrugated polyethylene Smooth lined high density polyethylene Type "S" Maximum allowable design velocity 15 fps 5 fps 15 fps 15 fps — 15 fps Minimum soil pH/resistivity — 6/1500 ohm/cm 5/1500 ohm/cm ——— Notes: 1) All pipe materials shall meet the minimum requirements of the Georgia Department of Transportation's Standard Specifications Construction of Transportation Systems, most current edition. 2) Allow smoothed-lined HDPE, Type S (AASHTO M294) pipe for storm (longitudinal and cross) and side drain applications through 48-inch diameter so long as roadway's ADT is less than fifteen thousand (15,000) vehicles per day. E. Pipe installation. 1. [Installation standards.] Reinforced concrete pipe (RCP), corrugated aluminum alloy pipe, corrugated aluminum coated steel pipe and smooth interior corrugated polyethylene pipe shall be installed in accordance with Section 550 of the Georgia DOT Standard Specifications, Construction of Roads and Bridges. Prior to approval of a final plat, the county may require the submittal of certification from a mandrel testing agency indicating that all installed pipe (other than RCP) does not exceed five-percent deflection. Based on field inspections, video surveillance may be conducted by the county or required by the county on storm drain installations before approval of the final plat or issuance of the certificate of occupancy. If required, video surveillance should be done after completion of all activities that may damage the pipe but prior to placement of base, paving or landscaping over or near the pipe. If video surveillance indicates problems such as pipe deformation, cracking or joint separation, the pipe shall be removed and replaced before approval. 2. Bedding. All pipe structures shall be placed on stable earth or fine granular foundation, the characteristics of which would be expected to provide long-term stability. In all live stream pipe installations, in areas of low bearing solid or non-uniform foundations, in area where rock is encountered at the foundation level, or in other locations where conditions warrant, a minimum of six (6) inches of crushed stone bedding is required, (maximum size of stone shall be three-fourths-inch). Geotextiles or geogrids may also be required by the county in problem areas. 3. Backfilling. Backfill for CSP, CAP, and HDPE pipe installations shall be constructed using graded aggregate base or crusher run six (6) inches below the bottom of pipe to twelve (12) inches above the pipe crown. Backfill for RCP pipe installations shall be constructed using graded aggregate base or crusher run six (6) inches below the pipe invert to one-quarter (1 /4) of the pipe diameter. Foundation backfill material shall be used for RCP above one-quarter (1 /4) of the pipe diameter (if graded aggregate base is not used above the one-quarter (1 /4) of the pipe diameter) as per Type I or Type II, as specified in sections 812.01 and 812.02 respectively, in Georgia DOT Standard Specifications. These materials shall be placed in Rlfll{f()i!Cfil C('NCJ!f;lt P.-Ft: -~lt M,Et;/ll'QN11fl!"'IIIAI ~'Dttll: li&L MV Dl1clll'I' layers of not more than six (6) inches loose. Compaction of these materials shall be accomplished by hand tamping or machine tamping. Required compaction levels are as follows: 4. [Within street right-of-way.] Backfill within all street rights-of-way shall be compacted to ninety-five (95) percent maximum density, tested using the AASHTO Method T-99. 5. [In other areas.] Backfill in all other areas shall be compacted to ninety (90) percent maximum density, tested using the AASHTO Method T-99. 6. Construction loads and minimum covers. If drainage pipe is installed prior to the completion of grading, a minimum of four (4) feet of fill should be provided where needed to adequately protect the drainage structure during the land development phase, unless the structure itself is designed to withstand the anticipated live load during construction. F. End finish. 1. Headwalls or other end treatments are required on all culverts and at the outlet of all piped collection systems. Where ends of pipe are located within, or near, the right-of-way and are parallel, or nearly parallel, with the roadway, safety end sections shall be required when the posted speed limit is thirty-five (35) mph and over. 2. Headwalls are to be precast concrete, stone masonry with reinforced concrete footings, or poured in place, reinforced concrete with reinforced concrete footings. Precast concrete headwalls for corrugated aluminum coated steel pipe or aluminum alloy pipe shall be made with aluminum coated steel or aluminum alloy pipe stubs. 3. End treatments that conform to the slope may be pre-cast concrete end sections; aluminum coated steel or aluminum alloy end sections, masonry, PE end sections, reinforced poured-in-place slope collars, or grouted rip-rap. Concrete and metal flared end sections shall conform to applicable Georgia DOT Standard Drawing 1120, 1122, or Detail D-39. G. Junction boxes and catch basins. Junction boxes and catch basins shall have metal manhole frames and lids for access. H. Other structures. Natural bottom arches and box culverts may be used in accordance with the latest standard specifications of the Georgia Department of Transportation. Bottomless culverts shall require that a scour analysis be done by a registered professional engineer in that field to Georgia Department of Transportation Specifications and Standards to ensure the soundness of the proposed structure. I. References. Gwinnett County Stormwater Systems and Facilities Installation Standards and Specifications (SSFISS) Chapter 3 — rev07.06 U.S. Department of Transportation, Federal Highway Administration, 1984. Drainage of Highway Pavements. Hydraulic Engineering Circular No. 12. (Ord. No. 10-20, § I(18), 6-15-10; Ord. No. 1703, § I, 2-7-17; Ord. No. 20-06, § II, 11-14-20; Ord. No. 22-06, § I, 9-7-22) Sec. 8.02.00. Off-street parking and loading requirements. 8.02.01. Purpose and intent. It is the intent of section 8.02.00 to ensure the appropriate location and quantity of off-street parking and loading and to ensure that all developments provide adequate and safe storage and movement of vehicles consistent with good site design principles. 8.02.02. Applicability. A. Except as provided in this section, no application for a building permit shall be approved unless there is included with the plan for such building, improvements, or use, a development plan showing the required space reserved for off-street parking and loading. Occupancy shall not be allowed unless the required off-street parking and loading facilities have been provided in accordance with those shown on the approved plan. B. Each use of land and each building or structure hereafter constructed or established, and each addition to a structure shall provide off-street parking and loading according to the standards set forth herein. C. When an addition is made to a building containing less than the required parking or loading requirements, off-street parking shall be provided for the entire building, based upon the standards in this section. D. No addition to an existing building shall be constructed which reduces the number of spaces, area, or usability of an existing parking lot or loading space, unless such building and its addition conform with the regulations for parking and loading contained herein. 8.02.03. Maintenance. All off-street parking and loading areas shall be well maintained. Parking lots and loading areas shall be free of potholes, debris, weeds, broken curbs, and broken wheel stops. 8.02.04. Calculation of required parking spaces and loading spaces. A. The table of parking and loading space standards specifies the required minimum number of off-street parking spaces for each listed use. Where the calculation of the required number of spaces results in a fraction, the number shall be rounded up to the next whole number. B. Where the unit of measure for determining the number of parking spaces is the number of seats in a facility, the number of seats shall be the maximum occupancy allowed pursuant to building and construction codes. C. When multiple uses occupy a building, or a mixed use development is proposed in separate buildings under unified control, the parking and loading requirement shall be met by each use, unless shared parking is approved according to the standards in section 8.02.08. D. Where a use is not listed in the table of parking and loading space standards, the division director or designee shall determine the appropriate parking and loading standard. The determination shall be based on the standards for similar uses. 8.02.05. Parking and loading space standards. Table 8.02.05. Parking and Loading Space Standards Use Required Number of Parking Spaces Per Each Unit of Measure as Follows (s.f. means square feet of gross floor area) Required Number of Loading Spaces Per Square Feet of Gross Floor Area Residential Activities, Activity Code 1000 Residential 2 Dwelling unit None NA Institutional living 1 Bedroom None NA Use Required Number of Parking Spaces Per Each Unit of Measure as Follows (s.f. means square feet of gross floor area) Required Number of Loading Spaces Per Square Feet of Gross Floor Area Transient living 1 plus 1 Sleeping room Employee on the largest shift 1 NA Shopping, Business, or Trade Activities, Activity Code 2000 General retail and shopping, up to 250,000 s.f. not otherwise specified 1 150 s.f. 1 plus 1 40,000 Each additional 20,000 Grocery and other food stores 1 100 s.f. customer area 1 plus 1 10,000 Each additional 20,000 Consumer and durable goods sales establishments 1 400 s.f. 1 plus 1 40,000 Each additional 20,000 Heavy consumer goods sales establishments 1 500 s.f. 1 plus 1 40,000 Each additional 20,000 Shopping center, 250,000 s.f. to 400,000 s.f. gross floor area 1 250 s.f. 1 plus 1 40,000 Each additional 20,000 Shopping center, over 400,000 s.f. gross floor area 1 300 s.f. 1 plus 1 40,000 Each additional 20,000 Gasoline station 1 2 pumps None NA Vehicles sales and/or service 1 plus 1 400 s.f. sales or service building Employee on the largest shift 1 NA Personal services 2 Employee None NA Restaurants, high turnover (fast food), with or without drive-up windows 1 75 s.f. (excluding kitchen and storage) 1 NA plus 1 Employee on the largest shift Restaurants, other than high turnover above 1 150 s.f. (excluding kitchen and storage) 1 NA plus 1 Employee on the largest shift Bars, taverns, or drinking establishments 1 plus 1 2 seats Employee on the largest shift 1 NA Use Required Number of Parking Spaces Per Each Unit of Measure as Follows (s.f. means square feet of gross floor area) Required Number of Loading Spaces Per Square Feet of Gross Floor Area Offices, professional and general, excluding medical 1 300 s.f. None NA Government and public service buildings 1 100 s.f. None NA Industrial, Manufacturing, and Related Activities, Activity Code 3000 Manufacturing, assembly, and processing plants 1 plus 1 2,500 s.f. Employee on the largest shift 1 plus 1 40,000 Each additional 60,000 Warehouse and storage service 4 plus 1 5,000 s.f. Each additional 5,000 s.f. 1 plus 1 40,000 Each additional 60,000 Salvage yards, junkyards, recycling centers, landfills 1 Employee on the largest shift 1 NA Social, Institutional, and Infrastructure-Related Activities, Activity Code 4000 Schools Pre-K—8th grade 1 plus 1 Employee 3 seats in auditorium None NA High school plus 1 6 students Libraries, museums and similar uses 1 400 s.f. of public space 1 plus 1 10,000 Each additional 30,000 Emergency response and public safety facilities 1 plus 1 200 s.f. public area Employee on the largest shift None NA Medical and dental offices, clinics, and similar uses, without overnight facilities 5 Physician or dentist None NA Hospitals, nursing homes, and medical uses with overnight facilities 1 plus 1 2 beds Employee on the largest shift 1 plus 1 10,000 Each additional 20,000 Funeral homes and mortuaries 1 3 seats in largest chapel 1 Each hearse or ambulance Travel Related Activities, Activity Code 5000 Use Required Number of Parking Spaces Per Each Unit of Measure as Follows (s.f. means square feet of gross floor area) Required Number of Loading Spaces Per Square Feet of Gross Floor Area Ground passenger terminals and stations 1 3 seats in waiting area None NA plus 1 Employee on the largest shift Postal, courier, and messenger services 1 plus 1 100 s.f. public area Employee on the largest shift 1 NA Truck and freight services 1 500 s.f. 1 plus 1 40,000 Each additional 60,000 Use Required Number of Parking Spaces Per Each Unit of Measure as Follows (s.f. means square feet of gross floor area) Required Number of Loading Spaces Per Square Feet of Gross Floor Area Mass Assembly of People, Activity Code 6000 Mass assembly, with fixed seats 1 3 fixed seats 1 plus 1 40,000 Each additional 20,000 Mass assembly, without fixed seats 1 50 s.f. of seating area in largest assembly room 1 plus 1 40,000 Each additional 20,000 Mass assembly with bench seating 1 24 linear inches of bench 1 plus 1 40,000 Each additional 20,000 Fairs, amphitheaters, outdoor assembly 1 50 s.f. of largest assembly area 2 NA Leisure Activities, Activity Code 7000 Recreation or park facilities 8 acre None NA 8.02.06. Handicapped accessible parking spaces. A. All uses shall provide parking spaces designated for handicapped access. B. Table of required handicapped parking: Table 8.02.06(B). Required Handicapped Parking Total Parking Spaces Required Handicapped Spaces Required Up to 25 1 26—50 2 51—75 3 76—100 4 101—150 5 151—200 6 201—300 7 301—400 8 401—500 9 501+ 2% of total required spaces C. Handicapped spaces shall be marked on the pavement and by appropriate signage, both markings to use the universally accepted "Handicapped" symbol. Handicapped spaces shall be located in closest proximity to major building entrances, but in no event shall such spaces be more than one hundred (100) feet from an entrance. D. Ramps shall meet the design standards set forth in the Georgia Accessibility Code Chapter 120-3-20 of The Rules and Regulations of The Georgia Safety Fire Commissioner. 8.02.07. Design requirements for parking lots, parking spaces, and loading areas. Off-street parking lots, individual parking spaces, loading areas, and loading stalls shall be designed to conform to the following criteria and standards: A. All multiple-family, commercial, and industrial uses shall provide a paved, dust-free surface. The use of approved permeable or pervious pavement materials is encouraged, provided such paving is approved for use by the county engineer. B. All off-street loading stalls shall have access from a public street. C. Loading stalls are not to hinder movement of pedestrians or vehicles over a street, sidewalk, or alley, or to and from an off-street parking area. D. Off-street parking and loading areas that are to be used at night shall include proper illumination for the safety of pedestrians, vehicles, and for security purposes. Lighting shall be located and shielded to avoid direct illumination of adjacent properties. E. Each off-street parking space shall be clearly marked, and directional arrows or signs shall be provided wherever necessary. Markers, directional arrows, and signs shall be properly maintained so as to ensure their maximum efficiency. F. All off-street parking, loading, and service areas shall be drained so as to prevent damage to abutting properties and/or public streets and shall be constructed of materials which shall assure a surface resistant to erosion. G. All off-street parking, loading, and service areas shall be separated from walkways, sidewalks, and streets by curbing or other suitable protective device. H. The following design standards shall be used to achieve compliance with parking provisions of this chapter. Construction standard drawings for standard parking spaces are available from the division director or designee or the Henry County website at www.co.henry.ga.us. Table 8.02.07(H). Parking Space Dimensions Type of Parking Space Required Dimensions of Parking Spaces See Construction Standard Drawing Full-size automobile space: 45° angle 9' wide; 25' deep 4.1.2 Full-size automobile space: 60° angle 9' wide; 22' deep 4.1.2 Full-size automobile space: 90° angle 8'6" wide; 20' deep 4.1.1 Full-size automobile space: Parallel to walk 8'6" wide; 20' deep 4.1.1 Compact automobile space: 90° angle 8' wide; 19' deep 4.1.1 Handicapped spaces Refer to the Georgia Accessibility Code Chapter 120-3-20 of The Rules and Regulations of The Georgia Safety Fire Commissioner I. There shall be provided adequate interior driveways to connect each parking space with a public right-of-way. Table 8.02.07(I). Parking Lot Design Required Width of Interior Driveways and Aisles (feet) Parking Design (degree of angle) 24 90° 18 60° 12 Parallel 12 One-way traffic: Not adjacent to parking 24 Two-way traffic: Not adjacent to parking J. The following are the design requirements for off-street loading stalls: Table 8.02.07(J). Off-Street Loading Stall Design Wholesale and Industrial Uses Width 10 feet Length 50 feet Overhead clearance 14 feet All Other Uses Width 10 feet Length 14 feet Overhead clearance 14 feet 8.02.08. Shared parking arrangements. A. Adjacent uses, multiple uses within a unified development, or establishments with multiple tenants of different uses may provide shared parking facilities. Such shared parking facilities may have a reduced quantity of parking as compared to the sum of parking spaces required for each individual use. B. Where shared parking facilities are proposed, the following standards shall be met: 1. There shall be a paved driveway connection between the adjacent developments such that automobiles may move from one (1) parcel or use to the adjacent parcel or use without exiting to the public street. 2. There shall be a designated pedestrian connection from all uses to the shared parking facility. 3. The owners of developments involved shall execute a cross-access and cross-parking agreement, provided in a recordable instrument, acceptable to Henry County. The agreement shall guarantee the joint use of a specified number of parking spaces. 4. The number of spaces in the shared parking facility shall be determined by one (1) of the methods in subsection 8.02.08.C., below. C. The calculation of required spaces in a shared parking facility shall use one (1) of the two (2) methods described below: 1. A parking study may be conducted to provide evidence of the combined parking requirements of the proposed uses. a. The study shall be prepared by a professional engineer with documented traffic expertise. b. The study shall include estimates of parking requirements based on professionally accepted data or studies, such as from the Institute of Traffic Engineers, Urban Land Institute, or other sources acceptable to Henry County. c. Parking requirements shall be based on uses that are the same or comparable to the proposed uses. Comparability shall be determined by density, scale, bulk, area, type of activity, and location in relationship to other uses and the transportation system. d. Parking requirements shall be based upon peak hours of need for each use proposed to share parking facilities. The hours of maximum, or peak, parking demand of the respective developments shall not overlap. e. The study shall document the source(s) of data used to develop recommendations. f. The study shall document the extent to which transportation system management and alternative forms of transportation (pedestrian and bicycle) reduce the parking requirement. g. The study shall document the availability of off-site parking to meet a portion of the parking requirements. Off-site parking shall not be located more than one hundred fifty (150) feet from the uses that require parking. The study shall be accompanied by documentation to demonstrate the continued availability of the off-site parking, such as easements or other recordable instruments. 2. Shared parking may be determined by the following method: a. Calculate the parking requirement for each proposed use, as set forth in Table 8.02.05. b. Multiply each amount by the corresponding percentages from the table below for each of the five (5) time periods. c. Total the amount of parking for each time period. d. The highest parking requirement shall be the minimum number of spaces required for the shared use facilities. Table 8.02.08(C). Shared Parking Demand Calculations General Land Use Week Days Weekend Daytime 9 a.m.—4 p.m. Evening 6 p.m.—12 M Daytime 9 a.m.—4 p.m. Evening 6 p.m.—12 M Nighttime 12 M—6 a.m. Office or industrial 100% 10% 10% 5% 5% Commercial 60% 80% 100% 60% 5% Hotel/motel 60% 100% 60% 100% 60% Restaurant 70% 100% 75% 100% 10% Entertainment 50% 100% 80% 100% 0% (Ord. No. 10-20, § I(19), 6-15-10) Sec. 8.03.00. Standards for utility infrastructure. 8.03.01. Generally. A. All development shall include adequate provision for utility infrastructure in full compliance with the standards of section 8.03.00. B. All potential utilities shall be identified on the development plan in order to indicate compliance with placement standards set forth in section 8.03.02. C. All construction drawings shall be prepared and sealed by a professional engineer registered in the State of Georgia. D. No private utilities (including irrigation system/sprinklers) allowed in county right-of-way. If any are placed within the county right-of-way, Henry County shall not be responsible for any damage to utilities. 8.03.02. Placement standards for all utilities. A. The standards for the placement of all utilities are shown in the figures 8-6, 8-7 and 8-8. B. Utilities shall be located within one (1) foot, plus or minus, of the specified plan locations shown in figures 8-6 and 8-7. 8.03.03. Potable water system requirements. A. All potable water systems shall comply with the design and construction standards of the Henry County Water and Sewerage Authority (HCWSA). B. Extension within subdivisions. The applicant shall be responsible for the material and labor cost of extending water systems within a subdivision as directed and inspected by the HCWSA. 1. The extensions of water mains within a subdivision shall be designed to provide adequate hydraulic capacity for future extensions to the surrounding area and shall be connected to existing surrounding water mains to accomplish desirable hydraulic looping. 2. Dead-end mains within a subdivision shall be avoided, based on a determination by the HCWSA. Water mains in dead-end streets shall have a fire hydrant installed at the end of the line on a common lot corner according to the standard details provided by HCWSA. C. Hydrants. Hydrants shall be placed to ensure free and clear access from the nearest public right-of-way. No equipment, landscaping, mail boxes, or other structures shall be placed in such a manner as to obstruct clear access from the right-of-way to the fire hydrant. 8.03.04. Wastewater system requirements. A. All wastewater systems shall comply with the design and construction standards of the HCWSA. B. Extension within subdivisions. 1. The applicant shall be responsible for the material and labor cost of extending wastewater systems within a subdivision as directed and inspected by the HCWSA. 2. Where it is anticipated that the HCWSA will extend a trunk or interceptor sewer line adjacent to the subdivision, sewer service lines shall be installed within the subdivision and temporarily plugged or capped at the points of service connection in the proposed lateral or trunk sewer line at individual lot lines in accordance with HCWSA specifications. 8.03.05. Other utilities. A. A certificate of occupancy shall not be issued for structures in a subdivision or development until all necessary utilities have been installed in full compliance with the design, construction, and placement standards set forth in section 8.03.00. B. Exemptions. The following specific facilities shall be exempt from the requirements of this section, provided that the placement of these facilities complies with the requirement for free and clear access to fire hydrants as set forth in subsection 8.03.03.C. 1. Poles used exclusively for street lighting, provided that the street lighting standards set forth in section 8.01.10 are met. 2. Poles, overhead lines, and associated overhead structures owned by a utility company crossing over any portion of an area from which overhead wires are allowed. 3. Overhead lines attached to the exterior of a building by means of a bracket or similar device and extending from one (1) location on the building, or to an adjacent building without crossing any street or right-of-way. 4. Radio antennae and associated structures and equipment used for furnishing communications service. 5. Service terminals and necessary pad-mounted electric transformer equipment installed above ground, used to distribute communications and electric service in underground systems. C. Electrical substations. Electrical substations are permissible in any zoning district, subject to the standards set forth in section 4.03.05. The utility company shall obtain an easement for these installations. The easement shall be clearly indicated on the preliminary and final plats. Sec. 8.04.00. Standards for stormwater management. 8.04.01. Purpose and intent. The purpose of this article is to protect, maintain and enhance the public health, safety, environment, and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased post-construction stormwater runoff and nonpoint source pollution associated with new development and redevelopment. Proper management of post- construction stormwater runoff will minimize damage to public and private property and infrastructure, safeguard the public health, safety, environment, and general welfare of the public, and protect water and aquatic resources. Additionally, the Henry County Stormwater Management Department is required to comply with several state and federal laws, regulations and permits and the requirements of the Metropolitan North Georgia Water Planning District's regional water plan related to managing the water quantity, velocity, and quality of post- construction stormwater runoff. This section seeks to meet that purpose through the following objectives: 1. Establish decision-making processes surrounding land development activities that protect the integrity of the watershed and preserve the health of water resources; 2. Require that new development and redevelopment maintain the pre-development hydrologic response in their post-development state as nearly as practicable in order to reduce flooding, streambank erosion, nonpoint source pollution and increases in stream temperature, and maintain the integrity of stream channels and aquatic habitats; 3. Establish minimum post-development stormwater management standards and design criteria for the regulation and control of stormwater runoff quantity and quality; 4. Establish design and application criteria for the construction and use of structural stormwater control facilities that can be used to meet the minimum post-development stormwater management standards; 5. Encourage the use of nonstructural stormwater management and stormwater better site design practices, such as the preservation of greenspace and other conservation areas, to the maximum extent practicable. Coordinate site design plans, which include greenspace, with the county's greenspace protection plan; 6. Establish provisions for the long-term responsibility for and maintenance of structural stormwater control facilities and nonstructural stormwater management practices to ensure that they continue to function as designed, are maintained, and pose no threat to public safety; and, 7. Establish administrative procedures for the submission, review, approval, and disapproval of stormwater management plans, and for the inspection of approved active projects, and long-term follow up. A. Applicability. 1. This section shall be applicable to all land development, including, but not limited to, site plan applications, subdivision applications, and grading applications, unless exempt pursuant to subsection 8.04.01.B below. These standards apply to any new development or redevelopment site that meets one (1) or more of the following criteria: a. New development that creates or adds five thousand (5,000) square feet or greater of new impervious surface area or that involves land disturbing activity of one (1) acre of land or greater; b. Redevelopment (excluding routine maintenance and exterior remodeling) that creates, adds, or replaces five thousand (5,000) square feet or greater of new impervious surface area or that involves land disturbing activity of one (1) acre or more; c. New development and redevelopment if: i. new development or redevelopment is part of a subdivision or other common plan of development, and ii. the sum of all associated impervious surface area or land disturbing activities that are being developed as part of such subdivision or other common plan of development meets or exceeds the threshold in (a) and (b) above; d. Any commercial or industrial new development or redevelopment, regardless of size, that is a hotspot land use as defined in this article; and e. Linear transportation projects that exceed the threshold in (a) or (b) above. B. [Exemptions.] The following activities are exempt from this section: 1. Individual single-family or duplex residential lots that are not part of a subdivision or phased development project; 2. Additions or modifications to existing single-family or duplex residential structures; 3. Agricultural or silvicultural land management activities within areas zoned for these activities; 4. Repairs to any stormwater management facility or practice deemed necessary by Henry County; and 5. Repairs or extensions of public utilities including water, sewerage, gas, cable, etc. C. Designation of ordinance administrator. The county manager may from time to time appoint someone to administer and implement this section. D. Compatibility with other regulations. This section is not intended to modify or repeal any other ordinance, rule, regulation or other provision of law. The requirements of this section are in addition to the requirements of any other ordinance, rule, regulation, or other provision of law, and where any provision of this section imposes restrictions different from those imposed by any other ordinance, rule, regulation or other provision of law, whichever provision is more restrictive or imposes higher protective standards for human health or the environment shall control. E. Severability. If the provisions of any section, subsection, paragraph, subdivision, or clause of this section shall be adjudged invalid by a court of competent jurisdiction, such judgment shall not affect or invalidate the remainder of any section, subsection, paragraph, subdivision or clause of this section. F. Stormwater design manual. Henry County Stormwater Management Department staff will utilize the policy, criteria and information including technical specifications and standards in the latest edition of the Georgia Stormwater Management Manual and any relevant local addenda, for the proper implementation of the requirements of this section. The manual may be updated and expanded periodically, based on improvements in science, engineering, monitoring and local maintenance experience. G. Definitions. Flooding means a volume of surface water that is too great to be confined within the banks or walls of a conveyance or stream channel and that overflows onto adjacent lands. 8.04.02. Permit procedures and requirements. A. Permit application requirements. 1. No owner or developer shall perform any land development activities without first meeting the requirements of this section prior to commencing the proposed activity. 2. Unless specifically exempted by this section, any owner or developer proposing a land development activity shall submit to Henry County a permit application on a form provided by or acceptable to the county for that purpose. 3. Unless otherwise exempted by this section, a permit application shall be accompanied by the following items in order to be considered: a. Pre-submittal meeting, stormwater concept plan, and stormwater management plan requirements. B. [Pre-submittal meeting request.] Before a land development permit application is submitted, an applicant may request a pre-submittal meeting with the Henry County Stormwater Management Department. The pre-submittal meeting should take place based on an early step in the development process such as before site analysis and inventory (GSMM section 2.4.2.4) or the stormwater concept plan (GSMM section 2.4.2.5). The purpose of the pre-submittal meeting is to discuss opportunities, constraints, and ideas for the stormwater management system before formal site design engineering. To the extent applicable, local and regional watershed plans, greenspace plans, trails and greenway plans, and other resource protection plans should be consulted in the pre-submittal meeting. Applicants must request a pre-submittal meeting with the Henry County Stormwater Management Department when applying for a determination of infeasibility through the practicability policy. To accomplish this goal the following information shall be included in the concept plan which shall be submitted in advance of the meeting: 1. Existing conditions/proposed site plans. Existing conditions and proposed site layout sketch plans, which illustrate at a minimum: existing and proposed topography; perennial and intermittent streams; mapping of predominant soils from soil surveys (when available); boundaries of existing predominant vegetation and proposed limits of clearing and grading; and location of existing and proposed roads, buildings, parking areas and other impervious surfaces. 2. Natural resources inventory. Site reconnaissance and surveying techniques shall be used to complete a thorough assessment of existing natural resources, both terrestrial and aquatic, found on the site. Resources to be identified, mapped, and shown on the stormwater management plan, shall include, at a minimum (as applicable): a. Topography (minimum of two-foot contours) and steep slopes (i.e., areas with slopes greater than fifteen (15) percent), b. Natural drainage divides and patterns, c. Natural drainage features (e.g., swales, basins, depressional areas), d. Natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers, drinking water wellhead protection areas and river corridors, e. Predominant soils (including erodible soils and karst areas), and f. Existing predominant vegetation including trees, high quality habitat and other existing vegetation. 3. Better site design practices for stormwater management. Stormwater management plans shall preserve the natural drainage and natural treatment systems and reduce the generation of additional stormwater runoff and pollutants to the maximum extent practicable. Additional details can be found in the GSMM section 2.3. 4. Stormwater runoff quality/reduction. Stormwater runoff quality/reduction shall be provided by using the following: a. For development with a stormwater management plan submitted before January 1, 2024, the applicant may choose either (A) runoff reduction or (B) water quality. b. For development with a stormwater management plan submitted on or after January 1, 2024, the applicant shall choose (A) runoff reduction and additional water quality shall not be required. To the extent (A) runoff reduction has been determined to be infeasible for all or a portion of the site using the practicability policy, then (B) water quality shall apply for the remaining runoff from a one and two-tenths-inch rainfall event and must be treated to remove at least eighty (80) percent of the calculated average annual post-development total suspended solids (TSS) load or equivalent as defined in the GSMM. i. Runoff reduction. The stormwater management system shall be designed to retain the first one (1.0) inch of rainfall on the site using runoff reduction methods, to the maximum extent practicable. ii. Water quality. The stormwater management system shall be designed to remove at least eighty (80) percent of the calculated average annual postdevelopment total suspended solids (TSS) load or equivalent as defined in the GSMM for runoff from a one and two-tenths-inch rainfall event. iii. If a site is determined to be a hotspot as detailed in section 8.04.01.A., the Henry County Stormwater Management Department may require the use of specific or additional components for the stormwater management system to address pollutants of concern generated by that site. 5. Local watershed plans, applicable greenspace projection plans, and any relevant resource protection plans will be consulted in the discussion of the concept plan. C. Stormwater management plan requirements. 1. An application for development activity as defined in subsection 8.04.01.A., above shall be accompanied by a stormwater management plan and an inspection and maintenance agreement regarding ongoing maintenance of the stormwater management facilities. 2. The stormwater management plan shall detail how post-development stormwater runoff will be controlled or managed and how the proposed project will meet the requirements of section 8.04.00. 3. The stormwater management plan shall be in accordance with the criteria established in section 8.04.00. The plan shall contain the stamp and signature of a professional engineer licensed in the State of Georgia, who must verify that the design of all stormwater management facilities and practices meet the submittal requirements outlined in the submittal checklist(s) found in the stormwater design manual. 4. The stormwater management plan shall contain sufficient information to demonstrate that the requirements and criteria in section 8.04.00 are being complied with and that opportunities are being taken to minimize adverse post-development stormwater runoff impacts from the proposed development. The plan shall consist of maps, narrative, and supporting design calculations (hydrologic and hydraulic) for the proposed stormwater management system. The plan shall include all of the information required in the stormwater management site plan checklist found in the Georgia Stormwater Management Manual Section E. 5. The following information is required, at a minimum. Existing conditions hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a. Topographic map of existing site conditions with the drainage basin boundaries indicated; b. Acreage, soil types and land cover of areas for each subbasin affected by the project; c. All perennial and intermittent streams and other surface water features; d. All existing stormwater conveyances and structural control facilities; e. Direction of flow and exits from the site; f. Analysis of runoff provided by off-site areas upstream of the project site; and g. Methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. 6. For redevelopment sites, predevelopment conditions shall be modeled using the established guidelines for the portion of the site undergoing land development activities. 7. A post-development hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a. A topographic map of developed site conditions with the post-development drainage basin boundaries indicated; b. Total area of post-development impervious surfaces and other land cover areas for each subbasin affected by the project; c. Calculations for determining the runoff volumes that need to be addressed for each subbasin for the development project to meet post-development stormwater management performance criteria; d. Location and boundaries of proposed natural feature protection and conservation areas as per chapter 3 of the ULDC; e. Documentation and calculations for any applicable site design credits that are being utilized; and f. Methodologies, assumptions, site parameters, and supporting design calculations used in analyzing the existing conditions site hydrology. g. If the land development activity on a redevelopment site constitutes more than fifty (50) percent of the site area for the entire site, then the performance criteria shall be met for the stormwater runoff from the entire site. 8. The description, scaled drawings, and design calculations for the proposed postdevelopment stormwater management system, which shall include: a. A map and/or drawing of the stormwater management facilities, including the location of nonstructural site design features and the placement of existing and proposed structural stormwater controls, including design water surface elevations, storage volumes available from zero (0) to maximum head, location of inlet and outlets, location of bypass and discharge systems, and all orifice/restrictor sizes; b. A narrative describing how the selected structural stormwater controls will be appropriate and effective; c. Cross-section and profile drawings and design details for each of the structural stormwater controls in the system, including supporting calculations to show that the facility is designed according to the applicable design criteria; d. A hydrologic and hydraulic analysis of the stormwater management system for all applicable design storms (including stage-storage or outlet rating curves, and inflow and outflow hydrographs); e. Documentation and supporting calculations to show that the stormwater management system adequately meets the post-development stormwater management performance criteria; f. Drawings, design calculations, elevations and hydraulic grade lines for all existing and proposed stormwater conveyance elements including stormwater drains, pipes, culverts, catch basins, channels, swales and areas of overland flow; and g. Where applicable, a narrative describing how the stormwater management system corresponds with any watershed protection plans as required in per chapter 3 of the ULDC or open space connectivity requirements for conservation subdivisions, as set forth in section 6.02.00. 9. A downstream peak flow analysis is required, which includes the assumptions, results and supporting calculations to show safe passage of post-development design flows downstream. The analysis of downstream conditions in the report shall address each and every point or area along the project site's boundaries at which runoff will exit the property. The analysis shall focus on the portion of the drainage channel or watercourse immediately downstream from the project. This area shall extend downstream from the project to a point in the drainage basin where the project area is ten (10) percent of the total basin area. In calculating runoff volumes and discharge rates, consideration may need to be given to any planned future upstream land use changes. The analysis shall be in accordance with the stormwater design manual. 10. An erosion and sedimentation control plan that meets the requirements of section 8.05.00. 11. The landscaping plan, as required in section 5.00.00 shall describe how vegetation will be placed within and adjacent to stormwater management facilities. 12. Detailed description of ongoing operations and maintenance procedures for stormwater management facilities and practices to ensure their continued function as designed and constructed or preserved. These plans shall identify the parts or components of a stormwater management facility or practice that need to be regularly or periodically inspected and maintained, and the equipment and skills or training necessary. The plan shall include an inspection and maintenance schedule, maintenance tasks, and responsible parties for maintenance, funding, access, and safety issues. Provisions for the periodic review and evaluation of the effectiveness of the maintenance program and the need for revisions or additional maintenance procedures shall be included in the plan. 13. All stormwater management facilities shall be on its own lot with a minimum twenty-foot access easement to ensure access from a public right-of-way. All driveways, access easements, and emergency access easements must be paved and dust free. Such access shall be sufficient for all necessary equipment for maintenance activities. Depending on the depth of pipe, the drainage easement width may be required to be increased. There shall be a twenty-foot easement around the outside perimeter of the facility. All subdivision lots shall have a ten-foot drainage easement along all side and rear lot lines. Upon final inspection and approval, a plat or document indicating that such easements exist shall be recorded and shall remain in effect even with the transfer of title of the property. 14. Runoff reduction infeasibility (RRI) form for determination of infeasibility. Runoff reduction infeasibility (RRI) forms for determination of infeasibility shall be maintained and supplied by the Henry County Stormwater Management Department. Such applications shall include, at a minimum: a. Applicant contact information. b. Description of the site. c. Maximum practicable runoff reduction volume. d. Stormwater concept plan. e. GSMM stormwater quality site development review tool for the stormwater concept plan. f. Justification that the site cannot accommodate best management practices that rely on evapotranspiration and reuse such as rainwater harvesting or green roofs. g. Site conditions. 8.04.03. Detention design requirements. A. Generally. 1. All stormwater detention facilities shall be designed to control the peak flow rates associated with storms having two-year, five-year, ten-year, twenty-five-year, fifty-year, and one hundred-year-storm frequencies. 2. A variety of methods of achieving stormwater management goals shall be acceptable in providing detention facilities. The type of facility provided shall be based on the following criteria: a. The type of development which the detention facility is being provided; b. The type of development which the detention facility is intended to protect; c. Volume of stormwater to be stored; d. Origin and magnitude of the flows to be managed; e. Topographic opportunities and limitations; f. Safety considerations; g. Maintenance requirements; h. Aesthetic considerations; i. Likelihood of facility operation interfering with access to public or private facilities; j. Proximity of facility to property lines, utilities, buffers, etc.; and k. Similar site-specific constraints. 3. Detention facilities may be of any of the following types, and two (2) or more types may be used in combination with one another: a. Underground detention/retention facilities; b. Lakes and ponds, whether excavated or created by damming a natural drainage feature or a combination of both methods, to be a feature of the development and shall include a method of water movement; or c. Normally dry and sodded basins, whether excavated or created by damming a natural drainage feature or a combination of both methods. 4. Detention facilities for non-residential developments shall be underground detention/ retention facilities. An underground detention/retention facility that is deemed not feasible by the Henry County Stormwater Department shall apply for an administrative waiver in accordance with subsection D below. 5. Plans, specifications, and computations must be complete in detail sufficient to enable another engineer to fully check and verify the results and computations. The plans used for construction must contain basic design data, a project narrative, schedule of construction, name and address of person responsible for construction, the engineer's seal or stamp, signature and address and engineering drawings required for the project construction. a. The detention facility shall be provided with an overflow device or emergency spillway to accommodate the one-hundred-year frequency storm in the event the outflow control structure becomes obstructed with debris. b. The configuration of the detention facility, outflow and overflow control devices shall be clearly depicted in plan and cross-section on the construction drawings. c. Graded access easement, (maximum six (6) percent grade) around all detention ponds in areas inaccessible to vehicular traffic. d. Temporary sediment basins shall be designed and shown at all detention sites and all major drainage exits. The detention facility shall be designed to provide temporary silt protection. e. Underground detention facilities will require details that provide: i. The location and type of access protection for the detention facility; ii. An outline of maintenance procedures to be filed with the county; iii. Safety requirements as specified by the county for the site. B. As constructed certification of detention pond. After construction and before acceptance for occupation or otherwise the engineer shall submit a certified field run topographic map of the detention area and a revised hydrology study using the as-built topographic map to verify that the required detention storage and outflow rates are being provided. C. Detention pond fencing. When a detention structure is over four (4) feet deep or in a location that constitutes a danger to human habitation, it shall be protected by a permanent fence and warning signs. Fences shall be five-foot-high with a ten-foot-wide gate. Fences shall be located on the outside edge of the twenty-foot perimeter easement. No fences shall be built that would inhibit proper function of the drainage system. D. Variations. Administrative waivers permit a practice that is not consistent with a specific provision of this section, but is justified by its intent or purpose, or by hardship. The administrator of the ULDC or their designee shall have the authority to approve or disapprove administratively a request for an administrative waiver in accordance with section 11.03.00 of the ULDC, in addition to granting relief from section 8.04.03. 8.04.04. Application procedures. 1. File a land development application with the Henry County Building Department on the Henry County Building Department's form of application with the following supporting materials: a. The stormwater management plan prepared in accordance with section 8.04.02.C, b. A certification that the development will be performed in accordance with the stormwater management plan once approved, c. A [preliminary determination of infeasibility, as applicable, prepared in accordance with the practicability policy], and d. An acknowledgement that applicant has reviewed the Henry County Stormwater Management Department's form of inspection and maintenance agreement, and that applicant agrees to sign and record such inspection and maintenance agreement before the final inspection. 2. Permit applications shall include the items set forth in section 8.04.02. above (two (2) copies of the stormwater management plan and the inspection maintenance agreement, if applicable, shall be included). 3. Henry County shall inform the applicant whether the application, stormwater management plan and inspection and maintenance agreement are approved or disapproved. 4. If either of the permit application, stormwater management plan or inspection and maintenance agreement is disapproved, Henry County shall notify the applicant of such fact in writing. The applicant may then revise any item not meeting the requirements hereof and resubmit the same, in which event subparagraph 3 above and this subparagraph shall apply to such re-submittal. 5. Upon a finding by Henry County that the permit application, stormwater management plan and inspection and maintenance agreement, if applicable, meet the requirements of this section, Henry County may issue a permit for the land development project, provided all other legal requirements for the issuance of such permit have been met. 6. Notwithstanding the issuance of the permit, in conducting the land development project, the applicant or other responsible person shall be subject to the following requirements: a. The applicant shall comply with all applicable requirements of the approved plan and this section and shall certify that all land clearing, construction, land development and drainage will be done according to the approved plan; b. The land development project shall be conducted only within the area specified in the approved plan; c. Henry County staff shall be allowed to conduct periodic inspections of the project; d. No changes may be made to an approved plan without review and written approval by Henry County; and, e. Upon completion of the project, the applicant or other responsible person shall submit the engineer's report and certificate and as-built plans required by section 8.04.03.B. A. Application review fees. The fee for review of any land development application shall be based on the fee structure established by Henry County, and payment shall be made before the issuance of any land disturbance permit or building permit for the development. B. Modifications for off-site facilities. 1. The stormwater management plan for each land development project shall provide for stormwater management measures located on the site of the project unless provisions are made to manage stormwater by an off-site or regional facility. The off-site or regional facility must be located on property legally dedicated for the purpose, must be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site practices and there must be a legally obligated entity responsible for long-term operation and maintenance of the off-site or regional stormwater facility. In addition, on-site measures shall be implemented, where necessary, to protect upstream and downstream properties and drainage channels from the site to the off-site facility. 2. A stormwater management plan must be submitted to Henry County which shows the adequacy of the off-site or regional facility. 3. To be eligible for a modification, the applicant must demonstrate to the satisfaction of Henry County that the use of an off-site or regional facility will not result in the following impacts to upstream or downstream areas: a. Increased threat of flood damage to public health, life, and property; b. Deterioration of existing culverts, bridges, dams, and other structures; c. Accelerated streambank or streambed erosion or siltation; d. Degradation of in-stream biological functions or habitat; or e. Water quality impairment in violation of state water quality standards, and/or violation of any state or federal regulations. 8.04.05. Post-development stormwater management performance criteria. The following performance criteria shall be applicable to all stormwater management plans, unless otherwise provided for in this section: A. Water quality. All stormwater runoff generated from a site shall be adequately treated before discharge. It will be presumed that a stormwater management system complies with this requirement if: 1. It is sized to treat the prescribed water quality treatment volume from the site, as defined in the Georgia Stormwater Management Manual; 2. Appropriate structural stormwater controls or nonstructural practices are selected, designed, constructed, or preserved, and maintained according to the specific criteria in the Georgia Stormwater Management Manual; and If a site is determined to be a hotspot as detailed in section 8.04.01., the Henry County Stormwater Department may require the use of specific or additional components for the stormwater management system to address pollutants of concern generated by that site. B. Stream channel protection. Stream channel protection shall be provided by using all of the following three (3) approaches: 1. Preservation, restoration and/or reforestation (with native vegetation) of the applicable stream buffer; 2. Twenty-four-hour extended detention storage of the one-year, twenty-four-hour return frequency storm event; 3. Erosion prevention measures such as energy dissipation and velocity control. C. Overbank flooding protection. Downstream overbank flood protection shall be provided by controlling the post-development peak discharge rate to the pre-development rate for the twenty-five-year, twenty-four-hour storm event. D. Extreme flooding protection. Extreme flood protection shall be provided by controlling the one hundred-year, twenty-four-hour storm event such that flooding is not exacerbated. E. Structural stormwater controls. All structural stormwater management facilities shall be selected and designed using the appropriate criteria from the Georgia Stormwater Management Manual. All structural stormwater controls must be designed appropriately to meet their intended function. For other structural stormwater controls not included in the Georgia Stormwater Management Manual, or for which pollutant removal rates have not been provided, the effectiveness and pollutant removal of the structural control must be documented through prior studies, literature reviews, or other means and receive approval from Henry County before being included in the design of a stormwater management system. In addition, if hydrologic or topographic conditions, or land use activities warrant greater control than that provided by the minimum control requirements, Henry County may impose additional requirements deemed necessary to protect upstream and downstream properties and aquatic resources from damage due to increased volume, frequency, and rate of stormwater runoff or increased nonpoint source pollution loads created on the site in question. Applicants shall consult the Georgia Stormwater Management Manual for guidance on the factors that determine site design feasibility when selecting and locating a structural stormwater control. F. Stormwater credits for nonstructural measures. The use of one (1) or more site design measures by the applicant may allow for a reduction in the water quality treatment volume required under section 8.04.02.C. The applicant may, if approved by Henry County, take credit for the use of stormwater better site design practices and reduce the water quality volume requirement. For each potential credit, there is a minimum set of criteria and requirements which identify the conditions or circumstances under which the credit may be applied. The site design practices that qualify for this credit and the criteria and procedures for applying and calculating the credits are included in the Georgia Stormwater Management Manual. G. Drainage system guidelines. Stormwater conveyance facilities, which may include, but are not limited to, culverts, stormwater drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutter, swales, channels, ditches, and energy dissipaters shall be provided when necessary for the protection of public right-of-way and private properties adjoining project sites and/or public rights-of-way. Stormwater conveyance facilities that are designed to carry runoff from more than one (1) parcel, existing or proposed, shall meet the following requirements: 1. Methods to calculate stormwater flows shall be in accordance with the stormwater design manual; 2. All culverts, pipe systems and open channel flow systems shall be sized in accordance with the stormwater management plan using the methods included in the stormwater design manual; and 3. Design and construction of stormwater conveyance facilities shall be in accordance with the criteria and specifications found in the stormwater design manual. H. Dam design guidelines. Any land disturbing activity that involves a site which proposes a dam shall comply with the Georgia Safe Dams Act and Rules for Dam Safety as applicable. 8.04.06. Construction inspections of post-development stormwater management system. A. Inspections to ensure plan compliance during construction. Periodic inspections of the stormwater management system construction shall be conducted by the staff of Henry County or conducted and certified by a professional engineer who has been approved by the county. Construction inspections shall utilize the approved stormwater management plan for establishing compliance. All inspections shall be documented with written reports that contain the following information: 1. The date and location of the inspection; 2. Whether construction is in compliance with the approved stormwater management plan; 3. Variations from the approved construction specifications; and 4. Any other variations or violations of the conditions of the approved stormwater management plan. If any violations are found, the applicant shall be notified in writing of the nature of the violation and the required corrective actions. B. Final inspection and as built plans. Upon completion of a project, and before a certificate of occupancy shall be granted, the applicant is responsible for certifying that the completed project is in accordance with the approved stormwater management plan. All applicants are required to submit actual "as-built" plans for any stormwater management facilities or practices after final construction has been completed. The plan must show the final design specifications for all stormwater management facilities and practices and must be certified by a professional engineer. A final inspection by Henry County staff is required before the release of any performance securities can occur. 8.04.07. Ongoing inspection and maintenance of stormwater facilities and practices. A. Long-term maintenance inspection of stormwater facilities and practices. Stormwater management facilities and practices included in a stormwater management plan that are subject to an inspection and maintenance agreement must undergo ongoing inspections to document maintenance and repair needs and ensure compliance with the requirements of the agreement, the plan and this section. A stormwater management facility or practice shall be inspected on a periodic basis by the responsible person in accordance with the approved inspection and maintenance agreement. In the event that the stormwater management facility has not been maintained and/or becomes a danger to public safety or public health, Henry County shall notify the person responsible for carrying out the maintenance plan by registered or certified mail to the person specified in the inspection and maintenance agreement. The notice shall specify the measures needed to comply with the agreement and the plan and shall specify the time within which such measures shall be completed. If the responsible person fails or refuses to meet the requirements of the inspection and maintenance agreement, Henry County may correct the violation as provided in subsection 8.04.07.D. hereof. Inspection programs by Henry County may be established on any reasonable basis, including, but not limited to: routine inspections; random inspections; inspections based upon complaints or other notice of possible violations; and joint inspections with other agencies inspecting under environmental or safety laws. Inspections may include, but are not limited to: reviewing maintenance and repair records; sampling discharges, surface water, groundwater, and material or water in stormwater management facilities; and evaluating the condition of stormwater management facilities and practices. B. Right-of-entry for inspection. The terms of the inspection and maintenance agreement shall provide for Henry County staff to enter the property at reasonable times and in a reasonable manner for the purpose of inspection. This includes the right to enter a property when it has a reasonable basis to believe that a violation of this section is occurring or has occurred and to enter when necessary for abatement of a public nuisance or correction of a violation of this section. C. Records of maintenance activities. Parties responsible for the operation and maintenance of a stormwater management facility shall provide records of all maintenance and repairs to Henry County. D. Owner's failure to maintain the stormwater management system. The terms of the inspection and maintenance agreement shall provide for what constitutes a failure to maintain a stormwater management system and the enforcement options available to the Henry County Stormwater Management Department. If a site was developed before the requirement to have an inspection and maintenance agreement or an inspection and maintenance agreement was for any reason not entered into, recorded, or has otherwise been invalidated or deemed insufficient, then: 1. An owner's failure to maintain the stormwater management system so that it performs as it was originally designed shall constitute and be addressed as a violation of, or failure to comply with, owner's property maintenance obligations pursuant to section 3, article 1; and 2. To address such a failure to maintain the stormwater management system, the Henry County Stormwater Department shall have all the powers and remedies that are available to it for other violations of an owner's property maintenance obligations, including without limitation prosecution, penalties, abatement, and emergency measures. (Ord. No. 23-06, § I, 6-6-23; Ord. No. 23-10, § II, 11-28-23) Sec. 8.05.00. Reserved. Sec. 8.06.00. Development impact fees. 8.06.01. Generally. A. Authority. 1. This section has been prepared and adopted by the board of commissioners of Henry County, Georgia, in accordance with the authority provided by Article 9, Section 2, Paragraph 3 of the Constitution of the State of Georgia, the Georgia Development Impact Fee Act (O.C.G.A. § 36-71-1 et seq. as amended), and such other laws as may apply to the provision of public facilities and the power to charge fees for such facilities. 2. The provisions of this section shall not be construed to limit the power of Henry County, Georgia, to use any other legal methods or powers otherwise available for accomplishing the purposes set forth herein, either in substitution of or in conjunction with this section. 3. This section shall apply to all areas under the regulatory control and authority of Henry County, Georgia, and such other areas as may be included by intergovernmental agreement. B. Findings. The board of commissioners of Henry County, Georgia, finds and declares: 1. That an equitable program for planning and financing public facilities to serve new growth and development is necessary in order to promote and accommodate orderly growth and development and to protect the public health, safety, and general welfare of the citizens of Henry County; and 2. That certain public facilities as herein defined have been and must be further expanded if new growth and development is to be accommodated at the same level of service available to existing development; and 3. That it is fair and equitable that new growth and development shall bear a proportionate share of the cost of such public facilities necessary to serve new growth and development. C. Purpose. 1. The purpose of this section is to impose impact fees, as hereinafter set forth, for certain public facilities, as hereinafter defined. 2. It is also the purpose of this section to ensure that adequate public facilities are available to serve new growth and development in Henry County and to provide that new growth and development bears a proportionate share of the cost of new public facilities needed to serve them. D. Intent. This section is intended to implement and be consistent with the Henry County Comprehensive plan, as it may be adopted or amended in accord with the Georgia Comprehensive planning Act (O.C.G.A. § 50-8-1 et seq.); and the applicable Minimum Standards and Procedures for Local Comprehensive planning and the Development Impact Fee Compliance Requirements, both as adopted by the Georgia Board of Community Affairs and amended from time to time. E. Provisions. The provisions of this section shall be construed so as to effectively carry out its purpose in the interest of the public health, safety, and general welfare of the citizens of the county. 8.06.02. Imposition of development impact fees. A. Any person who after the effective date of this section engages in development shall pay a development impact fee in the manner and amount set forth in this section. B. Construction not subject to impact fees. The following projects and construction activities do not constitute "development" as defined in this section, and are therefore not subject to the imposition of impact fees: 1. Rebuilding no more than the same number of units of development as defined in this section that were removed by demolition, or destroyed by fire or other catastrophe, on the same lot or property. 2. Remodeling or repairing a structure that does not result in an increase in the number of units of development. 3. Replacing a residential housing unit with another housing unit on the same lot or property. 4. Placing or replacing a manufactured home in a manufactured home park on a prepared manufactured home pad in existence and operation prior to the effective date of this section. 5. Placing a temporary transportable construction office or a temporary transportable sales office on a lot during the period of construction or build-out of a development project. 6. Constructing an addition to or expansion of a residential housing unit that does not increase the number of housing units. 7. Adding uses that are typically accessory to residential uses and intended for the personal use of the residents, such as a deck or patio, satellite antenna, pet enclosure, or private recreational facilities such as a swimming pool. C. Grandfathered projects. 1. Notwithstanding any other provision of this section, that portion of a project for which a valid building permit has been issued for platted and recorded lot(s) prior to the effective date of this ordinance, shall not be subject to any increases as set forth in [Ordinance No. 24-06] so long as the permit remains valid and construction has commenced and is pursued according to the terms of the permit. a. Said construction shall be commenced, pursued, and completed within the allowable time established by the building permit in accordance with section 103.6.1 of the ULDC. b. Building permits submitted prior to July 23, 2024, shall be grandfathered under the impact fee structure outlined in Resolution No. 22-214. All other applications shall not be grandfathered, including, but not limited to, land disturbance permits, rezonings and/or other trade permits. D. Method of calculation. 1. Any development impact fee imposed pursuant to this section shall not exceed a project's proportionate share of the cost of system improvements, shall be calculated on the basis of the establishment of service areas, and shall be calculated on the basis of levels of service for public facilities that are the same for existing development as for new growth and development, as established in the capital improvements element of the comprehensive plan. 2. Notwithstanding anything to the contrary in this section, the calculation of impact fees shall be net of credits for the present value of ad valorem taxes or other revenues as established in the capital improvements element of the comprehensive plan, and which: a. Are reasonably expected to be generated by new growth and development; and b. Are reasonably expected on the basis of historical funding patterns to be made available to pay for system improvements of the same category and in the same service area for which an impact fee is imposed. 3. The method of calculating impact fees for public facilities under this section shall be maintained for public inspection as a part of the official records of Henry County, Georgia, and may be amended from time to time by official act. 4. In addition to the cost of new or expanded system improvements needed to be built to serve new development, the cost basis of a development impact fee may also include the proportionate cost of existing system improvements to the extent that such public facilities have excess service capacity and new development will be served by such facilities, as established in the capital improvements element of the comprehensive plan. 5. Development impact fees shall be based on actual system improvement costs or reasonable estimates of such costs, as set forth in the capital improvements element of the comprehensive plan. 8.06.03. Rules of construction and definitions. The provisions of this section shall be construed so as to effectively carry out its purpose in the interest of the public health, safety, and general welfare of the citizens of Henry County. A. Rules of construction. Unless otherwise stated in this section, the following rules of construction shall apply to the text of this section: 1. In the case of any difference of meaning or implication between words or phrases as used in this section and as used in other codes, regulations or laws of Henry County, such difference shall not affect the meaning or implication of such words or phrases as used in this section. 2. In the case of any difference of meaning or implication between the text of this section and any caption, illustration, summary table or illustrative table, the text shall control. 3. The word "shall" is always mandatory and not discretionary; the word "may" is permissive. 4. Words used in the present tense shall include the future and words used in the singular number shall include the plural and the plural the singular, unless the context clearly indicates the contrary. 5. The word "person" includes an individual, a corporation, a partnership, an incorporated association, or any other legal or similar entity. 6. The conjunction "and" indicates that all the connected terms, conditions, provisions, or events shall apply. 7. The conjunction "or" indicates that the connected items, conditions, provisions, or events may apply singly or in any combination. 8. The use of "either or" indicates that the connected items, conditions, provisions, or events shall apply singly and not in combination. 9. The word "includes" or "including" shall not limit a term to the specific example but is intended to extend its meaning to all other instances or circumstances of like kind or character. 10. The section and paragraph headings and enumerations used in this section are included solely for convenience and shall not affect the interpretation of this section. B. Definitions. As used in this section, the following terms shall have the meaning set forth below. 1. Administrator means the county manager of Henry County, Georgia, or the county manager's designee, who is hereby charged with implementation and enforcement of this section. 2. Board of commissioners means the elected governing body of Henry County, Georgia. 3. Building permit is the permit required for new construction, completion of construction, or an interior finish pursuant to the applicable building code. As used herein, the term shall not include permits required for remodeling, rehabilitation, or other improvements to an existing structure provided there is no increase in the demand placed on those public facilities as defined herein. 4. Capital improvement means an improvement with a useful life of ten years or more, by new construction or other action, which increases the service capacity of a public facility. 5. Capital improvements element means a component of the Henry County comprehensive plan that sets out projected needs for system improvements during the planning horizon established therein, a schedule of capital improvements that will meet the anticipated need for system improvements, and a description of anticipated funding sources for each required improvement, as most recently adopted or amended by the board of commissioners. 6. Commencement of construction, for private development, means initiation of physical construction activities as authorized by a development or building permit and leading to completion of a foundation inspection or other initial inspection and approval by a public official charged with such duties; and for public projects, means expenditure or encumbrance of any funds, whether they be development impact fee funds or not, for a public facilities project, or advertising of bids to undertake a public facilities project. 7. Completion of construction means the issuance of the final certificate of occupancy by the appropriate governmental jurisdiction. The date of completion is the date on which such certificate is issued. 8. Community work program means the component of the comprehensive plan that lays out the specific activities the county plans to undertake during the five years following adoption of the plan. 9. Comprehensive plan (AKA comprehensive land use plan) means the Henry County plan or planning elements as adopted or amended in accord with the Georgia Comprehensive Planning Act (O.C.G.A. § 50-8-1 et seq.) and the applicable minimum standards and procedures for local comprehensive planning as adopted by the Georgia Board of Community Affairs. 10. County means Henry County, a legal subdivision of the State of Georgia, and also refers to the board of commissioners or to the appropriate county official appointed by the board of commissioners, whenever official action is taken or required. 11. Day means a calendar day, unless otherwise specifically identified as a "work" day or other designation when used in the text. 12. Developer means any person or legal entity undertaking development. 13. Development means any construction or expansion of a building, structure, or use; any change in use of a building, or structure; or any change in the use of land; any of which creates additional demand and need for public facilities, as defined herein. 14. Development approval means written authorization, such as issuance of a building permit, land disturbance permit or other approval for grading or site development, or other forms of official action required by local law or regulation which authorizes the commencement of construction. 15. Development impact fee means a payment of money imposed upon development as a condition of development approval to pay for a proportionate share of the cost of system improvements needed to serve new growth and development. 16. Encumber means to legally obligate by contract or otherwise commit to use by appropriation or other official act of Henry County, Georgia. 17. Excess capacity means that portion of the capacity of a public facility or system of public facilities which is beyond that necessary to provide adequate service to existing development at the adopted level-of-service standard. 18. Feepayor means that person or entity who pays a development impact fee, or his or her legal successor in interest where the right or entitlement to any refund of previously paid E. Provisions. The provisions of this section shall be construed so as to effectively carry out its purpose in the interest of the public health, safety, and general welfare of the citizens of the county. 8.06.02. Imposition of development impact fees. A. Any person who after the effective date of this section engages in development shall pay a development impact fee in the manner and amount set forth in this section. B. Construction not subject to impact fees. The following projects and construction activities do not constitute "development" as defined in this section, and are therefore not subject to the imposition of impact fees: 1. Rebuilding no more than the same number of units of development as defined in this section that were removed by demolition, or destroyed by fire or other catastrophe, on the same lot or property. 2. Remodeling or repairing a structure that does not result in an increase in the number of units of development. 3. Replacing a residential housing unit with another housing unit on the same lot or property. 4. Placing or replacing a manufactured home in a manufactured home park on a prepared manufactured home pad in existence and operation prior to the effective date of this section. 5. Placing a temporary transportable construction office or a temporary transportable sales office on a lot during the period of construction or build-out of a development project. 6. Constructing an addition to or expansion of a residential housing unit that does not increase the number of housing units. 7. Adding uses that are typically accessory to residential uses and intended for the personal use of the residents, such as a deck or patio, satellite antenna, pet enclosure, or private recreational facilities such as a swimming pool. C. Grandfathered projects. 1. Notwithstanding any other provision of this section, that portion of a project for which a valid building permit has been issued for platted and recorded lot(s) prior to the effective date of this ordinance, shall not be subject to any increases as set forth in [Ordinance No. 22-05] so long as the permit remains valid and construction has commenced and is pursued according to the terms of the permit. a. Said construction shall be commenced, pursued, and completed within the allowable time established by the building permit in accordance with Section 103.6.1 of the ULDC. Any extension or re-issuance shall require the applicant to pay the difference of the new development impact fee as set forth in the ordinance. b. Construction for each project shall be considered as having commenced on the date of the first required inspection as determined by the building and plan review department. c. Projects shall have a six-month grace period, from August 2, 2022, and shall continue to pay the current impact fee up and until February 2, 2023. Thereafter, all new permits will incur the updated fee. D. Method of calculation. 1. Any development impact fee imposed pursuant to this section shall not exceed a project's proportionate share of the cost of system improvements, shall be calculated on the basis of the establishment of service areas, and shall be calculated on the basis of levels of service for public facilities that are the same for existing development as for new growth and development, as established in the capital improvements element of the comprehensive plan. 2. Notwithstanding anything to the contrary in this section, the calculation of impact fees shall be net of credits for the present value of ad valorem taxes or other revenues as established in the capital improvements element of the comprehensive plan, and which: a. Are reasonably expected to be generated by new growth and development; and b. Are reasonably expected on the basis of historical funding patterns to be made available to pay for system improvements of the same category and in the same service area for which an impact fee is imposed. 3. The method of calculating impact fees for public facilities under this section shall be maintained for public inspection as a part of the official records of Henry County, Georgia, and may be amended from time to time by official act. 4. In addition to the cost of new or expanded system improvements needed to be built to serve new development, the cost basis of a development impact fee may also include the proportionate cost of existing system improvements to the extent that such public facilities have excess service capacity and new development will be served by such facilities, as established in the capital improvements element of the comprehensive plan. 5. Development impact fees shall be based on actual system improvement costs or reasonable estimates of such costs, as set forth in the capital improvements element of the comprehensive plan. 8.06.03. Rules of construction and definitions. The provisions of this section shall be construed so as to effectively carry out its purpose in the interest of the public health, safety, and general welfare of the citizens of Henry County. A. Rules of construction. Unless otherwise stated in this section, the following rules of construction shall apply to the text of this section: 1. In the case of any difference of meaning or implication between words or phrases as used in this section and as used in other codes, regulations or laws of Henry County, such difference shall not affect the meaning or implication of such words or phrases as used in this section. 2. In the case of any difference of meaning or implication between the text of this section and any caption, illustration, summary table or illustrative table, the text shall control. 3. The word "shall" is always mandatory and not discretionary; the word "may" is permissive. 4. Words used in the present tense shall include the future and words used in the singular number shall include the plural and the plural the singular, unless the context clearly indicates the contrary. 5. The word "person" includes an individual, a corporation, a partnership, an incorporated association, or any other legal or similar entity. 6. The conjunction "and" indicates that all the connected terms, conditions, provisions, or events shall apply. development impact fees which is required by this section has been expressly transferred or assigned to the successor in interest. In the absence of an express transfer or assignment of the right or entitlement to any refund of previously paid development impact fees, the right or entitlement shall be deemed "not to run with the land." 19. Individual assessment determination means a finding by the administrator that an individual assessment study does or does not meet the requirements for such a study as established by this section or, if the requirements are met, the fee calculated therefrom. 20. Individual assessment study means the engineering, financial, or economic documentation prepared by a fee pay or applicant to allow individual determination of a development impact fee other than by use of the applicable fee schedule. 21. Level of service means a measure of the relationship between service capacity and service demand for public facilities as established by Henry County, Georgia, in terms of demand to capacity ratios, the comfort and convenience of use or service of such public facilities, or both. 22. Present value means the current value of past, present, or future payments, contributions, or dedications of goods, services, materials, construction, or money, as calculated using accepted methods of financial analysis for determination of "net present value." 23. Project means a particular development on an identified parcel of land. 24. Project improvements means site improvements and facilities that are planned, designed, or built to provide service for a particular development project and that are necessary for the use and convenience of the occupants or users of the project and that are not "system" improvements. The character of the improvement shall control a determination of whether an improvement is a "project" improvement or a "system" improvement, and the physical location of the improvement on-site or off-site shall not be considered determinative of whether an improvement is a "project" improvement or a "system" improvement. If an improvement or facility provides or will provide more than incidental service or facility capacity to persons other than users or occupants of a particular project the improvement or facility is a system improvement and shall not be considered a project improvement. No improvement or facility included in a plan for public facilities and approved for public funding by Henry County, Georgia shall be considered a project improvement. 25. Property owner means that person or entity that holds legal title to property. 26. Proportionate share means that portion of the cost of system improvements that is reasonably related to the service demands and needs of a project. 27. Public facilities means (a) parks, open space, and recreation areas and related facilities; and (b) public safety facilities, including sheriff, inmate housing, animal control, fire rescue, emergency medical, emergency management, and E911 communications facilities; and (c) libraries and related facilities. 28. Service area means a geographic area defined by the board of commissioners, in which a defined set of public facilities provide service to development within the area. Service areas shall be designated on the basis of sound planning or engineering principles or both. 29. System improvement costs means costs incurred to provide additional public facilities capacity to serve new growth and development for planning, design, and construction, land acquisition, land improvement, design and engineering related thereto, including the cost of constructing or reconstructing system improvements or facility expansions. System improvement costs include, but are not limited to, the construction contract price, surveying and engineering fees, related land acquisition costs (including land purchases, court awards and costs, attorneys' fees, and expert witness fees; and expenses incurred for qualified staff or any qualified engineer, planner, architect, landscape architect, or financial consultant for preparing or updating the capital improvements element; and administrative costs, provided that such administrative costs shall not exceed three percent of the total amount of the costs. Projected interest charges and other finance costs may be included if the impact fees are to be used for the payment of principal and interest on bonds, notes, or other financial obligations issued by or on behalf of Henry County to finance the capital improvements element. System improvement costs do not include routine and periodic maintenance expenditures, personnel training, and other operating costs. 30. System improvements means capital improvements that are public facilities designed to provide service to more than one project or to the community at large, in contrast to "project" improvements. 31. ULDC means the Unified Land Development Code of Henry County, Georgia, 32. Unit of development means the standard incremental measure of land development activity for a specific type of land use upon which the rate of demand for public service and facilities is based, such as a dwelling unit, square foot of floor area, motel room, etc. 33. Unused or excess impact fee means any individual impact fee payment from which no amount of money or only a portion thereof has been encumbered or expended according to the requirements of this section. 8.06.04. Fee assessment and payment. A. Fee schedule. 1. Payment of a development impact fee pursuant to the fee schedule attached hereto and incorporated herein as Attachment A for a property located inside of Henry County, shall constitute full and complete payment of the project's proportionate share of system improvements as individually levied by Henry County, and shall be deemed to be in compliance with the requirements of this section. 2. When a land development activity for which an application for a building permit has been made includes two or more buildings, structures or other land uses in any combination, including two or more uses within a building or structure, the total development impact fee shall be the sum of the fees for each and every building, structure, or use, including each and every use within a building or structure. 3. In the event that an applicant contends that the land use category of the proposed development is not shown on the fee schedule or fits within a different category, then: a. The administrator in his or her sole discretion shall make a determination as to the appropriate land use designation and the appropriate development impact fee. b. In making such determination, the administrator may require such additional information from the applicant as necessary to form a logical fee determination relative to the impact fees shown on the adopted fee schedule. c. If a land use designation is not in a category contained in this section, then an appropriate new category may be added by the administrator and an appropriate fee established under the county's current impact fee methodology, subject to annual confirmation by the board of commissioners. d. Impact fees for other uses not included shall be determined in accordance with the methodologies contained in the capital improvements element of the comprehensive plan, or other methodologies as approved by the board of commissioners. e. Appeals from the decision of the administrator shall be made to the board of commissioners in accordance with the administrative appeals section, below. B. Timing of assessment and payment. 1. Development impact fees shall be assessed at the time of application for a building permit. 2. Impact fees may be collected any time a building permit is active, but shall be collected no later than the final building permit inspection for issuance of a certificate of occupancy for the development. a. Impact fees collected as part of the final building permit inspection shall be paid in the form of cash or certified check or other certified funds prior to the release of the certificate of occupancy. b. Impact fees may be reassessed based on actual construction prior to issuance of a certificate of completion, if applicable, and shall be paid prior to the release of the certificate of occupancy. 3. For projects not involving issuance of a building permit, all development impact fees shall be collected at the time of approval of the development permit or such other authorization to commence construction or to commence use of a property. 4. If the final use of a building cannot be determined at the time of issuance of the initial building permit, the administrator shall have the authority to assess a development impact fee based on the most likely use of the building, and may adjust the fee assessment prior to issuance of a certificate of completion (if applicable). a. Impact fees may be reassessed based on actual construction and shall be collected prior to approval of a certificate of occupancy. b. An adjustment may result in a refund to the feepayor or payment of the marginal increase of the adjusted fee over the amount already paid. 5. Notwithstanding any other provision of this section, any future change in demand for public facilities in excess of the average demand anticipated at the time of issuance of the building permit shall be assessed such additional fee as would otherwise have been due. Future changes in demand may result from a change in the land use category of the occupant of the building or property, the expansion of a building or use on a property that results in an increase in the units of development (as defined herein), or the subsequent discovery of facts unknown or misrepresented at the time of issuance of the building permit. C. Individual assessment determinations. Individual assessments of development impact fees may be established as follows: 1. At their option, an applicant for development approval may petition the administrator for an individual assessment determination of development impact fees due for their project in lieu of the fee established on the fee schedule attached hereto and incorporated herein as Attachment A. 2. In the event that an applicant elects an individual assessment, the applicant shall submit an individual assessment study. Each individual assessment study shall: a. Be based on relevant and credible information from an accepted standard source of engineering or planning data; or, b. Be based on actual, relevant, and credible studies or surveys of facility demand conducted in Henry County or its region, carried out by qualified engineers or planners pursuant to accepted methodology; and, c. Provide any other written specifications as may be reasonably required by the administrator to substantiate the individual assessment determination. 3. The administrator in his or her sole discretion shall determine whether the content of an individual assessment study satisfies the requirements of this section. A negative determination by the administrator may be appealed to the board of commissioners in accordance with the administrative appeals procedures of this section. 4. Any fee approved as an individual assessment determination shall have standing for 180 days following the date of approval. Payment of such an approved individual assessment determination shall constitute full and complete payment of the project's proportionate share of system improvements and shall be deemed to be in compliance with the requirements of this section. D. Fee certification. Upon application to the administrator, a developer may receive a certification of the development impact fee schedule attached hereto and incorporated herein as Attachment A or a certified fee for a particular project, as applicable. Such certified schedule or fee shall establish the development impact fee due for a period of 180 days from the date of certification, even if new or revised rate schedules are adopted in the interim. E. Exemptions. 1. Henry County recognizes that certain office, retail trade and industrial development projects may provide extraordinary benefit in support of the economic advancement of the county's citizens over and above the access to jobs, goods, and services that such uses offer in general. To encourage such development projects, the board of commissioners may grant a reduction in the impact fee for such a development project upon the determination and relative to the extent that the business or project represents extraordinary economic development and employment growth of public benefit to Henry County. 2. In addition, the board of commissioners recognizes that impact fees, in some circumstances, can negatively affect the affordability of housing, particularly "workforce" housing. 3. To encourage development projects of public benefit to Henry County, the board of commissioners shall first adopt exemption criteria to guide the granting of a reduction in the impact fee for: a. A business development project that represents extraordinary economic development and employment growth, and/or b. A residence or housing project that will increase the affordability of housing to disadvantaged individuals or families. 8.06.05. Deposit and expenditure of fees. A. Maintenance of funds. 1. All development impact fee funds collected for future expenditure on construction or expansion of facilities pursuant to this section shall be maintained in one or more interest-bearing accounts until encumbered or expended. Restrictions on the investment of development impact fee funds shall be the same that apply to investment of all such funds generally. 2. Separate accounting records shall be maintained for each public facility category of system improvements. 3. Interest earned on development impact fees shall be considered funds of the account on which it is earned and shall be subject to all restrictions placed on the use of development impact fees under this section. Interest earned each fiscal year shall be distributed among the various funds in proportion to their end-of-year balances on hand. B. Expenditures; restrictions. 1. Expenditures from the impact fee accounts shall be made only for the system improvements in the public facility category for which the development impact fee was assessed and collected. 2. Expenditures from the impact fee account for a particular public facility category shall be made only for projects that are listed for that category in the most recently adopted capital improvements element. a. Such expenditures for a specific project may be based on the amount of the actual cost of the project, but b. Such expenditures may not exceed the percentage of impact fee eligibility established for such project in the capital improvements element. c. Expenditures for projects not listed in the capital improvements element may be made only after they have been included in the capital improvements element by amendment adopted by the board of commissioners. 3. Notwithstanding anything to the contrary in this section, the following shall be considered general revenue of Henry County, and may be expended accordingly: a. Impact fees collected to recover the present value of excess capacity in existing system improvements; b. Any portion of an impact fee collected as a repayment for expenditures made by Henry County for system improvements intended to be funded by such impact fee; and, c. Any portion of an impact fee collected for administration of the impact fee program, and any such additional amount assessed for repayment of the cost of preparing the capital improvements element of the comprehensive plan. C. Annual report. 1. The administrator shall prepare an annual report to the board of commissioners as part of the annual audit describing the amount of any development impact fees collected, encumbered, and used during the preceding fiscal year by category of public facility. 2. Such annual report shall be prepared following guidelines of the Georgia Department of Community Affairs (DCA), and submitted to the Atlanta Regional Commission in conjunction with the annual update of the community work program of the comprehensive plan. The annual update of the community work program shall maintain, at a minimum, a schedule of system improvements for each of the subsequent five years and may include changes in funding sources or project costs, or changes in the scheduling of projects than as otherwise shown in the most recently adopted capital improvements element. 3. The annual report is to be closely tied to and updates the most recently adopted capital improvements element as approved by the Georgia Department of Community Affairs. No new projects that are not included within the capital improvements element may be added to the annual report. Such additions must be made as an amendment of the capital improvements element in accordance with the procedures contained in this section. 8.06.06. Credits. When eligible, feepayors shall be entitled to a credit against impact fees otherwise due and owing under the circumstances and in the manner set forth in this section. A. Credits; restrictions. 1. Except as provided in paragraph 2 below, no credit shall be given for construction, contribution, or dedication of any system improvement or funds for system improvements made before the effective date of this section. 2. If the value of any construction, dedication of land, or contribution of money made by a developer (or his or her predecessor in title or interest) prior to the effective date of this section for system improvements that are included for impact fee funding in the most recently adopted capital improvements element of the comprehensive land use plan, is greater than the impact fee that would otherwise have been paid for the project, then the developer shall be entitled to a credit for such excess construction, dedication, or funding. Notwithstanding anything to the contrary in this section, any credit due under this section shall not constitute a liability of Henry County, and shall accrue to the developer to the extent of impact fees assessed for new development for the same category of system improvements within the same service area. 3. In no event shall credit be given for project improvements, or for system improvements not included for impact fee funding in the most recently adopted capital improvements element of the comprehensive plan. B. Granting of credits. 1. Credit shall be given for the present value of any construction of improvements, contribution or dedication of land, or payment of money by a developer or his or her predecessor in title or interest for system improvements of the same public facilities category and in the same service area for which a development impact fee is imposed, provided that: a. The system improvement is included for impact fee funding in the most recently adopted capital improvements element of the comprehensive land use plan; b. The amount of the credit does not exceed the portion of the system improvement's cost that is eligible for impact fee funding, as shown in the most recently adopted capital improvements element; and c. The board of commissioners shall have explicitly approved said improvement, contribution, dedication, or payment and the value thereof prior to its construction, dedication, or transfer. 2. The credit allowed pursuant to this section shall not exceed the impact fee due for such system improvement unless a greater credit is authorized under a private agreement executed under the provisions of section 8-06-08 of this section. In the event that a developer enters into such a private agreement with the county to construct, fund, or contribute system improvements such that the amount of the credit created is in excess of the impact fee which would otherwise have been paid for the development project, the developer shall be reimbursed for such excess construction, funding, or contribution from impact fees paid by other development which is benefited by such improvements. C. Guidelines for credit valuation. Credits under this section shall be valued using the following guidelines: 1. For the construction of any system improvements by a developer or his or her predecessor in title or interest and accepted by the county, the developer must present evidence satisfactory to the administrator of the original cost of the improvement, from which present value may be calculated. 2. For any contribution or dedication of land for system improvements by a developer or his or her predecessor in title or interest and accepted by the county, the original value of the land shall be the same as that attributed to the property by the validated tax appraisal at the time of dedication, from which present value may be calculated. 3. For any contribution of capital equipment that qualifies as a system improvement by a developer or his or her predecessor in title or interest and accepted by the county, the value shall be the original cost to the developer of the capital equipment or the cost that Henry County, Georgia, would normally pay for such equipment, whichever is less. 4. For any contribution of money for system improvements from a developer or his or her predecessor in title or interest accepted by the county, the original value of the money shall be the same as that at the time of contribution, from which present value may be calculated. 5. In making a present value calculation, the discount rate used shall be the net of the interest returned on a State of Georgia, AA rated or better municipal bond less average annual inflation, or such other discount rate as the board of commissioners in its sole discretion may deem appropriate. D. Credits; application. 1. Credits shall be given only upon written request of the developer to the administrator. A developer must present written evidence satisfactory to the administrator at or before the time of development impact fee assessment. 2. The administrator, in his or her sole discretion, shall review all claims for credits and make determinations regarding the allowance of any claimed credit, and the value of any allowed credit. 3. Any credit approved by the administrator shall be acknowledged in writing by the administrator and calculated at the time of impact fee assessment. 4. Credit denials by the administrator may be appealed to the board of commissioners in accordance with the provisions for administrative appeals in this section. E. Credits; abandoned building permits. In the event that an impact fee is paid but the building permit is abandoned, credit shall be given for the present value of the impact fee against future impact fees for the same parcel of land, upon submission of adequate evidence to the administrator that an impact fee was received by the county, the amount paid, and that the building permit was abandoned. 8.06.07. Refunds. A. Eligibility for a refund. 1. Upon the request of a feepayor regarding a property on which a development impact fee has been paid, the development impact fee shall be refunded if: a. Capacity is available in the public facilities for which the fee was collected but service is permanently denied; or, b. The development impact fee has not been encumbered or construction has not been commenced within six years after the date the fee was collected. 2. In determining whether development impact fees have been encumbered, development impact fees shall be considered encumbered on a first-in, first-out (FIFO) basis. B. Notice of entitlement to a refund. When the right to a refund exists due to a failure to encumber the development impact fees, the administrator shall provide written notice of entitlement to a refund to the feepayor who paid the development impact fee at the address shown on the application for development approval or to a successor in interest who has given adequate notice to the administrator of a legal transfer or assignment of the right to entitlement to a refund and who has provided a mailing address. Such notice shall also be published in a newspaper of general circulation in Henry County within 30 days after the expiration of the six-year period after the date that the development impact fee was collected and shall contain a heading "Notice of Entitlement to Development Impact Fee Refund." No refund shall be made for a period of 30 days from the date of said publication. C. Filing a request for a refund. All requests for refunds shall be made in writing to the administrator within one year of the time the refund becomes payable or within one year of publication of the notice of entitlement to a refund, whichever is later. Failure to make a claim for a refund within said time period shall result in a waiver of all claims to said funds. Such funds together with the accrued interest thereon shall be transferred to the general revenue account of Henry County. D. Payment of refunds. 1. All refunds shall be made to the feepayor within 60 days after it is determined by the administrator that a sufficient proof of claim for refund has been made, but no sooner than 30 days after publication of the notice of entitlement to the refund. 2. A refund shall include a refund of a pro rata share of interest actually earned on the unused or excess impact fee collected. 3. In no event shall a feepayor be entitled to a refund for impact fees assessed and paid to recover the cost of excess capacity in existing system improvements, for any portion of an impact fee collected as a repayment for expenditures made by Henry County for system improvements intended to be funded by such impact fee, or for that portion of the fee payment that was assessed for administration of the impact fee section or for recovery of the cost of preparation of the capital improvements element of the comprehensive plan. 8.06.08. Private contractual agreements. A. Private agreements; authorized. Nothing in this section shall prohibit the voluntary mutual approval of a private contractual agreement between the county and any developer or property owner or group of developers and/or property owners in regard to the construction or installation of system improvements and providing for credits or reimbursement for system improvement costs incurred by a developer, including interproject transfers of credits or providing for reimbursement for project improvement costs which are used or shared by more than one development project, provided that: 1. The system improvements are included for impact fee funding in the most recently adopted capital improvements element of the comprehensive plan; and, 2. The amount of any credit or reimbursement granted shall not exceed the portion of the system improvement's cost that is eligible for impact fee funding. B. Private agreements; provisions. A private contractual agreement for system improvements may include, but shall not be limited to, provisions that: 1. Modify the estimates of impact on public facilities according to the methods and provisions concerning the calculation of impact fees, provided that any such agreement shall allow the county to assess additional development impact fees after the completion of construction according to the fee schedule set forth as Attachment A to this section. 2. Permit construction of, dedication of property for, or other in-kind contribution for specific public facilities of the type for which development impact fees would be imposed n lieu of or with a credit against applicable development impact fees. 3. Permit a schedule and method of payment appropriate to particular and unique circumstances of a proposed project in lieu of the requirements for payment under this section, provided that acceptable security is posted ensuring payment of the development impact fees. Forms of security that may be acceptable include a cash bond, irrevocable letter of credit from a bank authorized to do business within the State of Georgia, a surety bond, or lien or mortgage on lands to be covered by the building permit. C. Private agreements; procedure. 1. Any private agreement proposed by an applicant pursuant to this section shall be submitted to the administrator for review, negotiation, and submission to the board of commissioners. 2. Any such agreement must be presented to and approved by the board of commissioners prior to the issuance of a building permit. 3. Any such agreement shall provide for execution by mortgagees, lien holders or contract purchasers in addition to the landowner, and shall require the applicant to submit such agreement to the clerk of superior court for recording. 8.06.09. Periodic review and amendments. A. Amendments to this section. 1. This section may be amended from time to time as deemed appropriate or desirable. Any such amendment to this section, including an amendment to the development impact fee schedule (Attachment A hereto), shall follow the procedures for adoption of a section imposing a development impact fee as set out and required under the Georgia Development Impact Fee Act (O.C.G.A. § 36-71-1 et seq., as amended). 2. At least once each calendar year, as part of its annual capital improvement program process or as part of any other planning process, the board of commissioners may review the capital improvements element and calculation of development impact fees, and may amend the capital improvements element, fee calculation methodology, or development impact fee schedule, in accordance with subsection B.2, below, as deemed appropriate and necessary. 3. Interim amendments to the impact fee schedule regarding the establishment of new land use categories by the administrator are expressly authorized, and shall be confirmed by the board of commissioners when this section is subsequently amended. B. Capital improvements element periodic review. 1. Annual update. At least once each year, the board of commissioners shall review and may update the community work program so as to maintain, at a minimum, a schedule of system improvements for each of the subsequent five years. The capital improvements element update may include changes in funding sources or project costs, or changes in the list or scheduling of projects. The capital improvements element update shall be submitted to the Atlanta Regional Commission for their review, in accordance with the development impact fee compliance requirements as adopted by the Board of Community Affairs of the State of Georgia. 2. Amendment. In conducting a periodic review of the capital improvements element and calculation of development impact fees, the board of commissioners may determine to amend the capital improvements element itself. Amendments to the capital improvements element shall comply with the procedural requirements of the development impact fee compliance requirements as adopted by the Board of Community Affairs of the State of Georgia, and shall be required for any change to the capital improvements element that would: a. Change the list of system improvement projects by adding, deleting, or substantially modifying the projects; b. Redefine or extend growth projections, land development assumptions, or goals or objectives that would affect system improvements proposed in the capital improvements element; c. Add new public facility categories for impact fee funding; d. Change service levels established for an existing impact fee public facility category; or e. Make any other revisions needed to keep the capital improvements element up to date. C. Continuation of validity. Failure of the board of commissioners to undertake a periodic review of the capital improvements element shall result in the continued use and application of the latest adopted development impact fee schedule and other data. The failure to periodically review such data shall not invalidate this section. 8.06.010. Administrative appeals. A. Eligibility to file an appeal. Only applicants or feepayors who have already been assessed an impact fee by the county or who have already received a written determination of individual assessment, refund, or credit amount shall be entitled to an appeal. B. Appeals process. 1. The aggrieved applicant or fee payor must file a written appeal with the administrator within 15 days of the receipt of written determination of the amount of the development impact fee due, or entitlement to an amount of a refund or credit. Such written appeal shall be of sufficient content to clearly and unequivocally set forth the basis for the appeal and the relief sought. 2. Such written appeal shall state the basis for the appeal and the relief sought, and shall include: a. The name and address of the aggrieved applicant or feepayor; b. The location of the affected property; c. A copy of any applicable written decision or determination made by the administrator from which the appeal is taken. 3. Within 15 days after receipt of the appeal, the administrator shall make a written decision with respect to the appeal. Such decision shall be of sufficient content to set forth the basis for the determination. 4. Appeals from the decision of the administrator shall be made to the board of commissioners within 30 days of receipt by the aggrieved applicant or feepayor of the administrator's decision. Delivery by hand or certified mail to, or posting upon the property, at the address given by the aggrieved applicant or feepayor in the application for relief shall constitute "receipt by the aggrieved applicant or feepayor" under this provision. 5. The Board of commissioners shall thereafter establish a reasonable date and time for a hearing on the appeal, give written notice thereof to the applicant or feepayor, and decide the issue within a reasonable time following the hearing. Any party making an appeal shall have the right to appear at the hearing to present evidence and may be represented by counsel. C. Payment of impact fee during appeal. 1. The filing of an appeal shall not stay the collection of a development impact fee as a condition to the issuance of a building permit or other development approval (as defined herein). 2. A developer may pay a development impact fee to obtain a building permit or other development approval, and by making such payment shall not be estopped from exercising this right of appeal or receiving a refund of any amount deemed to have been collected in excess. 8.06.011. Enforcement and penalties. A. Enforcement authority. 1. The enforcement of this section shall be the responsibility of the administrator and such personnel as the administrator may designate from time to time. 2. The administrator shall have the right to inspect the lands affected by this section and shall have the right to issue cease and desist orders and citations for violations. Refusal of written notice of violation under this section shall constitute legal notice of service. 3. The administrator may suspend or revoke any building permit or withhold the issuance of other development approvals if the provisions of this section have been violated by the developer or the owner or their assigns. 4. For any violation, the administrator shall have the authority to issue a citation. The citation shall be in the form of a written official notice issued in person or by certified mail to the owner of the property, or to his or her agent, or to the person performing the work. a. The citation shall cite the specific provision of this section that is being violated and shall include, as an attachment, the text of the specific provision excerpted from this section. b. The receipt of a citation shall require that corrective action be taken within 30 days unless otherwise extended at the discretion of the administrator. In the case of an emergency as determined by the administrator, the time in which corrective action must be taken may be appropriately shorter than 30 days. If the required corrective action is not taken within the time allowed, the administrator may use any available civil or criminal remedies to secure compliance, including revoking a permit. B. Violations. 1. Knowingly furnishing false information on any matter relating to the administration of this section shall constitute an actionable violation. 2. Proceeding with construction of a project that is not consistent with the project's impact fee assessment, such as the use category claimed or units of development indicated, shall constitute an actionable violation. 3. Failure to take corrective action following the receipt of a citation shall constitute an actionable violation. 4. A violation of this section of the ULDC shall be a misdemeanor punishable according to law. However, in addition to or in lieu of criminal prosecution, the board of commissioners shall have the power to sue in law or equity for relief in civil court to enforce this section of the ULDC, including recourse to such civil and criminal remedies in law and equity as may be necessary to ensure compliance with the provisions of this section of the ULDC, including, but not limited to, injunctive relief to enjoin and restrain any person from violating the provisions of this section of the ULDC and to recover such damages as may be incurred by the implementation of specific corrective actions. 8.06.012. Repealer, severability, and effective date. A. Repeal of conflicting laws. Any and all sections, resolutions, or regulations, or parts thereof, in conflict with this section are hereby repealed to the extent of such conflict. B. Severability. If any sentence, clause, part, paragraph, section, or provision of this section is declared by a court of competent jurisdiction to be invalid, the validity of the section as a whole or any other part hereof shall not be affected. C. Incorporation by reference of Georgia law. It is the intent of the board of commissioners that this development impact fee section of Henry County, Georgia, comply with the terms and provisions of the Georgia Development Impact Fee Act (O.C.G.A. § 36-71-1 et seq. as amended). To the extent that any provision of this section is inconsistent with the provisions of said chapter 36-71, the latter shall control. Furthermore, to the extent that this section is silent as to any provision of said chapter 36-71 that is otherwise made mandatory by said chapter 36-71, such provision shall control and shall be binding upon the county. D. Effective date. This section shall take effect upon its adoption on July 23, 2024, by the Board of Commissioners of Henry County, Georgia. Attachment A. Impact fee schedule. Other uses: Impact fees for other uses not included shall be determined in accordance with the methodologies contained in the impact fee methodology report and capital improvements element of Henry County, Georgia, or other methodologies as approved by the county. Land Use Impact Fee per Unit Unit of Measure Single-Family Detached Housing $7,085.90 dwelling Apartment 7,085.90 dwelling Residential Condominium/Townhouse 7,085.90 dwelling Intermodal Truck Terminal 2.33 square foot General Light Industrial 3.80 square foot General Heavy Industrial 3.01 square foot Manufacturing 2.95 square foot Warehousing 1.51 square foot Mini-Warehouse 0.13 square foot High-Cube Warehouse 0.12 square foot Hotel or Conference Motel 938.53 room All Suites Hotel 823.65 room Motel 723.99 room Golf Course 404.60 acre Bowling Alley 1.65 square foot Movie Theater 2.42 square foot Arena 5,490.48 acre Amusement Park 14,982.00 acre Tennis Courts 401.76 acre Racquet/Tennis Club 0.51 square foot Health/Fitness Center 1.16 square foot Land Use Impact Fee per Unit Unit of Measure Recreational Community Center 2.04 square foot Private Elementary School 1.62 square foot Private High School 1.08 square foot Church/Place of Worship 0.57 square foot Day Care Center 4.64 square foot Cemetery 134.13 acre Hospital 4.84 square foot Nursing Home 3.84 square foot Clinic 6.47 square foot General Office Building 5.47 square foot Corporate Headquarters Building 5.64 square foot Single-Tenant Office Building 5.19 square foot Medical-Dental Office Building 6.68 square foot Research and Development Center 4.82 square foot Business Park 5.07 square foot Building Materials and Lumber Store 2.32 square foot Free-Standing Discount Superstore 1.58 square foot Variety Store 1.58 square foot Free-Standing Discount Store 3.27 square foot Hardware/Paint Store 1.59 square foot Nursery (Garden Center) 5.14 square foot Nursery (Wholesale) 2.75 square foot Shopping Center 2.75 square foot Factory Outlet Center 2.75 square foot Specialty Retail Center 3.27 square foot Automobile Sales 2.52 square foot Auto Parts Store 1.58 square foot Tire Store 2.11 square foot Tire Superstore 2.11 square foot Supermarket 1.92 square foot Convenience Market (Open 24 Hours) 2.97 square foot Convenience Market with Gas Pumps 2.97 square foot Discount Supermarket 3.71 square foot Wholesale Market 1.35 square foot Discount Club 2.14 square foot Home Improvement Superstore 1.58 square foot Electronics Superstore 1.58 square foot Apparel Store 2.75 square foot Department Store 3.26 square foot Pharmacy/Drugstore 2.75 square foot Furniture Store 0.68 square foot Drive-in Bank 7.89 square foot Quality Restaurant 12.29 square foot High-Turnover (Sit-Down) Restaurant 12.29 square foot Fast-Food Restaurant 17.96 square foot Quick Lubrication Vehicle Shop 3,459.35 service bay Gasoline/Service Station 263.57 pump Gasoline Station w/Convenience Mkt 355.82 pump Land Use Impact Fee per Unit Unit of Measure Self-Service Car Wash 329.46 stall (Ord. No. 22-05, 8-2-22; Ord. No. 23-1, § I, 1-4-23; Ord. No. 24-06, Exh. A, 7-23-24) Sec. 8.07.00. Illustrations of Design Concepts and Requirements: Figure 8.1 Reserved. Figure 8.2 Reserved. Figure 8.3 Figure 8.4 Figure 8.5 Figure 8.6 Figure 8.7 (Ord. No. 20-06, § III, 11-14-20) CHAPTER 9. RESERVED* CHAPTER 10. BOARDS AND COMMITTEES Sec. 10.00.00. Generally. The departments, boards, and commissions described in chapter 10 are established for the purpose of implementing the provisions of the ULDC. The departments, boards, and commissions described in this chapter shall have the powers and duties described necessary to achieve the purpose. Sec. 10.01.00. Henry County zoning advisory board. 10.01.01. Creation. The Henry County Zoning Advisory Board (ZAB) is hereby established, and shall be referred to as the zoning advisory board. 10.01.02. Membership. A. Composition. 1. The ZAB shall be composed of seven (7) qualified members. 2. One (1) member shall be appointed by the Henry County Board of Commissioners (BOC) from each of the five (5) commission districts; 3. One (1) member shall be appointed by the chairman of the BOC; and 4. One (1) member shall be appointed by the city council of Hampton. B. Term of office. 1. The term of each member appointed pursuant to subsection 10.01.02.B. above shall expire upon the earlier of: a. Two (2) years from the date of appointment; b. The date upon which the term of the member of the BOC from such member's commission district, in office at the time of the member's appointment, expires; or c. The date upon which the member of the BOC from such member's commission district, in office at the time of the member's appointment, vacates or resigns the position as member of the BOC. 2. The term of the member appointed pursuant to subsection 10.01.02.C. above shall expire upon the earlier of: a. Two (2) years from the date of appointment; b. The date upon which the term of the chairman of the BOC, in office at the time of the member's appointment, expires; or c. The date upon which the chairman of the BOC, in office at the time of the member's appointment, vacates or resigns the position as a member of the BOC. 3. All other members shall be appointed for a term of two (2) years. Each appointing entity shall have the authority to fill any vacancy occurring in its designated appointment. An appointment to fill any vacancy shall be for the remainder of the unexpired term of office. C. Removal/reappointment. 1. Any member appointed pursuant to subsection 10.01.02.A.2. above may be removed, with or without cause, by the BOC at any time. The BOC may, with or without cause, refuse to reappoint any member of the ZAB at the expiration of the term of office. A member may be reappointed only upon majority approval of the BOC. 2. The member appointed pursuant to subsection 10.01.02.A.3. above may be removed, with or without cause, by the chairman of the BOC at any time. The chairman of the BOC may, with or without cause, refuse to reappoint any member of the ZAB at the expiration of the term of office. The member may be reappointed only upon majority approval of the BOC. 3. Reserved. 4. The member appointed pursuant to subsection 10.01.02.A.4. above may be removed, with or without cause, by the city council of Hampton at any time. The city council of Hampton may, with or without cause, refuse to reappoint any member of the ZAB at the expiration of the term of office. A member may be reappointed only upon majority approval of the city council of Hampton. D. Qualifications/compensation. 1. In order to be qualified, all members shall complete training for ZAB members and shall receive a certificate of completion from an agency or organization competent to train appointed planning officials within one (1) year of appointment. 2. Each member shall be compensated in a manner prescribed by the BOC. No member shall be covered by Henry County's group health insurance. E. Conduct. 1. No member may: a. Make defamatory, slanderous, or discriminatory remarks toward or about any other board member, employee of Henry County, applicant or applicant's representatives, or audience member during the course of public hearings or meetings, workshop sessions, and official duties; b. Use profanity in any public hearing or meeting, nor generally in interaction with any of those persons listed in subparagraph a. above; c. Directly or indirectly threaten, harass, or intimidate any of those persons listed in subparagraph a. above; d. Violate any rules of procedure or supplemental rules of conduct established through ordinance or resolution by the BOC. 10.01.03. Quorum. A. Four (4) members shall constitute a quorum for the transaction of business. All rules, policies, and procedures governing the ZAB shall be hereinafter governed by this requirement. 10.01.04. Officers. A. The ZAB shall elect one (1) of its appointive members as chairman. The chairman shall serve for one (1) year or until he is reelected or his successor is elected. B. A second appointive member shall be elected as vice chairman, and he shall serve for one (1) year or until he is reelected or his successor is elected. C. The ZAB shall appoint a secretary, who may be an officer or an employee of the governing authority or of the ZAB. 10.01.05. Meetings. A. The ZAB shall meet once each month at a date and time established by the ZAB. This requirement can be reduced at the discretion of the ZAB due to unforeseen circumstances. B. Additional meetings shall be called, according to the procedures in Robert's Rules of Order. 10.01.06. Rules and operating procedures. A. The ZAB shall follow any by-laws and rules for the transaction of business adopted by the BOC. Any conduct of business or meetings not specified by rule of the ZAB shall be according to Robert's Rules of Order. B. The ZAB shall keep a record of its resolutions, transactions, findings, and determinations, which record shall be a public record. C. The chairman shall have no voting privileges except as provided in subsections 10.01.06.D., and E. D. In the event a zoning matter is within the chairman's appointed district, the chairman shall vote and the vice chair shall serve as chairman for that zoning action. The vice chair shall have no voting privileges on said zoning action. E. The chairman shall only vote in the event of a tie. 10.01.07. Duties and responsibilities. A. It shall be the function and duty of the ZAB to make careful and comprehensive surveys and studies of existing conditions and probable future developments and to prepare plans for physical, social, and economic growth as will best promote the public health, safety, morals, convenience, prosperity, and the general welfare as well as efficiency and economy in the development of the county. B. It shall be the duty of the ZAB to make a master plan or comprehensive plan of its political jurisdiction and to update it from time to time. Such master plan may show, among other things: existing and proposed streets, highways, expressways, bridges, tunnels, viaducts, and approaches thereto; routes of railroads and transit lines; terminals, ports, airports; parks, playgrounds, forests, reservations, and other public open spaces; sites for public buildings and structures; districts for residence, business, industry, recreation, agriculture, forestry; special districts for other purposes; limited development districts for purposes of conservation, water supply, sanitation, drainage, protection against floods, and the like; areas for housing developments, slum clearance, and urban renewal and redevelopment; location of public utilities whether publicly or privately owned including, but not limited to, sewerage and water-supply systems; zoning districts, and other planning features, together with time and priority schedules and cost estimates for the accomplishment of the proposals. The master plan shall be based upon and include appropriate studies of the location and extent of present and anticipated population, social and economic resources and problems, and other useful data. Such plan may be added to, and changed from time to time, by a majority vote of the ZAB. It shall be a public record, but its purpose and effect shall be solely to aid the ZAB in the performance of its duties. Such plan shall be recommended to the BOC for adoption. C. In particular, the ZAB shall have the power and duty to: 1. Prepare and recommend for adoption to the appropriate governing authority or authorities a zoning ordinance or resolution and map for the county. The zoning ordinance may be contained within a unified land development code. 2. In exercising the powers granted to it by this section, the ZAB shall prepare and recommend to the BOC for adoption regulations governing the subdivision of land within the county. Such regulations may provide for the harmonious development of the county; for the coordination of streets within subdivisions with other existing or planned streets for the size of blocks and lots; for the dedication or reservation of land for streets, school sites, and recreation areas and of easements for utilities and other public services and facilities; and for a distribution of population and traffic which will tend to create conditions favorable to health, safety, convenience, prosperity, and general welfare. Such regulations may include requirements as to how streets shall be graded, surfaced, and improved, and water, sewers, septic tanks, and other utility mains, piping, connections, or other facilities shall be installed as a condition precedent to the approval of the plat. The BOC may adopt and amend such land subdivision regulations according to the procedures set forth in chapter 12. 3. Prepare and recommend for adoption to the appropriate governing authority or authorities regulations for the subdivisions of land within the county and to administer the regulations that may be adopted. The subdivision regulations may be contained within a unified land development code. 4. Prepare and recommend for adoption to the BOC a plat or plats or a future infrastructure map showing the exact location of the boundary lines of existing, proposed, extended, widened or narrowed streets, public open spaces, or public building sites, together with regulations to control the erection of buildings or other structures within such lines, within the county or a specified portion thereof. These regulations may be contained within a unified land development code. 5. The ZAB may make, publish, and distribute maps, plans, reports, and recommendations relating to the comprehensive plan and development of the county to public officials and agencies, public utility companies, civic, educational, professional and other organizations, and citizens. It may recommend to the BOC programs for public improvements and the financing thereof. D. All public officials shall, upon request, furnish to the ZAB, within a reasonable time, such available information as it may require for its work. E. The ZAB, in the performance of its functions, may enter upon any land, make examinations and surveys, and place and maintain necessary monuments and marks thereon; provided, however, that Henry County shall be liable for any injury or damage to property resulting therefrom. F. The BOC may refer any matter to the ZAB for study, review and recommendation before the BOC takes final action on the matter. (Ord. No. 10-01, 1-5-10; Ord. No. 16-07, 11-1-16) Sec. 10.02.00. Compatibility standards review committee. For the purpose of reviewing the location of manufactured homes or mobile homes, as contemplated in sections 4.01.07 and 12.02.08 of this ULDC, a compatibility standards review committee is established. A. The committee shall consist of the county zoning administrator, the county building official, and the county tax assessor or their designees. B. A quorum shall consist of any two (2) of the three (3) members, and the decision of any two (2) of the three (3) members shall be binding on the committee and this county. C. The committee shall adhere to the provisions of the ULDC with regard to the appearance and location of manufactured homes and mobile homes. Sec. 10.03.00. Architectural review committee. The architectural review committee shall consist of the planning and zoning department, the building department and the development plan review department. Sec. 10.04.00. Historic preservation board. (Reserved) CHAPTER 11. VARIATIONS Sec. 11.00.00. Generally. The purpose of this chapter is to provide mechanisms for obtaining relief from the provisions of this ULDC where hardship would otherwise occur. Two (2) forms of hardship are addressed. Section 11.01.00 addresses hardships that would be caused if nonconforming development were required to immediately come into compliance with this ULDC. Sections 11.02.00 and 11.03.00 address hardships that occur in a particular situation due to the characteristics of the land to be developed based on the required site design standards. Sec. 11.01.00. Nonconforming lots, structures, and uses. 11.01.01. Generally. A. Within the zoning and overlay districts established by this ULDC or amendments that may later be adopted there may exist lots, structures, or uses of land which were lawfully established before this ULDC was adopted, but which do not comply with the requirements set forth in this ULDC. B. It is the intent of section 11.01.00 to allow these nonconformities to continue until they are removed or discontinued. It is further the intent of this section that nonconformities shall not be enlarged upon, expanded or extended, nor be used as grounds for adding structures or uses prohibited elsewhere in the same district. C. Nonconforming uses are declared to be incompatible with permitted uses in the district where the nonconforming use is located. D. Nothing in section 11.01.01 shall be construed to prevent the ordinary and routine maintenance and repair of nonconforming structures or structures which contain nonconforming uses provided that: 1. Repairs do not exceed ten (10) percent of the current replacement cost of the nonconforming portion of the structure, during any period of twelve (12) consecutive months; and 2. The cubic content of the structure is not increased. E. A structure damaged or destroyed by any means to an extent of more than fifty (50) percent of its replacement cost at time of destruction shall be reconstructed only in conformity with the provisions of this ULDC. F. Fair market value, where required, shall be determined by reference to current statutory provisions pertaining to real estate assessment and the records of the county assessor. G. A structure that is damaged to an extent less than fifty (50) percent of the fair market value may be restored and occupied as before the damage, provided the following standards are met: 1. Restoration shall be commenced within six (6) calendar months from the date damages were incurred. 2. If reconstruction is not commenced within six (6) months, the reconstruction and use of the land or structure shall thereafter conform to the provisions of this ULDC. H. A nonconforming structure or a structure containing a nonconforming use that is declared by the administrator to be physically unsafe or unlawful due to lack of repairs and maintenance shall not thereafter be restored, repaired, or rebuilt except in conformity with the regulations of the zoning district in which it is located. 11.01.02. Nonconforming lots of record. A. A single-family dwelling and permissible accessory structures may be constructed on a single lot of record in any zoning district where single-family dwellings are permissible, subject to the following requirements: 1. The lot of record was established at or before the time of adoption of this ULDC; 2. The lot of record is in separate ownership from adjacent lots with continuous frontage on the same street; 3. The lot is nonconforming due to failure to meet standards for the zoning district for minimum lot area and/or minimum lot width; and 4. The lot is developed in compliance with standards for front, side, and rear yard setbacks and building height for the zoning district in which it is located. B. Lots of record with continuous frontage, which became nonconforming at the time of adoption of this ULDC, shall meet the following requirements in order to be developed: 1. The lots of record consist of two (2) or more lots, combinations of lots, and portions of lots which are in single ownership and have continuous frontage; 2. A lot or a portion of a lot cannot meet the standards of the zoning district for lot area and lot width; 3. The combination of lots shall be considered to be an undivided parcel for the purpose of developing according to the site design standards of the zoning district; and 4. No portion of the undivided parcel shall be used or sold in a manner which does not comply with minimum lot area and minimum lot width requirements established by this ULDC. 11.01.03. Nonconforming structures. A lawfully established structure that becomes nonconforming at the time of adoption of this ULDC may continue subject to the following requirements: A. The structure is nonconforming with only the following site design standards: 1. Minimum lot area; 2. Maximum lot coverage or impervious surface ratio; 3. Maximum building height; 4. Minimum front, side, and rear yard setbacks; and 5. Other requirements regarding building location on the lot. B. The structure shall be in compliance with all other standards and requirements of this ULDC. C. The nonconforming structure shall not be enlarged. D. The structure or portion thereof may be altered to decrease its degree of nonconformity. E. If a nonconforming structure is moved for any reason for any distance, it shall be brought into conformance with the site design standards of the zoning district to which it is moved. 11.01.04. Nonconforming uses. A lawfully established use that becomes nonconforming at the time of adoption of this ULDC may continue subject to the following requirements: A. A structure containing a nonconforming use shall not be enlarged, extended, constructed, reconstructed, moved, or structurally altered except to change the use to a use permitted in the zoning district in which it is located. B. A nonconforming use shall not be extended to occupy any land outside the existing structure devoted to the use. Any nonconforming use may be extended throughout any parts of a building which were manifestly arranged or designed for such use at the time of adoption or amendment of this ULDC. C. A nonconforming use which is superseded by a permitted use in a structure or structure and land in combination shall not be resumed. D. A nonconforming use of a structure or structure and land in combination that is discontinued or abandoned for six (6) consecutive months (except when government action impedes access to the premises) shall not be resumed. The structure, or structure and land in combination, shall not thereafter be used except in conformity with the regulations of the zoning district in which it is located. 11.01.05. Termination of detrimental nonconforming structures and uses. A. There are found to be certain uses of land, buildings, and structures which have an adverse effect on the carrying out of the comprehensive plan. Such uses shall be discontinued after the time periods set out in subsection 11.01.05.B. below, irrespective of the requirements for nonconforming uses set forth in sections 11.01.00 through 11.01.04 above. B. The following uses shall be removed or made conforming within the specified amortization period. Said amortization period shall commence upon the effective date of this ULDC. 1. Fences, walls, and vegetation which constitute a hazard by virtue of impairing sight distances at a curve or intersection shall be made conforming within sixty (60) days. 2. All site design requirements for fencing, screening, or buffering of commercial or industrial uses, as set forth in chapters 4 or 5 of this ULDC, shall be met within sixty (60) days. 3. Nonconforming open storage operations, such as truck parking, automobile wrecking, salvage material storage, and similar uses, shall be made conforming within sixty (60) days. 11.01.06. Regulation of specific nonconforming structures. A. Nonconforming signs. (See section 7.04.00 regarding signs). 1. The following provisions shall apply to signs which were approved and legally erected pursuant to sign standards in effect prior to the adoption of this ULDC, and which became nonconforming at the time of adoption of this ULDC. 2. Nonconforming signs may stay in place until one (1) of the following conditions occurs: a. The sign deteriorates or is damaged to the extent that it becomes a hazard; or b. The sign has been damaged to such an extent that structural repairs are required to restore the sign. A structural repair is any repair necessary only to maintain the stability and safety of the sign. 3. The owner of the sign shall obtain a permit for the continuation of the sign, subject to the restrictions of this section. Application for such permit shall be filed within ten (10) days of the notice of nonconformance. There shall be no charge for this permit. Failure to apply for such permit within ten (10) days shall result in waiver of the protections afforded nonconforming signs by this section and the display of such sign shall be thereafter unlawful. 4. Minor repairs and maintenance of nonconforming signs shall be permitted. However, no structural repairs or changes in the size or shape of the sign shall be permitted except to make the sign comply with the requirements of this section. 5. A nonconforming sign damaged by fire or other causes to the extent of more than fifty (50) percent of its assessed value shall not be repaired or rebuilt except in compliance with the standards for the type and location of sign. 6. A nonconforming sign damaged by fire or other causes to the extent of more than fifty (50) percent of its assessed value which is not repaired or rebuilt in compliance with this section shall be removed from the lot, along with all associated debris, and disposed of appropriately. 7. A nonconforming sign shall not be replaced by another nonconforming sign, except that the substitution or interchange of poster panels, painted boards, or dismountable material on nonconforming signs shall be permitted. B. Nonconforming signs along interstate highways. A legally erected interstate sign which became nonconforming on May 6, 2002, pursuant to the adoption of Ordinance 02-05, may be allowed to remain until purchased by the Georgia DOT, provided that the sign meets the requirements of state laws, rules and regulations governing such signs. Sign regulations are set forth in section 7.04.00 of this ULDC. C. Mobile homes/manufactured homes. 1. All mobile homes located in a mobile home development shall provide documentation of compliance with the National Mobile Home Construction and Safety Act or compliance with specifications presented by the American National Standards Institute. Existing mobile homes within mobile home developments not in compliance with either of these standards are nonconforming. 2. An existing, nonconforming mobile home which was lawfully permitted may be replaced with another mobile home of the same size meeting the requirement set forth in paragraph C.1. above and with the requirements of this chapter within sixty (60) days from the date of removal of the original mobile home. D. Nonconforming WCFs. WCFs in existence on the date of the adoption of this article which do not comply with the requirements of this article are nonconforming WCFs and are subject to the following provisions: A. The owner of any nonconforming WCFs may request an administrative approval for a minor modification from the administrator. B. Nonconforming WCFs may add additional antennas (belonging to the same carrier or other carriers) subject to administrative approval in section 7.05.04. C. Nonconforming WCFs which are hereafter damaged or destroyed by less than fifty (50) percent of the replacement value due to any reason or cause may be repaired and restored to their former use, location, and physical dimensions subject to obtaining a building permit, without otherwise complying with this article. A nonconforming WCF that is damaged or destroyed by more than fifty (50) percent of the estimated replacement value shall be made conforming to this article. D. Major modifications to nonconforming WCFs may be allowed only upon the granting of a conditional use by the zoning advisory board; provided, however, that an existing nonconforming WCF may be replaced by a support structure replacement administratively approved according to the provisions of section 7.05.03, in which event, after administrative approval and replacement, the support structure replacement shall be legally conforming. (Ord. No. 09-07, 11-17-09; Ord. No. 14-06, § I(exh. A), 11-4-14) Sec. 11.02.00. Variances. 11.02.01. Generally. A. A variance may be granted where owing to special conditions, a literal enforcement of the provisions of the ULDC will, in an individual case, result in unnecessary hardship. B. A variance shall observe the spirit of this ULDC, secure public safety and welfare, and deliver substantial justice. C. The existence of a nonconforming use on adjacent land, buildings, or structures in the same or in other districts shall not constitute a reason for a variance. D. The zoning advisory board shall be responsible for consideration and a decision regarding requests for variances, pursuant to the notice and hearing requirements set forth in chapter 12. E. A variance may not be granted for actions specifically prohibited by this ordinance. A variance is to compensate for a dimensional standard in a real property which would prevent the property from complying with a zoning development regulation. Variances are only granted after a review process against specified approval criteria. 11.02.02. Types of variances. A request for a variance shall be limited to the following dimensional standards: Maximum building height; minimum lot width; minimum lot area, required spacing for driveways; minimum front, side, or rear yard setbacks; or dimensional standards for parking or loading spaces or no curb and gutter for subdivisions in the RA zoning district. Requests other than those stated will constitute a request to amend this section of the ULDC through procedures set forth by subsection 12.02.11. 11.02.03. Requirements for variances. A variance may be granted upon a finding by the zoning advisory board that all the following conditions have been met: A. There are extraordinary and exceptional conditions pertaining to the particular piece of property in question because of its size, shape, or topography that are not applicable to other lands or structures in the same zoning district; B. A literal interpretation of the provisions of this ULDC would deprive the applicant of rights commonly enjoyed by other properties of the zoning district in which the property is located; C. Granting the variance requested will not confer upon the property of the applicant any special privileges that are denied to other properties of the zoning district in which the applicant’s property is located; D. The requested variance will be in harmony with the purpose and intent of this ULDC and will not be incompatible with the neighborhood or to the general public welfare; E. The special circumstances are not the result of the actions of the applicant; F. The variance requested is the minimum variance that will make possible the legal use of the land, building or structure; and G. The variance is not a request to permit a use of land, buildings, or structures which are not permitted by right in the zoning district involved. 11.02.04. Specific requirements for a variance in a floodplain protection area. The following variance and appeals procedures shall apply to an applicant who has been denied a permit for a development activity or to an owner or developer who has not applied for a permit because it is clear that the proposed development activity would be inconsistent with the provisions of this ordinance. A request for a variance may be submitted by an applicant who has been denied a permit by the Henry County Development Plan Review Department or by an owner or developer who has not previously applied for a permit for the reasons stated herein above. A. Requests for variances from the requirements of this ordinance shall be submitted to the Henry County Planning and Zoning Department. All such requests shall be heard and decided in accordance with procedures to be published in writing by the Henry County Planning and Zoning Department. At a minimum, such procedures shall include notice to all affected parties and the opportunity to be heard. B. Any person adversely affected by any decision of the Henry County Planning and Zoning Department shall have the right to appeal such decision to the zoning advisory board as established by Henry County in accordance with procedures to be published in writing by the Henry County Zoning Advisory Board. At a minimum, such procedures shall include notice to all affected parties and the opportunity to be heard. C. Any person aggrieved by the decision of the Henry County Zoning Advisory Board may appeal such decision to the Henry County Board of Commissioners. D. Variances may be issued for the repair or rehabilitation of historic structures upon a determination that the proposed repair or rehabilitation will not preclude the structure's continued designation as an historic structure, and the variance issued shall be the minimum necessary to preserve the historic character and design of the structure. E. Variances may be issued for development necessary for the conduct of a functionally dependent use, provided the criteria of this section are met, no reasonable alternative exists, and the development is protected by methods that minimize flood damage during the base flood and create no additional threats to public safety. F. Variances shall not be issued within any designated floodway if any increase in flood levels during the base flood discharge would result. G. In reviewing such requests, the Henry County Stormwater Management Department and the Henry County Zoning Advisory Board shall consider all technical evaluations, relevant factors, and all standards specified in this and other sections of this article. H. Conditions for variances: 1. A variance shall be issued only when there is: a. A finding of good and sufficient cause; b. A determination that failure to grant the variance would result in exceptional hardship; and c. A determination that the granting of a variance will not result in increased flood heights, additional threats to public safety, extraordinary public expense, or the creation of a nuisance. 2. The provisions of this ordinance are minimum standards for flood loss reduction; therefore, any deviation from the standards must be weighed carefully. Variances shall only be issued upon determination that the variance is the minimum necessary, considering the flood hazard, to afford relief; and, in the instance of a historic structure, a determination that the variance is the minimum necessary so as not to destroy the historic character and design of the building. 3. Any person to whom a variance is granted shall be given written notice specifying the difference between the base flood elevation and the elevation of the proposed lowest floor and stating that the cost of flood insurance will be commensurate with the increased risk to life and property resulting from the reduced lowest floor elevation. 4. The building and development division director or designee shall maintain the records of all appeal actions and report any variances to the Federal Emergency Management Agency upon request. I. Any person requesting a variance shall, from the time of the request until the time the request is acted upon, submit such information and documentation as the Henry County Planning and Zoning Department shall deem necessary to the consideration of the request. J. Upon consideration of the factors listed above and the purposes of this article, the Henry County Planning and Zoning Department and the Henry County Zoning Advisory Board may attach such conditions to the granting of variances as they deem necessary or appropriate, consistent with the purposes of this article. K. Variances shall not be issued "after the fact". 11.02.05. Specific requirements for a variance to the aggregate signable area standard. A. A variance may be granted to allow more than five hundred (500) square feet of signable area where the following conditions are met: 1. The property shall be zoned OI, MU, C-1, C-2, C-3, IAC, M-1, or M-2; 2. The minimum land area for the project shall be ten (10) acres; 3. The property shall be under unified control and management; 4. All existing signs and structures within the property are in full conformance with the requirements of this ULDC; 5. The granting of a variance shall not create negative impacts to adjacent properties, to the general public, or the purposes and intents of the sign standards in this ULDC; and 6. Circumstances or conditions resulting from actions of the current or former owners shall not be grounds for a grant of a variance. B. The zoning advisory board shall consider the following additional factors to section 11.02.03 in determining whether to grant a variance: 1. Size of buildings on the property; 2. Potential to subdivide the property; 3. Number of different businesses occupying the property. C. Granting a variance shall include the condition that the variance shall terminate upon any subdividing of the property. 11.02.06. Requirement for a variance to the buffer. A. Where a parcel was platted prior to the effective date of the Stream Buffer Protection Ordinance, and its shapes, topography or other existing physical conditions prevent land development consistent with this ordinance, and Henry County Development Plan Review Department finds and determines that the requirements of this ordinance prohibit the otherwise lawful use of the property by the owner, the Administrator or Designee of Henry County may grant a variance from the buffer and setback requirement hereunder, provided such variance requires mitigation measures to offset the effects of any proposed land development on the parcel. B. No more than one hundred (100) square feet. 1. The following land-disturbing activities are examples of projects not specifically listed in O.C.G.A. § 12-7-17(3) that would be considered minor land-disturbing activities and therefore, exempt from the Georgia Erosion and Sedimentation Act and the applicable buffer requirements for the state waters: 2. Elevated structures such as decks, gazebos, patios, walkways, viewing platforms and/or open picnic shelters, provided: a. No more than one hundred (100) square feet of footprint of the elevated structure extends into or over the [buffer], with an exception for structures compliant with the Americans with Disabilities [Act]; b. No grading, cutting, filling or similar land-disturbing activities occurring as a part of the site preparation, construction or subsequent development; c. The structure is built on posts, concrete blocks and/or similar supports; d. Permanent protective vegetative cover remains or protective measures (e.g., mulch, gravel) are installed within the footprint of the elevated structure to prevent post construction soil erosion; e. A natural canopy is left in sufficient quantity to keep shade on the stream bed; f. No concrete and/or asphalt slabs, pads or foundations constructed or placed as a part of the site preparation, construction or subsequent development. 3. A pervious ground level walkway approach to a dock and/or similar structure, provided: a. No more than one hundred (100) square feet of the constructed walkway extends into the buffer, with an exception for structures compliant with ADA; b. No grading, cutting, filling or similar land-disturbing activities occurring as a part of the preparation, construction or subsequent development; c. No concrete and/or asphalt slabs, pads, supports or foundations constructed or placed as a part of the site preparation, construction or subsequent development; d. All ground preparation and walkway material placement is completed with use of hand held equipment. 4. Restoration of buffer area after the removal of an existing structure, provided; a. No more than one hundred (100) square feet of the structure footprint is in the buffer; and b. The buffer area must be replanted with native vegetation. 5. Maintenance or repair of existing structures, the failure of which would result in a threat to human health or state waters, such as sewer lines, water lines, dams, or gas lines. Total disturbance must be less than one hundred (100) square feet. 6. Placement of rock riprap within the buffer not to exceed one hundred (100) square feet on any one (1) property, provided: a. The placement of the riprap does not result in soil disturbance outside the placement area; and b. No grading, cutting, filling or similar land-disturbing activities occurring as part of the site preparation, construction or subsequent development. C. The following land-disturbing activities are examples of projects that are NOT considered minor land-disturbing activities and therefore, NOT exempt from the Georgia Erosion and Sedimentation Act and the applicable buffer requirements for state waters: 1. Any land-disturbing activity utilizing wheeled or tracked machinery and equipment resulting in soil erosion within the buffer; 2. Paving with poured or prefab concrete and/or asphalt; 3. Any project or combination or projects occurring within the same calendar year on the same property resulting in more than one hundred (100) square feet of any elevated structures and/or pervious ground level walkways within or extending into the buffer; 4. Construction of a barbeque pit on a concrete and/or asphalt slab or pad within the buffer; 5. Construction of a ground level patio within the buffer; 6. Construction of a swimming pool within the buffer; 7. Construction of a structural or decorative retaining wall within the buffer; 8. Construction of a new seawall with land-disturbing activities occurring within the buffer; and 9. Backfilling any new seawall construction within the buffer. 11.02.07. Appeal of zoning advisory board actions. An appeal of a decision of the zoning advisory board shall be processed as set forth in section 12.05.00. (Ord. No. 12-18, § I, 11-6-12) Sec. 11.03.00. Administrative waiver. The administrator shall have the power to reduce specific site design and development standards of this ULDC where the intent of the ULDC can be achieved and equal performance obtained by granting a waiver of standards. The authority to grant a waiver shall be limited to the following: A. A reduction in the minimum front, side, or rear yard setbacks for a single lot, provided the following standards are met: 1. The reduction is necessary because of any one (1) of the following: geologic conditions, topography, the inability to adhere to tree protection standards set forth in section 5.03.00, or the zoning conditions set forth by the Henry County Board of Commissioners. 2. The reduction is limited to a maximum of ten (10) percent of the minimum standard. B. A reduction in the parking requirements provided the following standards are met: 1. The reduction is necessary because of geologic conditions, topography, or the inability to adhere to tree protection standards set forth in section 5.03.00. 2. The reduction is five (5) spaces or five (5) percent, whichever is greater. 3. The reduction does not limit the availability or location of required handicapped parking. C. Side yard requirements may be waived by the administrator, where a joint fall-out shelter is proposed, provided that permanent easements are recorded to ensure access to both parties (see section 7.02.03). D. The forty-foot buffer requirement can be reduced to a twenty-foot buffer with a decorative fence by the administrator pending an administrative review of the development plans. E. A waiver may be issued by the administrator from section 8.02.07 requiring a dust free parking surface, as long as the parking area consists of a pervious or semi-pervious material meeting the following conditions: 1. There shall be a paved primary lot that serves the parking needs of customers and employees on a regular basis. Unpaved parking spaces may not count towards the parking requirements outlined in section 8.02.00 with the exception of spaces dedicated to employees of the business. 2. Materials used for unpaved parking shall be approved by the Henry County Fire Department prior to installation. 3. Unpaved parking areas shall be enclosed by a fence that restricts access to the area by the general public. All gates and locks shall be approved by the Henry County Fire Department prior to installation. 4. The unpaved parking area shall meet the design standards for parking lots, with the exception of paving requirements, and including size of spaces, drive aisles, maneuvering areas, and stormwater management. 5. There must be a paved driveway leading to the unpaved parking area that is a minimum of twenty-four (24) feet in length. 6. Unpaved parking areas are subject to the landscaping provisions in section 5.01.00 and all landscaping is to be maintained on a permanent basis. Surfaces must remain grass and weed free. Sec. 11.04.00. Vested rights. The purpose of section 11.04.00 is to provide a method to recognize vested rights and works-inprogress that were authorized prior to the adoption of this ULDC. 11.04.01. Applicability. A. Any property zoned PD (planned development) prior to the adoption of this ULDC shall be subject to all development agreements and approved master plans until such time the property is rezoned. B. Any property that has been rezoned prior to the adoption of this ULDC shall meet all zoning conditions imposed regardless of any zoning change caused by the ULDC until such time the property is rezoned. C. Applicant shall be vested in any permit approved prior to the adoption of the ULDC until such time as permit expires. D. All flag lots platted and recorded prior to the adoption of this ULDC shall be considered legal conforming lots of record. Sec. 11.05.00. Conditional uses. 11.05.01. Generally. Several of the zoning districts contained herein permit certain uses subject to an approved conditional use. The evaluation of conditional use request and determination of compliance shall be the responsibility of the zoning advisory board. See chapter 4 for uses requiring a conditional use. 11.05.02. Requirements for conditional uses. The zoning advisory board shall consider all of the following prior to making decisions on conditional uses: A. The proposed use shall not cause traffic congestion or conditions that will adversely affect other nearby properties in the area. B. The physical conditions of the site, including topography, drainage and size and shape, are suitable for the proposed development. C. There are adequate public facilities to serve the proposed use. D. The applicant has made a binding agreement for any specific limitations or conditions necessary to protect the public interest and assure the continued beneficial use and enjoyment of nearby properties or that no special limitations are necessary to protect the public. E. The conditional use with specific limitations and design features as may have been required will further the aims of the county land use plan and will not be unduly detrimental to nearby properties. 11.05.03. Appeal of zoning advisory board actions. An appeal of a decision of the zoning advisory board shall be processed as set forth in section 12.05.00. CHAPTER 12. ADMINISTRATIVE PROCEDURES Sec. 12.00.00. Generally. 12.00.01. Purpose. This ULDC sets forth the procedures for receiving, reviewing, and rendering decisions on applications for subdivisions, multifamily and nonresidential development, mixed use development, planned developments, rezoning, and all permits. This ULDC also sets forth the requirements for appealing decisions, and for enforcement. It is the county's intent that the procedures and requirements set forth in this ULDC shall be followed in order to seek approval for any development. 12.00.02. Approvals required. A. No person shall conduct any development activity within the jurisdictional boundaries of Henry County without first obtaining an approved subdivision plat, development plan, construction plans, and permits to perform such activities. However, a parcel, as shown on the most recent Henry County Tax Map, may be split into five (5) lots within a five-year period and shall not require a development plan. B. Permits shall be issued only for development on platted and recorded lots. 1. No permits shall be issued on lots described by metes and bounds. 2. All development activities or site work conducted after approval of a subdivision plat or development plan shall conform to the specifications of the approved plans. C. Major changes to an approved plan, as defined below, shall require specific approval of an amended plan. 1. Altering the amount and velocity of stormwater runoff from the site; 2. Increasing the amount of impervious surface within the development; 3. Altering the overall density of development; 4. Substantially increasing the amount of excavation, fill, or removal of vegetation during construction; or 5. Otherwise altering the overall appearance of the development as proposed as determined by the administrator. D. The following situations are exempt from the requirement to obtain an approved development plan prior to the issuance of required permits: 1. Repairs to a facility that is part of a previously approved and permitted development. 2. Accessory structures, provided applicable permits are obtained. 12.00.03. Expiration of approvals. A. Amendment of the official zoning map (rezoning). 1. After an approval has been granted for an amendment to the official zoning map to create or extend any zoning district, the applicant, agent or property owner has eighteen (18) months in which to make substantial progress in developing the property. 2. Substantial progress shall mean the point of construction at which time the first inspection is carried out. 3. If no substantial construction or alteration of the property or other affirmative action to develop the property has occurred within eighteen (18) months of the granting of an application for rezoning, the zoning advisory board may review the situation and report its findings with recommendations to the board of commissioners who may, at a public hearing, change the zoning category to its prior or other appropriate zoning district classification. B. Development permits. 1. If construction described in a development permit has not commenced within twelve (12) months from the date of issuance, the permit shall expire. However, the permit may be extended for an additional twelve (12) months, upon payment of the permit fee for such extension. 2. If construction described in the development permit is suspended after work has commenced, the permit shall expire twelve (12) months after the date the work ceased. In cases of permit expiration due to abandonment or suspension of work, the landowner shall be required to restore topography to its original contours and restore vegetation as determined by the administrator. 12.00.04. Fees required. All fee amounts are determined and adjusted periodically by the board of commissioners. All applications shall be accompanied by payment of application fees, as set forth in each department's fee schedule. 12.00.05. Procedures for conducting public hearings. In compliance with O.C.G.A. § 36-66-5 the following rules of procedure shall govern public hearings before the zoning advisory board and the board of commissioners: A. Each person speaking before the board or commissioners, shall identify himself/herself by name, address, and whether or not applicant is owner or agent for owner. B. Each applicant or other interested party who submits documents at the hearing shall have each document numbered and shall identify each document. Each document submitted shall be made a part of the official record of the hearing. C. Time periods for testimony: 1. Each applicant shall have ten (10) minutes to present data, evidence, and opinions pertinent to the application. A portion of this time period may be saved for rebuttal. 2. Persons in opposition to rezoning of property and amendment to the zoning ordinance shall have a total of ten (10) minutes to address the board. Each person shall provide the administrator with his/her name and address. 3. Additional time may be granted equally to the applicant and opponents at the discretion of the chairman of the board. D. At the conclusion of a hearing by the zoning advisory board, the board shall announce its decision or recommendation, as required, and direct the administrator to notify the applicant in writing of such decision or recommendation. The notification shall be made a part of the record on the date that the written notification is given to the applicant. E. At the conclusion of a hearing by the board of commissioners, the board may: 1. Approve the application. 2. Approve the application with conditions. 3. Disapprove the application. 4. The board of commissioners may continue or postpone their deliberations to a date certain to render their decision. 5. The board may remand to the zoning advisory board for additional review and consideration in a duly advertised public hearing. The board shall announce its decision and direct the administrator to notify the applicant in writing of the board's decision. The written notification shall immediately be entered on the minutes and made a part of the record on the date that written notification is given to the applicant. 12.00.06. Requirements for developments of regional impact. A. A proposed development that meets or exceeds the thresholds established by the Georgia DCA, ARC, and GRTA for a Development of Regional Impact (DRI) shall be reviewed according to the procedures in Chapter 110-12-3, Rules of the Department of Community Affairs (DCA). B. When a development meeting the threshold standards established by the DCA, ARC, and GRTA is proposed, the county shall not take action (including actions by the administrator, zoning advisory board, or board of commissioners) on the development until the DRI review process is completed. C. Upon receipt of a request for action related to a project that meets or exceeds the thresholds established for that development category, the local government may request that the applicant submit additional information about the project, using forms available from DCA. D. Upon determination that the proposed development is not a DRI, the county may continue with review and decision-making procedures set forth in this ULDC. E. Upon conclusion of the DRI review, the county may continue with review and decision-making procedures as set forth in this ULDC. 1. The county is encouraged to include the public finding and comments regarding the proposed DRI project in considering actions on the application for project approval. 2. Where the project received a negative public finding and the county approves the project, the county shall notify the DCA, indicating any conditions that have been placed on the project to mitigate the negative finding. 3. The planning and zoning department shall submit applications for DRI review to the DCA. (Ord. No. 22-03, § V, 5-3-22) Sec. 12.01.00. Application requirements. 12.01.01. Pre-application conference. The purpose of the pre-application conference is to provide an opportunity for the applicant to consult with county staff for advice and assistance prior to preparation of a preliminary plat, development plan, and zoning application. This will enable the applicant to become familiar with the approval process, required documents, inspections, the comprehensive plan, infrastructure and improvement standards adopted by Henry County and the Henry County Water and Sewerage Authority, the health department, the county DOT, and development factors which may impact the proposed development. It is the county's intent that all procedural and development requirements be identified during the pre-application conference. However, no person may rely upon any comment concerning a proposed development, or any expression of any nature about the proposal, made by a participant at the pre-application conference, as a representation or implication that the proposal will be ultimately approved or rejected in any form. Additionally, the failure to identify an applicable requirement or condition shall not preclude the county from requiring an applicant to comply with such requirement or condition. The following information shall be provided by the applicant: a. A Henry County application for zoning. b. Proof of ownership. c. When the applicant is a representative of the property owner, a notarized statement authorizing the representative to act as an agent of the property owner with regard to the application and associated procedures. d. Applicant campaign disclosure form (for applicant/owner, agent and/or attorney). e. A property survey conducted no more than five (5) years prior to the filing of the application, containing the legal description, boundaries, land area, notation whether any portion of the property is within a floodplain as regulated in section 3.01.00, and existing improvements located on the site. Where two (2) or more parcels are included within a proposed development, the survey shall include all parcels that are part of the proposed development, including all phases. The survey shall be prepared and sealed by a surveyor registered in the State of Georgia. If the survey is older than five (5) years, the survey must be certified by a surveyor registered in the State of Georgia as to whether changes have or have not been made to the property. f. A vicinity map indicating the location of the site proposed for development. g. Proof of payment of fees. h. Other information as may be required by the administrator. 12.01.02. Determination of completeness. A. All applications shall be complete before acceptance for review and decision-making. A determination of completeness is a determination that all required documents and plans have been submitted in sufficient number, and that all fees have been paid. A determination of completeness is not a determination of compliance with substantive standards and criteria. B. The administrator shall determine, within five (5) days of receipt of an application, whether the application is complete. C. If the administrator determines that the application is not complete, the administrator shall send notice to the applicant identifying the deficiencies. The applicant shall have thirty (30) days from the date of notice to correct the deficiencies. Until the applicant corrects the deficiencies, no further action shall be taken for processing the application. If the applicant fails to correct the deficiencies within the thirty-day period, the application shall be deemed withdrawn, and fees shall be forfeited. D. If the administrator determines that the application is complete, the application shall be processed for review and action in accordance with the procedural requirements set forth in section 12.02.00. 12.01.03. Applications subject to administrative action. A. The following applications shall be reviewed and decisions rendered by the administrator: 1. Development plans and subdivision plats for multifamily residential, manufactured home developments, and all nonresidential development, pursuant to the requirements for base zoning districts, overlay zoning districts, subdivision plats for conventional subdivisions, conservation subdivision developments, and residential fly-in neighborhoods. 2. Administrative waivers (see section 11.03.00). 3. Development permits (see section 12.02.06). 4. Applications for minor modifications to zoning conditions and development conditions related solely to dimensional or site design standards required by the board of commissioners. B. Applications for permits pursuant to the building and technical codes shall be reviewed and decisions rendered by the building official, pursuant to the requirements set forth in appendix B. 12.01.04. Applications subject to zoning advisory board action. A. The following applications shall be reviewed and decisions rendered by the zoning advisory board: 1. Variances (see section 11.02.00). 2. Conditional uses (see section 11.05.00). 3. Modifications to conditions placed on conditional uses and/or variances. B. The following applications shall be reviewed by the zoning advisory board and recommendations provided to the board of commissioners. 1. Rezoning of property and amendments to the official zoning map. 2. Amendments to the ULDC. 3. Amendments to the comprehensive plan and associated future land use map. 12.01.05. Reserved. 12.01.06. Applications subject to board of commissioners action. The following applications shall be reviewed and decisions rendered by the board of commissioners: 1. Rezoning (amendment of the official zoning map) of property. 2. Amendment of the future infrastructure map. 3. Amendments to the ULDC. 4. Amendments to the comprehensive plan. 5. Appeals of administrative and zoning advisory board decisions (see section 12.04.00.) 6. Modifications to conditions placed on rezonings. 7. Major modifications to master development plans. 12.01.07. Specifications for digital files. A. General requirements. 1. Final plats required in digital format showing address and lot number inside each lot; all lots must be closed polygons. 2. All drawings shall be geo-referenced to the US State Plane coordinate system, NAD 83, GA West Zone, US Survey Feet. All drawings shall contain a reference survey marker (pin) tied to the Henry County GIS GPS monument network. 3. All features depicted in the drawings shall be surveyed after construction. Henry County, may, from time to time spot check coordinates to ensure accuracy. The table in subsection 12.01.06.C. specifies the features that shall be surveyed. Water system features shall be surveyed at a horizontal accuracy of ≤ 0.3 foot and vertical accuracy of ≤ 0.5 foot. Sewer system features shall be surveyed at a horizontal accuracy of ≤ 0.5 foot and a vertical accuracy of ≤ 0.1 foot. 4. The following feature geometry types shall be shot directly using the survey instrument and tied to the Henry County GIS monument network: a. All point features (hydrants, valves, sewer manholes, etc.); b. All line features at all endpoints, bends, and turns (pipes, etc.); and c. All polygon features at all corners and bends (project boundaries, lots, rights-of-way, etc.). 5. The following feature types are acceptable: Line, polyline, text, and insert. Any other features such as leaders, blocks, etc., shall not be present on the standard Henry County GIS CAD layers. 6. Henry County GIS will provide template (or seed) drawing files upon request. B. Layering. 1. All required layers listed in Henry County GIS CAD layers shall contain only the features that are described for that layer. For example, the BOUNDARY_LINE layer shall only contain the boundary line and not such features as north arrows or parcels. 2. All required layers shall be present in the drawing except for features that do not pertain to a particular project. For example, some commercial projects may not contain sewer taps as part of the construction and should not be included in the drawing. 3. All layers shall be clearly differentiated from each other. a. Two (2) layers having the names "WATER_LINE" and "WATER_LINES" shall not exist in the same drawing. b. "SEWER_LINE_TEXT" and "SEWER_TEXT" shall not exist in the same drawing. 4. All text shall appear on separate layers from the layers they annotate. For example, text describing a sewer line shall be on the SEWER_LINE_TEXT layer not the SEWER_LINE layer. 5. Text leaders shall be placed on the text layer, not the feature layer. For example, the leader for the diameter of a water pipe shall be on the WATER_LINE_TEXT layer, not the WATER_LINE layer. Leaders shall be drawn using line features not leaders. C. Drawing. 1. All layers shall conform to the proper geometry type (line, polygon, text) as indicated in the table below. Layer Name Type Layer Contents Surveyed ADDRESS_TEXT Text Street postal address number No CASING Poly Water and sewer line casing Yes CASING_TEXT Text Text associated with CASING No EASEMENT_EXISTING Poly Existing water and sewer easements Yes EASEMENT_EXISTING_TEXT Text Existing water and sewer easement text No FDC Insert Fire department connection Yes FIRE_HYDRANT Insert Fire hydrants Yes FIRE_HYDRANT_EXISTING Insert Existing fire hydrants Yes FIRE_HYDRANT_TEXT Text Text associated with FIRE_HYDRANT layer No FIRE_HYDRANT_VALVE Insert Fire hydrant valves Yes FIRE_HYDRANT_VALVE_EXISTING Insert Existing fire hydrant valves Yes HORIZONTAL_AND_VERTICAL_ CONTROL_POINT Line Survey control points (rebar or monuments) with x, y, z coordinates Yes HORIZONTAL_AND_VERTICAL_ CONTROL_TEXT Text Text associated with HORIZONTAL_AND_VERTICAL_ CONTROL_POINT No LAND_LOT_LINE Line Land lot lines No LAND_LOT_LINE_TEXT Text Land lot numbers and other text No LOT_NUMBER_TEXT Text Individual lot numbers. No PROJECT_BOUNDARY Poly The boundary line of the subdivision or commercial property Yes PROJECT_BOUNDARY_TEXT Text Text labels for the project boundary line No PROPERTY_LINE Poly Property lines (parcel lines) Yes Layer Name Type Layer Contents Surveyed PUMP_STATION Poly Walls of the sewer pump (lift) station Yes PUMP_STATION_TEXT Text Text associated with PUMP_STATION No ROAD_EDGE_OF_PAVEMENT Poly Street edge of pavement (not back of curb) Yes ROAD_RIGHT-OF-WAY Poly Road right-of-way Yes ROAD_RIGHT-OF-WAY_TEXT Text Text relating to the ROAD_RIGHTOF-WAY No ROAD_TEXT Text Road Names No SEWER_EASEMENT Poly Sewer easements Yes SEWER_EASEMENT_TEXT Text Text associated with SEWER_EASEMENT No SEWER_END_OF_LINE Insert End of sewer line (stubbed out for future) Yes SEWER_END-OF-LINE_ TEXT Text Text associated with SEWER_ENDOF-LINE No SEWER_FORCE_MAIN Line Sewer force mains Yes SEWER_FORCE_MAIN_ EXISTING Line Existing sewer force mains Yes SEWER_FORCE_MAIN_ EXISTING_TEXT Text Text associated with SEWER_FORCE_MAIN_EXISTING No SEWER_LINE_TEXT Text Text associated with SEWER_LINE No SEWER_MANHOLE Insert Sewer manholes Yes SEWER_MANHOLE_EXISTING Insert Existing sewer manholes Yes SEWER_MANHOLE_EXISTING_ TEXT Text Text associated with SEWER_MANHOLE_EXISTING No SEWER_MANHOLE_TEXT Text Text associated with the SEWER_MANHOLE layer No SEWER_TAP Line Sewer taps Yes SEWER_TAP_TEXT Text Distance between taps in feet Yes UTILITY_EASEMENT Poly Utility line easement Yes UTILITY_EASEMENT_TEXT Text Text associated with utility easements No WATER_EASEMENT Poly Water easements Yes WATER_EASEMENT_TEXT Text Text associated with WATER_EASEMENT No WATER_END_CAP Line End of line cap Yes WATER_END_CAP_TEXT Text End of line cap text No WATER_LINE Line Water lines Yes WATER_LINE_EXISTING Line Water lines present before the development was built Yes WATER_LINE_EXISTING_TEXT Text Text associated with WATER_LINE_EXISTING No WATER_LINE_TEXT Text Text associated with WATER_LINE No WATER_METER Insert Customers water meters Yes WATER_METER_TEXT Text Text associated with WATER_METER No Layer Name Type Layer Contents Surveyed WATER_SERVICE Line Water service lines Yes WATER_SERVICE_TEXT Text Text associated with WATER_SERVICE No WATER_VALVE Insert Water valves Yes WATER_VALVE_EXISTING Insert Existing water valves Yes WATER_VALVE_EXISTING_TEXT Text Text associated with WATER_VALVE_EXISTING No WATER_VALVE_TEXT Text Text associated with WATER_VALVE No WATER_VAULT Insert Large meter or fire connection vault Yes WATER_VAULT_TEXT Text Text associated with WATER_VAULT No SW_ESMT Poly Stormwater easement Yes SW_ESMT_TEXT Text Text associated with new stormwater easement No SW_POND Poly Stormwater pond Yes SW_POND_TEXT Text Stormwater pond information (wet or dry) No SW_MGMT_SYSTEM_OTHER Insert or poly Other stormwater management system, device, or facility (swales, devices, bio-retention areas, filter strips etc,) Yes SW_MGMT_SYSTEM_OTHER_ TEXT Text Other stormwater management system, device, or facility information No SW_PIPE_EXISTING Line Storm sewer pipe existing prior to development Yes SW_PIPE_EXISTING_TEXT Text Text associated with storm sewer pipe existing prior to development (pipe or culvert size, material, invert in elevation, invert out elevation, slope, and length) No SW_PIPE_NEW Line Storm sewer pipe installed during development Yes SW_PIPE_NEW_TEXT Text Text associated with new storm sewer pipe (pipe or culvert size, material, invert in elevation, invert out elevation, slope, and length) No SW_PIPE_FLOW_ARROW Insert Storm sewer pipe flow arrow No SW_PIPE_END-of-LINE Insert End of storm sewer pipe Yes SW_PIPE_END-of-LINE_TEXT Text End of storm sewer pipe information No SW_STRUCTURE_EXIST Insert Storm sewer structure existing prior to development Yes SW_STRUCTURE_EXIST_TEXT Text Type, rim elevation, diameter, dimensions (x, y, z) for junction boxes, and grate type No SW_STRUCTURE_NEW Insert Storm sewer structure installed during development Yes Layer Name Type Layer Contents Surveyed SW_STRUCTURE_NEW_TEXT Text Type, material, rim elevation, diameter, dimensions (x, y, z) for junction boxes, and grate type No SW-HDWL Insert Storm pipe headwall Yes SW-HDWL-TEXT Text Headwall type and information (size, material) No SW_OUTFALL_OTHER Insert Outfalls other than headwalls Yes SW_OUTFALL_OTHER_TEXT Text Text associated with outfalls other than headwalls No 2. All polygon type features shall be completely closed. Lines may need to be duplicated on more than one (1) layer. a. Subdivision parcels shall be closed figures on their layer (not closed with the subdivision boundary). b. Road edge-of-pavement shall be drawn as closed polygons. c. Where a polygon feature extends beyond the edge of the plan, the property boundary (repeated on the polygon feature's layer) shall be used to close the polygon. d. All edges on polygon features shall be snapped together at the vertices. Gaps in polygon boundaries shall not be accepted. 3. Sewer features. a. Sewer lines and sewer taps shall be digitized with proper directionality: lines shall be drawn from the uphill node to the downhill node or flipped after the lines have been digitized. b. All tangents between sewer manholes shall be drawn with a single line. c. All tangents shall be snapped at endpoints intersecting at the exact center of the manhole. No gaps shall exist between tangents. d. Manholes shall be symbolized consistently with a circle centered exactly on the tangent endpoints. e. Water features. f. Water lines shall be digitized with all straight-line pipes consisting of only two (2) points. Straight-line pipes shall begin and end at the following features (nodes): Hydrants, valves, meters, pumps, tees, crosses, and valves. g. Curves may be digitized with enough vertices to capture the curve geometry. Curves or arcs may also be used to designate curved pipe. h. All water lines shall be continuous, with pipe endpoints snapped to each other at endpoints (nodes). i. End-of-line caps shall be drawn to differentiate end-of-lines from lines that extend beyond the extent of the drawing. Caps shall be drawn for lines that are to be permanently capped when the project is complete, not for lines that are temporarily capped pending inspection. 4. Stormwater features. a. Storm sewers shall be digitized with proper directionality: lines shall be drawn from the uphill node to the downhill node or flipped after the lines have been digitized. b. All tangents between stormwater structures shall be drawn with a single line. c. All tangents shall be snapped at endpoints intersecting at the exact center of the structure. No gaps shall exist between tangents. d. Stormwater structures shall be symbolized consistently with a designated symbol centered exactly on the tangent endpoints. D. Symbolization. Symbols shall be standardized according to examples provided in the Henry County GIS template file. The following "point" features shall be symbolized using standard Henry County GIS CAD symbols and drawn as inserts: E. Annotations. 1. Any nonstandard water and sewer lines shall be annotated as such. Line diameter, material, ownership, etc., that does not conform to standard practice shall be noted in the corresponding annotation layer. For example, standard subdivision sewer lines are eight (8) inches in diameter. Any other diameter shall be annotated on the SEWER_LINE_TEXT layer. 2. All addresses and lot numbers shall be number data type (that is, no text or symbols (#, -, ft, _, ", ', etc.)). If the lot does not have a number, this layer shall be blank. F. File naming and revisions. 1. File names shall correspond exactly to the subdivision name and shall be consistent from one (1) version to the next. The file name shall contain the drawing finalized date (in YYMMDD format) as part of the name. There shall be no blank spaces in the name, only underscores. An example file name for the November 10, 2003, final plat for the third phase of the Monarch Village subdivision is: "Monarch_Village_3_031110." 2. File finalized dates shall only be updated by the contractor/developer and not by Henry County GIS. G. Deliverable format. All files shall be delivered on single disk media in MicroStation or AutoCAD (release 14 or higher) DWG format and DXF software. CDs, four and one-half-inch floppies, and zip disks are all acceptable media. Files shall not be spanned over more than one (1) disk. H. Fee for nonelectronic submittal. An additional charge of twenty (20) percent of the final plat fee or ten dollars ($10.00) per lot, whichever is greater, will be required if a copy of the final revision is not submitted in electronic format. This fee must be paid prior to final plat approval. (Ord. No. 10-20, § I(21), 6-15-10) Sec. 12.02.00. Procedural requirements. 12.02.01. Submittal requirements for all applications. A. All maps, concept plans, development plans, and preliminary and final subdivision plats, though not building plans, shall conform to the following standards: 1. Drawings, except final plats and as-built plats, may be submitted either on paper or in digital files. 2. All final plats, as-built plats, and drawings submitted in digital format shall comply with the specifications set forth in section 12.01.06. UNIFIED LAND DEVELOPMENT CODE § 12.02.00 Valve t><1 V-11111lt D ~ant 0 P.1;t11hQla @ Met.er ~ • Stormw11ber stri:rut:ur,o (to k,1 d tS::1iml.oed) 3. All drawings shall contain the dates of preparation and any revisions. 4. All drawings shall be at the same scale, and shall be a minimum of one (1) inch equals one hundred (100) feet. 5. Drawing sheets shall be not larger than twenty-four (24) inches × thirty-six (36) inches and shall be uniform in size for a submittal. 6. All drawings shall contain a graphic and written scale and a north arrow. 7. All drawings shall contain the name, address, and telephone number of the preparer(s), property owner(s) and developer(s). 8. Drawings for development proposed in phases shall contain all required information for the total site, for each phase, and shall depict phase lines on the drawings. 9. All drawings shall contain the seal and signature of the licensed professional preparing the drawings and computations. 10. All plats shall conform to the following specifications: a. Dimensions shall be accurate to the nearest one-hundredth (0.01) of a foot. b. Bearings and angles: radii, arcs, and central angles of all curves with readings to the nearest second. c. The error of closure shall be not less than one (1) foot in ten thousand (10,000) feet. B. Required support data and plans. 1. Where a site contains, or borders, a cemetery or gravesite, the applicant shall clearly delineate the area on all development plans and construction drawings. The drawings shall indicate that the site shall be enclosed or fenced with a temporary fence or equivalent which allows access but clearly marks the site for protection during construction. In addition, a permanent, ten-foot, natural or landscaped buffer shall be maintained around the site and shown on the final plat. The site shall also be visibly marked before grading is to begin. 2. All preliminary plats and development plans shall be accompanied by a stormwater management plan meeting the requirements of section 8.04.00. 3. Whenever a development proposes to disturb the regulatory floodplain, an engineering study shall be provided, in compliance with the requirements set forth in section 3.01.00. 4. A landscape plan shall include sufficient information to determine whether the proposed landscape improvements are in conformity with the requirements of chapter 5, including the following: a. Identification of all trees, natural features, and manmade structures that will be retained upon the site; b. A description of proposed landscaping improvements and plantings, including the species, size, quantity, and location of trees, shrubs, and other landscaping materials. 5. Whenever a development contains protected open space, a management plan shall be provided, demonstrating compliance with the standards for resource and open space protection set forth in chapter 3 and in section 6.02.01. 6. Whenever a development contains a floodplain or floodway, a floodplain management plan shall be provided, demonstrating compliance with the requirements of section 3.01.00. 7. Applications for new or expanded mines or quarries shall provide information necessary to demonstrate compliance with state and federal laws and regulations. 8. Erosion and sediment control plans shall comply with the requirements of section 8.05.00 and shall contain the following additional information: a. Name and phone number of a twenty-four-hour local contact who is responsible for erosion and sedimentation controls. b. Activity schedule showing anticipated starting and completion dates for the project. Include the statement in bold letters that The installation of erosion and sedimentation control measures and practices shall occur prior to or concurrent with land disturbing activities. c. Stormwater and sedimentation management systems-storage capacity, hydrologic study, and calculations, including off-site drainage areas. d. Vegetative plan for all temporary and permanent vegetative measures, including species, planting dates, and seeding, fertilizer, lime, and mulching rates. The vegetative plan shall show options for year-round seeding. e. Include the statement: Mulch, temporary vegetation, or permanent vegetation shall be completed on all exposed areas within fourteen (14) days after disturbance ceases. f. Delineation of disturbed areas within project boundary. g. Detailed drawings and narrative notes to demonstrate compliance with the erosion and sediment control standards set forth in section 8.05.00 and the requirements in the current edition of the Manual for Erosion and Sediment Control in Georgia. h. Maintenance statement: Erosion and sedimentation control measures shall be maintained at all times. Additional erosion and sedimentation control measures and practices shall be installed if deemed necessary by onsite inspection. i. Existing and planned contours, with ground slope contour intervals of two (2) feet. Location of erosion and sedimentation control measures and practices using coding symbols from the Manual for Erosion and Sediment Control in Georgia. C. Requirements regarding permanent reference monuments. Materials, size, and location shall conform to the following: 1. Steel pins not less than one-half-inch in diameter and thirty (30) inches long, with a survey marker cap showing the land surveyors registration number shall be set at all lot corners. 2. Resetting monuments. Any monuments disturbed by construction or grading shall be reset by the applicant and approved by the administrator. 12.02.02. Requirements for development plans. A. A subdivision plat may be submitted along with a rezoning request. However, the administrator shall not approve the plat until the rezoning request has been granted by the board of commissioners. B. The applicant shall submit the number of copies of development plans and supporting data and supporting plans as specified by the county. C. The applicant shall submit one (1) copy of construction improvement plans to the HCWSA. D. All development plans shall provide the information specified in section 12.02.01 and the following information: 1. All information needed to demonstrate compliance with the site design and development standards in this ULDC. 2. Copies of all state and federal permits, including state and jurisdictional waters identification (delineation) and mapping, must be submitted to the stormwater quality and pollution prevention department for inclusion in the site development/disturbance plan review. Digital copies are encouraged. Proposed development plans will not receive approval without documentation of all necessary state and federal coordination, as required by law; 3. Proposed site developments that include multi-parcel layouts must include a master drainage plan for the complete proposed project site disturbance. Future alteration to site drainage for individual parcels as part of a larger site development plan is not allowed without approval from the stormwater quality and pollution prevention department director or designee. See subchapter 3.03.05(3) for stream buffer requirements regarding master grading project plans; 4. Flood limit identification and mapping must be submitted to the stormwater quality and pollution prevention department for any proposed development site which receives runoff from a drainage basin ten (10) acres in size or larger. As such, no structures or septic system components will be allowed within the ten-acre drainage area, unless the stormwater quality and pollution prevention department director or designee determines that the structure will have no adverse effect to water quality. 5. Depiction of existing uses in adjacent areas. 6. In the case of a resubdivision, a copy of existing plat shall be provided with the proposed resubdivision imposed thereon. 7. Proposed name of subdivision, including unit, phase, and lines separating phases and/or units. 8. Draft of proposed deed restrictions to be imposed. 9. Zoning district of the property, including any special conditions of zoning imposed by the board of commissioners. 10. Deed, record names, and addresses of adjoining property owners or subdivisions, along with zoning of the adjacent parcels. 11. Total area in acres and square feet. 12. Any project proposed to be developed in phases shall provide all information for the total site and for each phase. 13. Topographic contours and vertical intervals of not more than two (2) feet when a new street is proposed. 14. Soil conditions according to U.S. Soil Conservation Service Classifications Manual. 15. Proposed density (both gross and net) and lot layout, consistent with the requirements of the future land use map of the comprehensive plan, including lot and block numbers and/or letters. Layout of all lots shall indicate building setback lines, lot dimensions, and lot area. Lots with detention ponds shall meet minimum zoning area requirements outside the area of the detention pond. 16. For mixed use projects, including development in the OI, MU, and IAC zoning districts, drawing notes shall include a table summarizing the total amount of development in each use, the percentage of the total site, net density of proposed residential development. 17. Location of existing and platted property lines, location, width, and names of all platted roads, railroads, utility rights-of-way, public areas, existing buildings or structures. 18. Show all existing and proposed easements. Show drainage easements for storm drainage pipes which cross individual lots. 19. Protected open space. 20. Depiction of natural features on the site and adjacent areas, including streams, lakes, other water bodies, wetlands, designated groundwater recharge areas, land subject to a 100-year flood hazard, including contour elevations, and geologic features, and other protected environmental features, as set forth in chapter 3, including an outline of wooded areas, vegetation, and surface drainage, together with information on methods for protection of natural features as required in this ULDC. State if elevations are taken from a surveyed stream on a FEMA map or if the elevations are from an independent study (HEC-2, QUICK-2, etc.). Flood elevations on any lots within a 100-year flood hazard area shall be shown. In addition, the foundation elevation that is a minimum of three (3) feet above the established 100-year flood evaluation shall be shown. This data may be shown either on the layout or in tabular form. 21. Wetland areas shall be field located. Notation whether live streams and/or wetlands lie within this subdivision, or unit and phase. Provide a copy of wetlands delineation report from a qualified professional with training and experience in wetland delineation following the guidelines of the latest version of the Army Corps of Engineers Wetlands Delineation Manual. 22. Proposed buffers, landscaping, and tree protection as required by chapter 5. This shall include the location, size, and type of proposed plant materials. 23. Location of proposed buildings to be used for commercial, industrial, recreational or public facility uses, consistent with the requirements of chapter 4. 24. Details regarding other proposed structures or additions to existing structures, including accessory structures and signs. 25. Layout and names of proposed roads, alleys, public walkways/bikeways (i.e., sidewalks, trails, paths, bicycle facilities), with width of pavement and rights-of-way. Total lineal feet of proposed roads (per phase and total) shall be indicated. The proposed road system shall conform to the future infrastructure map and the requirements of section 8.01.00. 26. Construction plans of streets including typical cross section and grade profiles. Show percent of each grade and length of each vertical curve. 27. Show the centerline stopping distance for all points of access onto county roads. Show posted speed limit of existing county roads. 28. Existing sewers, water mains, drains, culverts or other underground facilities within the tract or within the right-of-way of boundary roads with sizes, grades, and invert elevations from field surveys or other sources. All sizes and data on all utilities shall be provided. Location of proposed public facilities such as sanitary sewers, water mains, storm drainage facilities, culverts, bridges, and other underground or aboveground facilities within the parcel to be developed, or within the rights-of-way of roads bordering the parcel, with sizes, grades and invert elevations from field surveys or other sources, consistent with the requirements of chapter 8. 29. Construction plans of sanitary sewers with grades, service, pipe size, and points of discharge and connection to other trunk or lateral sewers. 30. Construction plans of storm drainage systems with pipe sizes, length, grade, location of outlets, runoff and velocity calculations, etc. All storm drainage systems carrying off-site runoff shall be designed for the 100-year storm event. All storm pipe within the county right-of-way shall be approved by the county. 31. Construction plans of water supply system with pipe sizes and location of hydrants, valves, and all appurtenances. 32. Final contours. In some cases, the street profiles will suffice in showing the amount of cut and fill; however, in many cases, final contours need to be shown on the plans. 33. Any structural practice used shall be explained and illustrated with detail drawings. 34. Show the following notes on all plans: a. A twenty-foot storm sewer and sanitary sewer easement exists along each property line and along each lot line, centered on lot lines, for future drainage and sanitary sewer lines. b. All storm drains shall be extended to the rear setback line. c. Grade stakes shall be set on all streets prior to any street grading. An as-built subgrade centerline profile shall be submitted and approved by county prior to the installation of curb and gutter or waterlines. d. An as-built detention pond detail and revised hydro study shall be submitted to the county prior to the final approval. e. All undisturbed buffers shall be field located; staked and flagged or marked with tenzar (or similar type fencing); and shall be submitted to the county for approval prior to grading. E. Applications for development plans within each watershed protection area identified and regulated in section 3.02.00 shall provide the following additional information: 1. The distance of each impervious structure and surface to the nearest bank of an affected perennial stream and reservoir. 2. The location of each perennial stream that crosses or abuts the site. 3. The location of each public reservoir that abuts the site. 4. The location, elevation and orientation of the 100-year floodplain on the site. 5. A certification issued by a registered land surveyor or registered engineer verifying the location of the site as being located either within the water quality critical area, the limited development area or outside of the both areas. 6. Location and detailed design of any spill and leak collection systems designed for the purposes of containing accidentally released hazardous or toxic materials. F. Administrative action. 1. The administrator shall make a determination of completeness as set forth in section 12.01.02. 2. When an application for development plan has been determined to be complete, the application and all accompanying information shall be distributed to all required reviewers. 3. The plan review process shall include a determination of compliance with the regulations of this ULDC by the administrator and recommendations for any changes necessary to improve the subdivision. 4. If the development plan is determined to be deficient by the administrator or the HCWSA, it shall be returned to the applicant for changes and corrections. 5. A development plan may be approved with conditions. If the development plan is approved with modifications, the conditions shall be indicated on the plat. A copy of the plat with changes indicated shall be returned to the applicant, who shall have the revisions made by the engineer, surveyor, or landscape architect who prepared the plat before the final plat is submitted for approval. 6. A soil erosion and sedimentation control plan, when in compliance with the standards for erosion and sedimentation control as set forth in section 8.05.00, shall be approved prior to issuance of a building or development permit to begin construction. 12.02.03. Requirements regarding improvements. A. Pre-construction review and approval. 1. Prior to grading, the applicant shall arrange a pre-construction conference. The preconstruction meeting shall include a review of the soil erosion and sedimentation control plan, street cross sections and profiles, construction specifications, procedures for inspections and testing, stormwater drainage and detention facilities, and any other matters concerning the development. The applicant shall provide a list of names, telephone numbers, addresses, and business license numbers of all contractors and subcontractors employed on a job. A separate pre-construction meeting is required with the HCWSA prior to any water or sanitary sewer installation. 2. A development permit shall be issued only after the approval of the construction improvements plans and soil erosion and sedimentation control plan. Site grading shall be limited only to those areas clearly defined on the approved plans. Any site grading which is done without an approved soil erosion control plan and development permit is a violation of this ULDC and shall result in enforcement penalties as provided by sections 12.06.00 and 12.07.00. In instances where grading has occurred prior to issuance of a development permit, or when grading has exceeded the area approved according to the approved plans and development permit, the permit fee amount shall be doubled. Any violations of the conditions or limitations imposed by the development permit shall also be subject to penalties provided by section 12.07.00. B. Inspections. 1. [Requests for inspections.] The applicant is responsible for making requests for inspections before beginning any of the stages indicated below. No grading shall commence without an approved soil erosion and sedimentation control plan and a development permit. Soil erosion prevention measures shall be installed prior to grading. 2. Inspection notification. The applicant shall notify the development inspection department at least twenty-four (24) hours before any stage of construction begins. If construction during any phase is stopped or delayed due to inclement weather or other reasons, the applicant shall notify the development inspection department twenty-four (24) hours before commencing construction activity again. 3. Clearing and grubbing. After providing the notice in paragraph B.2. above, clearing of the right-of-way may begin. 4. Street grading. Following inspection and approval of the street clearing and grubbing, and street grade stakes have been set by the project's engineer, the contractor may proceed with the grading of the streets. Compaction tests shall be made as directed by the county to determine that the required ninety-five (95) percent maximum dry density is being achieved. At least one (1) test shall be made over each storm drainpipe when it has been covered with eighteen (18) inches of back fill material. 5. Curb and gutter. Following the installation of all proposed sanitary sewer lines, if required, and acceptance of the street grading the contractor may proceed with the construction of the curb and gutter. 6. Subgrade compaction. Following the completion and approval of the street grading and installation of curb and gutter the contractor may proceed with the preparation of the subgrade. Compaction tests shall be made as directed by the county to determine that the required one hundred (100) percent maximum dry density is being achieved. 7. Base preparation. After the street subgrade has been inspected and approved, the contractor may proceed with the construction of the street pavement base. Compaction tests shall be made as directed by the county to assure that the required one hundred (100) percent maximum dry density has been achieved. Cores shall be taken as directed by the county to determine the constructed thickness of the base course. 8. Paving. After the road base has been approved and accepted by the county, and the HCWSA has approved the video of the sanitary sewer (if the property has sewer lines), the contractor may proceed with the construction of the asphaltic concrete binder and/or surface courses. Compaction tests shall be made as directed by the county to assure that the required ninety-eight (98) percent maximum has been achieved. 9. Street core tests. Street core test results shall be submitted and approved prior to the recording of a final subdivision plat. These cores shall be taken as directed by the county immediately upon completion of the surface course. 10. Soil erosion and sedimentation control. During all of the stages of inspection, soil erosion, and sedimentation control measures shall be inspected. The subdivision shall be subject to soil erosion and sedimentation control inspection at any other times determined necessary to assure compliance with the approved plan. The applicant is responsible for continued maintenance of all soil erosion and sedimentation control measures. 11. Work stoppage. A stop work order may be issued at anytime if it is determined to be necessary due to failure of the applicant to comply with any of the requirements of this ULDC. A stop work notice shall be posted on the site and the applicant shall be notified in writing concerning the reasons for the stop work order. Any work which proceeds in violation of a stop order shall be subject to the penalties as prescribed in section 12.07.00. 12. Work delays. If construction during any phase of development is delayed due to inclement weather or for other reasons, the applicant shall notify the county prior to resuming construction activity. 13. [Street improvements.] Street improvements shall be inspected by the county as follows: a. Check results of subgrade, base, and embankment compaction tests and depth. b. Inspect for compaction around all drainage pipes and drainage structures. c. Inspect and document the alignment and condition of curb and gutter equipment. d. Check fill material before authorizing use. e. Inspect and document concrete pours for curbs and headwalls. f. Inspect and document paving machine adjustments. g. Inspect and document the placement of asphalt pavement for compliance with material and weight specifications. Check core testing results. h. Obtain from the applicant all records of asphalt mix and materials quantities. i. Require as-graded street profiles and review for compliance to the approved construction plans prior to installing any curb and gutter or base material. 14. [Storm drainage improvement inspections.] Storm drainage improvements shall be inspected by the county as follows: a. Inspect cross drainpipes to assure that metal pipe is properly coated and sized according to plans. b. Reject any defective pipe and assure that it is not used on the job. c. Observe pipe-laying operation to assure that pipes are true to line and grade, properly located, and bedding and back fill is compacted according to specifications. Document the depth and type of bedding, trench conditions, and back filling operations. d. Inspect riprap or concrete head walls for proper installation; ensure that drainage catch basins and manholes are installed properly. e. Inspect drainage ditches within the street right-of-way and drainage easements within the subdivision to assure proper embankment slope and grade according to specifications. f. For enclosed storm drainage systems, inspect to ensure that pipes are true to line and grade. Storm drain sewer pipes on steep slopes, greater than twelve (12) percent, shall be checked to see that they are properly anchored. Inspect pipe materials and document pipe manufacturer, class and size. Pipe materials for storm sewers shall be approved by the county. Inspect to ensure that sewers are laid with uniform slope between structures and have straight alignments between structures. g. Inspect stormwater detention facilities to assure compliance with approved plans capacity volumes and county construction standards. 15. [Sanitary sewer and water main inspections.] Sanitary sewer and water main improvements shall be inspected by the HCWSA. C. Action following completion of improvements. Once the proposed improvements are substantially in place, and the applicant is seeking final approval from the county, the applicant shall submit six (6) copies of the final plat for review and comment. The final plat shall conform substantially to the preliminary plat as approved. The final plat may include only that portion of the land area depicted on the preliminary plat which has been developed and is to be recorded, provided that it complies with all requirements of this ULDC. 1. The final plat shall be prepared by a registered professional engineer, surveyor, or landscape architect, at a scale of one hundred (100) feet or less to the inch and shall provide the following information: a. Name of the subdivision, including unit and/or phase of development (if applicable). b. North point, scale, and date. c. Names and addresses of the owners of record of the property to be subdivided. d. Developer name, address, and phone number(s). e. Name, addresses, phone number(s), and registration seal of the engineer, surveyor, or landscape architect who prepared the final plat. f. Certification by surveyor that all monuments exist and their sizes, locations, and materials are correctly shown on the plat. g. Legal description of the property including reference to land lot and district lines, street right-of-way lines, easements and other rights-of-way, property lines of lots and other sites with accurate dimensions to nearest one-hundredth (0.01) of a foot; bearings and angles on all lines, radii, arcs, and central angles of all curves with readings to the nearest minute. h. Blocks designated by letter and lots by numerical order. i. Current zoning, including setbacks and any special conditions placed on the rezoning of the property, or, stipulated in deed restrictions or restrictive covenants (i.e., minimum house size, type of construction). j. The layout of the subdivision, including the following information: i. All street right-of-way boundaries, street names, addresses, tax identification numbers, bearings, angles of intersection, and right-of-way and easement widths. ii. The lengths of all arcs, including radii, points of curvature, tangent bearings, and the length and bearing of the long cord of every arc. iii. Drainage, sanitary sewer, and utility easements along all side and rear lot lines and watercourses as required. iv. Detention pond maintenance and access easement to be shown, minimum twenty (20) feet to a public right-of-way. v. Location of all storm drains including pipe sizes. vi. Any buffer areas required in the ULDC, including statements whether or not the buffer areas are to be landscaped, undisturbed, fenced, or a combination-type buffer. vii. All lot lines measured to hundredths (0.01) of a foot. The bearings shall be indicated for all lot lines to the nearest second. The error of closure should not be less than one (1) foot in ten thousand (10,000) feet. viii. Individual lot sizes measured in square feet. This figure may be placed on the lot or in a table with addresses and tax parcel identification numbers. All lots with detention ponds must meet the minimum zoning area requirements outside the area of the detention pond. k. The outline of all property to be dedicated or reserved for public use, or to be reserved for common use of all property owners in the subdivision with the purpose of the dedication or reservation indicated. This shall include cemeteries or grave sites. l. Location of sidewalks and pedestrian and/or bicycle ways. m. Location and elevation of any 100-year flood hazard area, including the foundation elevation which is one (1) foot above the established 100-year flood elevation for each lot located within the flood hazard area. n. Notation that live streams and/or wetlands lie (do not lie) within this subdivision, or unit and phase. If wetlands do lie within this subdivision, or unit and phase, the plat must include the following notation: "Wetlands shown on this plat are under the jurisdiction of the U.S. Army Corps of Engineers. Lot owners may be subject to penalty by law for disturbance to these wetland areas without proper authorization." o. Copies of all materials test results for base and asphalt paving. p. Verification by the county that all required inspections have been made and approved and the improvements to the subdivision, including street construction, sidewalks, drainage systems, right-of-way seeding, are in compliance with approved plans, all underground utilities have been installed, and street and traffic signs installed by the county. q. Verification from the county that the soil erosion and sedimentation control for the subdivision is in compliance with the approved soil erosion and sedimentation control plan. r. Verification by the HCWSA that all requirements have been met, including submission of required documents and inspections. s. Notation that Henry County assumes no responsibility for the overflow or erosion of natural or artificial drains beyond the extent of the right-of-way, or for the extension of culverts beyond the points shown on the plat, and as required by Henry County. t. Notation that all storm drains shall be extended a minimum of thirty (30) feet behind any future residence or building. u. Notation listing all utilities to be provided. 2. As-built drawings shall be submitted as follows: a. The as-built drawing(s) shall be prepared by a professional engineer or surveyor, registered in the State of Georgia, at a minimum of one (1) inch equals one hundred (100) feet. As-built drawings shall also be submitted in digital format, in compliance with the specifications in section 12.01.06. b. As-built construction plans for all water and sewerage facilities submitted to and approved by the HCWSA. c. As-built construction plans for storm drainage system with grade, pipe sizes, and location of outlets and other drainage structures, street profiles, and stormwater management facilities. d. As-built drawings of streets, storm drainage systems, and stormwater detention. The minimum required as-built information to be submitted with the final plat application includes the following: i. The existing center line profile of all newly constructed streets. ii. The size, material, length, slope, invert elevations, and accurate location of all storm drain pipes (this information can be shown on the plan view). iii. The top and invert elevations of all drainage structures. iv. An as-built topographical survey of all detention basins and details of existing outlet structures. Calculations showing volumes and outflow rates. 3. When the final plat has been reviewed and approved by the administrator, the applicant shall supply one (1) original drawing of the final plat on mylar or sepia in black ink, as well as five (5) copies of the final plat to the administrator. The minimum size shall be eight and one-half (81 /2) by eleven (11) inches and the maximum size shall be seventeen (17) by twenty-two (22) inches. In addition, all other necessary documentation for recording shall be submitted at this time. 4. Protective covenants or deed restrictions, if any, shall be attached in a form for recording. 5. After completion of the physical development of the subdivision, the applicant shall contact the administrator for a checklist specifying the procedure in obtaining the various approvals from county departments which will release the subdivision for final [approval]. 6. The applicant shall provide a letter of credit or maintenance bond meeting the requirements of section 12.02.13, to guarantee the maintenance of infrastructure and improvements. 7. For developments with multiple phases of construction, the administrator shall require that portions of a previously approved phase be placed under an extended letter of credit or maintenance bond if the previously approved phase is used as access for construction traffic for the development of future phases. A plan showing the various streets that will be used as access for the construction traffic through the previously approved phase shall also be provided. The duration of such an extended letter of credit or maintenance bond shall not exceed three (3) years from the date of approval of the final [plat] for the final phase of the development. 8. A letter of credit or maintenance bond shall be released at the end of the three-year period. Ninety (90) days prior to expiration, a final inspection of all subdivision improvements shall be performed by the county to determine the need for any repairs. If repairs are necessary, the administrator shall provide written notice to the applicant. 9. If the applicant fails to take the necessary action to make repairs within thirty (30) days of notification by the county, the administrator shall authorize the surety or bank issuing the letter of credit or maintenance bond to release to the county all funds. 10. The administrator may require the letter of credit or maintenance bond to be extended to ensure the completion of repairs started but not completed by the application for a period not to exceed one hundred eighty (180) days. 11. When the final plat has been reviewed and approved by the administrator, the applicant shall submit the final plat in digital form, complying with the specifications in section 12.01.06. 12. Both the director of environmental compliance and plan review department and the director of the planning and zoning services division shall approve the final plat with a signature. The following notation shall be included on the final plat: "This plat is hereby approved for recording: By: , Director, Henry County Planning and Zoning Services Division Date: "This plat is hereby approved for recording: By: , Director, Henry County Department of Environmental Compliance and Plan Review Date: * Within the jurisdiction of a city for which the county, by agreement, has the responsibility to review the final plats, the notation shall be changed to reference the mayor of that respective city in lieu of the director of planning and zoning services division. 13. Once the final plat has been signed, the applicant shall be notified to pick up the mylar and prepare twenty-two (22) required copies for distribution. Three (3) original copies will be returned to the applicant for recording. Copies shall be distributed as necessary to county departments and utility companies. For projects located within the jurisdiction of a city, for which Henry County has an agreement to handle the final platting requirements, county staff will reference the applicable code section for that particular jurisdiction and adhere to their noted requirements. 14. The applicant shall be responsible for properly recording final plat at the clerk of the superior court of Henry County. 12.02.04. Requirements regarding dedication of public improvements or public sites. A. A plat is required for the dedication to the county of right-of-way, public improvements, and sites for public purposes. Public improvements may include streets, sewer lines, or water lines, outside of an area to be subdivided or developed, and which will provide access or service to development, or which will serve future development in an area. Sites for public purposes may include parks and recreation sites, school sites, site for public safety facilities, sites for water treatment facilities, sites for sewer treatment facilities, or sites for other public buildings. B. Land dedicated for public purposes to the Henry County Board of Commissioners or the HCWSA shall be eligible for credits toward any development impact fees adopted by the county. C. When a site is dedicated for public purposes to the appropriate county authority (board of commissioners, board of education, HCWSA), the land shall be transferred by a deed and dedication plat and recorded by the clerk of superior court, following acceptance by Henry County. 1. Park and recreation sites shall be first recommended by the zoning advisory board and recreation board prior to action for acceptance of dedication of the site by the board of commissioners. 2. The board of education shall review the location and need for the school sites, and decide whether or not to accept dedication of a site within ninety (90) days of receipt of a preliminary plan, or preliminary plat and construction improvements plans. The board of education shall consult with the zoning advisory board for recommendation on school sites. If the board of education decides to accept dedication of the site for a school, it shall notify the board of commissioners. The board of commissioners shall then direct the administrator to have the deed and dedication plat recorded by the clerk of superior court. 3. Land dedication for fire or police stations, public buildings, and other public works that are non-rights-of-way related, shall be transferred to the county by a deed and dedication plat and recorded by the clerk of superior court, following acceptance by the board of commissioners. Right-of-way deeds and dedication plats associated with subdivisions shall be transferred to the county through the final plat process, in accordance with the provisions detailed in section 12.02.03, and shall only require the signatures of the environmental compliance and plan review director, and the planning and zoning services division director, or in the case where the subdivision is located within the jurisdiction of a city for which the county has an agreement to review the final plats, the signature of the mayor of that respective city shall be referenced in lieu of the signature of the planning and zoning services division director. 4. Land dedicated for water and sewage treatment facilities and other facilities under jurisdiction of the HCWSA shall be recorded following approval of the HCWSA. D. The review of a dedication plat may include approval of a preliminary plat, construction improvement plans, a final plat, and as-built construction plans. The approval process for dedication plats shall be the same as for a final subdivision plat. A letter of credit shall be required for all public improvements as required for final plats (see section 12.02.13). E. When a site is determined necessary for public purposes by the county, and the applicant elects to reserve rather than dedicate the site, then it shall be reserved for public purposes. The applicant shall allow a period of one (1) year from the date of preliminary plat and construction improvements plan approval, during which time the county may authorize and complete the purchase of the site. During the one-year period for acquisition, the applicant may proceed with the necessary approvals for subdivision of the remainder of the development of the reserved tract. 12.02.05. Requirements for development plans for a manufactured home development. A. The application shall be accompanied by eight (8) copies of a development plan and a narrative report summarizing the development concept and time schedule. B. The development plan shall comply with the submittal requirements in section 12.02.02 and shall include the following additional information: 1. Details demonstrating compliance with the requirements of section 4.03.16 regarding manufactured home parks and developments, including the proposed location of all lots or pads, buffers, required recreation areas, structures, and appurtenant facilities. 2. If the manufactured home development is proposed as a subdivision, all information required for a subdivision plat. 3. Detailed information regarding placement of all improvements, in compliance with the requirements set forth in chapter 8. C. The narrative report shall include the following information: 1. A summary of acres, dwelling units, and net density, as well as a statement of the number of acres devoted to buffer areas, recreation acres, and green belts, or other amenities, such as lakes, etc. 2. A description of the phases under which construction shall be programmed, depicting the geographical limits of each phase of construction. 3. A draft of the proposed rules and regulations which shall be established and enforced by management if the development is a mobile home park. 4. A draft of the text of covenants running with the land which shall be binding on the applicant and/or any future owner of the property so long as the property is used as a mobile home development, which shall provide for perpetual upkeep and maintenance in a clean and healthy state, all grass, lawns, shrubbery, trees, recreation areas, and other natural amenities of the property including buffer zones. Said covenants shall be drawn to the satisfaction of, and subject to approval of Henry County, and Henry County shall be made a party thereto having full powers of enforcement at law or equity or otherwise. Upon approval by the county attorney, said covenants shall be recorded in the superior court of Henry County and the recording of said covenants shall be a condition precedent to any development, defoliation, or other construction on the property. 5. In addition, typical elevation drawings, including general architectural style and buildings exterior materials, if possible, of all permanent buildings and structures to be constructed on the premises shall be submitted. 12.02.06. Requirements for permits. (Note: Permits required by the International Building, Gas, Mechanical and Plumbing Codes, the National Electrical Code and the International Residential Code shall also comply with the requirements set forth in Appendix B, Administration of Building and Technical Codes.) A. Generally. 1. Applications for permits shall be submitted on forms provided by the county. 2. Applications shall be accompanied by payment of fees as required by each department's most recently approved fee schedule. 3. Applications shall be accompanied by plans, drawings, or other documents as required by the county. 4. All permit applications shall be complete prior to processing. B. Sign permits generally. 1. In addition to the general submittal requirements, an applicant for a sign permit shall provide the following information: a. Address of building, structure, or lot to where the sign is to be attached or erected; b. Position of the sign in relation to nearby buildings or structures, property lines and other signs located on the lot showing compliance with all setback lines required by the county; c. Three (3) sets of accurately scaled color drawings of the plans, contents, specifications, and method of construction and attachment to the building or the ground for the sign as well as a scaled drawing of the site showing drives, structures, and any other limiting site features; d. Name of person, firm, corporation, or association erecting the sign (i.e., contractor or builder); e. Written consent of the owner of the building or lot upon which the sign is to be erected; and f. A written list describing all other signs located on the lot indicating the sign type, size and placement. 2. Sign permits shall be reviewed and approved or denied by the administrator and the building official. Approval or denial shall be based upon the conformance of the plans and specifications with the requirements in the ULDC and with the applicable building code requirements. 3. All permits shall either be issued or denied within thirty (30) days of the submission date. 4. If the application is denied because it does not contain the required information or the information is inaccurate or false, a new application shall be submitted with all of the required information and such application shall be assigned a new submission date. When the application is denied, the administrator shall notify the applicant and state the reason(s) for the denial. 5. Every sign constructed, erected, or maintained for which a permit is required by this ULDC shall be plainly marked with the identification number issued by the building department for the structure firmly affixed to the sign in such manner that the identification number shall be readily visible, accessible for inspection and durable. 6. Displaying an identification number that has been tampered with, altered, or mutilated, or displaying a sign without an identification number shall be a misdemeanor offense punishable in magistrate court. C. Temporary sign permits. 1. Permits may be issued for temporary signs in compliance with the standards set forth in subsection 7.04.07.D. 2. Permits for banners in county parks shall be valid for seventy-two (72) hours. Banners shall be removed at the end of this time period. 3. Permits for other temporary signs shall be valid for thirty (30) days from the date of permit issuance. 4. Permits for temporary signs, other than banners, may be renewed up to three (3) times, without additional application or fees. 5. A temporary sign permit shall not be issued for any lot for more than a twelve-month period. D. Application requirements. 1. Copy of lease or letter of authorization from the property owner evidencing applicant’s authority to pursue the WCF application; 2. The name, address and phone number of the person preparing the report; 3. The name, address, and phone number of the property owner, operator, and applicant; 4. The postal address and tax map parcel number of the property; 5. The zoning district of the subject property and all adjacent properties; 6. A written legal description of the property; 7. Size of the property stated both in square feet and lot line dimensions, and a diagram showing the location of all lot lines; 8. Topography of the property utilizing two-foot contour intervals; 9. The location of adjacent residential structures within one-hundred (100) feet of the property boundary; 10. The location, size and height of all structures on the property which is the subject of the application; 11. All required zoning and support structure setbacks; 12. Number and type of proposed antennas and their height above ground level, including the proposed placement of antennas on the support structure; 13. Certification that demonstrates the need for the WCF. Such documentation shall include all adjoining planned, proposed, in-service or existing sites owned by the applicant or others and propagation studies of the proposed site; 14. When requesting a permit for a WCF greater than one hundred (100) feet within a residential area, a written certification and technical analysis of why a similar structure at a height of less than one hundred (100) feet cannot be used. Documentation shall include a propagation study of the proposed site with a monopole or tower less than one hundred (100) feet. 15. Existing or proposed public rights-of-way, private roads and/or access easements through, on, or adjacent to the subject property. The proposed access driveway or roadway and parking area at the WCF site shall be shown, to include grading, drainage and traveled width, and type of surface materials proposed. A turn-around space and parking shall be provided to assure adequate emergency and service access. Maximum use of existing roads, whether public or private, shall be made to the extent practicable. Road construction shall at all times minimize ground disturbance and the cutting of vegetation. Road grades shall closely follow natural contours to assure minimal visual disturbance and reduce soil erosion. 16. A landscaping plan that conforms to the requirements of the ULDC. The method of irrigation and any proposed removal of vegetation shall be identified. 17. The applicant shall demonstrate and provide in writing and/or by drawing how it shall effectively screen from view the base and all related facilities and structures of the proposed WCFs. 18. Both the WCF and any and all accessory or associated facilities shall maximize the use of building materials, colors and textures designed to blend with the structure to which it may be affixed and/or to harmonize with the natural surroundings. May include the utilization of concealment design as required by the county. 19. WCF plan. For all WCFs, a plan (no larger than twenty-four (24) inches by thirty-six (36) inches with an eleven-inch by seventeen-inch reduced copy) shall include a diagram of the proposed facility and antenna(s), including: A. Elevations to include the following proposed dimensions: height, width and breadth. B. Elevation views of the security barrier or equipment compound, indicating architectural design, exterior appearance and materials, including color. The security barrier shall not be less than six (6) feet in height with anti-climbing devices, as deemed appropriate by the administrator. C. Mounting location on support structure, including height (AGL). D. If a collocation on existing WCF or a concealed attached or nonconcealed attached WCF is proposed, identification of all mounting frames, arms, brackets or other devices or equipment used to hold antennas and other equipment in place. E. Certification that the WCF, the foundation and all attachments are designed and will be constructed to meet all applicable and permissible local codes, ordinances, and regulations, including any and all applicable county, state and federal laws, rules, and regulations, including, but not limited to, the most recent editions of the National Electrical Safety Code and the National Electrical Code, as well as accepted and responsible workmanlike industry practices and recommended practices of the National Association of Tower Erectors. F. If a freestanding WCF is proposed, it shall be demonstrated that the structure will be able to accommodate additional antenna, as required by section 7.05.09. Where a certification is called for in this section, such certification shall bear the signature and seal of a professional engineer licensed in the State of Georgia. E. Residential land disturbance (outside of a watershed protection area). 1. Applicants for the residential land disturbance permit shall provide a proposed site plan, drawn to scale by a registered surveyor or engineer, showing the lot, rights-of-way, easements, buffers, all preserved areas of trees, direction of drainage and proposed placement of the septic system, if any. Such plan shall also show the proposed location of all erosion control devices, setback lines, building size, location of the building on the lot, driveway, and the location of all other structures on the site. 2. A permit shall be issued upon submittal of the application and the required permit fee; however, land disturbance is not to proceed until an inspector has visited and approved an initial inspection verifying that the application complies with the ULDC. 3. Additional inspections may be made, as necessary at the discretion of the administration, in order to verify compliance with the requirements for erosion control in section 8.05.00 and tree protection in section 5.03.00. F. Other land disturbance (outside of a watershed protection area). Applications for permits for any land-disturbing activity for any development shall meet the general requirements for all applications, shall include an erosion and sedimentation control plan as required in subsection 12.02.01.B.8., and the following additional information: 1. In addition to the local permitting fees, fees shall also be assessed pursuant to O.C.G.A. § 12-5-23(5)(a), provided that such fees shall not exceed eighty dollars ($80.00) per acre of land disturbing activity, and these fees shall be calculated and paid by the primary permittee as defined in the state general permit for each acre of land disturbing activity included in the planned development or each phase of development. All applicable fees shall be paid prior to issuance of the land disturbance permit. In a jurisdiction that is certified pursuant to O.C.G.A. § 12-7-8(a), half of such fees levied shall be submitted to the division; except that any and all fees due from an entity which is required to give notice pursuant to O.C.G.A. § 12-7-7 shall be submitted in full to the division, regardless of the existence of a local issuing authority in the jurisdiction. 2. Approval by the Henry County Soil and Water Conservation District (district). Immediately upon receipt of an application and plan for a permit, the county shall refer the application and plan to the district for its review and approval or disapproval concerning the adequacy of the erosion and sedimentation control plan. The district shall approve or disapprove a plan within thirty-five (35) days of receipt. Failure of the district to act within thirty-five (35) days shall be considered an approval of the pending plan. The results of the district review shall be forwarded to the county. Such review shall not be required if the county and the district have entered into an agreement which allows the county to conduct such review and approval of the plan without referring the application and plan to the district. 3. Identification of any violations of previous permits, the requirements of section 8.05.00, or the Erosion and Sedimentation Act, as amended, within three (3) years prior to the date of filing of the application under consideration. 4. Proof of irrevocable letter of credit. 5. Proof of payment of all ad valorem taxes levied against the property. 6. No permit shall be issued by the administrator unless the erosion and sedimentation control plan has been approved by the district and the administrator has affirmatively determined that the plan is in compliance with the requirements of section 8.05.00. If a letter of credit is required, the permit shall not be issued until the requirements regarding the letter of credit have been satisfied. 7. If the permit is denied, the reason for denial shall be furnished to the applicant. 8. If the tract is to be developed in phases, then a separate permit shall be required for each phase. 9. The permit may be suspended, revoked, or modified by the administrator, as to all or any portion of the land affected by the plan, upon finding that the holder or his successor in the title is not in compliance with the approved erosion and sedimentation control plan or that the holder or his successor in title is in violation of this ULDC. A holder of a permit shall notify any successor in title to him as to all or any portion of the land affected by the approved plan of the conditions contained in the permit. G. Permits for land disturbing activity within a watershed protection area. 1. Within a watershed protection area, established as set forth in section 3.02.00, no land disturbing activity, construction, or other development, other than specifically exempted activities, may be conducted without a permit. 2. The following land use activities are exempted from the development review and permit requirements of this section: a. Agriculture and forestry. Normal agricultural and forestry activities involving planting and harvesting of crops are exempted if they conform to best management practices established by the Georgia Department of Agriculture. Silvicultural activities shall conform to best management practices by the Georgia Forestry Commission. b. Mining activities. All mining activities that are permitted by the Georgia Department of Natural Resources under the Georgia Surface Mining Act, as amended, are exempted. H. Permits for timber removal. Applications for permits for timber removal shall follow the requirements below: 1. § 12-6-24. Notice of timber harvesting operations. (a) (1) A county governing authority may by ordinance or resolution require all persons or farms harvesting standing timber in any unincorporated area of such county for delivery as pulpwood, logs, poles, posts, or wood chips to any wood yard or processing plant located inside or outside this state to provide notice of such harvesting operations to the county governing authority or the designated agent thereof prior to entering onto the property if possible, but in no event later than twenty-four (24) hours after entering onto the property. Further, such persons shall give notice of cessation of cutting within twenty-four (24) hours after the job is completed. (2) A municipal governing authority may by ordinance or resolution require all persons or firms harvesting standing timber in any incorporated area of such municipality for delivery as pulpwood, logs, poles, or wood chips to any wood yard or processing plant located inside or outside this state to provide notice of such harvesting operations to the municipal governing authority or the designated agent thereof prior to entering onto the property if possible, but in no event later than twenty-four (24) hours after entering onto the property. Further, such persons shall give notice of cessation of cutting within twentyfour (24) hours after the job is completed. (b) Any ordinance or resolution adopted pursuant to subsection (a) of this Code section shall conform to the following requirements: (1) Prior written notice shall be required of any person or firm harvesting such timber for each separate tract to be harvested thereby, shall be made only in such form as prescribed by rule or regulation of the director, and shall be limited to the following: (A) A map of the area which identifies the location of the tract to be harvested and, as to those trucks which will be traveling to and from such tract for purposes of picking up and hauling loads of cut forest products, the main point of ingress to such tract from a public road and, if different, the main point of egress from such tract to a public road; (B) A statement as to whether the timber will be removed pursuant to a lump sum sale, per unit sale, or owner harvest for purposes of ad valorem taxation under Code Section 48-5-7.5; (C) The name, address, and daytime telephone number of the timber seller if the harvest is pursuant to a lump sum or per unit sale or of the timber owner if the harvest is an owner harvest; and (D) The name, business address, business telephone number, and nighttime or emergency telephone number of the person or firm harvesting such timber; (2) Notice may be submitted in person, by transmission of an electronic record via tele facsimile, e-mail, or such other means as approved by the governing authority, or by mail; (3) The governing authority may require persons or firms subject to such notice requirement to deliver a bond or letter of credit as provided by this paragraph, in which case notice shall not be or remain effective for such harvesting operations unless and until the person or firm providing such notice has delivered to the governing authority or its designated agent a valid surety bond, executed by a surety corporation authorized to transact business in this state, protecting the county or municipality, as applicable, against any damage caused by such person or firm in an amount specified by the governing authority not exceeding five thousand dollars ($5,000.00) or, at the option of the person or firm harvesting timber, a valid irrevocable letter of credit issued by a bank or savings and loan association, as defined in Code Section 7-1-4, in the amount of and in lieu of such bond. Each county or municipality shall require no more than one (1) bond from each person or firm harvesting timber regardless of the number of tracts harvested in such county or municipality by each such person or firm so long as the bond remains in effect. Otherwise, a valid replacement bond must be obtained and delivered to the governing authority of such county or municipality or its designated agent no later than the close of business on the fifth business day following the day that such governing authority filed a claim to recover damages against the then-existing bond. Upon filing such claim, such governing authority shall immediately provide notice thereof, including the date such claim was filed, to the person or firm causing the damage. Such notice may be given in person, by transmission of an electronic record via tele facsimile, or by e-mail. For purposes of this paragraph, any such surety bond or letter of credit shall be valid only for the calendar year in which delivered; (4) Notice shall be effective for such harvesting operation on such tract within such unincorporated area of the county or incorporated area of the municipality upon receipt of the same by the applicable governing authority or its designated agent and, if applicable, compliance with the requirements of paragraph (3) of this subsection and until such time as the person or firm giving such notice has completed the harvesting operation for such tract; provided, however, that any subsequent change in the facts required to be provided for purposes of such notice shall be reported to the governing authority or its designated agent within three (3) business days after such change; (5) Notice requirements shall be applicable to any such timber harvested on or after the effective date of the ordinance or resolution adopted pursuant to this Code section; and (6) Violation of the notice requirements of any ordinance or resolution adopted pursuant to this Code section shall be punishable by a fine not exceeding five hundred dollars ($500.00). (c) The director shall promulgate such rules and regulations as are reasonable and necessary for purposes of the standard form required by paragraph (1) of subsection (b) of this Code section. (d) Any municipal governing authority or designated agent thereof which receives a notice required by ordinance or resolution adopted pursuant to this Code section regarding timber harvesting operations to be conducted in whole or in part within the corporate limits of such municipality shall transmit a copy of such notice to the governing authority of the county or the designated agent thereof. (e) (1) No county, municipality, or other political subdivision in this state shall require any person or firm harvesting standing timber therein for delivery as pulpwood, logs, poles, posts, or wood chips to any wood yard or processing plant located inside or outside this state to provide any notice of or plan or security for such harvesting or hauling of forest products except as provided by this Code section. (2) No county, municipality, or other political subdivision in this state shall require any person or firm harvesting standing timber therein for delivery as pulpwood, logs, poles, posts, or wood chips to any wood yard or processing plant located inside or outside this state to obtain any permit for such harvesting or hauling of forest products, including without limitation any permit for any new driveway in connection with timber harvesting operations; provided, however, that this paragraph shall not otherwise limit the authority of a county or municipality to regulate roads or streets under its jurisdiction in accordance with Title 32. (3) The provisions of paragraphs (1) and (2) of this subsection shall not preclude counties, municipalities, and other political subdivisions from enacting and enforcing tree ordinances, landscape ordinances, or streamside buffer ordinances; provided, however, such ordinances shall not apply to timber harvesting as described in subparagraph (A) of paragraph (4) of this subsection or in unzone tracts as described in subparagraph (B) of paragraph (4) of this subsection. (4) (A) The limitations on the regulatory authority of counties, municipalities, or other political subdivisions provided by paragraphs (1), (2), and (3) of this subsection shall apply only to timber harvesting operations which qualify as forestry land management practices or agricultural operations under Code Section 12-7-17, not incidental to development, on tracts which are zoned for or used for forestry, silvicultural, or agricultural purposes. (B) The limitations on the regulatory authority of counties, municipalities, or other political subdivisions provided by paragraphs (1), (2), and (3) of this subsection shall also apply to tracts which are unzone. (5) No county or municipality shall require a fee of any kind for receiving a notification of a timber harvest. I. Temporary permits for special events. 1. In addition to the general submittal requirements, an applicant for a temporary permit for a special event shall provide the following information: a. Address of building, structure, or lot to where the special event is to be located; b. A site plan depicting the layout of the proposed special event; c. Written consent of the owner of the building or lot upon which the special event will be located; and 2. Temporary permits for special events shall be reviewed and approved or denied by the administrator. Approval or denial shall be based upon the conformance of the plans and specifications with the requirements in the ULDC. 3. All permits shall either be issued or denied within thirty (30) days of the submission date. 4. If the application is denied because it does not contain the required information or the information is inaccurate or false, a new application shall be submitted with all of the required information and such application shall be assigned a new submission date. When the application is denied, the administrator shall notify the applicant and state the reason(s) for the denial. 5. The number of special events related to event facility uses shall be limited to five (5) per year, having no more than one (1) event facility related special event per month. This limitation is per calendar year and shall be effective the date of the official adoption of this ordinance [Ord. No. 17-06] and shall apply to both the applicant and subject property. Those properties that are zoned RA (Residential-Agricultural) must have an approved conditional use and special event permit, for event facility related uses. J. Permit to disturb a cemetery. No known cemetery, burial ground, human remains, or burial object shall be knowingly disturbed by the owner or occupier of the land on which said subject is located for the purpose of developing or changing the use of any part of such land unless a permit is first obtained from the board of commissioners. 12.02.07. Requirements regarding ownership and management of open space. A. Where open space is required in a proposed development, the open space shall be protected in perpetuity by a binding legal instrument that is recorded with the deed. If the entity accepting an easement is not Henry County, then a right of enforcement favoring Henry County shall be included in the easement. The instrument shall be one (1) of the following: 1. A permanent conservation easement in favor of either paragraph a. or b. below: a. A land trust or similar conservation-oriented nonprofit organization with legal authority to accept such easements. The organization shall be bona fide and in perpetual existence. The conveyance instruments shall contain an appropriate provision for retransfer in the event the organization becomes unable to carry out its functions; or b. A governmental entity that will ensure perpetual management of the open space. 2. A permanent restrictive covenant, recorded on the final plat in favor of Henry County. 3. An equivalent legal tool that provides permanent protection, if approved by the Henry County Board of Commissioners. B. The legal instrument for permanent protection shall include clear restrictions on the use of the open space. The restrictions shall include all required by this ULDC. C. Open space may be owned by a homeowners' or property owners' association. Where such association is established and authorized to own the protected open space, membership in the association shall be mandatory for all owners and their successors within the development containing the protected open space. The association shall be responsible for managing and maintaining the open space and any structures located within the open space. D. A plan setting forth the requirements and procedures to be followed in order to manage the land and the vegetation on the land. Such management shall be consistent with the protection of natural resources on the land, consistent with the requirements of chapter 3. 12.02.08. Specific requirements regarding placement of manufactured homes in single-family residential districts. A. Applications for approval of placement of manufactured homes shall meet the general submittal requirements set forth in section 12.02.05. In addition the application shall provide photographs or renderings of the front and side of the manufactured home or mobile home exterior finish and other information reasonably necessary to make determinations required by this ULDC. B. The administrator shall make a determination of completeness as set forth in section 12.01.02. C. The completed application shall be submitted to the compatibility standards review committee for review and approval or denial. D. Approval or denial of the application shall be made within thirty (30) days of the date of receipt of the application and all required supporting materials. 1. The applicant shall be notified in writing of the approval, conditional approval, or denial of the application within two (2) working days after such decision is made. 2. Conditional approval shall require that the specific conditions and the reasons therefore be stated in writing and be agreed to by the applicant; such conditions shall be binding upon the applicant upon agreement. 3. In the case of disapproval, the reasons therefore shall be specifically stated in writing by designating each specific provision of this ULDC which is not met and an explanation as to the reason or reasons why each such provision is not met. E. Approved manufactured homes and their placements shall be taxed in the same manner as comparable site-built homes within the area where the manufactured home is located. 12.02.09. Requirements for amending the official zoning map (rezoning). A. [Requirements.] The official zoning map may be amended by the board of commissioners on its own motion, on recommendation from the zoning advisory board, or by approval by the board of commissioners of an application from a property owner. An adopted zoning resolution shall be an amendment to the official zoning map. B. [Concept plans.] Concept plans shall be submitted with rezoning applications. Any concept plan shall contain the information required for all applications and the information set forth below: 1. Project name. 2. Vicinity map showing zoning districts and existing land use within five hundred (500) feet of the boundaries of the site. 3. Total area in acres and square feet. 4. Current and proposed zoning classification, together with a summary of the applicable development standards for the proposed zoning district. 5. Natural features, including topography at ten-foot intervals, surface drainage, surface waters, floodplains, watershed areas, groundwater recharge areas, general location of wetlands, and the general location of wooded areas. 6. General location of existing and proposed roads and utility rights-of-way or easements. 7. Location of existing property lines within the development site. 8. General location of existing and proposed development by type of use. 9. Proposed residential density and dwelling unit types, if applicable. 10. Location of proposed open spaces, recreational areas, and public buildings and uses, indicating those areas reserved or dedicated for public use. 11. General plan for the provision of utilities and infrastructure. A report or letter from HCWSA indicating the availability of water and sewer and a report or letter from the Henry County Environmental Health Department indicating septic suitability if sewer is not available. C. Action by the administrator. 1. The administrator shall make a determination of completeness as set forth in section 12.01.02. 2. The administrator shall prepare a staff report addressing the following issues, in priority: a. Consistency with the comprehensive plan. b. The relation that the proposed amendment bears to the purpose of the overall zoning scheme with due consideration given to whether or not the proposed change will help carry out the purposes of this ULDC. c. Potential positive effects of the amendment on the character of the proposed zoning district, a particular piece of property, neighborhood, a particular area, or the community. d. The physical conditions of the site relative to its capability to be developed as requested, including topography, drainage, access, and size and shape of the property. e. The impact upon adjacent property owners shall the request be approved. f. The potential impact of the proposed amendment on county infrastructure including water and sewerage systems. g. The impact of the proposed amendment on adjacent thoroughfares and pedestrian and vehicular circulation and traffic volumes. h. The merits of the requested change in zoning relative to any other guidelines and policies for development which the zoning advisory board and board of commissioners may use in furthering the objectives of the comprehensive plan. i. The ability of the subject land to be developed as it is presently zoned. D. Zoning advisory board recommendation. 1. The application shall be submitted to the zoning advisory board for review at a public hearing, conducted as set forth in section 12.00.05. 2. The zoning advisory board shall review the application according to the published schedule. 3. The zoning advisory board shall submit its report with comments and recommendations according to the published schedule. The recommendations of the zoning advisory board shall be submitted to the board of commissioners. The recommendations of the zoning advisory board shall be of an advisory nature and shall not be binding on the board of commissioners. 4. In making its recommendation, the zoning advisory board may recommend approval, approval with conditions, or denial. Findings shall be set forth in official minutes of the zoning advisory board. E. Board of commissioners action. 1. The board of commissioners shall consider the application for rezoning at a public hearing conducted as set forth in section 12.00.05. 2. The board of commissioners shall consider the information set forth in the staff report and the findings and recommendations of the zoning advisory board. 3. In deciding upon any application for an amendment to the official zoning map, the board of commissioners may, on their own motion or upon the suggestion of the applicant, or on consideration of the recommendations of the zoning advisory board, grant the application subject to certain conditions necessary to promote and protect the health, safety and general welfare. 4. The board of commissioners may include conditions as follows: a. Such conditions as deemed necessary to protect neighboring properties and to lessen any potentially adverse effects of the zoning change; b. Setback requirements from any lot line; c. Specified or prohibited locations for buildings, parking, loading or storage areas; d. Restrictions on land use activities to be permitted; e. Maximum building dimensions and height; f. Landscaping or planted area which shall include the location, type, and maintenance of plant materials within a designated buffer area; g. Fences, walls, earth berms, or other landscape buffer provisions or protective measures; h. Preservation of existing trees and vegetation; i. Special conditions to eliminate or reduce undesirable views, light, glare, dust, or odor; j. Hours of operation; and k. Architectural details to be compatible with existing buildings in the area. 5. A rezoning approved with conditions shall list in writing those conditions agreed to and shall include a requirement for adherence to concept plan, if any, submitted to accompany the application. The applicant or any successor in title shall construct only those uses and only in such a manner as identified in writing or upon the concept plan. 6. Prior to a final vote being taken upon any application for an amendment to the official zoning map for which such conditions shall be imposed, such conditions shall be announced at the public hearing and made a part of the motion to approve. If such conditions are found to be unacceptable, the applicant may, withdraw or request postponement. Such withdrawal shall not enable the applicant to re-file the same zoning map amendment for the same property until one (1) year has elapsed from the date of withdrawal. 7. If the zoning decision of the board of commissioners is for the rezoning of property and the amendment to accomplish the rezoning is defeated by the board of commissioners, then the same property shall not again be considered for rezoning until the expiration of at least twelve (12) months immediately following the defeat of the rezoning by the board of commissioners. 12.02.10. Requirements for modifications to approved zoning conditions, concept plans, and development plans. A. Major modifications to zoning conditions include any changes to allowable uses, maximum density, maximum intensity, or compatibility requirements attached to the zoning approval as conditions of approval. The following procedure shall be followed: 1. An application shall be submitted containing details of the amendment requested, the situation giving rise to the need for an amendment, and accompanied by plans fully describing the nature and extent of the amendment. 2. A staff report shall be prepared to address the issues listed in subsection 12.02.09.C. for the amended concept plan and/or zoning conditions. 3. The zoning advisory board shall review the application for an amended concept plan. The zoning advisory board shall consider the application for amended conditions placed on conditional uses and/or variances according to the procedure in subsection 12.02.09.D. 4. The board of commissioners shall consider the application for amended zoning conditions and/or concept plan at a public hearing according to the procedures in subsection 12.02.09.E. B. Minor modifications include changes to dimensional design features as depicted on a concept plan. Such dimensional design features as provided on a development plan shall generally conform to the conditions depicted on the concept plan, but shall be allowed to vary so long as the administrator determines that the development plan is generally consistent with the concept plan conditions. The following information shall be provided: 1. The development plan shall be accompanied by a detailed description of the site design features depicted on the development plan that differ from the concept plan. 2. The description of the modifications shall also include an explanation of the need for the modification. 3. The development plan application will be processed as set forth in section 12.02.02. C. Requests to modify approved development plans may be approved by the administrator as set forth below: 1. An application shall be submitted containing details of the amendment requested, the situation giving rise to the need for an amendment, and accompanied by plans fully describing the nature and extent of the amendment. 2. Review by the administrator shall follow the same procedures and address the same issues as for the original application. 12.02.11. Requirements for amendments to the ULDC. This ULDC may be amended by the board of commissioners on its own motion or by the initiation of planning and zoning staff. Otherwise, a complete application packet shall be required as described below: 1. An application to amend the text of the ULDC shall be submitted on forms provided by the county. 2. The application shall include the following information: A. Identification of the specific provision proposed for amendment; B. The proposed modifications in a strikethrough and underline format; C. A detailed explanation of the rationale and justification for the requested amendment; D. A detailed explanation of the potential impacts of the modification on the development of Henry County; 3. The administrator shall prepare a staff report analyzing the proposed amendment and recommending approval, denial, or approval with modifications. The staff report shall address the following issues: A. Consistency of the amendment with the comprehensive plan. B. Potential impacts on the character and quality of development in Henry County and any affected zoning districts. C. Potential impacts on the provision of infrastructure and improvements. D. The merits of the proposed amendments relative to any guidelines, policies, or programs adopted in furtherance of the comprehensive plan. 4. The zoning advisory board shall consider the proposed amendment to the ULDC at a public hearing, according to the procedures set forth in section 12.00.05. A. The zoning advisory board shall evaluate the proposed amendment, considering the issues and recommendations contained in the staff report. B. The zoning advisory board shall make a recommendation to the board of commissioners for approval, approval with further modifications, or denial. 5. The board of commissioners shall consider the proposed amendment at a public hearing conducted as set forth in section 12.00.05. A. The board of commissioners shall consider the information set forth in the staff report and the recommendations of the zoning advisory board. B. The board of commissioners may approve, approve with modifications, or deny the proposed amendment to the ULDC. 12.02.12. Requirements for amendment to the comprehensive plan. The comprehensive plan may be amended by the board of commissioners on its own motion. Otherwise, a complete application packet shall be required as described below. A. An application to amend the text or maps of the comprehensive plan shall be submitted on forms provided by the county. B. The application shall include the following information: 1. Identification of the specific provision proposed for amendment. 2. The proposed modifications in a strikethrough and underline format. 3. A detailed explanation of the rationale and justification for the requested amendment. 4. A detailed explanation of the potential impacts of the modification on the development of Henry County. C. The administrator shall prepare a staff report analyzing the proposed amendment and recommending approval, denial, or approval with modifications. D. The zoning advisory board shall consider the proposed amendment to the comprehensive plan at a public hearing, according to the procedures set forth in section 12.00.05. 1. The zoning advisory board shall evaluate the proposed amendment, considering the issues and recommendations contained in the staff report. 2. The zoning advisory board shall make a recommendation to the board of commissioners for approval, approval with further modifications, or denial. E. The board of commissioners shall consider the proposed amendment at a public hearing conducted as set forth in section 12.00.05. 1. The board of commissioners shall consider the information set forth in the staff report and the recommendations of the zoning advisory board. 2. The board of commissioners may approve, approve with modifications, or deny the proposed amendment to the comprehensive plan. 12.02.13. Requirements for irrevocable letters of credit, escrow letter of surety or maintenance bond. A. Standards for an irrevocable letter of credit, escrow letter of surety or maintenance bond: 1. The letter of credit, escrow letter of surety or maintenance bond shall be issued from a bank having Atlanta area offices. Include local contact name, phone number, and physical address of the bank. No post office boxes allowed. 2. A letter of credit, escrow letter of surety or maintenance bond from other institutions shall be subject to approval by the administrator, or designee who shall be authorized to reject a letter of credit escrow letter of surety or maintenance bond if he reasonably determines the obligor or surety is unreliable or there would be practical difficulties in enforcing the obligation of the letter of credit, escrow letter of surety or maintenance bond for other reasons. 3. The letter of credit, escrow letter of surety or maintenance bond shall name the Henry County Board of Commissioners as obligee. 4. The amount of the letter of credit, escrow letter of surety or maintenance bond shall be determined by the department's most recently adopted fee schedule. B. A letter of credit for a permit for a land disturbing activity shall be required. See the building department's most recently adopted fee schedule for amount. C. A letter of credit or a removal bond for wireless communications facility shall be required. See the building department's most recently adopted fee schedule for amount. D. Time period for a letter of credit, escrow letter of surety or maintenance bond. 1. A letter of credit, escrow letter of surety or maintenance bond for infrastructure and other public improvements shall remain in effect for three (3) years from the date of final plat approval. During the three (3) year period, it shall be the applicant's responsibility to repair any defects that occur in the streets, drainage systems, and stormwater detention systems. Extensions of a letter of credit, escrow letter of surety or maintenance bond may be required as set for in the procedures for approval of improvements (see section 12.02.04). 2. A letter of credit for a wireless communication facility shall be for the length of the lease, including potential extensions, or twenty (20) years. The letter of credit shall be renewable for periods not to exceed five (5) years. 3. A letter or credit or escrow letter of surety for a move in structure shall be for one (1) year. 4. The Henry County Board of Commissioners may draw upon this letter of credit, escrow letter of surety or maintenance bond to the amount set forth above upon presentation to the surety company of the following: A letter from the Henry County Building Department Director stating that the principal has failed to comply with section 12.02.13 of this ULDC with regard to making all of the required repairs and that the cost of the repairs equals or exceeds the amount of the letter of credit, escrow letter of surety or maintenance bond. 12.02.14. Requirements for development agreements. A. Purpose. The purpose of a development agreement is to authorize the use and development of a large tract of land where development will be carried out in phases over a long period of time. The development agreement may provide vested rights to the property owner during the term of the agreement to ensure that the development proceeds in compliance with the land use regulations in effect on the date of the agreement. B. Minimum land area. 1. A minimum of twenty-five (25) acres of eligible land shall be required in order to execute a development agreement. C. Required information. A development agreement shall contain the following information: 1. All information required in subsection 12.02.01.A. 2. The time period and specific expiration date of the agreement, and a time period and specific expiration date for development of the property. 3. Description of compliance with the comprehensive plan. 4. Specification of land uses, including population, density of development, and dimensions of lots and site features. 5. Description of public facilities and infrastructure to serve the development, including an identification of the service provider, and the time of service availability. 6. Description of easements that are necessary for public facilities and infrastructure. 7. Identification of land to be reserved or dedicated for public purposes. 8. Identification of land that is required to be protected as set forth in chapter 3. 9. Identification of any conditions, terms, restrictions, or other requirements that may be necessary to protect the public health, safety, or welfare. 10. Identification of all parties to the agreement. 11. Deviations, exceptions, and modifications from or to otherwise applicable ordinances, codes, rules, regulations, and other laws, to the extent permitted by law, including, but not limited to, this section 12.02.14.C. to the extent permitted by law, provided that the development agreement is adopted in accordance with the procedures set out in section 12.02.11.4 and section 12.02.11.5. D. Adoption of the agreement. 1. Notice shall be provided as set forth in section 12.03.00. 2. The zoning advisory board shall conduct a hearing, pursuant to the requirements set forth in section 12.00.05, and shall provide a recommendation to the board of commissioners. 3. The board of commissioners shall conduct a hearing, pursuant to the requirements set forth in section 12.00.05. The board of commissioners shall approve, approve with modification(s), or deny the development agreement. E. Breach of agreement. 1. Where the review reveals a material breach of the agreement, a notice of breach shall be provided to the property owner and all parties to the development agreement. 2. The notice shall set forth in detail the nature of the breach, the evidence that supports the determination that a breach has occurred, and shall provide a reasonable time period to correct the breach. 3. Upon failure of the property owner to correct the breach within the specified time period, the board of commissioners may terminate or modify the agreement. Termination or modification shall occur in the same manner as the initial adoption of the agreement. 4. The property owner shall have an opportunity to rebut the determination that a breach has occurred or to consent to a modification of the agreement as necessary to correct the breach. F. Modification of agreements. 1. A modification to an existing agreement may be initiated by the board of commissioners. 2. Modification to an agreement shall occur in the same manner as the initial adoption of the agreement. G. Recording required. The property owner shall record the development agreement with the clerk of the superior court of Henry County. (Ord. No. 09-07, 11-17-09; Ord. No. 10-20, § I(22—24), 6-15-10; Res. No. 13-02, 2-19-13; Ord. No. 14-06, § I(exh. A), 11-4-14; Ord. No. 15-02, § I, 2-17-15; Ord. No. 16-06, 10-18-16; Ord. No. 17-06, 4-18-17; Ord. No. 17-17, § I, 12-5-17; Ord. No. 25-4, § IV, 3-18-25) Sec. 12.03.00. Notice requirements. 12.03.01. Public notice required. A. Notice shall be provided by the county for public meetings and hearings regarding the following actions: 1. Amendment of the official zoning map; 2. Amendment of the comprehensive plan; 3. Amendment of ULDC; 4. Major modification of zoning conditions and/or concept plans; 5. Variance; 6. Conditional use; 7. Permit to disturb a cemetery; 8. Designation of historic districts and historic properties; and 9. Certificate of appropriateness. B. Notice shall include the following information: 1. Time of the public meeting or public hearing; 2. Place of the public meeting or public hearing; 3. Purpose of the requested action; 4. For requests to amend the official zoning map, the notice shall include the current and proposed zoning district. 12.03.02. Legal advertisements. A. The public notice shall be published within a newspaper of general circulation within the territorial boundaries of Henry County, at least fifteen (15) but not more than forty-five (45) days prior to the date of the hearing, unless otherwise specified in subsection B. The notice shall state the time, place, and purpose of the hearing. B. Notice of public hearings of the following shall be provided at least thirty (30) days prior to the hearing: 1. Variance; 2. Conditional use; 3. Modifications to Variance or Conditional Use conditions; and 4. Appeals of administrative decisions or interpretations. C. If a rezoning is initiated by a party other than the county then the notice shall include the present zoning classification of the property, and the proposed zoning classification of the property. 12.03.3. Requirements for posting signs. A. The county shall provide standardized signs for posting to provide public notice of meetings and hearings. B. The county shall be responsible for posting the sign as follows: 1. The sign shall be posted in a conspicuous location on the property. 2. The sign shall be posted not less than fifteen (15) and not more than forty-five (45) days prior to the date of the hearing. 3. If the property proposed for rezoning does not have frontage on a public street, then the sign may be posted on the right-of-way of the nearest public street which provides access to the site. 4. The county shall be responsible for timely removal of the sign following the hearing. 12.03.04. Mailed notice. Mailed notice shall be provided at least fifteen (15) but not more than forty-five (45) days prior to the date of the hearing for all variances, conditional uses, modifications, amendments to the ULDC, amendments to the comprehensive plan, and amendments to the official zoning map (rezoning). The county shall provide the mailed notice to all adjacent property owners as well as the property owner. (Ord. No. 23-05, § I, 6-6-23) Sec. 12.04.00. Appeal of zoning advisory board or administrative actions. 12.04.01. Public notice required. A. The board of commissioners shall hear and decide appeals where it is alleged by the appellant that there is error in any approval, denial, or decision made by the zoning advisory board (ZAB). 1. Only persons or entities that have legal standing in the challenged action shall be permitted to file an appeal under this code section. 2. Appeals under this code section shall be filed with the planning and zoning department director or such other designee. Upon receipt of the appeal documents and once the requisite fees have been filed, the department head or his/her designee shall be responsible for notifying the county clerk via email within two (2) days that an appeal application has been filed and shall thereafter, be responsible for ensuring that all appeal documentation is provided to the county clerk for inclusion of the matter on a scheduled public meeting to be heard by the board of commissioners not later than thirty (30) days from the date of filing. All appeals pertaining to ZAB decisions shall be handled by the planning and zoning department head or their designee, which will include the legal advertisement, posting of signage, notification of all parties and postcard notification. The department head or his/her designee shall be responsible for providing an executive summary detailing the rationale for the decision in question and shall present the findings and all relevant documents pertaining to the appeal to the county clerk for presentation at the board of commissioner's meeting in which the appeal will be heard. B. The board of commissioners shall hear and decide appeals where it is alleged by the appellant that there is error in any approval, denial, written interpretation, or decision made by the planning and zoning or building and plan review department, based on the interpretation or enforcement of the ULDC. 1. Only persons or entities that have legal standing in the challenged action shall be permitted to file an appeal under this code section. 2. Appeals under this code section shall be filed with the planning and zoning department director or such other designee. Upon receipt of the appeal documents and once the requisite fees have been filed, within two (2) days, the planning and zoning department director or such other designee shall notify the appropriate department that an appeal application has been filed and shall immediately forward those documents to the appropriate department head and/or his or her designee for handling. Upon receipt of the appeal documents and once the requisite fees have been filed, the department head or his/her designee shall be responsible for notifying the county clerk via email that an appeal application has been filed and shall thereafter, be responsible for ensuring that all appeal documentation is provided to the county clerk for inclusion of the matter on a scheduled public meeting to be heard by the board of commissioners not later than thirty (30) days from the date of filing. The notifying department head or his/her designee shall, where required, be responsible for submitting any required legal advertisements and posting the appropriate signage. The department head or his/her designee shall be responsible for notifying all affected parties that an appeal has been filed and the date in which the appeal will be heard by the board of commissioners. The department head or his/her designee shall be responsible for providing an executive summary detailing the rationale for the decision in question and shall present the findings and all relevant documents pertaining to the appeal to the county clerk for presentation at the board of commissioner's meeting in which the appeal will be heard. C. If the board of commissioners has designated the ZAB by way of resolution to hear and decide appeals where it is alleged by the appellant that there is error in any approval, denial, written interpretation, or decision made by the planning and zoning or building and plan review department, based on the interpretation or enforcement of the ULDC, the following shall apply: 1. Only persons or entities that have legal standing in the challenged action shall be permitted to file an appeal under this code section. 2. Appeals under this code section shall be filed with the planning and zoning department director or such other designee. Upon receipt of the appeal documents and once the requisite fees have been filed, within two (2) days, the planning and zoning department director or such other designee shall notify the ZAB via email that an appeal application has been filed and shall thereafter, be responsible for ensuring that all appeal documentation is provided to ZAB for inclusion of the matter on a scheduled public meeting to be heard by the ZAB not later than thirty (30) days from the date of filing. The planning and zoning department director or such other designee shall be responsible for submitting any required legal advertisements and posting the appropriate signage. The planning and zoning department director or such other designee shall be responsible for notifying all affected parties that an appeal has been filed and the date in which the appeal will be heard by the ZAB. The planning and zoning department director or such other designee shall be responsible for providing an executive summary detailing the rationale for the decision in question and shall present the findings and all relevant documents pertaining to the appeal to the ZAB at the ZAB meeting in which the appeal will be heard. D. A scheduled appeal may be temporarily postponed at the request of the appellant or staff; however, the party requesting such postponement shall be responsible for the cost of any legal advertisement fees prior to the matter being rescheduled for a new hearing date. E. Should the board of commissioners or the zab overturn the decision of staff and/or the ZAB the applicant shall have thirty (30) days from the date of the decision to request a refund of no more than seventy-five (75) percent of the appeal fee paid. 12.04.01. Applicability. A. Appeals may be filed by any person aggrieved by any written approval, denial, interpretation, decision or enforcement action of the administrator, based on or made in the enforcement of the ULDC. B. A person shall be considered aggrieved if: 1. Said person or said person's property was the subject of the action appealed from; or 2. Said person has a substantial interest in the action appealed from and is in danger of suffering special damage or injury not common to all property owners similarly situated. 12.04.02. Time for applications and hearings. A. An appeal shall be filed within thirty (30) days following the written approval, denial, interpretation, or decision of the zoning advisory board or the administrator. B. A hearing before the board of commissioners shall be held according to the published schedule. 12.04.03. Application requirements. An appeal request, along with the advertising and review fee of three hundred dollars ($300.00) shall be filed with the Henry County Planning and Zoning Department, indicating on the application in which the administrative decision originated and include a letter of intent addressing the following: A. Completed application form, provided by the county; B. Written documentation specifying the alleged errors in the approval, denial, interpretation, or decision of the zoning advisory board or the administrator; C. Citation of the section(s) of the ULDC pertaining to the action of the administrator; and D. A statement of the specific relief requested by the party appealing. 12.04.04. Stay of proceedings. An appeal stays all legal proceedings in furtherance of the action appealed from unless the administrator certifies to the board of commissioners, after notice of appeal has been filed, that by reasons of facts stated in the certificate, a stay would, in the administrator's opinion, cause imminent peril to life or property. In such case, proceedings shall be stayed only by a restraining order granted by the superior court of Henry County on notice to the administrator and on due cause shown. 12.04.05. Action on appeals. A. The hearing of the appeal shall be quasi-judicial and shall be conducted at a regular meeting, according to the published schedule, or at a special meeting of the board of commissioners. B. Notice shall be provided pursuant to the requirements of sections 12.03.01 and 12.03.02 as well as due notice to the parties in interest. C. Any party may appear at the hearing in person, by an authorized agent, or by an attorney. D. Following the consideration of all testimony, documentary evidence, and matters of record, the board of commissioners shall make a determination on the appeal. An appeal shall be sustained only upon an expressed finding by the board of commissioners that the zoning advisory board's or the administrator's action was based on an erroneous finding of a material fact, or that the administrator acted in an arbitrary manner. In exercising its powers, the board of commissioners may reverse or affirm, wholly or partly, or may modify the requirement, decision or determination appealed from, and to that end shall have all the powers of the administrator from whom the appeal was taken and may issue or direct the issuance of a permit provided all requirements imposed by all other applicable laws are met. (Ord. No. 10-20, § I(25), 6-15-10; Ord. No. 13-01, § I, 1-15-13; Ord. No. 23-05, § II, 6-6-23) Sec. 12.05.00. Appeals of board of commissioners actions. All appeals of final decisions of the board of commissioners shall be as follows: A. Any person aggrieved by a final decision of the board of commissioners may appeal such decision by filing a petition in writing with the superior court of Henry County setting forth plainly, fully, and distinctly why the decision is contrary to law. B. An appeal shall be filed within thirty (30) days after the disputed final decision is rendered. Sec. 12.06.00. Enforcement. A. The administrator, the building official, and their authorized designees shall have the authority under the guidance of the board of commissioners to enforce the provisions of this ULDC. B. The administrator, the building official, and their authorized designees shall have authority to enter upon privately owned land for the purpose of performing their duties under this ULDC and may take or cause to be made such examinations, surveys, or sampling as the county deems necessary. C. Agents and employees of the county and the authority and law enforcement officials of the county and other law enforcement officials having police powers shall have authority to assist the enforcer in enforcement of this section. D. No person shall refuse entry or access to any authorized representative or agent of the county who requests entry for the purposes of inspection, and who presents appropriate credentials, nor shall any person obstruct, hamper or interfere with any such representative while in the process of carrying out his official duties. E. The administrator or the building official shall, at any time, order the cessation of all work on a site if any aspects of this ULDC are violated. Issuance of a certificate of occupancy shall be conditioned on compliance with this ULDC at the time a final inspection is requested. F. The administrator or the building official shall have the authority to revoke, suspend, or void any development or building permit or to withhold issuance of a certificate of occupancy until the requirements hereof are met. G. If any building or structure is constructed, reconstructed, altered, repaired, converted or maintained, or if any building, structure or land is used in violation of this ULDC, the board of commissioners, the administrator, or the building official, in addition to other remedies, may institute an injunction, mandamus or other appropriate action in proceeding to stop the violation in the case of such building, structure or land use. H. When a building or other structure has been constructed in violation of this ULDC, the violator shall be required to remove the structure. I. When removal of vegetative cover, excavation or fill has taken place in violation of this ULDC, the violator shall be required to restore the affected land to its original contours and to restore vegetation, as far as practicable, in compliance with the erosion and sedimentation control standards of this ULDC. J. Enforcement regarding land disturbing activities: 1. The administrator shall periodically inspect sites of land disturbing activities for which permits have been issued to determine if the activities are being conducted in accordance with the plan and if the measures required in the plan are effective in controlling erosion and sedimentation. If, through inspection, it is deemed that a person engaged in land disturbing activities as defined herein has failed to comply with the approved plan, with permit conditions, or with the provisions of this ULDC, a written notice to comply shall be served upon that person. The notice shall set forth the measures necessary to achieve compliance and shall state the time within which such measures shall be completed. If the person engaged in the land disturbing activity fails to comply within the time specified, he shall be deemed in violation of this ULDC. 2. The administrator shall have the following authority: a. To address violations and to refer violations for code enforcement action by the County; b. To issue citations for violation of this section; c. To issue administrative orders; d. To commence civil and criminal actions; e. To issue cease and desist orders in the event of any violation. 3. For the first and second violations of the provisions of this ULDC, the administrator shall issue a written warning to the violator. The violator shall have five (5) days to correct the violation. If the violation is not corrected within five (5) days, the administrator shall issue a stop work order requiring that land disturbing activities be stopped until necessary corrective action or mitigation has occurred; provided, however, that, if the violation presents an imminent threat to public health or waters of the state or if the land disturbing activities are conducted without obtaining the necessary permit, the administrator shall issue an immediate stop work order in lieu of a warning. 4. For a third and each subsequent violation, the administrator shall issue an immediate stop work order. 5. All stop work orders shall be effective immediately upon issuance and shall be in effect until the necessary corrective action or mitigation has occurred. K. Nothing herein shall prevent Henry County from taking other legal action as determined necessary to enforce this ULDC, or to prevent or remedy any violation. Sec. 12.07.00. Penalties. A. Violations of the provisions of this ULDC or failure to comply with any of its requirements, including violation of conditions and safeguards in connection with grants of variances shall, upon conviction, be punishable by a fine not to exceed one thousand dollars ($1,000.00), or by imprisonment of not more than sixty (60) days, or both, except as set forth in subsection B., below. B. Any person violating any provision of this ULDC, permitting conditions, or a stop work order, when such violation involves the construction of a single-family dwelling which is under contract with an owner for occupancy, shall be liable for a minimum fine of two hundred fifty dollars ($250.00) per day for each violation, by a sentence of imprisonment not exceeding sixty (60) days in jail, or both. C. The imposition of one (1) penalty for any violation shall not excuse the violation or permit it to continue. Each day such violation continues shall be considered a separate offense. D. All costs, attorney's fees, expert witness fees and other expenses incurred by the county in connection with the enforcement of this ULDC shall be recovered from the violator. Sec. 12.08.00. Reasonable accommodation. 12.08.01. Purpose. It is the policy of the jurisdiction, pursuant to the Federal Fair Housing Amendments Act of 1988 (hereafter "fair housing laws"), to provide individuals with disabilities reasonable accommodation in rules, policies, practices and procedures to ensure equal access to housing and facilitate the development of housing for individuals with disabilities. This section establishes a procedure for making requests for reasonable accommodation in land use, zoning and building regulations, policies, practices and procedures of the jurisdiction to comply fully with the intent and purpose of fair housing laws. 12.08.02. Findings. The Federal Fair Housing Amendments Act of 1988 imposes an affirmative duty on local governments to make reasonable accommodation in their land use and zoning regulations and practices when such accommodation may be necessary to afford individuals with disabilities an equal opportunity to housing. A. The housing element of the jurisdiction must identify and develop a plan for removing governmental constraints to housing for individuals with disabilities including local land use and zoning constraints or providing reasonable accommodation. B. A fair housing reasonable accommodation procedure for individuals with disabilities and developers of housing for individuals with disabilities to seek relief in the application of land use, zoning and building regulations, policies, practices and procedures will further the jurisdiction's compliance with federal and state fair housing laws and provide greater opportunities for the development of critically needed housing for individuals with disabilities. 12.08.03. Applicability. Reasonable accommodation in the land use and zoning context means providing individuals with disabilities or developers of housing for people with disabilities, flexibility in the application of land use and zoning and building regulations, policies, practices and procedures, or even waiving certain requirements, when it is necessary to eliminate barriers to housing opportunities. An individual with a disability is someone who has a physical or mental impairment that limits one (1) or more life activities; anyone who is regarded as having such impairment; or anyone with a record of such impairment. A request for reasonable accommodation may be made by any individual with a disability, his or her representative, or a developer or provider of housing for individuals with disabilities, when the application of a land use, zoning or building regulation, policy, practice or procedure acts as a barrier to fair housing opportunities. 12.08.04 Notice to the public of availability of accommodation process. Notice of the availability of reasonable accommodation shall be prominently displayed at public information counters in the planning, zoning and building departments, advising the public of the availability of the procedure for eligible individuals. Forms for requesting reasonable accommodation shall be available to the public in the planning and building and safety departments. 12.08.05. Requesting reasonable accommodation. A. In order to make housing available to an individual with a disability, any eligible person as defined in subsection 12.08.03 may request a reasonable accommodation in land use, zoning and building regulations, policies, practices and procedures. B. Requests for reasonable accommodation shall be in writing and provide the following information: (1) Name and address of the individual(s) requesting reasonable accommodation; (2) Name and address of the property owner(s); (3) Address of the property for which accommodation is requested; (4) Description of the requested accommodation and the regulation(s), policy or procedure for which accommodation is sought; and (5) Reason that the requested accommodation may be necessary for the individual(s) with the disability to use and enjoy the dwelling. C. Any information identified by an applicant as confidential shall be retained in a manner so as to respect the privacy rights of the applicant and shall not be made available for public inspection to the extent allowed by law. D. A request for reasonable accommodation in regulations, policies, practices and procedures may be filed at any time that the accommodation may be necessary to ensure equal access to housing. A reasonable accommodation does not affect an individual's obligations to comply with other applicable regulations not at issue in the requested accommodation. E. If an individual needs assistance in making the request for reasonable accommodation, the jurisdiction will provide assistance to ensure that the process is accessible. 12.08.04. Reviewing authority. The reviewing authority shall consist of representatives from planning and zoning, building, and fire and code enforcement departments. A. Requests for reasonable accommodation shall be reviewed by the "reviewing authority" using the criteria set forth in subsection 12.08.07. B. The reviewing authority shall issue a written decision on a request for reasonable accommodation within sixty (60) days of the date of the application and may either grant, grant with modifications, or deny a request for reasonable accommodation in accordance with the required findings set forth in subsection 12.08.07. C. If necessary to reach a determination on the request for reasonable accommodation, the reviewing authority may request further information from the applicant consistent with fair housing laws, specifying in detail the information that is required. In the event that a request for additional information is made, the sixty-day period to issue a decision is stayed until the applicant responds to the request. 12.08.07. Required findings. The written decision to grant, grant with modifications, or deny a request for reasonable accommodation shall be consistent with fair housing laws and based on the following factors: A. Whether the housing, which is the subject of the request for reasonable accommodation, will be used by an individual with disabilities protected under fair housing laws; B. Whether the requested accommodation is necessary to make housing available to an individual with disabilities protected under the fair housing laws; C. Whether the requested accommodation would impose an undue financial or administrative burden on the jurisdiction; and D. Whether the requested accommodation would require a fundamental alteration in the nature of the jurisdiction’s land use and zoning or building program. 12.08.08. Written decision on the request for reasonable accommodation. A. The written decision on the request for reasonable accommodation shall explain in detail the basis of the decision, including the reviewing authority’s findings on the criteria set forth in subsection 12.08.07. All written decisions shall give notice of the applicant’s right to appeal and to request reasonable accommodation in the appeals process as set forth below. The notice of decision shall be sent to the applicant by certified mail. B. The written decision of the reviewing authority shall be final unless an applicant appeals it to the jurisdiction’s planning commission. C. If the reviewing authority fails to render a written decision on the request for reasonable accommodation within the sixty-day time period allotted by subsection 12.08.06, the request shall be deemed granted. D. While a request for reasonable accommodation is pending, all laws and regulations otherwise applicable to the property that is the subject of the request shall remain in full force and effect. 12.08.09. Appeals. A. Within sixty (60) days of the date of the reviewing authority’s written decision, an applicant may appeal an adverse decision. Appeals from the adverse decision shall be made in writing. B. If an individual needs assistance in filing an appeal on an adverse decision, the jurisdiction will provide assistance to ensure that the appeals process is accessible. C. All appeals shall contain a statement of the grounds for the appeal. Any information identified by an applicant as confidential shall be retained in a manner so as to respect the privacy rights of the applicant and shall not be made available for public inspection. D. Nothing in this procedure shall preclude an aggrieved individual from seeking any other state or federal remedy available. (Ord. No. 14-04, § I, 1-9-14) APPENDICES Acronyms BMP — Best management practices (BMP plan) BTL — Build-to line CLOMA — Conditional letter map of amendment CLOMR — Conditional letter of map revision CSD — Conservation subdivision development DBH — Diameter at breast height DCA — Department of community affairs DHR — Department of human resources DNR — Department of natural resources FAA — Federal Aviation Administration FCC — Federal Communications Commission FEMA — Federal Emergency Management Agency FHBM — Flood hazard boundary map FIRM — Flood insurance rate map FIS — Flood insurance study GSMM — Georgia Stormwater Management Manual HCWSA — Henry County Water and Sewer Authority HPB — Historic preservation board HVAC — Heating, ventilation, and air conditioning ICWPA — Indian Creek Watershed Protection Area LBCS — Land based classification standards LBWPA — Long Branch Creek Watershed Protection Area MNGWPD — Metropolitan North Georgia Water Planning District NGVD — National Geodetic Vertical Datum NWI — National Wetland Inventory OCGA — Official Code of Georgia Annotated PD — Planned development RFN — Residential fly-in neighborhood RNC — Rural neighborhood commercial ROW — Right-of-way RPZ — Runway protection zone RV — Recreational vehicle SCWPA — Shoal Creek Watershed Protection Area TCWPA — Tussahaw Creek Watershed Protection Area TND — Traditional neighborhood development TRWPA — Towaliga River Watershed Protection Area ULDC — Unified land development code WCF — Wireless communication facility WCWPA — Walnut Creek Watershed Protection Area WPA — Watershed protection area ZAB — Zoning advisory board Definitions: For the purposes of this ULDC in addition to their common meanings certain words and terms used herein, unless the context otherwise requires, shall be defined and interpreted as follows. The use of the singular includes the plural and the plural the singular; the present tense includes the future; the use of shall means the action is mandatory, the use of may or should means the action is optional. Any masculine pronoun shall be deemed to refer to a person, whether male or female. All terms not defined herein shall be defined as elsewhere in the Henry County Code. Terms not found in the Henry County Code shall be defined as in the Official Code of Georgia Annotated. A Abandoned cemetery means a cemetery which shows signs of neglect including, without limitation, the unchecked growth of vegetation, repeated and unchecked acts of vandalism, or the disintegration of grave markers or boundaries and for which no person can be found who is legally responsible and financially capable of the upkeep of such cemetery. Accessory apartment (garage apartment). See accessory dwelling. Accidental discharge means a discharge prohibited by this ordinance which occurs by chance and without planning or thought prior to occurrence. Activity center means an area that includes office, retail, service, residential or civic uses that create a central focus for a larger area. An activity center also has generally recognizable boundaries. Crossroads. A small node at a major intersection or crossroad in rural or estate residential community that provides local needs along with a sense of place. The crossroads activity center includes a nucleus comprised of one (1) or more of the following elements: a church, community center, cemetery or other civic/historic landmark, recreation center, restaurant, gas station, or small store with convenient commercial services used on a daily basis for local residents that frequently pass by. The design of the crossroads community center should take into consideration how it could be expanded as the population grows in the surrounding area. The node may be served by septic tanks. School node. For many county residents, the local school and in particular the local school cluster where one (1) or more schools are co-located, serves as a major center and focus of activity. This type of center is designed to compliment this type of lifestyle. Being predominately residential in its composition, it will also include neighborhood oriented commercial areas as well as recreational areas ideally linked by a network of multiuse trails and sidewalks. The center should extend a reasonable walking or cycling distance from the schools or approximately a mile from the core. Specialty use center. This type activity center is truly unique and unlike the other centers is usually dominated by one (1) major large-scale use. The best example in the county is the Atlanta International Motor Speedway. A specialty use center often has its own unique transportation needs, and in many ways serves a showcase for the community. Special attention should be given to preserving and enhancing the function of the focal point of this type of center. Suburban employment center. An activity center located around one (1) or more of the county’s interstate interchanges. The core of the center would be largely commercial and included a wide range of retail, commercial and service uses. This type of center would include such uses as office buildings, major commercial centers, large civic facilities, and a wide variety of housing types. Large-scale mixed-use developments are also appropriate here. The center should extend a half mile or more on one (1) or both sides of the interstate. Being located close to the interstate, the most prominent gateway to the county, the design of the center and the buildings within it should pay special attention to the viewshed from the interstate. Village node. This type of center would have at its core a compact and well-organized commercial and civic core built along a formal gridded, interconnected street network. The center will include a full array of life-cycle housing choices and provide cultural and passive recreational opportunities. The village center will have its own unique identity, enforced by common design themes used for public facilities and spaces. The village center should also be relatively self-contained providing most of everyday services needed by village residents. Accessory structure or facility means a structure which is on the same parcel of property as the principal structure and the use of which is incidental to the use of the primary structure. Addition means any walled and roofed expansion to the perimeter or height of a building. Addition to an existing building means any walled and roofed expansion to the perimeter of a building in which the addition is connected by a common load-bearing wall other than a fire wall. Any walled and roofed addition which is connected by a fire wall or is separated by an independent perimeter load-bearing wall shall be considered new construction. Adjacent means an area located within the defined horizontal distance from the future-conditions floodplain boundary that are at, or lower, in elevation than either three (3) feet above the base flood elevation or one (1) foot above the future-conditions flood elevation, whichever is higher, unless the area is hydraulically independent (meaning absolutely no connection to the flooding source such as through pipes, sewer laterals, down drains, foundation drains, ground seepage, overland flow, gated or valved pipes, excavated and backfilled trenches, etc. with no fill or other manmade barriers creating the separation). Administrative waiver means a grant of relief by the administrator from specified standards of the ULDC and where such a waiver will not be contrary to the public interest and where, owing to conditions peculiar to the property and not the result of the actions of the applicant, a literal enforcement of the chapter would result in unnecessary and undue hardship. Administrator means the person, officer, official, or his authorized representative designated by the board of commissioners, Henry County, as its agent for the administration of the provisions of the ULDC. Adult day care means a facility that provides support for elderly individuals (and their families, if present), who do not function fully independently, but who do not need twenty-four-hour nursing care. Adult entertainment establishment means any establishment featuring live performances, films, still pictures, electronic reproductions, or video with graphic or other visual images distinguished or characterized by an emphasis on sexual conduct or sexual explicit nudity. Adult entertainment establishments include, but are not limited to, adult bookstores, adult dance establishments, adult motion picture arcades, adult movie theaters, and adult video stores. Agriculture means cultivating the soil, producing crops and raising of livestock (farming, and associated activities) upon one (1) or more tracts of land containing not less than three (3) acres. Selling of products raised on the premises shall be considered a permissible activity; provided, that space for the off-county right-of-way parking is available to customers. Aircraft means any vehicle used or designed for flight in the air. Airport means any area of land or water designed and set aside for the landing and taking off of aircraft. The term may include facilities for refueling, repair, handling, and storage of aircraft or facilities for passengers and freight. Amusement park (outdoor or indoor) means land designed to be used by the public for a fee that contains amusement facilities, such as merry-go-rounds, race car and bike tracks, outdoor motion picture theaters, paint ball courses, driving ranges, miniature golf courses, skateboard rinks, and similar uses for entertainment. Animal sanctuary and rehabilitation facilities means a facility operated by a nonprofit or similar entity, established for the lifetime care, rehabilitation, or sheltering or domestic, wild, or exotic animals, where animals are not bred, sold, traded, or used for commercial entertainment purposes. Any animal sanctuary may provide education programming and limited public visitation as a secondary use, but the primary function is the long-term welfare and housing of animals. All sanctuaries must obtain and maintain applicable permits from the Georgia Department of Natural Resources, the U.S. Department of Agriculture (if required), and comply with county animal control inspection requirements for domestic animals. Antenna means any structure or device used to collect or radiate electromagnetic waves for the provision of services including, but not limited to, cellular, paging, personal communications services (PCS) and microwave communications. Such structures and devices include, but are not limited to, directional antennas, such as panels, microwave dishes and satellite dishes, and omnidirectional antennas, such as whips. This definition does not apply to broadcast antennas, antennas designed for amateur radio use, or satellite dishes designed for residential or household purposes. Apartment means a room or suite of rooms, with sleeping, bathroom, and kitchen accommodations, designed and used as a residence, physically separated from and located in a building containing a number of such rooms/suites of rooms, designed for occupancy by families living independently of each other and not owned in a fee simple title. Studio apartment means an apartment unit containing only one (1) habitable room. Applicant means for the purposes of section 8.04.00, a person submitting a post-development stormwater management application and plan for approval. Appeal means a request for a review of the (article administrator)'s interpretation of any provision of this ULDC. Approach surface means the area longitudinally centered on the extended runway centerline, extending outward and upward from the end of the primary surface and at the same slope as the approach zone height limitation slope. Arcade means a roofed passageway, lane, or area supported by columns, piers, or pillars, either freestanding or attached to a wall to form a gallery contiguous to a street or plaza that is open provides public access to building entrances, retail space and/or public space and is accessible to the public. An arcade may be especially one with shops on one (1) or both sides or a commercial establishment featuring rows of coin-operated games. Arch means a structure forming the curved, pointed, or flat upper edge of an open space and supporting the weight above it, as in a bridge or doorway. Archeologist means any person who is: (1) A member of or who meets the criteria for membership in the Society of Professional Archaeologists and can demonstrate experience in the excavation and interpretation of human graves; or (2) Employed on July 1, 1991, by the state or by any county or municipal governing authority as an archeologist. Archery range means a public or privately owned facility designed and operated for the purpose of archery practice at targets within a controlled setting. Area of future-conditions flood hazard means the land area that would be inundated by the one-percent-annual-chance flood based on future-conditions hydrology (100-year future-conditions flood). Area of shallow flooding means a designated AO or AH Zone on a community's flood insurance rate map (FIRM) with a one (1) percent or greater chance of flooding to an average depth of one (1) to three (3) feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity flow may be evident. Such flooding is characterized by ponding or sheet flow. Area of special flood hazard means the land area subject to a one (1) percent or greater chance of flooding in any given year. This includes all floodplain and floodprone areas at or below the base flood elevation designated as zones A, A1-30, A-99, AE, AO, AH, and AR on a community's flood insurance rate map (FIRM). As-built plans means detailed construction plans showing completed improvements as constructed. Assisted living facility means a state-licensed use in which domiciliary care is provided to adults who are provided with food, shelter and personal services within independent living units which could include kitchen facilities in which residents have the option of preparing and serving some or all of their own meals. This use shall not include hospitals, convalescent centers, nursing homes, hospices, clinics, or similar institutions devoted primarily to the diagnosis and treatment of the sick or injured. Athletic field means open land used for outdoor games such as baseball, football, soccer and other field sports. Attached wireless communication facility (attached WCF). See wireless communication facility. Automotive service, major means repair services to motor vehicles which require substantial replacement and/or repair of major components. Examples of major automotive repair services include, but are not limited to, transmission repairs/replacement, engine overhaul and radiator repair. Any repair services to construction equipment, agricultural equipment, commercial highway tractors, or dump trucks shall be considered major automotive services. Automotive services, minor means repair and maintenance services which require only very brief adjustment and replacement of minor components. Examples of minor automotive services include, but are not limited to, tune-up, oil change, lubrication, brake repair, air conditioning system servicing, muffler replacement and alignment. Automobile service station means a building or premises where products necessary for automobile service or maintenance are sold; provided, there is no storage or dismantling of automobiles and only minor services are rendered. An automobile service station is neither a repair nor a body shop. Automobile wash. Establishments primarily engaged in washing, waxing, and polishing motor vehicles. Authority. The use of the word "authority" shall mean the Henry County Water and Sewerage Authority or the Clayton County Water Authority. B Base flood means the flood having a one-percent chance of being equaled or exceeded in any given year, also known as the "100-year flood." Base flood elevation means the highest water surface elevation anticipated at any given location during the base flood. Basement means any area of a building having its floor subgrade below ground level on all sides. Bed and breakfast facility means a private residence that offers sleeping accommodations to lodgers in six (6) or fewer rooms for rent, in the owner or operator's principal residence while renting rooms to lodgers, and serves breakfasts at no extra cost to its lodgers. For the purpose of this definition, a lodger means a person who rents a room in a bed-and-breakfast establishment for fewer than thirty (30) consecutive days. Bedroom means a room that has a closet. Berm means an earthen mound or embankment, usually two (2) to six (6) feet in height, designed to provide visual interest, screen views, reduce noise, or fulfill other such purposes. Best management practices means a collection of structural practices and measures written by a state agency or other known authority which, when properly designed, installed and maintained, will prove effective in the areas of erosion and sedimentation control, silviculture, stormwater, etc. The term "properly designed" means designed in accordance with the hydraulic design specifications contained in the "Manual for Erosion and Sediment Control in Georgia" specified in O.C.G.A. § 12-7-6(b). Best management practices plan (BMP plan) means a plan consisting of a wide range of management procedures, activities, and prohibitions or practices which control the quality and/or quantity of stormwater runoff and which are compatible with the planned land use. Block means an area of land within a subdivision that is entirely surrounded by streets, public lands, rights-of-way, watercourses, or other well-defined and fixed boundaries. (Blocks are illustrated in figure A.1.) Boarding and/or rooming house means a building dedicated to and used for the lodging and/or feeding, for compensation, of up to six (6) nontransient persons, unrelated by blood or marriage to the owner or operator of the house, and where renting individuals are also served with meals prepared in one (1) kitchen by the owner or operator of the house, as defined herein. Foster children placed in a family home, a community residential home with six (6) or fewer residents, a nursing home, or a personal care home shall not be established as a boarding and/or rooming house. Board of commissioners means the board of commissioners of Henry County, Georgia. Body shop means a building or location where motor vehicle repair and/or replacement are performed, including, but not limited to, painting and metal fabrication of motor vehicles bodies or structures. A body shop is a major automotive service. Breezeway means a roofed, often open, passageway connecting two (2) buildings or halves of buildings. In residential zoning districts the maximum length of a breezeway that is used to incorporate a new structure as part of the principal building is not to exceed twenty (20) feet and the minimum width is to be four (4) feet. The breezeway is to connect each building at an exterior door. Buffer means a natural and/or enhanced vegetated landscaped area of a lot located and/or established. A buffer is maintained and created with the intention to visibly separate different and possible incompatible types of uses, measured from the common property line of the different uses, to shield or block noise, light, glare, or other nuisances, or the area of land immediately adjacent to the banks of state waters in its natural state of vegetation, which facilitates the protection of water quality and aquatic habitat within a water supply watershed adjacent to reservoirs or perennial streams. Buffer strip means land area located within the boundary of a lot required to be set aside and used for landscaping and upon which only limited encroachments are authorized. Build-to line means the line at which construction of a building facade is to occur on a lot. A build-to line runs parallel to the front property line and is established to create an even (or more or less even) building facade line on a street. Buildable area means the portion of a lot which is not located within any minimum required yard, landscape strip/area or buffer; that portion of a lot wherein a building or structure may be located. Building has the same meaning as Structure. Building addition means any walled and roofed expansion to the perimeter of a building which is connected by a common load-bearing wall other than a firewall. Building frontage means the linear feet of the exterior wall of a building that faces any road or street that provides a means of direct ingress and egress to the lot. Building permit means the permit required for new construction, completion of construction, or an interior finish pursuant to the applicable building code. As used herein, the term shall not include permits required for remodeling, rehabilitation, or other improvements to an existing structure provided there is no increase in the demand placed on those public facilities as defined herein. Building envelope means the area formed by the front, side, and rear building restriction or setback lines of a lot within which the principal buildings must be located. Building official means the official designated by the board of commissioners of Henry County as being responsible for issuing construction permits and certificates of occupancy. Building height means the vertical distance measured from average elevation of the proposed finished grade to the highest point of the coping of a flat roof or to the deck line of a mansard roof, or to the average height of the highest gable of a pitch or hip roof on a building. When referring to a tower, sign or other structure, the distance measured from ground level to the highest point on the tower, sign or other structure, even if said highest point is an antenna. When a building faces on more than one (1) street, the height shall be measured from the average of the grades at the center of each street front. Built environment means the elements of the environment that are generally built or made by people as contrasted with natural processes. Burial ground means an area dedicated to and used for interment of human remains. The term shall include privately owned burial plots, individually and collectively, once human remains have been buried therein. The fact that the area was used for burial purposes shall be evidence that it was set aside for burial purposes. Burial object means any item reasonably believed to have been intentionally placed with the human remains at the time of burial or interment or any memorial, tombstone, grave marker, or shrine which may have been added subsequent to interment. Such term also means any inscribed or un-inscribed marker, coping, curbing, enclosure, fencing, pavement, shelter, wall, stoneware, pottery, or other grave object erected or deposited incident to or subsequent to interment. Business subdivision. See subdivision. C Caliper means the diameter or thickness of the trunk of a nursery-grown tree as measured at four (4) inches above the top of the root mass. Canopy roofed structure means a roofed structure that covers an area, or especially one that shelters a passageway between two (2) buildings. Canopy tree (large tree or shade tree) means any tree, evergreen or deciduous, whose mature height can be expected to exceed thirty-five (35) feet and whose crown spread can be expected to exceed thirty (30) feet. Shade trees for landscaping industrial, commercial, office-institutional, multifamily residential and mobile home zoning developments, existing or planted, shall be at least eight (8) feet in height and two (2) inches in diameter, measured at six (6) inches above grade for new trees and measured at four and one-half (41 /2) feet above grade for existing trees. Examples include Red Maple, Sycamore, English Oak, Willow Oak, Loblolly Pine, or trees of similar stature. Capital improvement means an improvement with a useful life of ten (10) years or more, by new construction or other action, which increases the service capacity of a public facility. Capital improvements element means that portion of the Henry County Comprehensive Plan that sets out projected needs for system improvements during the planning horizon established therein, which provides a schedule that will meet the anticipated need for system improvements, and which provides a description of anticipated funding sources for each required improvement, as most recently adopted or amended by the board of commissioners. Care home means a care facility where personal care services are provided to more than six (6) nonfamily adults. See personal care home definition for permitted services and other requirements. Carport means any parking space(s) having a covered roof but not enclosed by walls and is an accessory structure to a dwelling unit. Carports shall not include any parking structures. Cemetery or cemeteries means any land or structure in Henry County dedicated to and used, or intended to be used for interment of the dead. It may be either a burial park for earth interments, a mausoleum for vault or crypt interments, a columbarium or a combination of one (1) or more thereof, and including chapels or churches when operated in conjunction with and within the boundaries of such cemetery. Central sanitary sewer system. See wastewater system. Certificate of appropriateness means a document evidencing approval by the historic preservation board of an application to make a material change in the appearance of a designated historic property located within a designated historic district. Certificate of occupancy means a document issued by the building official indicating the use of a particular building or land which conforms to the requirements of this ULDC. Channel means a natural or artificial watercourse with a definite bed and banks that conducts continuously or periodically flowing water. Channel bank means the sloping land bordering a channel. The bank has a steeper slope than the bottom of the channel and is normally steeper than upland areas adjacent to the channel. Character means the image and perception of a community as defined by its built environment, landscaping, natural features and open space, types and style of housing, and number and size of roads and sidewalks. Charette means public design workshop in which designers, property owners, developers, public officials, environmentalists, citizens, and other persons or group of people work in harmony to achieve an agreeable master plan. Church or other place of worship means a building used for public worship including temples, synagogues and related Sunday school or church facilities. Clean Water Act means the Federal Water Pollution Control Act (33 U.S.C. § 1251 et seq.), and any subsequent amendments thereto. Clinic means an establishment where patients, who are not lodged overnight, are admitted for examination and treatment by one (1) physician or dentist or a group of physicians or dentists practicing medicine. Club means a building or facilities owned or operated by and for special educational or recreational purposes, but not primarily for a profit or to render a service that is customarily carried on for a gain. Cluster housing means a residential development which provides for the grouping of attached and/or detached single-family dwellings on lots that may be smaller than normally permitted in a certain zoning district for purposes of preserving open space and natural features of the terrain thereby allowing public facilities and services to be provided for more economically. Development shall be limited to not more than four (4) units occupying one (1) building. Collector. See street: collector street. Collocation/site sharing means collocation/site sharing shall mean use of: (a) A common WCF by two (2) or more wireless license holders or by one (1) wireless license holder for more than one (1) type of communications technology; (b) A common WCF-site by two (2) or more wireless license holders or by one (1) wireless license holder for more than one (1) type of communications technology; or (c) The placement of a WCF on a structure owned or operated by a utility or other public entity (i.e., water tower, billboard, etc.). Commencement of construction, for private development means initiation of physical construction activities as authorized by a development permit and leading to completion of a foundation inspection or other initial inspection and approval by a public official charged with such duties; and for public projects, means expenditure or encumbrance of any funds, whether they be development impact fee funds or not, for a public facilities project, or advertising of bids to undertake a public facilities project. Commercial vehicle means a vehicle whose gross vehicle weight rating (GVWR) is over twenty-six thousand (26,000) pounds, or a trailer with a gross vehicle weight rating of over ten thousand (10,000) pounds, including commercial tractor-trailers, dump trucks, wreckers, and earth-moving equipment. Agricultural vehicles and equipment and school buses shall be excluded from this definition. Common area means land within a development, not individually owned or dedicated for public use, which is designed and intended for the common use or enjoyment of the residents of the development. Common area may include complementary structures and improvements. Compatibility means the characteristics of different uses, activities or design which allow them to be located near or adjacent to each other in harmony. Some elements affecting compatibility include the following: height, scale, mass and bulk of structures, pedestrian or vehicular traffic, circulation, access and parking impacts, landscaping, lighting, noise, odor and architecture. Completion of construction means the issuance of the final certificate of occupancy by the appropriate governmental jurisdiction. The date of completion is the date on which such certificate is issued. Comprehensive plan means the Henry County Plan or planning elements as adopted or amended in accord with the State of Georgia Minimum Standards and Procedures for Local Comprehensive Planning. Comprehensive Planning Act means the Official Code of Georgia Annotated, § 50-8-1 et seq. and the Minimum Standards and Procedures for Local Comprehensive Planning as adopted by the Georgia Board of Community Affairs. Concealed telecommunications facility means any telecommunications facility that is integrated as an architectural feature of an existing structure or any new support structure designed so that the purpose of the facility or support structure for providing wireless services is not readily apparent to a casual observer. Examples may include, but are not limited to, architecturally screened roof-mounted antennas, building-mounted antennas painted to match the existing structure, antennas integrated into architectural elements, antenna structures designed to look like light poles and structures designed to resemble natural features such as trees and rock outcroppings. Concealed facilities are also sometimes known as alternative or stealth facilities. Conditional use means a use within a certain zoning districts of this chapter which is not permitted as a matter of right, but may be permitted within these districts by the Henry County Zoning Advisory Board. A conditional use is permanent in nature. Condemnation means the taking of private property by a government unit for public use, when the owner will not relinquish it through sale or other means; the owner is compensated by payment of market value. The power to take the property is based on the concept of eminent domain. Condominium means the ownership in fee simple title of a single unit in a multi-unit structure and an undivided ownership interest, in common with other owners of the common elements of the structure, including the common areas of land and its appurtenances. Confined animal feeding operation means a building or fenced enclosure designed and used for holding or fattening of animals in preparation for market. It does not include the pasturing of animals at densities recommended by the best management practices of the Georgia Department of Agriculture as follows: Horses—one (1) per forty-three thousand five hundred sixty (43,560) square feet (one (1) acre); cows—one (1) per forty-three thousand five hundred sixty (43,560) square feet; sheep or goats—one (1) per twenty thousand (20,000) square feet; fowl—twenty (20) per forty-three thousand five hundred sixty (43,560) square feet. Conical surface means the surface that extends outward and upward from the periphery of the horizontal surface at a slope of twenty to one (20:1) for a horizontal distance of four thousand (4,000) feet. Conservation easement means an agreement between a land owner and Henry County or other government agency or land trust that permanently protects open space or greenspace on the owners land by limiting the amount and type of development that can take place, but continues to leave the remainder of the fee interest in private ownership. Construction means any site, preparation, assembly, erection, substantial repair, alteration or similar action but excluding demolition, for or of public or private right-of-way, structures, utilities or similar property. Construction activity means activities subject to the Georgia Erosion and Sedimentation Control Act or NPDES General Construction Permits. These include construction projects resulting in land disturbance. Such activities include, but are not limited to, clearing and grubbing, grading, excavating, and demolition. Construction standard drawing means the Henry County Construction Standards Manual and related drawings for public improvements. Consumer goods sales and service. There are three (3) types of consumer goods sales and service; they are other, durable and heavy. These types group establishments by product, characteristic and intensity. The following outlines permitted uses/businesses within each consumer goods sales and service type: Consumer goods sales and service, other. (1) Apparel stores. (2) Antique and art shops, provided there is no outdoor display area. (3) Banks, including drive-in banks, provided that both the teller’s cage and vehicles awaiting service are located completely off the public right-of-way and provision is made to accommodate a minimum of five (5) waiting vehicles per service window. (4) Bakeries, whose entire products are sold at retail on the premises. (5) Books, stationery and card shops. (6) Clothes cleaning agencies, pressing establishment, laundry pickup stations. (7) Confectionery (candy) stores. (8) Custom dress making or millinery shops. (9) Drug stores and apothecary shops. (10) Electrical appliance repair shops. (11) Florist and gift shops. (12) Gift and card shops. (13) Hardware and appliance stores selling predominantly at retail. (14) Jewelry stores. (15) Laundromats. (16) Loan offices. (17) Music stores. (18) Neighborhood shopping centers. (19) News and tobacco shops. (20) Package (beer and wine) stores. (21) Paint and decorating stores. (22) Photographers (including the sale of supplies and equipment). (23) Quick copy print shops when employing not more than five (5) employees. (24) Radio/television repair (including the sale of supplies and equipment). (25) Shoe stores and shoe repair shops. (26) Tailors and clothing shops. (27) Automotive service, minor. (28) Other retail and service uses as may be determined by the planning staff to be similar and compatible with the above-listed permitted uses. Durable consumer goods sales and service. (1) Auction gallery. (2) Automobile wash. (3) Community and regional shopping centers. (4) Department stores. (5) Furniture stores. (6) Professional type assembly and repair of such items as eyeglasses, custom jewelry, prosthetic devices and other similar services and manufacture. (7) Parking lots and structures. (8) Printing, job, when mechanical operation is not visible from a street, and employing not more than four (4) persons. (9) Stationery and office machines sales and service. (10) Upholstery shops. (11) Other uses as may be determined by the planning staff to be similar and compatible with the above-listed permitted uses. Heavy consumer goods sales and services. (1) Boat sales. (2) Automotive service, major. (3) Feed and seed stores. (4) Heavy equipment sales and service. (5) Recreational vehicle sales and service. (6) Tire retreading. (7) Trade shops, including electrical, plumbing, gutter, machines, and HVAC contractors. (8) Other uses as may be determined by the planning staff to be similar and compatible with the above-listed permitted uses. Cooking facilities means any device used in the preparation of food, including range, ovens, cook-top surface units, refrigerators, electric warming irons or hot plates, microwave ovens, coffee makers, toaster ovens, and other similar small electric appliances, freezers separate from or not included within a refrigeration unit are not included in this definition. Cornice means the uppermost horizontal molded projection or other uppermost horizontal element located at the top of a building or portion of a building. Corridor means a street, roadway, river or other linear element connecting major sources of trips that may contain a number of streets, highways, and transit route alignments. A corridor is also defined as all land within the buffer areas established adjacent to reservoirs or perennial streams within a water supply watershed. County. The use of the word county shall mean the board of commissioners of Henry County. County street means a street which is owned and/or maintained by Henry County. Covenant, protective means a contract entered into between private parties which constitute a restriction on the use of a particular parcel of property. Covenant, restrictive means private contracts entered into between the developer and purchaser(s) which constitute a restriction on the use of all private property within a development for the benefit of property owners, and provide a mutual protection against undesirable aspects of development which would tend to impair stability of values. Critical root zone means an area on the ground around a tree that is equal to the reach of the farthest branches, containing sufficient root mass for survival. Cross access easement means a limited right to make use of a property owned by another to gain access to another property; a right-of-way across the property. Crosswalk means a public right-of-way used primarily for pedestrians’ travel through or across any portion of a block. Culvert means a pipe, conduit, or similar enclosed structure with appurtenant works which carries surface or stormwater under or through an embankment or fill, roadway, or pedestrian walk, or other structure. Curb cut means the providing of vehicular ingress or egress between a property and an abutting public street. Cupola means a roof or ceiling in the form of a dome or a small structure on a roof, sometimes made of glass and providing natural light inside. Cut means a portion of land surface or area from which earth has been removed or will be removed by excavation; the depth below original ground surface to excavated surface. Also known as excavation. Cutting (pertaining to tree protection) means the detaching or separating of any limb, branch, or root from a tree. Development means any manmade change to improved or unimproved real estate including, but not limited to, buildings or other structures, mining, dredging, filling, clearing, grading, paving, any other installation of impervious cover, excavation or drilling operations or storage of equipment or materials. Development approval means written authorization, such as issuance of a building permit, approval for grading or site development, or other forms of official action required by local law or regulation prior to commencement of construction. Development impact fee means the payment of money imposed upon and paid by new development as a condition of development approval as its proportionate share of the cost of system improvements needed to serve it. Development of regional impact (DRI) means a development project, regardless of the mix of land uses, which is likely to have impacts to the transportation network and environment beyond the limits of the jurisdiction in which it is being constructed. Development or single development means any project or group of related projects constructed or planned for construction on a single parcel or on contiguous parcels under single ownership. Any manmade change to improved or unimproved real estate including, but not limited to, buildings or other structures, clearing, digging, filling, dredging, excavating, grading, grubbing, mining, paving, removal of vegetation, stripping, drilling operations, storage of equipment or materials, transportation and filling of land, and any other installation of impervious cover; land development or land development project. New development. A land development activity on a previously undeveloped site. Post-development. The time period, or the conditions that may reasonably be expected or anticipated to exist, after completion of the land development activity on a site as the context may require. Pre-development. The time period, or the conditions that exist on a site, prior to the commencement of land alteration, clearing, construction, or other activity that constitutes development. Where phased development or plan approval occurs (preliminary grading, roads and utilities, etc.) the existing conditions at the time prior to the first item being approved or permitted shall establish pre-development conditions. Development rights. A governmentally recognized entitlement to use or develop land at a certain density, or intensity, or for a particular purpose, which may be severed from the realty and placed on some other property. Receiving area. The region or district where development rights may be affixed to property. Receiving property. The lot or parcel where development rights are affixed, thereby increasing the permissible density or intensity of use on the property. Sending area. The region or district where development rights may be removed for purposes of transfer to another location. Sending property. The lot or parcel where development rights are removed, thereby eliminating permissible uses on the property. Transfer of development rights. The process by which development rights from a sending property are affixed to one (1) or more receiving properties. Diameter at breast height means a forestry term that takes the thickness measurement of a tree at four and one-half (4.5) feet above the ground. Drainage easement means an easement appurtenant or attached to a tract or parcel of land allowing the owner of adjacent tracts or other persons to discharge stormwater runoff onto the tract or parcel of land subject to the drainage easement. Drainage structure means a device composed of a virtually nonerodible material such as concrete, steel, plastic, or other such material that conveys water from one (1) place to another by intercepting the flow and carrying it to a release point for stormwater management, drainage control, or flood control purposes. Roadway drainage structure. A device such as a bridge, culvert, or ditch, composed of a virtually nonerodible material such as concrete, steel, plastic, or other such material that conveys water under a roadway by intercepting the flow on one (1) side of a traveled way consisting of one (1) or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side. Drive-in means a retail or service enterprise wherein service is provided to the customer on the outside of the principal building. Drive-in restaurant means any place or premises used for sale, dispensing or servicing of food, refreshment or beverages in automobiles or other vehicles, including those establishments where customers may consume same on the premises. Dwelling means a building or portion thereof which is designed or used exclusively for residential purposes, including single-family, two-family, multiple-family dwellings, rooming and boarding houses, fraternities, sororities and modular dwellings, but not including hotels or motels. Accessory dwelling. A dwelling unit established within the principal building or in a separate structure, and on the same lot as the principal structure. It is an independent dwelling unit, but it may share an entrance, yard and parking with the principal unit. Duplex or two-family. A building containing two (2) dwelling units, designed for occupancy by not more than two (2) families living independent of each other. Multifamily. Three (3) or more dwelling units in one (1) building with the number of families in residence not exceeding the number of dwelling units provided. Single-family. One (1) dwelling unit in one (1) building, other than a mobile home, hotel or motel, designed for and occupied by one (1) family, containing rooms for living, sleeping, toilet facilities and one (1) kitchen, that meets the standards set forth in section 4.01.07. Townhouse. One (1) of a series of three (3) or more attached dwelling units on separate lots which are separated from each other by a coincidental property line and party wall partitions. The structure must meet all front, rear and side yard setback requirements in the zoning district in which it is located, except for the coincidental property line and wall. Each dwelling unit must be separately metered for all utilities, have access to a public street and the coincidental property line and wall must be fire-rated and extend from the foundation or ground (whichever is lower) to the roof decking of the structure. Each dwelling unit shall contain rooms for living, sleeping, toilet facilities and one (1) kitchen. Dwelling unit means one (1) room, or rooms connected together, constituting a separate, independent housekeeping establishment for owner occupancy, for rental or lease on a weekly, monthly, or longer basis and physically separated from any other rooms or dwelling units which may be in the same structure, and containing independent living, sleeping, toilet and a single kitchen with cooking facilities. E Easement means a grant of one (1) or more property rights by a property owner to the general public, a public utility, a governmental unit, or a private individual or corporation for the use of a portion of the owner’s land for a specific purpose, or use as a means of access to other property. Easements shall be designated public or private depending upon the nature of the usage. Conservation easement. An agreement between a land owner and a governmental agency or land trust that permanently protects the land by limiting the amount and type of development that is permissible, while leaving the remainder of the fee interest in private ownership. Drainage easement. An agreement allowing the owner of adjacent tracts or other persons to discharge stormwater runoff onto the tract or parcel of land subject to the drainage easement. Eave means the projecting lower edges of a roof overhanging the wall of a building. Elevated building means a non-basement building which has its lowest elevated floor raised above the ground level by foundation walls, shear walls, posts, piers, pilings, or columns. Encumber means to legally obligate by contract or otherwise commit to use by appropriation or other official act of Henry County, Georgia. Enforcer means the enforcer is defined as the administrator or his designee. The person, officer, official, or his authorized representative designated by the Board of Commissioners, Henry County, as its agent for the administration of the provisions of the ULDC. Equipment facility means an equipment facility is any structure used to contain ancillary equipment for a WCF which included cabinets, shelters, a buildout of an existing structure, pedestals, and other similar structures. Erect means to build, paint, construct, attach, hang, place, suspend, assemble or affix. Erosion means the process by which land surface is worn away by the action of wind, water, ice or gravity. Erosion and sedimentation control plan means a plan that is designed to minimize and control the accelerated soil erosion and sedimentation runoff resulting from a land disturbing activity. Also known as the plan. Essential public services means the components of potable water systems, sanitary sewer systems, drainage systems, gas, electricity, cable, television, telephone, and other utilities and services that deliver the service to individual properties. Included are cables, utility poles, pipes, mains, lift stations, switch boxes, culverts, and the like. Specifically excluded are high voltage towers, wireless communication towers, and electrical substations. Evergreen tree means any tree that retains green leaves throughout the year. This includes magnolias and tree-type hollies, as well as pines and cedars. Excess capacity means that portion of the capacity of a public facility or system of public facilities which is beyond that necessary to provide adequate service to existing development at the adopted level-of-service standard. Exempt means a project which has been determined to have negligible impacts to emissions and air quality and, therefore, is not typically incorporated into travel demand modeling and emissions analyses. Typical exempt projects include bicycle and pedestrian facilities, facilities to support transit services (but not the services themselves), studies, minor intersection improvements and safety upgrades. Extreme flood protection means measures taken to prevent adverse impacts from large lowfrequency storm events with a return frequency of one hundred (100) years or more. Existing construction means any structure for which the start of construction commenced before September 15, 2009. Existing manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including, at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed before September 15, 2009. Expansion to an existing manufactured home park or subdivision means the preparation of additional sites by the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads). Extended detention means the detention of stormwater runoff for an extended period, typically twenty-four (24) hours or greater. Extreme flood protection means measures taken to prevent adverse impacts from large lowfrequency storm events with a return frequency of one hundred (100) years or more. F Facade. Primary (front) facade. The exterior wall surface(s) across the building front, extending from grade to top of the parapet, wall, gable, or eaves and from side corner to side corner that are visible from any location on the street or main parking area and includes the primary entrance into the building. If the building faces more than one (1) parking area or street, the largest exterior wall of the building with a primary entrance which is most nearly parallel to the widest street or largest parking area to which the building faces. Secondary facade. Any exterior wall of a building, other than the primary facade. Family means one (1) or more persons occupying a premises and living as a single housekeeping unit, as distinguished from a group occupying a boarding house, lodging house, hotel, fraternity or sorority house. Farm means a farm includes all places of three (3) or more acres devoted to the raising of agricultural products regardless of the quantity or value of production. Feepayor means that person or entity who pays a development impact fee, or his or her legal successor in interest when the right or entitlement to any refund of previously paid development impact fees required has been expressly transferred or assigned to the successor in interest. Feedlot means land devoted to confinement feeding of livestock. A lot or building or combination lots and buildings intended for the confined feeding, breeding, raising or holding of livestock while being fattened for slaughter and where animal waste may accumulate, but not including barns, pens or similar structures not intended for the fattening of animals for slaughter. FEMA means the Federal Emergency Management Agency. Fill means a portion of land surface to which soil or other solid material has been added; the depth above the original ground. Finished grade. See grade. Firing range means a public or privately owned facility designed and operated for the purpose of discharge of rifles, shotguns and handguns at targets within a controlled setting. Flag lot. See lot definition. Flood or flooding means a general and temporary condition of partial or complete inundation of normally dry land areas from: 1. The overflow of inland or tidal waters; or 2. The unusual and rapid accumulation or runoff of surface waters from any source. Flood hazard area means the area possibly threatened by periodic flooding as determined by various data, e.g., maps provided by the United States Department of Housing and Urban Development, United States Soil Conservation Service, Army Corps of Engineers, or hydrological studies utilizing generally accepted engineering practices. Flood hazard areas shall include all lands underneath a permanent body of water, e.g., a lake, pond, river, and stream, and all land within the limits of a flood hazard area having a one-hundred-year return frequency. Flood hazard boundary map or FHBM means an official map of a community, issued by the Federal Insurance Administration, where the boundaries of areas of special flood hazard have been defined as zone A. Flood insurance rate map or FIRM means an official map of a community, issued by FEMA, delineating the areas of special flood hazard and/or risk premium zones applicable to the community. Flood insurance study or FIS means the official report by FEMA providing an examination, evaluation and determination of flood hazards and corresponding flood profiles and water surface elevations of the base flood. Floodplain means any land area susceptible to flooding with at least a one-percent probability of flooding occurrence in any calendar year based on the basin being fully developed as shown on the current land use plan. Floodproofing means any combination of structural and nonstructural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents. Floodway or egulatory floodway means the channel of a stream, river or other watercourse and the adjacent land areas of the floodplain which is necessary to contain and discharge the base flood without cumulatively increasing the water surface elevation more than one (1) foot. Floor area means the total number of square feet of floor area in a building determined by horizontal measurements between the exterior faces of the outside walls, but excluding any attic, unfinished basement area, breezeway, cellar, porch, or verandah. Floodplain or flood-prone area means any land area susceptible to flooding. Floodproofing means any combination of structural and non-structural additions, changes, or adjustments to structures which reduce or eliminate flood damage to real estate or improved real property, water and sanitary facilities, structures and their contents. Floodway or regulatory floodway means the channel of a stream, river, or other watercourse and the adjacent areas that must be reserved in order to discharge the base flood without cumulatively increasing the water surface elevation more than a designated height. Floor area means the total number of square feet of floor area in a building determined by horizontal measurements between the exterior faces of the outside walls, but excluding any attic, unfinished basement area, breezeway, cellar, porch, or verandah. Frontage or road frontage means the distance measured along a public street right-of-way, or the main street property line of a lot. Functionally dependent use means a use which cannot perform its intended purpose unless it is located or carried out in close proximity to water. The term includes only docking facilities, port facilities that are necessary for the loading and unloading of cargo or passengers, and ship building and ship repair facilities, but does not include long-term storage or related manufacturing facilities. Functional street classification. Streets provide two (2) distinct functions: Mobility (through movement) and access to land. Functional classification is a hierarchical ranking based on the degree of mobility and access that a street provides. Streets are generally classified as arterials, collectors and local streets. See streets. Future-conditions flood means the flood having a one-percent chance of being equaled or exceeded in any given year based on future-conditions hydrology. Also known as the 100-year future-conditions flood. Future-conditions flood elevation means the highest water surface elevation anticipated at any given location during the future-conditions flood. Future-conditions floodplain means any land area susceptible to flooding by the future-conditions flood. Future-conditions hydrology means the flood discharges associated with projected land-use conditions based on a community’s zoning maps, comprehensive land-use plans, and/or watershed study projections, and without consideration of projected future construction of stormwater management (flood detention) structures or projected future hydraulic modifications within a stream or other waterway, such as bridge and culvert construction, fill, and excavation. G Garage, parking means a structure, lot or any portion thereof which is open to the public in which one (1) or more vehicles are housed or kept, not including exhibition, show rooms, storage of cars or cars for sale. Garage, repair means a building or structure used to house, cover or protect automobiles or other vehicles from the elements while repairs are being made thereto. Genealogist means a person who traces or studies the descent of persons or families and prepares a probative record of such descent. Grade means the lowest point of elevation of the finished surface of the ground immediately surrounding the building or structure. Finished grade. The final elevation and contour of the ground after cutting or filling and conforming to the proposed design. Highest adjacent grade. The highest natural elevation of the ground surface adjacent to the proposed foundation walls of a structure prior to construction. Grade (roadway) means the slope (ratio of change in elevation to change in distance) or a roadway typically given in percent. For example, a two-percent grade represents two (2) feet of elevation change over a one hundred-foot distance. Grading means altering the shape of ground surfaces to a predetermined condition; this includes stripping, cutting, filling, stockpiling and shaping or any combination thereof and shall include the land in its cut or filled condition. Greenspace (or open space) means any area protected as permanently vegetated land. Ground coverage means the area of a lot occupied by all buildings expressed as a percentage of the gross area of the lot. Ground elevation means the original elevation of the ground surface prior to cutting or filling. Group home means a residence where two (2) or more unrelated persons live that is under the supervision of a resident manager. Group homes are established to assist persons who have left highly structured institutions such as a hospital or prison, to adjust to and reenter society and live within its accepted norms. The purpose of a group home is to allow people to begin the process of reintegration with society, while still providing monitoring and support. Group homes shall not provide treatment of drug or alcohol dependency, or provide an alternative to incarceration. H Hardship means the presence of some unique or rare condition of land, different in type and extent from other land in the same location or in the same zoning district. Hazardous material means any substance defined as "hazardous waste" by the Georgia Department of Natural Resources pursuant to O.C.G.A. § 12-8-60 et seq. as hereafter amended. Hazard to air navigation means an obstruction determined to have a substantial adverse effect on the safe and efficient utilization of the navigable airspace. Hazardous waste means any solid waste which has been defined as "hazardous waste" in regulations promulgated by the Administrator of the United States Environmental Protection Agency pursuant to the Federal Act which are in force and effect on February 1, 1991, codified as 40 C.F.R. Section 261.3 as hereafter amended and any designated hazardous waste. Also any substance defined as "hazardous waste" by the Georgia Department of Natural Resources pursuant to O.C.G.A. § 12-8-60 et seq. as hereafter amended. Health and personal services means establishments providing nonmedically related services, including beauty and barber shops; clothing rental; dry cleaning pick-up stores; laundromats (self-service laundries); psychic readers; shoe repair shops; tanning salons. These uses may also include accessory retail sales of products related to the services provided. Height means the vertical distance measured from average elevation of the proposed finished grade to the highest point of the coping of a flat roof or to the deck line of a mansard roof, or to the average height of the highest gable of a pitch or hip roof on a building. When referring to a tower, sign or other structure, the distance measured from ground level to the highest point on the tower, sign or other structure, even if said highest point is an antenna. When a building faces on more than one (1) street, the height shall be measured from the average of the grades at the center of each street front. Height of building. See building height. Heliport means a designated area for landing and takeoff of rotorcraft. Henry County's separate storm sewer system means any facility designed or used for collecting and/or conveying stormwater, including, but not limited to, any roads with drainage systems, highways, Henry County streets, curbs, gutters, inlets, catch basins, piped storm drains, pumping facilities, structural stormwater controls, ditches, swales, natural and manmade or altered drainage channels, reservoirs, and other drainage structures, and which is: (a) Owned or maintained by unincorporated Henry County; (b) Not a combined sewer; and (c) Not a part of a publicly-owned treatment works. Highest adjacent grade means the highest natural elevation of the ground surface prior to construction next to the proposed walls of a structure. Historic district means a geographically definable area, possessing a significant concentration, linkage, or continuity of sites, buildings, structures or objects united by past events or aesthetically by plan or physical development. A district may also comprise individual elements separated geographically but linked by association or history. A historic district shall further mean an area designated by the board of commissioners as a historic district pursuant to the criteria established in section 10.05.04 of this ULDC. Historic structure means any structure that is: (1) Listed individually in the National Register of Historic Places (a listing maintained by the U.S. Department of Interior) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual listing on the National Register; (2) Certified or preliminarily determined by the Secretary of the Interior as contributing to the historical significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a registered historic district; (3) Individually listed on a state inventory of historic places by states with historic preservation programs which have been approved by the Secretary of the Interior; or (4) Individually listed on a local inventory of historic places by communities with historic preservation programs that have been certified either: a. By an approved state program as determined by the Secretary of the Interior, or b. Directly by the Secretary of the Interior in states without approved programs. Home occupation means an occupation for gain or support conducted on the premises or within a dwelling unit by a person or family residing thereon. The term "home occupation" shall not be deemed to include a tourist home. Horizontal multifamily apartment means a residential development which provides for the clustering or grouping of attached and/or detached apartment units on a singular lot with an undivided ownership interest of the common areas of land and its appurtenances. Horizontal multifamily condominium means a residential development which provides for the clustering or grouping of dwelling units, attached or detached, with each unit owned in fee simple title, on a multi-unit property with an undivided ownership interest in common with other owners of the common areas of land and its appurtenances. Hospice care facility. Hospice care provides humane and compassionate care for people in the last phases of incurable disease so that they may live as fully and comfortably as possible. Hospice is to enable patients to continue an alert, pain-free life and to manage other symptoms so that their last days may be spent with dignity and quality, surrounded by their loved ones. Hospice affirms life and does not hasten or postpone death. Hospice care treats the person rather than the disease; it focuses on quality rather than length of life. It provides family-centered care; care is provided for the patient and family twenty-four (24) hours a day, seven (7) days a week. Hospice care can be given in the patient's home, a hospital, nursing home, or private hospice facility. Hospital means an institution receiving in-patients, or a public institution receiving out-patients, and authorized under Georgia law to render medical, surgical and/or obstetrical care. The term "hospital" shall include a sanitarium for the treatment and care of mental patients, alcoholics or drug addicts, but shall not include office facilities for the private practice of medicine or dentistry. Hotel means a building in which lodging, generally without in-room cooking facilities, is provided for guests. However, for hotels in C-3 or IAC zoning districts, cooking facilities are allowed within each room used for lodging. The term "hotel" includes the terms "motel", "extended stay" hotel or motel and "tourist court". Hotspot means an area where the use of the land has the potential to generate highly contaminated runoff, with concentrations of pollutants in excess of those typically found in stormwater. Human remains means the bodies of deceased human beings in any state of decomposition, including cremated remains. Hydrologic soil group (HSG) means a Natural Resource Conservation Service classification system in which soils are categorized into four (4) runoff potential groups. The groups range from group A soils, with high permeability and little runoff produced, to group D soils, which have low permeability rates and produce much more runoff. I Illicit discharge means any direct or indirect nonstormwater discharge to Henry County's separate storm sewer system, except as exempted in section 3-6-118 of this ULDC. Illegal connection means either of the following: (a) Any pipe, open channel, drain or conveyance, whether on the surface or subsurface, which allows an illicit discharge to enter the storm drain system including, but not limited to, any conveyances which allow any nonstormwater discharge including sewage, process wastewater, and wash water to enter the storm drain system, regardless of whether such pipe, open channel, drain or conveyance has been previously allowed, permitted, or approved by an authorized enforcement agency; or (b) Any pipe, open channel, drain or conveyance connected to Henry County's separate storm sewer system which has not been documented in plans, maps, or equivalent records and approved by an authorized enforcement agency. Impervious surface (or impervious cover) means any manmade paved, hardened or structural surface composed of any material that significantly impedes or prevents the natural infiltration of water or stormwater into the ground below the structure or surface into soil. Impervious surfaces include, but are not limited to, rooftops, buildings, streets and roads, swimming pools and any concrete or asphalt surface. Improvements means physical changes to the land which are necessary to create useable lots including (but not limited to) grading and paving streets, sewer and water facilities, hydrants, sidewalks, monuments, changes to existing utilities, and stormwater drainage and detention systems. Individual assessment determination means a finding by the administrator that an individual assessment study does or does not meet the requirements for such a study as established by this article or, if the requirements are met, the fee calculated therefrom. Individual assessment study means the engineering, financial, or economic documentation prepared by a feepayor or applicant to allow individual determination of a development impact fee other than by use of the applicable fee schedule. Indoor play space means play space required inside the principal structure of child care centers set aside for children's recreation and play. The area provided must be at least thirty-five (35) square feet of indoor play space for each child. Industrial activity means activities subject to NPDES industrial permits as defined in 40 CFR, Section 122.26(b)(14). Industrialized building means any structure or component thereof which is wholly or in substantial part made, fabricated, formed, or assembled in manufacturing facilities for installation on a building site and has been manufactured in such a manner that all parts or processes cannot be inspected at the installation site without disassembly, damage to, or destruction thereof. Industrialized buildings are constructed and regulated in accordance with the "Industrialized Buildings Act", Georgia Law 1981 pp 1637—1643 (O.C.G.A., § 8-2-2(1)). Industrial stormwater permit means a National Pollutant Discharge Elimination System (NPDES) permit issued to an industry or group of industries which regulates the pollutant levels associated with industrial stormwater discharges or specifies on-site pollution control strategies. Inert construction waste means waste building materials and other waste resulting from the construction, remodeling or repair of houses, buildings and other structures which will not or are not likely to cause production of leachate of environmental concern. Such waste is limited to earth and earth-like products, concrete, cured asphalt, rock, bricks, yard trimmings, stumps, limbs and leaves. This definition excludes all waste not specifically listed above. (See Section 3-5-109(f) of the Henry County Code of Ordinances.) Infill means development of vacant or remnant lands passed over by previous development in the area. Infiltration means the process of percolating stormwater runoff into the subsoil. Infrastructure means manmade structures and systems which serve the common needs of the population, such as: sewage disposal systems; potable water systems; potable water wells serving a system; solid waste disposal sites or retention areas; stormwater systems; utilities; piers; docks; wharves; breakwaters; bulkheads; seawalls; bulwarks; revetments; causeways; marinas; navigation channels; bridges; and roadways. Inoperable vehicle means any motorized vehicle incapable of immediately being driven. Inspection and maintenance agreement means a written agreement providing for the long-term inspection and maintenance of stormwater management facilities and practices on a site or with respect to a land development project, which when properly recorded in the deed records constitutes a restriction on the title to a site or other land involved in a land development project. Institutional use means activities for civic, cultural, educational, social, or governmental purposes. Interparcel connection means a vehicular and pedestrian road, street or lane connecting segment and or sidewalk access for public use to gain access to adjacent residential subdivisions, commercial, industrial and mixed use subdivisions and establishments where access to contiguous properties would otherwise require vehicle trips on frontage roads for access. Interior landscape area means an area to be landscaped which is located in the interior area of a development or building site where vehicular parking spaces are to be provided or which is otherwise to be covered with impervious surface. J Junk/salvage yard means any use on public streets or private property involving the parking, storage or disassembly of vehicles and/or machinery; the storage, sale or resale of used auto parts, tires, scrap iron, metal; used plumbing fixtures, old stoves, refrigerators and other old household appliances; used brick, wood, or other building/structural materials, used paper, rags or other scrap materials. These uses shall be considered junk yards whether or not all or part of these operations are conducted inside a building or in conjunction with, or accessory to other uses of the premises. Junked vehicle means any wrecked nonoperable, dismantled automobile, truck or other vehicle which does not bear a current state license plate. Jurisdictional wetland means an area that is inundated or saturated by surface water or groundwater at a frequency and duration sufficient to support a prevalence of vegetation typically adapted for a life in saturated soil conditions, commonly known as hydrophytic vegetation. K Kennel. The following shall constitute a kennel: (1) Commercial kennel: Any location which provides boarding and care for dogs, cats, or other small animals for pecuniary gain. (2) Noncommercial kennel: Any single-family residence in the RA zoning district where no more than ten (10) adult dogs and/or cats are kept as pets for the noncommercial purpose of hunting, exhibition in shows, field trials or breeding. Surplus offspring bred at such kennels to enhance or perpetuate any given breed, recognized by the American Kennel Club, may be sold at such kennels and shall not be considered a commercial activity. All animals kept or maintained in said kennel must be owned by the individual or family residing upon the lot upon which the kennel is located. Kindergarten means a state-approved institution for the education of pre-school aged children. Kitchen means a room or interior area equipped for preparing and cooking food. L Ldn noise contour means a line linking together a series of points of equal cumulative noise exposure, based upon airport flight patterns, number of daily operations by type of aircraft, and typical runway utilization patterns. Land development. See development. Land development activities means those actions or activities which comprise, facilitate or result in land development. Land development project means a discrete land development undertaking. Land disturbance means any land or vegetation change, including, but not limited to, clearing, grubbing, stripping, removal of vegetation, dredging, grading, excavating, transporting, and filling of land, that do not involve construction, paving or any other installation of impervious cover. Land disturbing activity means any activity which may result in soil erosion from water or wind and the movement of sediments into state waters or onto lands within the state, including, but not limited to, clearing, dredging, grading, excavating, transporting, and filling of land but not including agricultural practices. Landscape plan means a detailed plan depicting proposed landscaping which will accompany all site plans submitted for development approval when required by the ULDC. Large quantity generator of hazardous waste means any person, corporation, partnership, association or other legal entity that is defined as a "large quantity generator" by the Georgia Department of Natural Resources pursuant to O.C.G.A. § 12-8-60 et seq. as hereafter amended and that is regulated by the State of Georgia under that section. Larger common plan of development or sale means a contiguous area where multiple separate and distinct construction activities are occurring under one (1) plan of development or sale. For the purposes of this paragraph, "plan" means an announcement; piece of documentation such as a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, or computer design; or physical demarcation such as boundary signs, lot stakes, or surveyor marking, indicating that construction activities may occur on a specific plot. Level of service means a measure of the relationship between service capacity and service demand for specified public facilities as established by Henry County, Georgia in terms of demand to capacity ratios or the comfort and convenience of use or service of such public facilities or both. Litter means any organic or inorganic waste material, rubbish, refuse, garbage, trash, hulls, peelings, debris, grass, weeds, ashes, sand, gravel, slag, brickbats, metal, plastic, and glass containers, broken glass, dead animals or intentionally or unintentionally discarded materials of every kind and description which are not "waste" as such terms defined on O.C.G.A., § 16-7-51(6). Loading space, off-street means space logically and conveniently located for bulk pickups and deliveries, scaled to the size of delivery vehicles expected to be used. Local issuing authority means the governing authority of any county or municipality which is certified pursuant to O.C.G.A § 12-7-8(a). Lodge means a membership organization that holds regular meetings and that may, subject to other regulations controlling such uses, maintain dining facilities, serve alcohol, or engage professional entertainment for the enjoyment of dues-paying members and their guests. There are no sleeping facilities. Lot means a portion or parcel of land separated from other portions or parcels by description, such as on a subdivision plat, survey map, or metes and bounds. Corner lot. A lot abutting two (2) or more streets at their intersection, or bounded on two (2) or more adjacent sides by street right-of-way lines. Double frontage lot (through lot). A lot, other than a corner lot, that has frontage upon two (2) or more streets that do not intersect at a point abutting the property. Flag lot. A lot with uneven dimensions in which the portion fronting on a street is less than the required minimum width required for construction of a building or structure. Interior. A lot other than a corner lot or a through lot. Lot depth means the average horizontal distance between the front and rear lot lines. (Lot definitions are illustrated in figure A.1.) Lot line (property line) means the property boundary, abutting a right-of-way line, or any line defining the exact location of a lot. Lot width means the horizontal distance between the side lot lines measured along the street right-of-way lines. Lot of record means an individual lot or a lot which is a part of a subdivision, the map of which has been recorded in the office of the clerk of superior court of Henry County, Georgia, or a parcel of land the deed of which has been recorded in the office of the clerk of superior court of Henry County. Lowest floor means the lowest floor of the lowest enclosed area, including basement. An unfinished or flood resistant enclosure, usable solely for parking of vehicles, building access or storage in an area other than a basement area, is not considered a building's lowest floor, provided that such enclosure is not built so as to render the structure in violation of other provisions of this ULDC. M Malt beverages means a fermented drink in which the primary ingredient is the grain, or seed, of the barley plant, which has been allowed to sprout slightly in a traditional way called "malting" before it is processed. Manufactured home means a structure, transportable in one (1) or more sections, which is built on a permanent chassis and is designed to be used with or without a permanent foundation when attached to the required utilities. The term includes any structure commonly referred to as a "mobile home" regardless of the date of manufacture. The term also includes parked trailers, travel trailers and similar transportable structures placed on a site for one hundred eighty (180) consecutive days or longer and intended to be improved property. The term does not include a "recreational vehicle." Major recreational equipment means boats and boat trailers, travel trailers, pickup campers or coaches (designed to be mounted on automotive vehicles), motorized dwelling, motor coaches, tent trailers, and cases or boxes used for transporting recreational equipment, whether occupied by such equipment or not. Master development plan means a written and graphic submission for a mixed-use development which represents a tract of land, proposed subdivision, the location and bulk of buildings and other structures, density of development, public and private streets, parking facilities, common open space, public facilities and all covenants relating to use thereof. The master development plan is submitted in conjunction with a rezoning application for the MU zoning district. Material change in appearance means a change that will affect either the exterior architectural or environmental features of a historic property or any building, structure, site, object, or landscape feature within a historic district, such as: (a) A reconstruction or alteration of the size, shape or façade of a historic property, including relocation of any doors or windows or removal or alteration of any architectural features, details or elements; (b) Demolition or relocation of a historic structure; (c) Commencement of excavation for construction purposes; (d) A change in signage visible from the public right-of-way; or (e) The erection, alteration, restoration or removal or any buildings or other structure within a historic property or district, including walls, fences, steps and pavements, or other appurtenant features. Mean sea level means the datum to which base flood elevations shown on a community's flood insurance rate map (FIRM) are referenced. For purposes of this ULDC the term is synonymous with National Geodetic Vertical Datum (NGVD) of 1929 or the North American Vertical Datum (NAVD) of 1988. Metropolitan River Protection Act (MRPA) means a state law referenced as O.C.G.A. § 12-5-440 et seq., which addresses environmental and developmental matters in certain metropolitan river corridors and their drainage basins. Mini-warehouse means a building or portion thereof used for dead storage, mainly of the excess personal property of an individual or family, but also of small amounts of goods or merchandise for businesses or individuals. Mini-warehouses shall not include retail sale on the premises, commercial repair or other services, manufacturing or any other commercial use. Mixed use (development) means a development project that incorporates two (2) or more different types of land uses or activities, such as residential, commercial, office, and/or industrial. A mixed-use development has the different types of land uses in proximity, vertically or horizontally, planned as a unified complementary whole, and functionally integrated to the use of shared vehicular and pedestrian access and parking areas. Mobile food services, portable restaurants, temporary outdoor and sales, and sidewalk sales means any temporary business selling goods or merchandise from a tent, truck, vending cart or other areas outside of a permanent structure on property owned or leased by the business. Temporary outdoor sales do not include sales conducted by charitable organizations incidental to the principal or permitted use or structure on the property. Mobile home means a structure, transportable in one (1) or more sections, which, in the traveling mode, is eight (8) body feet or more in width or forty (40) body feet or more in length or, when erected on site, is three hundred twenty (320) or more square feet and which is built on a permanent chassis and designed to be used as a dwelling with or without a permanent foundation when connected to the required utilities and includes the plumbing, heating, air-conditioning, and electrical systems contained therein and manufactured prior to June 15, 1976. Documentation of compliance with the National Mobile Home Construction and Safety Standard Act (United States Department of Housing and Urban Development certification) shall be required. Mobile home community means a mobile home development with continuing local general management and with special facilities for common use by the occupants, including such items as common recreational building and areas, common open space, laundries and the like. Mobile home development means a mobile home development included mobile home parks, mobile home subdivisions and mobile home condominiums. Mobile home park means a parcel of land that has been planned and improved for the placement of mobile homes for living or sleeping purposes, or where spaces or lots are set aside and offered for rent for use by mobile homes for living or sleeping purposes, including any land, building or structure or facility used by occupants of mobile homes on such premises. A mobile home park does not include an automobile or mobile home sales lot on which unoccupied mobile homes are parked for inspection or sale. Mobile home or manufactured home subdivision means a tract of land that is used, designated, maintained or held out for sale of lots to accommodate mobile homes or manufactured housing. A mobile home or manufactured home subdivision shall meet the requirements of the zoning district in which it is located. Monopole means a single, freestanding pole-type structure supporting one (1) or more antenna. For purposes of this ordinance, a monopole is not a tower. Motel means an establishment where lodging without separate cooking facilities are provided to the public for compensation, in which ingress or egress to and from all rooms are made primarily directly from an exterior walkway rather than from an inside lobby. Includes a building or group of buildings intended for short-term use by transients or the travelers, and containing sleeping accommodations with sanitary facilities. Other synonymous terms include hotel, tourist court, motor court, motor inn, or motor lodge. Extended stay motel or hotel means a motel providing sleeping accommodations, sanitary facilities, and kitchen facilities, intended for overnight or weekly use. Move in house or structure means a pre-existing dwelling or structure relocated to another lot or on the same lot. N National Geodetic Vertical Datum, as corrected in 1929, means a vertical control used as a reference for establishing varying elevations within the floodplain. National Pollutant Discharge Elimination System (NPDES) Stormwater Discharge Permit means a permit issued by the Georgia EPD under authority delegated pursuant to 33 USC § 1342(b) that authorizes the discharge of pollutants to waters of the United States, whether the permit is applicable on an individual, group, or general area-wide basis. Natural area means an area of natural vegetation that is generally undisturbed, unmaintained, and is self-perpetuating. It includes not only trees, but also native shrubs, ground covers, wildflowers, vines, and grasses. Natural vegetated area means an undeveloped area largely free from human disturbance where naturally occurring vegetation is allowed to remain undisturbed or is enhanced and maintained by human intervention. Activities specifically allowed in such an area include, but are not limited to: Conservation or preservation of soil, water, vegetation, fish, shellfish and other wildlife; outdoor recreational activities, including hunting, fishing, trapping, bird watching, hiking, boating, horseback riding, swimming, canoeing, skeet and trap shooting; education, scientific research and nature trails; maintenance or repair of lawfully located roads, structures and utilities used in the service of the public, provided that the work is conducted using best management practices to ensure that negative effects on the previous nature of the land shall be minimized; and limited excavating, filling and land disturbance necessary for the repair and maintenance of structures necessary to the uses permissible in the area as above. Natural ground surface means the ground surface in its original state before any grading, excavation or filling. Nephelometric turbidity units (NTU) means numerical units of measure based upon photometric analytical techniques for measuring the light scattered by finely divided particles of a substance in suspension. This technique is used to estimate the extent of turbidity in water in which colloidally dispersed particles are present. Net acreage means the total acreage of any parcel or combined parcels of land to be developed as a single project, less the sum of the following: total number of acres contained in the 100-year flood hazard area, total number of acres contained in rights-of-ways and the total number of acres contained in detention or retention ponds to be constructed. Net density. See density (net density). New development. See development. New construction means any structure (see definition) for which the start of construction commenced on or after September 15, 2009, and includes any subsequent improvements to the structure. New manufactured home park or subdivision means a manufactured home park or subdivision for which the construction of facilities for servicing the lots on which the manufactured homes are to be affixed (including at a minimum, the installation of utilities, the construction of streets, and either final site grading or the pouring of concrete pads) is completed on or after September 15, 2009. Noncombustible material means any material which will not ignite at or below a temperature of one thousand two hundred degrees Fahrenheit (1,200°F) and will not continue to burn or glow at that temperature. Nonconformity or nonconforming use means a land use activity, building or structure legally established prior to adoption of this ULDC, or subsequent amendment to it, that would not otherwise be permissible under the provisions of this section. Nonpoint source pollution means a form of water pollution that does not originate from a discrete point such as a sewage treatment plant or industrial discharge, but involves the transport of pollutants such as sediment, fertilizers, pesticides, heavy metals, oil, grease, bacteria, organic materials and other contaminants from land to surface water and groundwater via mechanisms such as precipitation, stormwater runoff, and leaching. Nonpoint source pollutions a by-product of land use practices such as agricultural, silvicultural, mining, construction, subsurface disposal and urban runoff sources. Nonstormwater discharge means any discharge to the storm drain system that is not composed entirely of stormwater. Nonstructural stormwater management practice (nonstructural practice) means any natural or planted vegetation or other nonstructural component of the stormwater management plan that provides for or enhances stormwater quantity and/or quality control or other stormwater management benefits, and includes, but is not limited to, riparian buffers, open and green space areas, overland flow filtration areas, natural depressions, and vegetated channels. North American Vertical Datum (NAVD) of 1988 means a vertical control used as a reference for establishing varying elevations within the floodplain. Nursery school, kindergarten schools. See day care definition. Nursing home means a use in which domiciliary care is provided to one (1) or more convalescing, chronically or terminally ill non-family members who are provided with food, shelter and care. This use shall not include hospitals, clinics or similar institutions devoted primarily to the diagnosis and treatment of the sick or injured. O Object means a material thing of functional, aesthetic, cultural, historical or scientific value that may be, by nature or design, movable yet related to a specific setting or environment. Off-site facility means a stormwater management facility located outside the boundaries of the site. On-site facility means a stormwater management facility located within the boundaries of the site. Open space means permanently protected areas that are preserved in a natural state and. undisturbed lands or otherwise properties set aside for recreational uses, buffers, common areas, landscape areas, as well as other uses defined under the open space categories described below. Buffers and wetlands, if located on lots to be conveyed to private property owners, shall not be considered as open space. Land contained within the 100-year flood zone shall not be considered as open space if located on lots that are to be conveyed to private property owners. Land designated as open space is divided into five (5) categories (the open space categories or, singularly, an open space category): • Category A wetland stream buffers; 100-year flood hazard areas, undisturbed buffers between various land uses, roadside buffers, wildlife sanctuaries, and other forms of buffers, if owned by the developer or a property owners association; • Category B improved and revegetated areas utilized for active recreation, such as ball fields, parks and golf courses; • Category C improved, active recreation areas, such as swimming pools, tennis courts and playgrounds; • Category D state waters, including wetlands, ponds, lakes, if owned by a developer or a property owners association; and • Category E land donated to a governmental entity for public use, provided such land is not located in a wetland or 100-year flood zone. In order to calculate the total open space, the total acreage contained within each open space category is multiplied by its respective factor, as set forth below: • Category A factor = 1.0 • Category B factor = 0.7 • Category C factor = 0.2 • Category D factor = 0.5 • Category E factor = 2.0. Open space, public means land dedicated or reserved for use by the general public. It includes parks, recreation facilities, school sites, community or public building sites and similar spaces for public use. Operator means the party or parties that have: (a) Operational control of construction project plans and specifications, including the ability to make modifications to those plans and specifications; or (b) Day-to day operational control of those activities that are necessary to ensure compliance with a stormwater pollution prevention plan for the site of other permit conditions, such as a person authorized to direct workers at a site to carry out activities required by the stormwater pollution prevention plan or to comply with other permit conditions. Orphanage means an institution devoted to the care of children whose parents are deceased or otherwise unable to care for them. Parents, and sometimes grandparents, are legally responsible for supporting children, but in the absence of these or other relatives willing to care for the children, they become a ward of the state, and orphanages are a way of providing for their care and housing. Outdoor play area means an area outside the principal structure designed and set aside for recreation and play in the open air and sunshine and may contain some play equipment. See child care center definition. Outside storage means the placement or containment of goods, materials, or equipment other than within a building, for purposes of keeping such goods, materials, or equipment for processing, use, sale, or transfer to other locations. Overbank flood protection means measures taken to prevent an increase in the frequency and magnitude of out-of-bank flooding (i.e., flow events that exceed the capacity of the channel and enter the floodplain), and that are intended to protect downstream properties from flooding for the two-year through twenty-five-year frequency storm events. Overhang means the edge of a roof that projects out over the space or wall beneath. Overlay zoning district or overlay district means a defined geographic area that encompasses one (1) or more underlying zoning districts and that superimposes additional requirements above those required by the underlying zoning district. An overlay district can be coterminous with existing zoning districts or containing only parts of one (1) or more such districts. Permitted uses in the underlying zoning district shall continue subject to compliance with the regulations of the overlay zone or district where that use is expanded or enlarged after the adoption of this ULDC. Owner means the legal or beneficial owner of a site, including, but not limited to, a mortgagee or vendee in possession, receiver, executor, trustee, lessee or other person, firm or corporation in control of the site. P Parcel means any plot, lot or acreage shown as a unit on the latest county tax assessment records. Parking space, off-street means an off-street parking space consisting of a space adequate for parking an automobile with room for opening doors on both sides, together with properly related access to a public street or alley and maneuvering room, design standards for which are contained in the ULDC. Patio cover means an attached structure with open, screened or glazed walls which is used only for recreational, outdoor living purposes associated with the dwelling unit and not as carports, garages, storage rooms or habitable rooms. Pavement width means the cross section width of a paved road measured from edges of pavement. Perennial stream means any stream which flows throughout the entire year, as shown as a solid blue line on a United States Geological Survey (USGS) 7-minute Topographic Series Maps (1:24,000). Perimeter landscape area means an area to be landscaped which is located between the buffer area required by the ULDC and the interior landscape area, as defined in the ULDC. Permit means the permit issued by the Henry County to the applicant which is required prior to undertaking any development activity. Person means any individual, partnership, firm, association, joint venture, public or private corporation, trust, estate, commission, board, public or private institution, utility, cooperative, state agency, municipality or other political subdivision of this state, any interstate body or any other legal entity. Personal care home means a personal care home is a single home where personal care services are provided to no more than six (6) nonfamily adults. Personal care services includes, but is not limited to, individual assistance with or supervision of self-administered medication and essential activities of daily living such as eating, bathing, grooming, dressing, and toileting. A care home cannot provide nursing or other medical services or admit and retain residents who need continuous medical or nursing care (see O.C.G.A. § 31-7-12 for state requirements for personal care homes). The term personal care home does not include buildings which are devoted to independent living units which include kitchen facilities in which residents have the option of preparing and serving some or all of their own meals, nor does it include halfway houses, residential treatment facilities, nursing homes, sanitariums, hospital or other institutional facilities, or rooming or boarding facilities which do not provide personal care. Pet means a tame animal kept for companionship or pleasure. In all residential zoning districts the maximum number of pets allowed per residence is four (4). Planned development means development which has both residential and nonresidential land uses according to a master development plan, with related covenants and restrictions. Developments within a PD project may have flexibility in the application of development standards when approved according to a master development plan, and to promote the conservation of natural resources, more efficient use of land, and, efficiency in the extension of streets and utilities. Planning and zoning department means the professional planning staff of Henry County, Georgia, responsible for administering the zoning ordinance, subdivision regulations and comprehensive land use plan. Pollutant means anything which causes or contributes to pollution. Pollutants may include, but are not limited to: Paints, varnishes, and solvents; petroleum hydrocarbons; automotive fluids; cooking grease; detergents (biodegradable or otherwise); degreasers; cleaning chemicals; nonhazardous liquid and solid wastes and yard wastes; refuse, rubbish, garbage, litter, or other discarded or abandoned objects and accumulations, so that same may cause or contribute to pollution; floatables; pesticides, herbicides, and fertilizers; liquid and solid wastes; sewage, fecal coliform and pathogens; dissolved and particulate metals; animal wastes; wastes and residues that result from constructing a building or structure; concrete and cement; and noxious or offensive matter or any kind. Pollution means the contamination or other alteration of any water’s physical, chemical or biological properties by the addition of any constituent and includes, but is not limited to, a change in temperature, taste, color, turbidity, or odor of such waters, or the discharge of any liquid, gaseous, solid, radioactive, or other substance into any such waters as will or is likely to create a nuisance or render such waters harmful, detrimental or injurious to the public health, safety, welfare, or environment, or to domestic, commercial, industrial, agricultural, recreational, or other legitimate beneficial uses, or to livestock, wild animals, birds, fish or other aquatic life. Portico or porch means a covered entrance to a large building or a covered walkway, often leading to the main entrance of a building that consists of a roof supported by pillars. Post-development refers to the time period, or the conditions that may reasonably be expected or anticipated to exist, after completion of the land development activity on a site as the context may require. Pre-development refers to the time period, or the conditions that exist, on a site prior to the commencement of a land development project and at the time that plans for the land development of a site are approved by the plan approving authority. Where phased development or plan approval occurs (preliminary grading, roads and utilities, etc.) the existing conditions at the time prior to the first item being approved or permitted shall establish pre-development conditions. Premises means any building, lot, parcel of land, or portion of land whether improved or unimproved including adjacent sidewalks and parking strips. Present value means the current value of past, present, or future payments, contributions, or dedications of goods, services, materials, construction, or money, as calculated using accepted methods of financial analysis for determination of net present value. Preserve and protect means to keep from destruction, peril, or other adversity and may include the placement of signs, markers, fencing, or other such appropriate features so as to identify the site as a cemetery or burial ground and may also include the cleaning, maintenance, and upkeep of the site so as to aid in its preservation and protection. Primary surface means an area longitudinally centered on a runway extending two hundred (200) feet beyond each end of the runway. The elevation of any point on the primary surface is the same as the elevation of the nearest point on the runway centerline. Principal building means the building or structure in which the primary use permissible on the lot is conducted. In RA (less than two (2) acres or a platted subdivision), R-1, R-2, R-3, R-4, R-5, RD, RM, RS and RMH residential zoned districts a dwelling shall be deemed to be the principal building on the lot. A structurally independent garage, carport or other structure may be attached to the principal buildings by a roofed breezeway which shall cause the entire structure to be construed as part of the principal building and shall be subject to the sections applicable to the principal building or structure. A detached and structurally independent carport, garage or other structure shall conform to the requirements of any accessory building. Principal permitted use means that use of a lot which is among the uses allowed as a matter of right under the zoning classifications. (Also see WCF principal or accessory use.) Private deed restrictions or covenants means private deed restrictions or covenants imposed on land by private land owners. They bind and restrict the land in the hands of present owners and subsequent owners. They are enforceable only by the land owners involved and not by the county or other public agency. Project means a single improvement or set of interrelated improvements undertaken together within a finite time period at a specific location. With regard to land development, a project may be identified as those construction activities authorized collectively by a building permit or other development approval, or for an interrelated collection of buildings and common public facilities such as a residential subdivision or an office park. Project improvements means site specific improvements or facilities that are planned, designed, or built to provide service for a specific development project and that are necessary for the use and convenience of the occupants or users of that project only, and that are not system improvements. The character of the improvement shall control a determination of whether an improvement is a project improvement or a system improvement, and the physical location of the improvement on-site or off-site shall not be considered determinative of whether an improvement is a project improvement or a system improvement. A project improvement may provide no more than incidental service or facility capacity to persons other than users or occupants of the particular project they serve. No improvement or facility included in a plan for public facilities and approved for public funding by Henry County, Georgia, shall be considered a project improvement. Property line. See lot line. Property owner means that person or entity that holds legal title to property. Proportionate share means that portion of the cost of system improvements that is reasonably and fairly related to the service demands and needs of a project. Protection area or stream protection area means, with respect to a stream, the combined areas of all required buffers and setbacks applicable to such stream. Public or private property means the right-of-way of any road or highway; any body of water or watercourse or the shores or beaches thereof; any park, playground, building, refuge, or conservation or recreation area; timberlands or forests; and residential, commercial, industrial, or farm properties. Public facilities or public spaces means: (a) Parks, open space, and recreation areas and related facilities; and (b) Public safety facilities, including police, inmate housing, fire, animal control, emergency medical, and rescue facilities; (c) Libraries and related facilities; and (d) Roads, streets, and bridges, including rights-of-way, traffic signals, landscaping, and any other components of state or federal highways. Public streets means right-of-way dedicated to the county or owned by the county for public street purpose. Public utility means firms, corporations, or local government authorities providing gas, electricity, communications service, and similar essential services. Public water facilities means mains and service lines owned and operated by the Henry County Water and Sewage Authority, or when approved by the board of commissioners, a private water system operating under the direct supervision of the DNR. Q Qualified personnel means any person who meets or exceeds the education and training requirements of O.C.G.A. § 12-7-19. Quarters means a place of residence. R Recreational vehicle means a vehicle which is: (a) Built on a single chassis; (b) Four hundred (400) square feet or less when measured at the largest horizontal projection; (c) Designed to be self-propelled or permanently towable by light duty truck; and (d) Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use. Redevelopment means a land development project on a previously developed site, but excludes ordinary maintenance activities, remodeling of existing buildings, resurfacing of paved areas, and exterior changes or improvements which do not materially increase or concentrate stormwater runoff, or cause additional nonpoint source pollution. Regional development centers (RDC) means State of Georgia regional agencies created to facilitate coordinated and comprehensive planning in conformity with state standards and procedures. Regional stormwater management facility (regional facility) means stormwater management facilities designed to control stormwater runoff from multiple properties, where the owners or developers of the individual properties may assist in the financing of the facility, and the requirements for on-site controls is either eliminated or reduced. Regulatory flood (regulatory flood elevation) means the flood standard equal to or higher than the base flood. Repetitive loss means flood related damage sustained by a structure on two (2) separate occasions during a ten-year period for which the cost of repairs at the time of each such flood event, on the average, equals or exceeds twenty-five (25) percent of the market value of the structure before the damage occurred. Reservoir boundary means the edge of a reservoir, defined by its normal pool level (elevation above mean sea level). Residence means a home, abode, or place where an individual is actually living on a nontemporary basis. Residential fly-in neighborhood means a subdivision designed to include a private airport or landing strip. Retail establishment means an establishment that sells goods or merchandise from a fixed location directly to a consuming purchaser and includes establishments that prepare and sell meals or other edible products either for carry out or service within the establishment. The term retail means a sale made to the consuming purchaser or purchaser without a retail license. Right-of-way means access over or across a particularly described property for a specific purpose. A strip of land intended to be occupied by a street, crosswalk, railroad, electric transmission line, oil or gas pipeline, water line, storm sewer, drainage structure, sewer line, or other similar use. Riparian means belonging or related to the bank of a river, stream, lake, pond or impoundment. Road frontage. See Frontage. Roadway drainage structure means a device such as a bridge, culvert, or ditch, composed of a virtually nonerodible material such as concrete, steel, plastic, or other such material that conveys water under a roadway by intercepting the flow on one (1) side of a traveled way consisting of one (1) or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side. Rotorcraft means a heavier-than-air aircraft that derives its support in flight principally from lift generated by one (1) or more rotors. Runoff means stormwater runoff. Runway means a defined area at the airport prepared for landing and takeoff of aircraft along its length. Runway protection zone means a trapezoidal shaped, two-dimensional area located near each planned runway end. S Sediment means solid material, both organic and inorganic, that is in suspension, is being transported, or has been moved from its site of origin by air, water, ice, or gravity as a product of erosion. Sedimentation means the process by which eroded material is transported and deposited by the action of water, wind, ice, or gravity. Self-service storage facility means a fully enclosed facility containing independent bays and/or self contained units which are leased to or owned by individuals exclusively for dead storage of goods or personal property. Service area means a geographically defined area as designated in the capital improvements element of the comprehensive plan in which a defined set of public facilities provide or are proposed to provide service to existing or future development. Setback means the horizontal distance between a building or building line and a property line or a buffer line in which a structure cannot be erected or, with respect to a stream, the area established by the ULDC extending beyond any buffer applicable to the stream. (Setbacks are illustrated in figure A.2.) Sewer line, lateral means sanitary sewer collection lines within a subdivision or development that transports effluent to larger trunk sewers for sewage treatment. Sewer line, trunk means the main sanitary sewer lines which collect sewage from lateral sewer lines for transportation either directly to sewage treatment plants or to larger interceptor sewers entering a treatment plant. Shopping center means a group of commercial establishments having a building composition that is a single architectural unit and is not a miscellaneous assemblage of stores. It is planned and developed as a unit, related in location, size and type of shops to the trade area that the unit serves, and provides on-site parking in definite relationship to the types and sizes of stores. Shopping centers are classified by type, each distinctive in its own function: Neighborhood shopping center. Provides for the sale of convenience goods (foods, drugs, sundries, etc.) and personal services (laundry, dry cleaning, barbering, shoe repair, etc.) for the day-to-day living needs of the immediate neighborhood. It is generally built around a supermarket which is the major tenant. Neighborhood shopping centers may have an average gross leasable area (GLA) close to fifty thousand (50,000) square feet and range between thirty thousand (30,000) square feet and one hundred thousand (100,000) square feet in GLA. Typically, the lot size for a neighborhood shopping center is between four (4) and ten (10) acres, with a trade area population of five thousand (5,000) to forty thousand (40,000) people. Community shopping center. Provides for the sale of a wide range of durable goods and other types of merchandise in addition to convenience goods and personal services found in a neighborhood shopping center and typically has a junior department store or specialty store as the major tenant. Community shopping centers may have an average GLA close to one hundred fifty thousand (150,000) square feet and range between one hundred thousand (100,000) square feet and three hundred thousand (300,000) square feet GLA. Typically, the lot size for a community shopping center is between ten (10) and thirty (30) or more acres, with a trade area population of forty thousand (40,000) to one hundred fifty thousand (150,000) people. Regional shopping center. Provides for the sale of a wide range and variety of general merchandise, apparel, furniture, furnishings, novelties, personalized services and amusements in addition to those items found in neighborhood and community shopping centers. Typically, there are several major tenants which include nationally known department stores and grocery stores. Regional shopping centers may have an average GLA close to four hundred thousand (400,000) square feet and range between three hundred thousand (300,000) square feet and one million (1,000,000) square feet GLA. Typically, the lot size for a regional shopping center is thirty (30) to fifty (50) or more acres, with a trade area population in excess of one hundred fifty thousand (150,000) people. Sign means every device, item, product, frame, letter, figure, character, mark, plane, point, design, picture, stroke, stripe, trademark, or reading matter, which is used or intended to be used to attract attention or convey information when the same is placed in view of the general public. For the purpose of determining number of signs, a single display surface or a single display device containing different elements that are organized, related, and composed to form a unit shall be considered to be one (1) sign. Where different elements are displayed in a random manner without an organized relationship to each other, or where there is reasonable doubt as to the relationship of different elements to each other, each element shall be considered to be a single separate sign. Aerial view sign. Any sign which is designed primarily to be viewed from the sky from an airplane, helicopter, etc. This includes, but is not limited to, any sign horizontally affixed to a roof or attached to a roof such that the sign is not readily viewable from the surrounding ground. Aggregate signable area. The sum total of the signable area of any and all signs, for a given lot. Street numbers assigned by the United States Postal Service shall not be considered in calculating the aggregate signable area. Animated sign. See flashing sign. Awning sign. Any sign on a cloth, metal, plastic or other cover designed to shade a window or entrances and attached to any structure. Back-to-back sign. A sign with two (2) parallel sign faces oriented in opposite directions. Banner sign. See temporary sign. Beacon. See temporary sign. Bench sign. See ground sign. Billboard. An outdoor advertising sign, typically drawing attention to activities on premises other than the sign location. Blade sign. See projecting sign or swinging sign. Bracket sign. See projecting sign or swinging sign. Canopy sign. See wall sign. Changeable copy sign. See flashing sign. Decal. A picture, design or label made to be transferred (as to glass, wood, metal or any other hard object) from specially prepared paper. Detached sign. See ground sign. Door sign. See wall sign or window sign. Entrance sign. Any sign placed at the intersection of a public street and a public or private entryway into an apartment complex, condominium complex, office complex, industrial complex or other building or buildings with multifamily residential dwelling units or multiple commercial units. Externally illuminated signs. Any sign illuminated by an external light source directed primarily toward such sign. Fascia sign. See wall sign. Flag. A usually rectangular piece of fabric of distinctive design that is used as a symbol as of a nation, as a signaling device or as a decoration. Flashing sign. Any sign whose message or appearance scrolls, flashes, rotates or changes, or whose illumination changes in intensity more often than once every fifteen (15) seconds, including, but not limited to, reader boards. Flat sign. See wall sign. Ground sign. Any sign supported by uprights or braces which are permanently placed into the ground, and not supported by or suspended from any building. Hand-held signs. Any sign larger than six (6) inches by six (6) inches carried by a human appendage or prosthesis including, but not limited to, picket signs, shields or sandwich boards. Height, sign. The vertical distance measured from the lowest adjacent grade to the highest point of the sign or sign structure. Internally illuminated signs. Any sign which has characters, letters, figures, designs or outlines illuminated by electric lights or luminous tubes located within the interior parts of the sign. Mansard sign. See roof sign or wall sign. Marquee sign. See flashing sign. Mobile sign. See temporary sign. Monument sign. See ground sign. Moving sign. See flashing sign. Multiple message sign. See flashing sign. Nonconforming sign. Any sign which does not conform to the provisions of this ULDC at the date of adoption of same. Painted wall sign. See wall sign. Parapet sign. See wall sign. Pennant. See temporary sign. Pitched roof sign. See roof sign. Pole sign. See ground sign. Portable sign. See temporary sign. Projecting sign. Any sign which is attached perpendicular to a building or other structure and extends more than twelve (12) inches horizontally from the plane of the building wall. Pylon sign. See ground sign. Readerboard. See flashing sign. Reflectors. Any device created for the purpose of reflecting light directed at the device so as to render the device especially visible. Revolving sign. See flashing sign. Roof sign. A sign which is attached to a building or structure and is displayed above the lowest horizontal line of a building's roof. Rotating sign. See flashing sign. Sandwich sign. See temporary sign or hand-held sign. Searchlight. See temporary sign. Shingle sign. See projecting sign or swinging sign. Sidewalk sign. See temporary sign. Sign face. See signable area. Signable area. The total area upon which a message is displayed on any sign. For double-face signs, the side with the largest signable area shall be used in computing signable area. If the two (2) faces of a double-face sign are of unequal area, the signable area shall be the area of the larger face. For wall signs consisting entirely of products shaped in the form of letters or other figures attached directly to a wall or roof, the signable area shall consist of the net geometric area measured by the smallest possible single square or rectangle enclosing the display surface of the sign including the outer extremities of all letters, characters and delineations. Stake sign. Any temporary sign supported by at least one (1) upright placed into the ground, and not supported by or suspended from any building with signable area not greater than eight (8) square feet. Streamer. See temporary sign. Subdivision internal sign. Any sign placed at the intersection of two (2) public roads inside a residential subdivision. Subdivision sign. Any sign placed at the intersection of two (2) public roads where one (1) of the roads is the main thoroughfare into and out of a single-family residential subdivision. Suspended sign. See projecting sign or swinging sign. Swinging sign. Any sign which is mounted such that the sign may freely move back and forth. Temporary sign. Any sign or device which is not permanently attached to the ground or other permanent structure, which is designed to be mobile or is designed to remain in place for a limited time. This includes, but is not limited to, signs which are designed to be transported regularly from one (1) location to another, signs which are designed with wheels, regardless of whether the wheels remain attached to the sign, or signs tethered to an existing structure. These signs include, but are not limited to: (1) Sky lights; (2) Balloons; (3) Streamers; (4) Flag strings; (5) Inflatable displays; (6) Banners; (7) Beacons; (8) Searchlights; (9) Pennants; and (10) Mechanical or animated figures. V-formation sign. A sign with two (2) sign faces, forming the shape of the letter "V" when viewed from above, with an angle between the two (2) faces of not more than sixty (60) degrees. Wall sign. Any sign which is attached parallel to or painted on an exterior building wall, which may include a door. Window sign. Any sign displayed to an outside observer on or through a window or covering a window, which may include a door. Site means the parcel of land being developed, or the portion thereof on which the development project is located. Small box discount store. A retail store: (a) With floor area less than fifteen thousand (15,000) square feet; (b) That primarily offers for sale a combination and variety of convenience shopping goods and consumer shopping goods; and (c) Continuously offers and advertises a majority of the items in their inventory for sale at a price less than ten dollars ($10.00) per item. Small box discount stores shall not include the following: Drug stores or a convenience store. Special event means a gathering or event for which the promoter or other person, firm, or corporation holding or producing the event must obtain a permit. Soil and water conservation district approved plan means an erosion and sedimentation control plan approved in writing by the Henry County Soil and Water Conservation District. Solid waste management facilities means public or private disposal facilities or transfer stations, operated for the purpose of recycling, reclaiming, treating, or disposal of garbage, sewage, rubbish, offal, oil field wastes, hazardous waste, or other waste material originating on or off the premises. Stabilization means the process of establishing an enduring soil cover of vegetation by the installation of temporary or permanent structures for the purpose of reducing to a minimum the erosion process and the resultant transport of sediment by wind, water, ice or gravity. Stable, private means a stable with a capacity of not more than four (4) horses, mules or other draught animals. Stable, public means a stable other than a private stable with a capacity of more than four (4) horses, mules or other draught animals. Start of construction includes substantial improvement, and means the date the permit was issued, provided the actual start of construction, repair, reconstruction, rehabilitation, addition placement, or other improvement was within one hundred eighty (180) days of the permit date. The actual start means either the first placement of permanent construction of the structure on a site, such as the pouring of slabs or footings, the installation of piles, the construction of columns, or any work beyond the stage of excavation; or the placement of a manufactured home on a foundation. Permanent construction does not include initial land preparation, such as clearing, grading and filling; nor does it include the installation of streets and/or walkways; nor does it include excavation for a basement, footings, piers or foundations or the erection of temporary forms; nor does it include the installation on the property of accessory buildings, such as garages or sheds not occupied as dwelling units or part of the main structure. For a substantial improvement, the actual start of construction means the first alteration of any wall, ceiling, floor, or other structural part of a building, whether or not that alteration affects the external dimensions of the building. State general permit means the National Pollution Discharge Elimination System general permit or permits for stormwater runoff from construction activities as is now in effect or as may be amended or reissued in the future pursuant to the state’s authority to implement the same through federal delegation under the Federal Water Pollution Control Act, as amended, 33 U.S.C. Section 1251, et seq., and O.C.G.A. § 12-5-30(f). State waters means any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural or artificial, lying within or forming a part of the boundaries of the state which are not entirely confined and retained completely upon the property of a single individual, partnership, or corporation, except any project involving less than one (1) acre of disturbed area and as may be defined in O.C.G.A. § 12-7-17(7). Store front means the primary facade of a single, undivided unit. Stormwater better site design means nonstructural site design approaches and techniques that can reduce a site’s impact on the watershed and can provide for nonstructural stormwater management. Stormwater better site design includes conserving and protecting natural areas and green space, reducing impervious cover and using natural features for stormwater management. Stormwater management means the collection, conveyance, storage, treatment and disposal of stormwater runoff in a manner intended to prevent increased flood damage, stream bank channel erosion, habitat degradation and water quality degradation, and to enhance and promote the public health, safety and general welfare. Stormwater management facility means any infrastructure that controls or conveys stormwater runoff. Off-site facility. A stormwater management facility located outside the boundaries of the property being developed. On-site facility. A stormwater management facility located within the boundaries of the property being developed. Regional stormwater management facility. Stormwater management facilities designed to control stormwater runoff from multiple properties, where the owners or developers of the individual properties may assist in the financing of the facility, and the requirement for on-site controls is either eliminated or reduced. Stormwater management measure means any stormwater management facility or nonstructural stormwater practice. Stormwater management plan means a document describing how existing runoff characteristics will be affected by a land development project and containing measures for complying with the provisions of this ordinance. Stormwater management system means the entire set of structural and nonstructural stormwater management facilities and practices that are used to capture, convey and control the quantity and quality of the stormwater runoff from a site. Stormwater retrofit means a stormwater management practice designed for a currently developed site that previously had either no stormwater management practice in place or a practice inadequate to meet the stormwater management requirements of the site. Structural stormwater control means a structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow of such runoff. Stormwater runoff or stormwater means any surface flow, runoff, and drainage consisting entirely of water from any form of natural precipitation, and resulting from such precipitation. Stream means any stream, beginning at: (1) The location of a spring, seep, or underground outflow that sustains streamflow; or (2) A point in the stream channel with a drainage area of twenty-five (25) acres or more; or (3) Where evidence indicates the presence of a stream in drainage area of other than twenty-five (25) acres, Henry County may require field studies to verify the existence of a stream. Stream bank means the sloping land that contains the stream channel and the normal flows of the stream. Stream channel means the portion of a watercourse that contains the base flow of the stream. Stream protection area. See protection area. Street means the land between the right-of-way lines, whether improved or unimproved, and may comprise pavement, shoulders, curb and gutter, sidewalks, drainage ditches and structures, and other areas within the right-of-way lines. (Types of streets are illustrated in figure A.3.) Alley. A strip of land providing vehicular and pedestrian access to the rear of properties which abut and are served by a public street. Boulevard. A street developed with two (2) one-way pavements separated by a landscaped median. Collector street. A public street whose function is to collect traffic from local streets and neighborhoods and connects to another public street of equal or greater classification. A collector may also provide direct access to adjacent properties. Cul-de-sac. A dead-end local street, of limited length, opened at one (1) end and closed at the other by a permanent turnaround. Dead-end street. A local street open at one (1) end and closed at the other. Expressway. The expressway system includes high volume limited access thoroughfares through the county and region beyond. Frontage road. A street which is parallel to, and adjacent to major thoroughfare and which provides access to abutting properties and protection from through traffic. Local street. A public street that serves a limited area and whose primary function is to provide direct access to adjoining properties. Major arterial. A public street whose primary function is to connect two (2) highways of equal or greater classification or capacity, provide primary access to a large land area, provide access to a large traffic generator, or connect two (2) or more towns or communities. The secondary function is to provide local access. Minor arterial. A public street that serves an intermediate function between collectors and major arterials, and also serves as a traffic feeder to major arterials and for cross-country and regional travel. Stub street. A dead-end street at adjoining property lines intended for future extension to serve the development of adjoining areas. Structural erosion and sedimentation control practices means practices for the stabilization of erodible or sediment producing areas by utilizing the mechanical properties of matter for the purpose of either changing the surface of the land or storing, regulating or disposing of runoff to prevent excessive sediment loss. Examples of structural erosion and sediment control practices are riprap, sediment basins, dikes, level spreaders, waterways or outlets, diversions, grade stabilization structures, sediment traps and land grading, etc. Such practices can be found in the publication Manual for Erosion and Sediment Control in Georgia. Structural stormwater control means a structural stormwater management facility or device that controls stormwater runoff and changes the characteristics of that runoff including, but not limited to, the quantity and quality, the period of release or the velocity of flow of such runoff. Structure means a walled and roofed building (including a gas or liquid storage tank), that is principally above ground, or a manufactured home. Structure, principal. The building or structure in which the primary use permissible on the lot is conducted. In RA (less than two (2) acres or a platted subdivision), R-1, R-2, R-3, R-4, R-5, RD, RM, RS and RMH residential zoned districts a dwelling shall be deemed to be the principal building on the lot. A structurally independent garage, carport or other structure may be attached to the principal buildings by a roofed breezeway which shall cause the entire structure to be construed as part of the principal building and shall be subject to the sections applicable to the principal building or structure. A detached and structurally independent carport, garage or other structure shall conform to the requirements of any accessory building. Structure, accessory or accessory use. A building subordinate to the principal building or use on a lot and used for purposes incidental to the principal building or use and located on the same lot therewith. An accessory structure shall not be erected on a lot prior to the time of construction of the principal structure to which it is accessory. Subdivision means the division of a tract or parcel of land resulting in one (1) or more new lots or building sites for the purpose, whether immediately or in the future, of sale, other transfer of ownership or land development, and includes divisions of land resulting from or made in connection with the layout or development of a new street or roadway or a change in an existing street or roadway. Business subdivision. A single parcel on which multiple businesses are located, or multiple connected parcels on which businesses are located and where the owners of the parcel share any common property. Lot division. The division of a tract or parcel of land into no more than five (5) separate lots or building sites for the purpose, whether immediately or in the future, of sale, other transfer of ownership or land development, and does not create divisions of land resulting from or made in connection with the layout or development of a new street or roadway or a change in an existing street or roadway. Major subdivision. A type of development not classified as lot division or a minor subdivision which includes the subdivision of land resulting in six (6) or more lots, or any size subdivision requiring the installation of any street, public or private, or utilities or other public improvements or infrastructure. Minor subdivision. A type of development not classified as a lot division or a major subdivision which meets all of the requirements for minor subdivisions by ordinance. Generally, minor subdivisions include the subdivision of land resulting in a final plat of six (6) or more lots achieving the approval of the administrator to be recorded but which is not required by ordinance to meet all of the requirements of a major subdivision. Submission date. The date stamped on a sign application indicating the date the application was actually received by the department. Substantial damage means damage of any origin sustained by a structure whereby the cost of restoring the structure to it's before damaged condition would equal or exceed fifty (50) percent of the market value of the structure before the damage occurred. This term also includes repetitive loss. Substantial improvement means any reconstruction, rehabilitation, addition, or other improvement to a structure, taking place during a ten-year period, in which the cumulative cost equals or exceeds fifty (50) percent of the market value of the structure prior to the improvement. The market value of the building means: (1) The appraised value of the structure prior to the start of the initial repair or improvement; or (2) In the case of damage, the value of the structure prior to the damage occurring. This term includes structures which have incurred "substantial damage," regardless of the actual repair work performed. The term does not, however, include those improvements of a structure required to comply with existing state or local health, sanitary, or safety code specifications which are the minimum necessary to assure safe living conditions, which have been identified by the code enforcement official. The term does also not include any alteration of a historic structure, provided that the alteration will not preclude the structure's continued designation as a historic structure. Substantially improved existing manufactured home park or subdivision means the repair, reconstruction, rehabilitation or improvement of the streets, utilities and pads equals or exceeds fifty (50) percent of the value of the streets, utilities and pads before the repair, reconstruction or improvement commenced. Surface water includes any river, creek, stream, or body of water that is not manmade. System improvement costs means costs incurred to provide public facilities capacity to serve new growth and development, including the costs of planning, design, engineering, construction, land acquisition, and land improvement for the construction or reconstruction of facility improvements or expansions. System improvement costs include the construction contract price, surveying and engineering fees, related land acquisition costs (including land purchases, court awards and costs, attorneys' fees, and expert witness fees), and expenses incurred for qualified staff or any qualified engineer, planner, architect, landscape architect, or financial consultant for preparing or updating the capital improvements element, and administrative costs of up to three (3) percent of the total of all other costs. Projected interest charges and other finance costs may be included if the impact fees are to be used for the payment of principal and interest on bonds, notes, or other financial obligations issued to finance system improvements, but such costs do not include routine and periodic maintenance expenditures, personnel training, and other operating costs. System improvements means capital improvements that are public facilities designed to provide service to more than one (1) project or to the community at large, in contrast to "project" improvements. T Telecommunications means the transmission and reception of audio, video, data, and other information by wire, radio frequency, light, and other electronic or electromagnetic systems. Temporary wireless communication facility (temporary WCF) means a WCF to be placed in use for ninety (90) or fewer days. Transitional surface means an area extending outward and upward at right angles to the runway centerline, extended at a slope of seven to one (7:1) from the sides of the primary surface and from the sides of the approach surfaces. Transportation facility means the means by which a transportation mode is provided. For example, sidewalks are a facility serving the walking mode, a roadway is a facility serving the driving mode and a heavy rail line is a facility serving the transit mode. Tree means any living, self-supporting, woody perennial plant which has a trunk DBH of one and one-half (11 /2) inches and which normally attains a height of at least twelve (12) feet at maturity, usually with one (1) main stem or trunk and many branches. Tree diameter means the widest cross-sectional dimension of a tree trunk measured at diameter breast height (dbh). Tourist home means a dwelling in which sleeping accommodations are provided or offered to transient visitors for compensation. Tower means a lattice-type structure, guyed or freestanding, that supports one (1) or more antennas. Townhouse, fee simple. See dwelling. Toxic means any chemical or substance that has been defined as toxic by the Environmental Protection Agency of the United States, Environmental Protection Department of the State of Georgia, or the Department of Agriculture of the State of Georgia. Trailer (motor home) means a motorized vehicle, designed and/or maintained for use as a temporary dwelling or sleeping place for travel or recreation purposes exclusively, having no foundation other than for wheels or jacks. Trailer (travel) means a nonmotorized vehicle, pulled by an automobile or truck designed and/or maintained for use as a temporary dwelling or sleeping place for travel or recreation purposes exclusively. Trailer park means a parcel of land which is used solely for the rental or lease of lots for transient campers, trailers, motor homes or temporary parking of any other recreational vehicle that is not a mobile home. Transportation means the movement of people and goods from one place to another. Director of transportation planning. The director of transportation planning [or county engineer], or his or her designee. Horizon year. The horizon year shall be twenty (20) years into the future from the year during which a traffic impact study is being prepared, unless otherwise specified or approved by the director of transportation planning. Internal trips. Trips that are made within a multi-use or mixed-use development, by vehicle or by an alternate mode, such as walking. Level of service (LOS). A quantitative and qualitative measure of how well traffic flows on a given street or highway. Level of service relates to such factors as highway width, number of lanes, percentage of trucks, total traffic volume, turning movements, lateral clearances, grades, sight distance, capacity in relation to volume, travel speed and other factors which affect the quality of flow. Level of service is typically summarized by letter grades described as follows: Level A is a condition with low traffic volumes, high speeds and free-flow conditions. Level B is a condition with light traffic volumes, minor speed restrictions and stable flow. Level C is a condition with moderate traffic volumes, where speed and maneuvering are restricted to a limited degree by the amount of traffic. Level D is a condition with heavy traffic operating at tolerable speeds, although temporary slowdowns in flow may occur. Level E is a condition of very heavy flow and relatively low speeds. Under Level E the traffic is unstable and short stoppage may occur. Level F is a condition of extremely heavy flow, with frequent stoppage and very slow speeds. It is an unstable traffic condition under which traffic often comes to a complete halt. New trips. Total vehicle trips, minus pass-by trips, minus internal trips, if applicable. Pass-by trips. Vehicle trips which are made by traffic already using the adjacent roadway and entering the site as an intermediate stop on the way to another destination. Peak hour. From 7:00 a.m. to 8:00 a.m., or 8:00 a.m. to 9:00 a.m. or the highest four (4) fifteen-minute increments within such time period for the a.m. peak hour; 4:00 p.m. to 5:00 p.m., 5:00 p.m. to 6:00 p.m. or the highest four (4) fifteen-minute increments within such a time period for the p.m. peak hour. Peak-hour trip generation study. A study by a qualified professional of one (1) or more actual developments of similar land use and development characteristics which provides empirical data on the actual number of trips entering and exiting said development(s) during the a.m. and p.m. peak hour. A peak-hour trip generation study shall consist of a.m. and p.m. peak hour traffic counts by direction (entering and exiting) on at least three (3) separate weekdays if the study is based on only one (1) similar development, or at least one (1) a.m. and p.m. traffic count for three (3) different actual developments. The results of actual traffic counts from peak-hour trip generation studies may be adjusted to discount pass-by trips as provided in this ordinance. Professionally accepted. Published by the Institute of Transportation Engineers, or prepared by a qualified professional under work supervised by the county, or prepared by a qualified professional and accepted by the director of transportation planning. Qualified professional. For purposes of conducting traffic impact studies as may be required by this ordinance, a qualified professional shall mean a registered professional engineer with experience in traffic engineering. For purposes of conducting peak-hour trip generation studies, a qualified professional shall mean a registered professional engineer with experience in traffic engineering, or another professional approved by the director of transportation planning based on education and experience to conduct such trip generation studies. System improvements. Improvements that are public facilities designed to provide service to more than one (1) project or to the community at large, in contrast to project improvements. Project improvements. Site specific improvements that are planned, designed or built to provide service for a specific development project and that are necessary for the use and convenience of the occupants or users of that project only, and that are not system improvements. Traffic impact study. A traffic impact study (TIS) is an important tool in the overall development planning process (residential, commercial, industrial, institutional, etc.). It provides information which identifies impacts of proposed developments on the existing, short range and long range roadway/circulation networks. It also identifies mitigation measures for the impacts identified. Traffic impact studies shall be conducted by a qualified professional. Trip. A single or one-directional travel movement with either the origin or destination of the trip inside the study site. Trip generation. An estimate of the number of vehicle trips that will be generated due to the new development, which is calculated based on the type and amount of land uses in the proposed development and professionally accepted trip generation rates for each such land use. Trip generation may be expressed on an average daily basis or average peak hour (a.m., p.m. or both). U Understory tree (also medium or small tree) means a class of trees and large shrubs that do not attain the height of a canopy or shade tree, yet are large enough at maturity to provide shade for people, as well as many of the benefits of larger shade trees. Examples include Dogwood, Red Bud, Crabapple, Crepe Myrtle, Wax Myrtle, Ornamental Cherry, Hawthorne, and tree-type type hollies. Undisturbed buffer means a buffer, either impervious or vegetated, in which no encroachment of buildings or structures is permitted. Unit of development means the standard incremental measure of land development activity for a specific type of land use upon which the rate of demand for public service and facilities is based, such as a dwelling unit, square foot of floor area, motel room, etc. Unused or excess impact fee means any individual impact fee payment from which no amount of money or only a portion thereof has been encumbered or expended according to requirements. Use means the purpose or activity for which land or buildings are designed, arranged, intended, or occupied and maintained or leased. Utility means public or private water or sewer piping systems, water or sewer pumping stations, electric power lines, fuel pipelines, telephone lines, roads, driveways, bridges, river/lake access facilities, stormwater systems and railroads. V Variance means a grant of relief from the requirements of this article. Vegetative erosion and sedimentation control measures means measures for the stabilization of erodible or sediment-producing areas by covering the soil with: (1) Permanent seeding, sprigging or planting, producing long-term vegetative cover; (2) Temporary seeding, producing short-term vegetative cover; or (3) Sodding, covering areas with a turf of perennial sod-forming grass. Such measures can be found in the publication Manual for Erosion and Sediment Control in Georgia. Vehicle, abandoned means a vehicle which does not bear a current state license plate, unless said vehicle is stored within a completely enclosed building or it is stored on a bona fide sales lot and is in satisfactory operating condition. Vehicle use area means any area, paved or unpaved, used for egress or ingress, or to store or park motor vehicles. Vineyard means a plantation of grape-bearing vines, grown mainly for winemaking, but also raisins, table grapes and non-alcoholic grape juice. Violation means the failure of a structure or other development to be fully compliant with the requirements of this article. A structure or other development without the elevation certificate, other certifications, or other evidence of compliance required in this article is presumed to be in violation until such time as that documentation is provided. W Waiver. See administrative waiver. Wastewater system means the collection, transportation and treatment of sanitary sewerage, via a pipe network, to a common collection point as required by the department of natural resources for the State of Georgia. Stub-out service means sanitary sewer connection facilities within the street right-of-way provided from lateral sewer line to the private property line for connection to building sewer lines. Water quality critical area means the water quality critical area is defined as follows: (a) All land that lies adjacent to the normal pool level of a reservoir and extending either to the ridge line boundary of the watershed or five hundred (500) feet whichever is shorter; and (b) All land extending a distance of three (3) miles upstream from the normal pool level of the reservoir that is adjacent to each perennial stream upstream from the reservoir and extending either to the ridge line boundary of the watershed on each side of the perennial stream or five hundred (500) feet, whichever is shorter. Water supply watershed means the drainage area (watershed) of lands upstream of a governmentally owned public drinking water intake or water supply reservoir or a proposed public drinking water intake or water supply reservoir. Watercourse means any natural or artificial stream, river, creek, channel, ditch, canal, conduit, culvert, drain, waterway, gully, ravine, or wash in which water flows either continuously or intermittently and which has a definite channel, bed, and banks, and including any area adjacent thereto subject to inundation by reason of overflow or floodwater. Watershed means the land area that drains into a particular stream. WCF principal or accessory use means antennas and towers may be considered either principal or accessory uses. A different existing use or an existing structure on the same lot shall not preclude the installation of existing antennas or towers on such lot. For purposes of determining whether the installation of an antenna or tower complies with district development regulation, including, but not limited to, setback requirements, lot coverage requirements, and other such requirements, the dimensions of the entire lot shall control, even though the antennas or towers may be located on leased parcels within such lots. Towers that are constructed and antennas that are installed in accordance with the provisions of this article shall not be deemed to constitute the expansion of a nonconforming use or structure. Wetlands means those areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil conditions. Wholesale establishment means an establishment or place of business primarily engaged in selling and/or distributing merchandise to retailers; to industrial, commercial, institutional, or professional business users, or to other wholesalers; or acting as agents or brokers and buying merchandise for, or selling merchandise to, such individuals or companies. The term "wholesale" means a sale made for the purpose of resale and not one made to the consuming purchaser. Retail sales may be permitted within a wholesale establishment and shall be limited to the elimination of wholesale stock due to damage, abandonment, or distribution to employees of the wholesale establishment, with occasional retail sales to the general public. Winery means A winery which makes at least forty (40) percent of its annual production from agricultural produce grown in the state where the winery is located and; is located on the premises, a substantial portion of which is used for agricultural purposes, including the cultivation of grapes, berries, or fruits to be utilized in the manufacture or production of wine by the winery; or is owned and operated by persons who are engaged in the production of a substantial portion of the agricultural produce used in its annual production. Wireless communications means any personal wireless services as defined in the Telecommunications Act of 1996, which includes FCC-licensed commercial wireless communications services, including cellular, digital communications (DCS), personal communications services (PCS), specialized mobile radio (SMR), enhanced specialized mobile radio (ESMR), paging, radio and television communications, and similar services that currently exist or that may in the future be developed. Wireless telecommunications facility means a structure, facility or location designed, or intended to be used as, or used to support, antennas or other transmitting or receiving devices. This includes without limit, new and existing support structures, replacement support structures, collocations on existing support structures, attached wireless telecommunications facilities and concealed wireless telecommunications facilities. Abandonment. The intent to abandon or discontinue operations as evidenced by voluntary conduct or failure to use a wireless telecommunications facility for a period of six (6) months or more. Above ground level (AGL). A measurement of height from the natural grade of a site to the highest point of a structure. Administrative approval. Zoning approval that the director of the planning and zoning department, or his designee, is authorized to grant after administrative review. Attached wireless telecommunications facility. Antennas that are secured to an existing building or structure (except a monopole or tower) with any accompanying pole or device which attaches it to the building or structure, together with transmission cables, and an equipment cabinet, which may be located either on the roof or inside/outside of the building or structure. An attached wireless telecommunications facility is considered to be an accessory use to the existing principal use on a site. Collocation. Where two (2) or more wireless personal service providers place a wireless telecommunications antenna on the same support structure without increasing the height of the tower or structure. Collocation also means locating telecommunications facilities on an existing structure (for example: buildings, water tanks, towers, utility poles, etc.) without the need to construct a new support structure. Coverage. The geographic area reached by an individual wireless telecommunications facility installation. Geographic search area (GSA). An area designated by a wireless provider or operator for a new base station, produced in accordance with generally accepted principles of wireless engineering. Modification or modify. The improvement, upgrade, expansion, or replacement of existing wireless facilities on an existing wireless support structure or within an existing equipment compound, provided such improvement, upgrade, expansion, or replacement does not increase the height of the wireless support structure or increase the dimensions of the equipment compound. Major modifications. The addition, removal or change of any of the physical and visually discernable components or aspects of an existing telecommunications facility or support structure that result in a substantial change to the facility or structure. Collocation of new telecommunications facilities to an existing support structure without replacement of the structure shall not constitute a major modification. "Major modifications" include, but are not limited to, extending the height of the support structure by more than twenty (20) feet or the replacement of the structure. Minor modifications. The addition, removal or change of any of the physical and visually discernable components or aspects of an existing telecommunications facilities or support structures, that result in some material change to the facility or support structure but of a level, quality or intensity that is less than a "substantial" change. Such minor modifications include, but are not limited to, collocations of new telecommunications facilities, extending the height of the support structure by less than twenty (20) feet, and the expansion of the compound area for additional accessory equipment. Provider. Any entity licensed by the FCC to provide subscriber-based personal wireless telecommunications services. Radiofrequency engineer. An engineer specializing in electrical or microwave engineering, especially the study of radio frequencies. Support structure. A structure, with or without a foundation designed to support or capable of supporting telecommunications facilities including, but not limited to, monopoles and towers. Support structure replacement. Constructing a replacement support structure that is a new tower or monopole with related antennas of proportions and of equal height or lesser height to a pre-existing or nonconforming support structure in order to support a telecommunications facility(ies) or to accommodate collocation and removing the pre-existing support structure. Telecommunications. The transmission and/or reception of audio, video, data, and other information by wire, radio frequency, light, and other electronic or electromagnetic systems. Telecommunications facility(ies). Any unmanned facility established for the purpose of providing wireless transmission of voice, data, images or other information including, but not limited to, cellular telephone service, personal communications service, and paging service. A telecommunication facility can consist of one (1) or more antennas and accessory equipment or one (1) base station. Wrecker service means the recovering or removing wrecked, junked, abandoned, disabled or repossessed vehicles by a person, vehicle, or piece of equipment employed, especially a truck with a hoist and towing apparatus. Vehicle storage areas are only allowed with an approved conditional use. Dismantling of stored vehicles for resale purposes shall be prohibited. X Y Yard means a required open space located on the same lot as the principal building, unoccupied and unobstructed except for accessory uses, vegetation, and fences. (Types of yards are illustrated in figure A.2.) Front yard. That area of a lot lying between the abutting street right-of-way line and the principal building of the lot and extending across the front of a lot from side lot line to side lot line. The front yard of a corner lot shall include the yard abutting the street with the least frontage, unless otherwise determined on a recorded plat or in a recorded deed. The front yard of a lot existing between two (2) streets not intersecting at a corner of the lot, shall be that yard abutting the street on which adjoining properties face, unless otherwise determined on a recorded plat or in a recorded deed. Rear yard. That area of a lot extending across the rear of a lot from side lot line to side lot line and lying between the rear lot line and the principal building on the lot. The rear yard of a corner lot shall not include the yard abutting the street with the least frontage, unless otherwise determined on a recorded plat or in a recorded deed. Side yard. The area of a lot between the side lot line and the principal building on the lot extending from the front yard to the rear yard. Z Zero lot line means the location of building on a lot in such a manner that one (1) or more building sides have no (zero) front, side or rear building setback (or yard requirements) and rests directly on a front, side, or rear lot line. A zero lot line development is one where houses in the development on a common street frontage are shifted to one (1) side of their lot. Zoning district means the use classification of parcels of land as generally defined under this ULDC. The following zoning districts are further described in chapter 2: RA Residential agriculture MU Mixed-Use R-1 Single-family residential OI Office—Institutional R-2 Single-family residential C-1 Neighborhood commercial R-3 Single-family residential C-2 General commercial R-4 Single-family residential C-3 Highway commercial R-5 Single-family residential IAC Interchange activity center RS Residential suburban M-1 Light industrial RD Residential—Duplex M-2 Heavy industrial RM Multifamily residential RMH Mobile or manufactured home development Illustrations of Defined Terms: Figure A-1 (Ord. No. 09-07, 11-17-09; Ord. No. 10-20, § I(26), 6-15-10; Ord. No. 10-08, 8-17-10; Ord. No. 12-15, § II, 7-17-12; Ord. No. 14-02, § 3, 6-17-14; Ord. No. 14-06, § I(exh. A), 11-4-14; Ord. No. 15-04, 4-21-15; Ord. No. 16-01, § I, 7-19-16; Ord. No. 18-02, 6-19-18; Ord. No. 20-04, § I, 5-5-20; Ord. No. 22-03, § IV, 5-3-22; Ord. No. 23-04, § I, 4-18-23; Ord. No. 23-07, § II, 6-6-23; Ord. No. 23-08, § III, 6-20-23; Ord. No. 25-10, § II, 10-21-25) Figure A-2 Figure A-3 101.1. Scope. The provisions of the chapter shall govern the administration and enforcement of the building, gas, mechanical plumbing, electrical and the one- and two-family dwelling code, as approved by the State of Georgia and adopted by the Henry County board of commissioners, hereinafter referred to as the "technical codes." 101.2. Title. The provisions of this section shall constitute and be known as the "Appendix B, Administration" when used in conjunction with the technical codes as approved by the State of Georgia and adopted by the Henry County Board of Commissioners. 101.3. Code remedial. 101.3.1. General. The technical codes are hereby declared to be remedial and shall be construed to secure the beneficial interests and purposes thereof, which are public safety, health and general welfare through structural strength, stability, sanitation, adequate light and ventilation and safety to life and property from fire and other hazards attributed to the built environment including alteration, repair, removal, demolition, use and occupancy of building, structures, or premises, and by regulating the installation and maintenance of all electrical, gas, mechanical and plumbing systems, which may be referred to as service systems. 101.3.2 Quality control. Quality control of materials and workmanship is not within the preview of the technical codes except as it relates to the purpose stated herein. 101.3.3 Permitting and inspections. The inspection or permitting of any building, system or plan by the Henry County Building Department, under the requirements of the technical codes, shall not be construed in any court as a warranty of the physical condition of such building, system or plan or their adequacy. Neither the Henry County Building Department nor any employee of same shall be liable in tort for damages for any defect or hazardous or illegal condition or inadequacy in such building, system or plan, nor for any failure of any component of such, which may occur subsequent to such inspection or permitting. 101.4. Applicability. 101.4.1. General. Where, in any specific case, different sections of the technical codes specify different materials, methods of construction or other requirements, the most restrictive shall govern. Where there is a conflict between a general requirement and a specific requirement, the specific requirement shall be applicable. 101.4.2. Building. The provisions of the building code, as approved by the State of Georgia and adopted by the Henry County Board of Commissioners, shall apply to the construction, alteration, repair, equipment, use and occupancy, location, maintenance, removal and demolition, of every building or structure or any appurtenances connected or attached to such buildings or structures. 101.4.3. Electrical. The provisions of the electrical code, as approved by the State of Georgia and adopted by the Henry County Board of Commissioners, shall apply to the installation of electrical systems, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings and appurtenances thereto. 101.4.4. Gas. The provisions of the gas code, as approved by the State of Georgia and adopted by the Henry County Board of Commissioners, shall apply to the installation of consumers' gas piping, gas appliances and related accessories as covered in this code. These requirements apply to gas piping systems extending from the point of delivery to the inlet connections of appliances, and the installation and operation of residential and commercial gas appliances and related accessories. 101.4.5. Mechanical. The provisions of the mechanical code, as approved by the State of Georgia and adopted by the Henry County Board of Commissioners, shall apply to the installation of mechanical systems, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings and/or appurtenances, including ventilating, heating, cooling, air conditioning and refrigeration systems, incinerators, and other energy-related systems. 101.4.6. Plumbing. The provisions of the plumbing code, as approved by the State of Georgia and adopted by the Henry County Board of Commissioners, shall apply to every plumbing installation, including alterations, repairs, replacement, equipment, appliances, fixtures, fittings and appurtenances, when connected to a water or sewerage system and all aspects of a medical system. 101.4.7. One- and two-family dwelling code. The provisions of the one- and two-family dwelling code, as approved by the State of Georgia and adopted by the Henry County Board of Commissioners, shall apply to the construction, addition prefabrication, alteration, repair, use, occupancy and maintenance of detached one- and two-family dwellings and one-family townhouses not more than three (3) stories in height, and their accessory structures. 101.4.8. Federal and state authority. The provisions of the technical codes shall not be held to deprive any federal or state agency, or any applicable governing authority having jurisdiction, of any power or authority which it had on the effective date of the adoption of the technical code or of any remedy then existing for the enforcement of its orders, nor shall it deprive any individual or corporation of its legal rights as provided by law. 101.4.9. Appendices. To be enforceable, the appendices included in the technical codes must be referenced in the code text or specifically included in the adopting ordinance. 101.4.10. Referenced standards. Standards referenced in the technical codes shall be considered an integral part of the codes without separate adoption. If specific portions of a standard are denoted by code text, only those portions of the standard shall be enforced. Where code provisions conflict with a standard, the code provisions shall be enforced. Permissive and advisory provisions in a standard shall not be construed as mandatory. 101.4.11. Existing structures. The legal occupancy of any structure existing on the date of adoption of the technical codes shall be permitted to continue without change, except as is specifically covered in the technical code, the fire prevention code, property maintenance code or the existing building code, or as is deemed necessary by the building official for the general safety and welfare of the occupants and the public. 101.4.11.1. Additions, alterations or repairs. Additions, alterations or repairs to any structure shall conform to that required for a new structure without requiring the existing structure to comply with all of the requirements of the Technical Codes, unless otherwise stated. Additions, alterations or repairs shall not cause an existing structure to become unsafe or adversely affect the performance of the building. 102. Powers and duties of the building official. 102.1. General. The building official is hereby authorized and directed to enforce the provisions of the technical codes. The building official is further authorized to render interpretations of the technical codes, which are consistent with its spirit and purposes. 102.2. Right of entry. 102.2.1 Whenever necessary to make an inspection to enforce any of the provisions of the technical codes, or whenever the building official has reasonable cause to believe that there exists in any building or upon any premises any condition or code violation which makes such building, structure, premises, electrical, gas, mechanical or plumbing systems unsafe, dangerous or hazardous, the building official may enter such building, structure, or premises at all reasonable times to inspect the same or to perform any duty imposed upon the building official by the technical codes. If such building or premises are occupied, he shall first present proper credentials and request entry. If such building, structure, or premises are unoccupied, he shall first make reasonable effort to locate the owner or other persons having charge or control of such and request entry. If entry is refused, the building official shall have recourse to every remedy provided by law to secure entry. 102.2.2 When the building official shall have obtained a proper inspection warrant or other remedy provided by law to secure entry, no owner or occupant or any other persons having charge, care or control of any building, structure, or premises shall fail or neglect, after proper request is made as herein provided, to promptly permit entry therein by the building official for the purpose of inspection and examination pursuant to the technical codes. 102.3. Stop work orders. 102.3.1 Upon notice from the building official, work on any building, structure, electrical, gas, mechanical or plumbing system that is being done contrary to the provisions of the technical codes or in a dangerous or unsafe manner, shall immediately cease. Such notice shall be in writing and shall be given to the owner of the property, or to his agent, or to the person doing the work, and shall state the conditions under which work may be resumed. Where an emergency exists, the building official shall not be required to give a written notice prior to stopping the work. 102.3.2 Unlawful continuance. Any person who shall continue any work after having been served with a stop work order, except such work as that person is directed to perform to remove a violation or unsafe condition, shall be subject to penalties as prescribed by law. 102.4. Revocation of permits. 102.4.1 Misrepresentation of application. The building official may revoke a permit or approval, issued under the provisions of the technical codes, in case there has been any false statement or misrepresentation as to the material fact in the application or plans on which the permit or approval was based. 102.4.2 Violation of code provisions. 1. The building official or his/her authorized representative may revoke a permit and/or issue a summons for violation of the building code or development code and require the responsible party to appear in the appropriate court of jurisdiction upon determination by the building official that the construction, erection, alteration, repair, moving, demolition, installation, or replacement of the building, structure, electrical, gas, mechanical or plumbing systems for which the permit was issued is in violation of, or not in conformity with, the provisions of the technical codes and the Code of Henry County. 2. The building official may declare buildings, structures, electrical, gas, mechanical or plumbing systems unsafe as defined in subsection 103.5 and may issue a summons for the violation of the building or safety code and require the responsible party to appear in the appropriate court of jurisdiction to respond to such charges. 3. The building official or his authorized representative may issue summons as provided for in subparagraph (a) of this section 103.4.2; "such building official or his representative may not nor shall this ordinance be construed to permit or empower any building official to make a physical arrest, carry a firearm or otherwise perform the duties of a sworn and certified/ registered law enforcement official. 102.4.3 Violation of zoning provisions. 1. The building official or his/her authorized representative may withhold a permit on any building or development project if it is determined that the zoning provisions associated with the project have not been fulfilled. 102.5. Unsafe buildings or systems. All buildings, structures, electrical, gas, mechanical or plumbing systems which are unsafe, unsanitary, or do not provide adequate egress, or which constitute a fire hazard, or are otherwise dangerous to human life, or which in relation to existing use, constitute a hazard to safety or health, are considered unsafe buildings or service systems. All such unsafe buildings, structures or service systems are hereby declared illegal and shall be abated by repair and rehabilitation or by demolition in accordance with the provisions of the Unsafe Building Abatement Code as adopted by the Henry County Board of Commissioners and as approved by chapter 3-17, article V of the Henry County Code. 102.6. Requirements not covered by code. Any requirements necessary for the strength, stability or proper operation of an existing or proposed building, structure, electrical, gas, mechanical or plumbing system, or for the public safety, health and general welfare, not specifically covered by the technical codes, shall be determined by the building official. 102.7. Alternate materials and methods. The provisions of the technical codes are not intended to prevent the use of any material or method of construction not specifically prescribed by them, provided any such alternate has been reviewed by the building official. The building official shall approve any such alternate, provided the building official finds that the alternate for the purpose intended is at least the equivalent of that prescribed in the technical codes, in quality, strength, effectiveness, fire resistance, durability and safety. The building official shall require that sufficient evidence or proof be submitted to substantiate any claim made regarding the alternate. 102.8. Modifications. Wherever there are practical difficulties involved in carrying out the provisions of the technical codes, the building official shall have the authority to grant modifications for individual cases, upon application of the owner or owner's representative, provided the building official shall first find that special individual reason makes the strict letter of the technical codes impractical and the modification is in compliance with the intent and purpose of the technical code and that such modification does not lessen health, accessibility, life and fire safety, or structural requirements. The details of action granting modifications shall be recorded and entered in the files of the department of building safety. 103. Permits. 103.1. Permit application. 103.1.1 When required. Any owner, authorized agent, or contractor who desires to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system, the installation of which is regulated by the technical codes, or to cause any such work to be done, shall first make application to the building official and obtain the required permit for the work. EXCEPTION: Work exempt from permit. Exemptions from permit requirements of the technical codes shall not be deemed to grant authorization for any work to be done in any manner in violation of the provisions of the technical codes or any other laws or ordinances of this jurisdiction. Permits shall not be required for the following: Building: 1. One (1) story detached, portable accessory structures, or portable structures attached to a permitted and approved permanent foundation, located on a residentially zoned lot, used as tool sheds, playhouses and similar uses. 2. One (1) story detached accessory structures, located on a residentially zoned lot, used as tool sheds, playhouses and similar uses, provided the floor area does not exceed one hundred twenty (120) square feet (11.15m2). 3. Fences not over six (6) feet (1,829 mm) high. 4. Retaining walls which are not over four (4) feet (1,219 mm) in height measured from the bottom of the footing to the top of the wall, unless supporting a surcharge or impounding Class I, II or III-A liquids. 5. Water tanks supported directly upon grade if the capacity does not exceed five thousand (5,000) gallons (18,927 L) and the ratio of height to diameter or width does not exceed two to one (2:1). 6. Sidewalks and driveways not more than thirty (30) inches (762 mm) above grade and not over any basement or story below and which are not part of an accessible route. 7. Painting, papering, tiling, carpeting, cabinets, counter tops and similar finish work. 8. Temporary motion picture, television and theater stage sets and scenery. 9. Prefabricated swimming pools accessory to a Group R-3 occupancy, as application in section 101.2, which are less than twenty-four (24) inches (610 mm) deep, do not exceed five thousand (5,000) gallons (19,000 L) and are installed entirely above ground. 10. Shade cloth structures constructed for nursery or agricultural purposes and not including services systems. 11. Swings and other playground equipment accessory to one- and two-family dwellings. 12. Window awnings supported by an exterior wall of Group R-3, as applicable in section 101.2, and Group U occupancies. 13. Movable cases, counters and partitions not over five (5) feet nine (9) inches (1,753 mm) in height. Electrical: Repairs and maintenance: Minor repair work, including the replacement of lamps or the connection of approved portable electrical equipment to approve permanently installed receptacles. Radio and television transmitting stations: The provisions of the technical codes shall not apply to electrical equipment used for radio and television transmissions, but does apply to equipment and wiring for power supply, the installation of towers and antennas. Temporary testing systems: A permit shall not be required for the installation of any temporary system required for the testing or servicing of electrical equipment or apparatus. Gas: 1. Portable heating appliance. 2. Replacement of any minor part that does not alter approval of equipment or make such equipment unsafe. Mechanical: 1. Portable heating appliance; 2. Portable ventilation equipment; 3. Portable cooling unit; 4. Steam, hot or chilled water piping within any heating or cooling equipment regulated by this code; 5. Replacement of any part which does not alter its approval or make it unsafe; 6. Portable evaporative cooler; 7. Self-contained refrigeration system containing ten (10) pounds (4.54 kg) or less of refrigerant and actuated by motors of one (1) horsepower (746 W) or less. Plumbing: The stopping of leaks in drains, water, soil, water or vent pipe; provided, however, that if any concealed trap, drain pipe, water, soil, waste or vent pipe becomes defective and it becomes necessary to remove and replace the same with new material, such work shall be considered as new work and a permit shall be obtained and inspections made as provided in the technical codes. The clearing of stoppages or the repairing of leaks in pipes, valves or fixtures, and the removal and reinstallation of water closets, provided such repairs do not involve or repair the replacement or rearrangement of valves, pipes or fixtures. 103.1.2. Temporary structures. A special building permit for a limited time shall be obtained before the erection of temporary structures such as construction sheds, seats, canopies, tents and fences used in construction work or for temporary purposes such as reviewing stands. Such structures shall be completely removed upon the expiration of the time limit stated in the permit. 103.1.3. Work authorized. A building, electrical, gas, mechanical or plumbing permit shall carry with it the right to construct or install the work, provided the same are shown on the drawings and set forth in the specifications filed with the application for the permit. Where these are not shown on the drawings and covered by the specifications submitted with the application, separate permits shall be required. 103.1.4. Repairs. 103.1.4.1 Emergency repairs. Where equipment replacements and repairs must be performed in an emergency situation, the permit application shall be submitted within the next working business day to the building official. 103.1.4.2 Ordinary repairs. Application or notice to the building official is not required for ordinary repairs to structures, replacement of lamps or the connection of approved portable electrical equipment to approved permanently installed receptacles. Such repairs shall not include the cutting away of any wall, partition or portion thereof, the removal or cutting of any structural beam or load bearing support, or the removal or change of any required means of egress, or rearrangement of parts of a structure affecting the egress requirements; nor shall ordinary repairs include addition to, alteration of, replacement or relocation of any standpipe, water supply, sewer, drainage, drain leader, gas, soil, waste, vent or similar piping, electric wiring or mechanical or other work affecting public health or general safety. 103.1.5. Information required. Each application for a permit, with the required fee, shall be filed with the building official on a form furnished for that purpose. Such application shall: 1. Identify and describe the work to be covered by the permit for which application is made. 2. Describe the land on which the proposed work is to be done by legal description, street address or similar description that will readily identify and definitely locate the proposed building or work. 3. Indicate the use and occupancy for which the proposed work is intended. 4. Be accompanied by construction documents and other information as required in section 104.2. 5. State the valuation of the proposed work. 6. Be signed by the applicant, or the applicant's authorized agent. 7. Give such other data and information as required by the building official. 103.1.6. Time limitations. An application for a permit for any proposed work shall be deemed to have been abandoned six (6) months after the date of filing for the permit, unless before then a permit has been issued. One or more extensions of time for periods of not more than ninety (90) days each may be allowed by the building official for the application, provided the extension is requested in writing and justifiable cause is demonstrated. 103.1.7. Health department approval. 1. No building permit shall be issued by the building official until the Henry County Health Department shall have approved the proposed water supply and sewage disposal facilities required in connection with the proposed buildings; provided, that in an area served by a public utility for water or for sewage disposal, or both, the health department may elect to waive the requirement for approval. The Henry County Health Department shall either approve or disapprove said water and sewerage facilities within thirty (30) days after the receipt thereof. 2. Nothing contained in these regulations shall be deemed to prevent the commissioner of health, after study of the site of a proposed use, from requiring for reason of health that all or any portion of such site not be used for the intended purpose or that the minimum lot sizes set forth for the zoning district in which the use will be located be increased with regard to the proposed use; provided that the commissioner of health shall define his decision in writing, with reasons therefor, within thirty (30) days upon being so requested by an applicant for the building permit. 103.2. Drawings and specifications. 103.2.1 Requirements. When required by the building official, two (2) or more copies of specifications, and of drawings drawn to scale with sufficient clarity and detail to indicate the nature and character of the work, shall accompany the application for a permit. Such drawings and specifications shall contain information, in the form of notes or otherwise, as to the quality of materials, where quality is essential to conformity with the technical codes. Such information shall be specific, and the technical codes shall be cited as a whole or in part, nor shall the term "legal" or its equivalent be used as a substitute for specific information. All information, drawings, specifications and accompanying data shall bear the name and signature of the person responsible for the design. 103.2.2 Additional data. The building official may require details, computations, stress diagrams, and other data necessary to describe the construction or installation and the basis of calculations. All drawings, specifications and accompanying data required by the building official to be prepared by an architect or engineer shall be affixed with their official seal. 103.2.3 Fire protection system shop drawings. Shop drawings for the fire protection system(s) shall be submitted to indicate conformance with this code and the construction documents and shall be approved prior to the start of system installation. Shop drawings shall contain all information as required by the referenced installation standards in the technical codes. 103.2.4 Design professional. The design professional shall be an architect or engineer legally registered under the laws of this state regulating the practice of architecture or engineering and shall affix his official seal to said drawings, specifications and accompanying data, for the following: 1. All Group A, E and I occupancies. 2. Buildings and structures three (3) stories or more high. 3. Buildings and structures five thousand (5,000) square feet (465m2) or more in area. For all other buildings and structures, the submittal shall bear the certification of the application that some specific state law exception permits its preparation by a person not so registered. EXCEPTION: Group R3 buildings, regardless of size, shall require neither a registered architect or engineer, nor a certification that an architect or engineer is not required. 103.2.5. Structural and fire resistance integrity. Plans for all buildings shall indicate how required structural and fire resistance integrity will be maintained where a penetration of a required fire resistant wall, floor or partition will be made for electrical, gas, mechanical, plumbing and communication conduits, pipes and systems and also indicate in sufficient detail how the fire integrity will be maintained where required fire resistant floors intersect the exterior walls and where joints occur in required fire resistant construction assemblies. 103.2.6 Site drawings. All applications for a building permit shall be accompanied by a plot or site plan drawn to scale, showing the actual dimensions of the lot to be built upon, the right-of-way of existing roads, the location and size of the proposed building or structure to be erected and of every existing building or structure on the site or lot, the setback lines of the proposed buildings, the location of easements and other such information as may be essential for determining whether the provisions of the ULDC and all county ordinances are being observed. The building official may require a boundary line survey prepared by a qualified surveyor. The building official is authorized to waive or modify the requirements for a site plan when the application for a permit is for alterations or repair or when otherwise warranted. A record of such applications and plot or site plans shall be kept. 103.2.7 Hazardous occupancies. The building official may require the following: 1. General site plan. A general site plan drawn at a legible scale which shall include, but not be limited to, the location of all buildings, exterior storage facilities, permanent accessways, evacuation routes, parking lots, internal roads, chemical loading areas, equipment cleaning areas, storm and sanitary sewer accesses, emergency equipment and adjacent property uses. The exterior storage areas shall be identified with the hazard classes and the maximum quantities per hazard class of hazardous materials stored. 2. Building floor plan. A building floor plan drawn at a legible scale, which shall include, but not be limited to, all hazardous materials storage facilities within the building and shall indicate rooms, doorways, corridors, exits, fire rated assemblies with their hourly rating, location of liquid-tight rooms, and evacuation routes. Each hazardous materials storage facility shall be identified on the plan with the hazard classes and quantity range per hazard class of the hazardous materials stored. 103.3. Examination of documents. 103.3.1 Plan review. The building official shall examine or cause to be examined each application for a permit and the accompanying documents, consisting of drawings, specifications, computations and additional data, and shall ascertain by such examinations whether the construction indicated and described is in accordance with the requirements of the technical codes and all other pertinent laws or ordinances. 103.3.2 Affidavits. The building official may accept a sworn affidavit from a registered architect or engineer stating that the plans submitted conform to the technical codes. For buildings and structures, the affidavit shall state that the plans conform to the laws as to egress, type of construction and general arrangement and, if accompanied by drawings, show the structural design and that the plans and design conform to the requirements of the technical codes as to strength, stresses, strains, loads and stability. The building official may without any examination or inspection accept such affidavit, provided the architect or engineer who made such affidavit agrees to submit to the building official copies of inspections reports as inspections are performed and upon completion of the structure, electrical, gas, mechanical, or plumbing systems a certification that the structure, electrical, gas, mechanical, or plumbing system has been erected in accordance with the requirements of the technical codes. Where the building official relies upon such affidavit, the architect or engineer shall assume full responsibility for the compliance with all provisions of the technical codes and other pertinent laws or ordinances. 103.4. Issuing permits. 103.4.1 Action on permits. The building official shall act upon an application for a permit without unreasonable or unnecessary delay. If the building official is satisfied that the work described in an application for a permit and the contract documents filed therewith conform to the requirements of the technical codes and other pertinent laws and ordinances, and all license fees required by Henry County have been paid, he shall issue a permit to the applicant. 103.4.2 Refusal to issue permit. If the application for a permit and the accompanying contract documents describing the work do not conform to the requirements of the technical codes or other pertinent laws or ordinances, the building official shall not issue a permit, but shall return the contract documents to the applicant with his refusal to issue such permit. Such refusal shall, when requested, be in writing, shall contain the reason for refusal, and shall be issued within ten (10) days after said request. 103.4.3 Special foundation permit. When application for permit to erect or enlarge a building has been filed and pending issuance of such permit, the building official may, at his discretion, issue a special permit for the foundation only. The holder of such a special permit is proceeding at his own risk and without assurance that a permit for the remainder of the work will be granted nor that corrections will not be required in order to meet provisions of the technical codes. 103.4.4 Public right-of-way. A permit shall not be given by the building official for the construction of any building, or for the alteration of any building where said building is to be changed and such change will affect the exterior walls, bays, balconies, or other appendages or projections fronting on any street, alley or public lane, or for the placing on any lot or premises of any building or structure removed from another lot or premises, until the building official or his designee have confirmed that the structure does not encroach upon the public street on which he proposes to build, erect or locate said building; and it shall be the duty of the building official to see that the street lines are not encroached upon except as provided for in the building code or otherwise allowed by the Henry County Department of Transportation. 103.4.5 Amended construction documents. Work shall be installed in accordance with the reviewed construction documents, and any changes made during construction that are not in compliance with the approved construction documents shall be resubmitted for approval as an amended set of construction documents. 103.5. Contractor's responsibilities. It shall be the duty of every contractor who shall make contracts for the installation or repairs of building, structure, electrical, gas, mechanical or plumbing systems, for which a permit is required, to comply with state or local rules and regulations concerning licensing and inspections which the applicable governing authority may have adopted. 103.6. Conditions of the permit. 103.6.1 Permit intent. A permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or set aside any of the provisions of the technical codes, nor shall issuance of a permit prevent the building official from thereafter requiring a correction of errors in plans, construction, or violations of this Code. Every permit issued shall become invalid unless the work authorized by such permit is commenced within six (6) months after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of six (6) months after the time the work is commenced. Construction is said to have commenced at the time when initial inspection is made prior to the installation of the foundation system. One (1) or more extensions of time, for periods not more than ninety (90) days each, may be allowed for the permit. The extensions shall be requested in writing and justifiable cause demonstrated. Extensions shall be in writing by the building official. 103.6.2 Permit issued on basis of an affidavit. Whenever a permit is issued in reliance upon an affidavit or whenever the work to be covered by a permit involves installation under conditions which, in the opinion of the building official, are hazardous or complex, the building official shall require that the architect or engineer who signed the affidavit or prepared the drawings or computations shall supervise such work. In addition, they shall be responsible for conformity with the permit, provide copies of inspection reports as inspections are performed, and upon completion make and file with the building official written affidavit that the work has been done in conformity with the reviewed plans and with the structural provisions of the technical codes. In the event such architect or engineer is not available, the owner shall employ in his stead a competent person or agency whose qualifications are reviewed by the building official. 103.6.3 Plans. When the building official issues a permit, he shall endorse, in writing or by stamp, both sets of plans "Reviewed for Code Compliance." One (1) set of drawings so reviewed shall be retained by the building official and the other set shall be returned to the applicant. The permit drawings shall be kept at the site of work and shall be open to inspection by the building official or his authorized representatives. 103.6.4 Construction and use to be as stated in application, plans, and permits. Building permits or certificates of occupancy issued on the basis of plans and applications approved by the building official authorize only the use, arrangement, and construction set forth in such approved plans and applications, and no other use, arrangement, or construction. Use, arrangement, or construction at variance with that authorized shall be deemed a violation of this chapter. 103.7. Fees. 103.7.1 Prescribed fees. A permit shall not be issued until the fees prescribed by the board of commissioners have been paid. Nor shall an amendment to a permit be released until the additional fee, if any, due to an increase in the estimated cost of the building, structure, electrical, plumbing, mechanical or gas systems, has been paid. 103.7.2 Work commencing before permit issuance. Any person who commences any work on a building, structure, electrical, gas, mechanical or plumbing system before obtaining the necessary permits shall be subject to a penalty of one hundred (100) percent of the usual permit fee in addition to the required permit fee, at the discretion of the building official or his deputy. 103.7.3 Accounting. The building official shall keep a permanent and accurate accounting of all permit fees and other monies collected, the names of all persons upon whose account the same was paid, along with the date and amount thereof. 103.7.4 Schedule of permit fees. On all buildings, structures, electrical, plumbing, mechanical and gas systems or alterations requiring a permit, a fee for each permit shall be paid as required, in accordance with the schedule as established by the applicable governing authority. 103.7.5 Building permit valuations. If, in the opinion of the building official, the valuation of building, alteration, structure, electrical, gas, mechanical or plumbing systems appears to be underestimated on the application, permit shall be denied, unless the applicant can show detailed estimates to meet the approval of the building official. Permit valuations shall include total cost, such as electrical, gas, mechanical, plumbing equipment and other systems, including materials and labor. 103.7.6. Procedure for contesting permit valuations relating to new construction. 1. Building permits for new construction are determined by the square footage value established by the International Code Council for the group and type of construction as adopted by the Board of Commissioners. 2. If an applicant contests the valuation data provided by the most current International Code Council Construction Costs table, the applicant may contest such valuation by submitting at least two of the following documents to the Building Official for consideration: a. A copy of the turn-key contract for the construction project, supported by an affidavit as sworn to and executed by the owner and the contractor that the contract accurately reflects the true cost of the completed project; b. A bank approved appraisal, prepared no later than twelve months prior to the building permit application, or if no bank appraisal is available, a self-contained appraisal prepared by an appraiser approved by the building official at the applicant's expense; or c. Another type of published National or International Valuation Data (other than the valuation data provided by the International Code Council) nationally recognized and used in other jurisdictions in the United States, supporting the value of the completed project. 3. If the building official finds that the alternative documentation supports the applicant's valuation of the completed project, then, with the approval of the county manager, the building permit fee shall be recalculated based on the alternative valuation data as submitted by the applicant. 4. If the building official finds that the alternative documentation does not support the applicant's valuation of the completed project, then the building official shall deny the applicant's request and the original permit valuation as initially determined shall prevail. Any applicant aggrieved by any such denial, shall have the right to appeal to the board of commissioners pursuant to the appeal provisions as set forth in U.L.D.C. Section 12.04.00, et seq. 5. Any applicant who utilizes the procedure set forth herein to contest a permit valuation shall be ineligible to seek or receive building permit fee reductions or waivers under any other practice, policy or resolution of Henry County. 6. This process shall not be applicable to the calculation or assessment of impact fees. 104. Inspections. 104.1. General. Construction or work for which a permit is required shall be subject to inspections by the building official and such construction or work shall remain accessible and exposed for inspection purposes until approved. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of the technical codes or of other ordinances of the jurisdiction. Inspections presuming to give authority to violate or cancel the provisions of the technical codes or of other ordinances of the jurisdiction shall not be valid. It shall be the duty of the permit applicant to cause the work to remain accessible and exposed for inspection purposes. Neither the building official nor the jurisdiction shall be liable for expense entailed in the removal or replacement of any material required to allow inspection. 104.2. Existing building inspections. Before issuing a permit, the building official may examine or cause to be examined any building, electrical, gas, mechanical, or plumbing systems for which an application has been received for a permit to enlarge, alter, repair, move, demolish, install, or change the occupancy. He shall inspect all buildings, structures, electrical, gas, mechanical and plumbing systems, from time to time, during and upon completion of the work for which a permit was issued. He shall make a record of every such examination and inspection and of all violations of the technical codes. 104.3. Manufacturers and fabrication. When deemed necessary by the building official, he shall make, or cause to be made, an inspection of materials or assemblies at the point of manufacture or fabrication. A record shall be made of every such examination and inspection and of all violations of the technical codes. 104.4. Inspection service. The building official may make, or cause to be made, the inspections required by section 105. He may accept reports of inspections of recognized inspection services, provided that after investigation he is satisfied as to their qualifications and reliability. A certificate called for by any provision of the technical codes shall not be based on such reports unless the same are in writing and certified by a responsible officer of such service. 104.5. Inspections prior to issuance of certificate of occupancy or completion. The building official shall inspect or cause to be inspected at various intervals all construction or work for which a permit is required, and a final inspection shall be made of every building, structure, electrical, gas, mechanical or plumbing system upon completion, prior to the issuance of the certificate of occupancy or completion. 104.6. Posting of permit. Work requiring a permit shall not commence until the permit holder of his agent posts the permit card in a conspicuous place on the premises. The permit shall be protected from the weather and located in such position as to permit the building official or representative to conveniently make the required entries thereon. This permit card shall be maintained in such position by the permit holder until the certificate of occupancy or completion is issued by the building official. 104.7. Required inspections. The building official upon notification from the permit holder of his agent shall make the following inspections and such other inspections as necessary, and shall either release that portion of the construction or shall notify the permit holder or his agent of any violations which must be corrected in order to comply with the technical codes: Building: 1. Foundation inspection: To be made after trenches are excavated and forms erected. 2. Frame inspection: To be made after the roof, all framing, fire blocking and bracing are in place, all concealing wiring, all pipes, chimneys, ducts and vents are complete. 3. Final inspection: To be made after the building is completed and ready for occupancy. Electrical: 1. Underground inspection: To be made after trenches or ditches are excavated, conduit or cable installed, and before any backfill is put in place. 2. Rough-in inspection: To be made after the roof, framing, fire blocking and bracing is in place and prior to the installation of wall or ceiling membranes. 3. Final inspection: To be made after the building is complete, all required electrical fixtures are in place and properly connected or protected, and the structure is ready for occupancy. Plumbing: 1. Underground inspection: To be made after trenches or ditches are excavated, piping installed, and before any backfill is put in place. 2. Rough-in inspection: To be made after the roof, framing, fire blocking and bracing is in place and all soil, waste and vent piping is complete, and prior to the installation of wall or ceiling membranes. 3. Final inspection: To be made after the building is complete, all plumbing fixtures are in place and properly connected, and the structure is ready for occupancy. NOTE: See the plumbing code for required tests. Mechanical: 1. Underground inspection: To be made after trenches or ditches are excavated, underground duct and fuel piping installed, and before any backfill is put in place. When excavated soil contains rocks, broken concrete, frozen chunks and other rubble that would damage or break the piping or cause corrosive action, clean backfill shall be on the job site. 2. Rough-in inspection: To be made after the roof, framing, fire blocking and bracing are in place and all ducting, and other concealed components are complete, and prior to the installation of wall or ceiling membranes. 3. Final inspection: To be made after the building is complete, the mechanical system is in place and properly connected, and the structure is ready for occupancy. Exception: Ground-source heat pump loop systems tested in accordance with the mechanical code, shall be permitted to be backfilled prior to inspection. Gas: 1. Underground inspection: To be made after trenches or ditches are excavated, underground duct and fuel piping installed, and before any backfill is put in place. When excavated soil contains rocks, broken concrete, frozen chunks and other rubble that would damage or break the piping or cause corrosive action, clean backfill shall be on the job site. 2. Rough piping inspection: To be made after all new piping authorized by the permit has been installed, and before any such piping has been covered or concealed or any fixtures or gas appliances have been connected. 3. Final piping inspection: To be made after all piping authorized by the permit has been installed and after all portions which are to be concealed by plastering or otherwise have been so concealed, and before any fixtures or gas appliances have been connected. This inspection shall include a pressure test. 4. Final inspection: To be made on all new gas work authorized by the permit and such portions of existing systems as may be affected by new work or any changes, to insure compliance with all the requirements of this code and to assure that the installation and construction of the gas system is in accordance with reviewed plans. 104.8. Written release. Work shall not be done on any part of a building, structure, electrical, gas, mechanical or plumbing system beyond the point indicated in each successive inspection without first obtaining a written release from the building official. Such written release shall be given only after an inspection has been made of each successive step in the construction or installation as indicated by each of the foregoing inspections. 104.9. Reinforcing steel and structural frames. Reinforcing steel or structural framework of any part of any building or structure shall not be covered or concealed without first obtaining a release from the building official. 104.10. Gypsum board or plaster fire protection. In all building where gypsum board or plaster is used for fire protection purposes, the permit holder or his agent shall notify the building official after all lathing and gypsum board, interior and exterior, is in place, but before any plastering is applied or before gypsum board joints and fasteners are taped and finished and shall not be applied until the release from the building official has been received. 104.11. Fire-resistant joints and penetrations. The protection of joints and penetrations in required fire-resistant construction assemblies shall not be covered or concealed from view without first obtaining a release from the building official. 104.12. Energy efficiency inspections. Inspections shall be made to determine compliance with the Georgia State Energy Code and shall include, but not be limited to, inspections for: envelope insulation R and U value, fenestration U value, duct system R value, and HVAC and water heating equipment efficiency. 104.13. Other inspections. In addition to the inspections specified above, the building official is authorized to make or require other inspections of any construction work to ascertain compliance with the provisions of the technical codes and other laws that are enforced by the department of building safety. 104.14. Inspection requests. It shall be the duty of the holder of the building permit or their duly authorized agent to notify the building official when work is ready for inspection. It shall be the duty of the permit holder to provide access to and means for inspection of such work for any inspections that are required by the technical codes. 105. Certificates. 105.1. Certificate of occupancy. 105.1.1 Building occupancy. A new building shall not be occupied or a change made in the occupancy, nature or use of a building or part of a building until after the building official has issued a certificate of occupancy. Said certificate shall not be issued until all required electrical, gas, mechanical, plumbing and fire protection systems have been inspected for compliance with the technical codes and other applicable laws and ordinances and released by the building official. Issuance of a certificate of occupancy shall not be construed as an approval of a violation of the provisions of the technical codes or of other ordinances of the jurisdiction. Said certificate of occupancy may be applied for either coincidently with a building permit or at any time thereafter; provided, however, that no such occupancy, use or change of use shall take place until a certificate of occupancy shall have been issued by the building official. A record of all certificates of occupancy shall be maintained and a copy shall be furnished upon request to any person. Failure to obtain a certificate of occupancy shall be a violation of this chapter. 105.1.2 Changes in use. Changes in the character or use of an existing structure shall not be made except as specified in the technical codes. 105.1.3 Issing certificate of occupancy. Upon satisfactory completion of construction of a building or structure and installation of electric, gas, mechanical and plumbing systems in accordance with the technical codes, reviewed plans and specifications, and after the final inspection, the building official shall issue a certificate of occupancy stating the nature of the occupancy permitted, the number of persons for each floor when limited by law, and any other information that is deemed necessary in accordance with the provisions of this code. A certificate of occupancy shall be required for any of the following: 1. Occupancy and use of a building hereafter erected or enlarged. 2. Change in use of existing buildings to use of a different classification. 3. Occupancy and use of vacant land, except for raising of crops. 4. Change in use of land to a different classification, except for the raising of crops. 5. Any change in use of a nonconforming use. 6. Development of a mobile home park. Any final inspection report or a certificate of occupancy issued for any structure shall have noted thereon: "To the best of Henry County's knowledge and belief at the time of inspection, the structure has been erected in substantial compliance with the applicable Technical Codes. Any oversight by the Henry County building inspector shall not excuse violation of any ordinance of Henry County." 105.1.4 Temporary/partial occupancy. A temporary/partial certificate of occupancy may be issued for a period not exceeding six (6) months for a portion or portions of a building, which may safely be occupied prior to final completion of the building. 105.1.5 Correction of code violations after the issuance of the certification of occupancy. 1. The requirement of a builder, electrical contractor, plumbing contractor, HVAC contractor, owner, individual or other entity who chooses to do business in Henry County shall comply with all technical codes and local ordinances. 2. After issuance of the certificate of occupancy, the county reserves the right for a period of one (1) year to reinspect a dwelling for latent code violations which existed at the time of the final inspection but were not detected. Any inspection made after the issuance of the certificate of occupancy and before the termination of the one (1) year requirement by Henry County Building Department shall be in response to a written complaint by the owner. 3. The builder, electrical contractor, plumbing contractor, HVAC contractor, owner, individual or other entity securing the permit shall be responsible for the correction of any code violations by him that are discovered during the period of construction and for a period of one (1) year from the issue date of the certificate of occupancy, excepting routine maintenance, abuse, modification and normal wear and tear. 4. In responding to a written complaint and upon inspection of the dwelling, should the Henry County Building Official or his authorized representative determine that there exists in any structure covered by the codes, any violations of these codes, the builder, electrical contractor, plumbing contractor, HVAC contractor, owner, individual or other entity obtaining a permit for construction, shall be notified by certified mail of the violations and shall be allowed ten (10) working days from the receipt of the notification to respond to the charge of violations and to meet with the Henry County Building Official or his authorized representative regarding a remedy for the violaUNIFIED LAND DEVELOPMENT CODE App. B tions. It shall be the responsibility of said principal to ensure that the Henry County Building Department has a current mailing address for the principal on every permit issued. Unless the principal informs otherwise in writing, the address provided on the building permit shall be deemed to be the proper mailing address for notifications under this section. The principal shall have thirty (30) days from the date the notice of violations is received, refused, or returned to correct the violations cited in the notice. Should the principal not correct the violations in a manner satisfactory to the Henry County Building Official or his authorized representative, or, in the judgment of the building official or his authorized representative, have not made satisfactory progress in remedying the violations within this 30-day period, the principal shall be subject to the provisions of section 106.1.6. 5. The principal may appeal the notice of violation to the Henry County Board of Commissioners to hear and rule on such complaints within twenty (20) days of the receipt of the notice of violation. The appeal must be in writing and filed with the Henry County Building Department. Should the Henry County Board of Commissioners, find the principal in violation of the code and in its judgment the violations are sufficiently serious as to affect the structural integrity or the expected normal service life of the structure or installed systems, or the safety and welfare of any occupants of the structure, the principal shall have thirty (30) days to remedy the violations to the satisfaction of the Henry County Building Official or his authorized representative. Should the principal not correct the violations in a manner satisfactory to the building official or his authorized representative, or, in the judgment of the building official or his authorized representative, have not made satisfactory progress in remedying the violations within this 30-day period, then the principal shall be notified in writing that further actions will be taken in remedying the violations. 105.1.6 Withholding of permits and inspections for previous violations. The building official is authorized to withhold the issuance of building permits or to refuse inspections to any building contractor, or any person authorized to do building under the laws of this Code, until such time as such contractor or person has resolved satisfactorily all outstanding violations from previously issued permits with the Henry County Building Department. 105.2. Certificate of completion. Upon satisfactory completion of a building, structure, electrical, gas, mechanical or plumbing system, a certificate of completion may be issued. This certificate is proof that a structure or system is complete and for certain types of permits is released for use and may be connected to a utility system. This certificate does not grant authority to occupy or connect a building, such as a shell building, prior to the issuance of a certificate of occupancy. 105.3. Revocation. The building official is authorized to, in writing, suspend or revoke a certificate of occupancy or completion issued under the provisions of the technical codes wherever the certificate is issued in error, or on the basis of incorrect information supplied, or where it is determined that the building or structure or portion thereof is in violation of any ordinance or regulation or any of the provisions of the technical codes. 105.4. Service utilities. 105.4.1 Connecting of service utilities. No person shall make connections from a utility, source of energy, fuel or power to any building or system which is regulated by the technical codes for which a permit is required, until released by the building official and a certificate of occupancy or completion is issued. 105.4.2 Temporary connection. The building official may authorize the temporary connection of the building or system to the utility source of energy, fuel or power for the purpose of testing building service systems or for use under a temporary certificate of occupancy. 105.4.3 Authority to disconnect service utilities. The building official shall have the authority to authorize disconnection of utility service to the building, structure or system regulated by the technical codes, in case of emergency where necessary to eliminate an immediate hazard to life or property. The building official shall notify the serving utility, and whenever possible the owner and occupant of the building, structure or service system of the decision to disconnect prior to taking such action. If not notified prior to disconnecting, the owner or occupant of the building, structure or service system shall be notified in writing, as soon as practical thereafter. 105.5. Posting floor loads. 105.5.1 Occupancy. An existing or new building shall not be occupied for any purpose, which will cause the floors thereof to be loaded beyond their safe capacity. The building official may permit occupancy of a building for mercantile, commercial or industrial purposes, by a specific business, when he is satisfied that such capacity will not thereby be exceeded. 105.5.2 Storage and factory-industrial occupancies. It shall be the responsibility of the owner, agent, proprietor or occupant of Group S and Group F occupancies, or any occupancy where excessive floor loading is likely to occur, to employ a competent architect or engineer in computing the safe load capacity. All such computations shall be accompanied by an affidavit from the architect or engineer stating the safe allowable floor load on each floor in pounds per square foot uniformly distributed. The computations and affidavit shall be filed as a permanent record of the building department. 105.5.3 Signs required. In every building or part of a building used for storage, industrial or hazardous purposes, the safe floor loads, as reviewed by the building official on the plan, shall be marked on plates of approved design which shall be supplied and securely affixed by the owner of the building in a conspicuous place in each story to which they relate. Such plates shall not be removed or defaced, and if lost, removed or defaced, shall be replaced by the owner of the building. 106. Tests. The building official may require tests or test reports as proof of compliance. Required tests are to be made at the expense of the owner, or his agent, by an approved testing laboratory or other approved agency. 107. Severability. In any section, subsection, sentence, clause or phrase of this code is for any reason held to be unlawful and or unconstitutional; such decision shall not affect the validity of the remaining portions of this code. 108. Violations and penalties. Any person, firm, corporation or agent who shall violate a provision of the technical code, or fail to comply therewith, or with any of the requirements thereof, or who shall erect, construct, alter, install, demolish or move any structure, electrical, gas, mechanical or plumbing system, or has erected, constructed, altered, repaired, moved or demolished a building, structure, electrical, gas, mechanical or plumbing system, in violation of a detailed statement or drawing submitted and permitted hereunder, shall be guilty of a misdemeanor. Each such person shall be considered guilty of a separate offense for each and every day or portion thereof during which any violation of any of the provisions of the technical code is committed or continued, and upon conviction of any such violation such person shall be punished within the limits and as provided by section 12.07.00 of the ULDC. (Ord. No. 10-11, § I, 10-5-10; Ord. No. 12-03, § I, 2-7-12; Ord. No. 13-07, 6-18-13; Ord. No. 13-08, 7-16-13) A. Landscape requirements. 1. All disturbed (disturbed shall mean areas other than natural areas) yard areas in residential zoning districts shall be landscaped with grass appropriate to the season and mulched as set forth in the standards for erosion and sedimentation control in section 8.05.00 prior to final inspection of the residential structure by the building department. Landscaping shall be made in all disturbed front, side and rear yards as defined by the zoning ordinance. All yard landscaping shall extend to the edge of pavement of the nearest public street. All drainage easements on the property shall be graded and landscaped for positive surface drainage, with consideration for avoidance of surface drainage problems and flooding of adjoining properties. The grading and landscaping of drainage easements shall be in conformance with drainage easement locations and design as indicated on the approved final plat of the subdivision. 2. Inspections. The building inspector shall determine that the minimum landscaping requirements of subsection (a) are in compliance at the final inspection of the structure. 3. When weather does not permit landscaping to be done before a final inspection of the structure is made, the builder may request in writing and the building inspector may grant up to a thirty-day extension for the completion of landscaping. Failure to complete the landscaping within the time granted shall constitute a violation of this section and shall be dealt with as provided for in section 12.07.00 of the ULDC. B. Sprinkler systems. 1. The 1996 edition of National Fire Protection Association (NFPA) 13 and 13R of Sprinkler Systems for Residential and Commercial Occupancies is hereby approved and adopted as if the same appeared upon the pages herein; 2. All amendments, updates and modifications of said publication, as approved by the State of Georgia, shall automatically become a part of this Code without further action by the governing authority; 3. In addition to the NFPA Code any residential occupancies containing more than two (2) dwelling units must install NFPA 13R. Exception No. 1, Townhouse — a single-family dwelling constructed in a series or group of attached units with property lines separating each unit. 4. In addition to the NFPA Code, the fire department connection (FDC) must be placed at the main entrance (driveway) and out of the collapse zone of the building with no obstructions, and within fifty (50) feet of a fire hydrant. The FDC should stand between thirty-six (36) inches to forty-eight (48) inches above grade. 5. In addition to the NFPA Code, all day care occupancies must install NFPA 13R. 6. In addition to the NFPA Code, working plans shall be submitted for review and approval to the authority having jurisdiction before any equipment is installed or remodeled and must show the following items: • Site plan with fire hydrant and FDC location must be submitted. • Copy of state license. • All sets of working plans shall be signed and a certified seal placed thereon. • Hydraulic calculations. Information sheets (cut sheets) on materials. 7. In addition to the NFPA Code, in business and/or mercantile occupancies each suite must have horn/strobe placed inside each unit for communication of water flow on the sprinkler system. 8. Additional plan review and inspection fee will be charged by the fire department. This fee will be set and approved by the board of commissioners. 9. Any person violating any provision of this section shall be subject to the enforcement and penalties set forth in sections 12.06.00 and 12.07.00 of the ULDC. YEAR 1824 1824 1825 1826 1830 1831 1833 1834 1835 1837 1840 1842 1843 1844-45 1845 1849-50 1851-52 1853-54 1860 1869 1870 1870 1871-72 1872 1873 1875 1877 1878-79 BEGINNING