--- title: Hogansville Zoning Ordinance, Sec. 102-B-13-7. Application requirements collection: local-codes id: local-code:hogansville/zoning/102-b-13-7 cite_as: Hogansville, Ga., Zoning Ordinance § 102-B-13-7 canonical_url: https://georgiacommons.org/code/local/hogansville/zoning/102-b-13-7 md_url: https://georgiacommons.org/code/local/hogansville/zoning/102-b-13-7.md text_url: https://georgiacommons.org/code/local/hogansville/zoning/102-b-13-7/text source_url: https://library.municode.com/ga/hogansville date: 2026-11-11 status: active jurisdiction: city:hogansville jurisdiction_name: Hogansville place_fips: "1339244" corpus_version: local-codes-hogansville-90e92a8b142f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/hogansville/zoning/~part-ii/~chapter-102/~article-xiii.md previous: https://georgiacommons.org/code/local/hogansville/zoning/102-b-13-6.md next: https://georgiacommons.org/code/local/hogansville/zoning/102-b-13-8.md index: https://georgiacommons.org/code/local/hogansville.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:hogansville/zoning/102-b-13-7@2026-11-11-0ef4fc16ef --- # Hogansville Zoning Ordinance, Sec. 102-B-13-7. Application requirements > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 102 - UNIFIED DEVELOPMENT ORDINANCE / Article XIII - ANTENNAS AND TOWERS Application for a building permit for any wireless facility shall be made by the person, company or organization that will own and operate the telecommunications facility. An application will not be considered until it is complete, and the following information shall be submitted when applying for said permit and must be submitted for an application to be considered complete: (1) Basis information. A report from a qualified, registered professional engineer licensed in the State of Georgia, documenting the following: (a) Wireless facility height and design, including technical, engineering, economic and other pertinent factors governing selection of the proposed design; (b) Total anticipated capacity of the telecommunications facility, including number and types of antennas which can be accommodated by the facilities; (c) Evidence of structural integrity of the tower structure; and (d) Structural failure characteristics of the telecommunications facility and demonstration that site setbacks are of adequate dimension (to contain debris). (2) A definition of the area of service to be served by the antenna or tower and whether such antenna or tower is needed for coverage or capacity; (3) The identity of a community liaison officer appointed by the applicant to resolve issues of concern to neighbors and residents relating to the construction and operation of the facility. Included within such designation shall be name, address, telephone number, facsimile number and electronic mail address, if applicable. (4) Site plan. An applicant for a telecommunications facility building permit must present a site plan that discloses the following: (a) Location of guy wires; (b) Location to nearest residential structure; (c) Height elevations above ground level; (d) Height elevation above sea level; and (e) Full description of landscaping and fence material to be used. ## History (Ord. No. 23-0605, § 1(Exh. A), 6-5-2023)