Skip to content
Georgia Commons
Menu

Hogansville · Zoning Ordinance

Part II - CODE OF ORDINANCES / Chapter 102 - UNIFIED DEVELOPMENT ORDINANCE / Article XIII - ANTENNAS AND TOWERS

Sec. 102-B-13-6. Requirements for telecommunication facilities.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(1) Lighting. No illumination is permitted on telecommunications facilities unless required by the FCC, FAA or other state or federal agency of competent jurisdiction or unless necessary for the air traffic safety. If lighting is required or necessary, the zoning administrator of the department of community development may review the available lighting alternatives and approve the design that would cause the least disturbance to the surrounding uses and views.

(2) Advertising. No advertising or signage is permitted on telecommunications facilities.

(3) Visual effects. If an antenna is installed on a structure other than a tower, the antenna and associated electrical and mechanical equipment must be of neutral color that is identical to, or closely compatible with, the color of the supporting structure so as to make the antenna and related equipment as visually unobtrusive as possible.

(4) Accessory uses. Accessory structures used in direct support of a telecommunications facility shall be allowed but shall not be used for offices, vehicle storage or other outdoor storage. Mobile or immobile equipment not used in direct support of a telecommunications facility shall not be stored or parked on the site of the telecommunications facility.

(5) Lot size and setbacks. Telecommunications facilities must be set back from any property line a sufficient distance to protect adjoining property from the potential impact of telecommunications facility failure by being sufficiently distant to accommodate such failure of the site, based on the engineer's analysis as required in section 102-B-13-7. Such setback distance shall in no event be less than the calculated distance covered by the telecommunications facility should such fail, plus an additional ten feet.

(6) On-site vegetation. Existing on-site vegetation shall be preserved or improved, and disturbance of the existing topography shall be minimized, unless such disturbance would result in less visual impact of the site to the surrounding area.

(7) Buffer strip and fence. Any tower site (including the entire "guyed" area) shall be surrounded by a buffer strip and fence as approved by the zoning administrator based on applicable regulations of the UDO for buffers and fencing.

History

The history line the source prints at the end of the section.

(Ord. No. 23-0605, § 1(Exh. A), 6-5-2023)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hogansville/zoning/102-b-13-6@2026-11-11-88915c585a

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hogansville Zoning Ordinance, Sec. 102-B-13-6. Requirements for telecommunication facilities | Georgia Commons