--- title: Hogansville Zoning Ordinance, Sec. 102-C-7-13. Lift station requirements collection: local-codes id: local-code:hogansville/zoning/102-c-7-13 cite_as: Hogansville, Ga., Zoning Ordinance § 102-C-7-13 canonical_url: https://georgiacommons.org/code/local/hogansville/zoning/102-c-7-13 md_url: https://georgiacommons.org/code/local/hogansville/zoning/102-c-7-13.md text_url: https://georgiacommons.org/code/local/hogansville/zoning/102-c-7-13/text source_url: https://library.municode.com/ga/hogansville date: 2026-11-11 status: active jurisdiction: city:hogansville jurisdiction_name: Hogansville place_fips: "1339244" corpus_version: local-codes-hogansville-90e92a8b142f publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/hogansville/zoning/~part-ii/~chapter-102/~article-vii.md previous: https://georgiacommons.org/code/local/hogansville/zoning/102-c-7-12.md next: https://georgiacommons.org/code/local/hogansville/zoning/102-c-8-1.md index: https://georgiacommons.org/code/local/hogansville.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:hogansville/zoning/102-c-7-13@2026-11-11-cc73152cdc --- # Hogansville Zoning Ordinance, Sec. 102-C-7-13. Lift station requirements > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Chapter 102 - UNIFIED DEVELOPMENT ORDINANCE / Article VII - SOLID WASTE (1) Lift station policy. It is the goal of the city to provide for the conveyance of wastewater by natural gravity flow wherever and whenever possible. In order to facilitate the city's goal, the city has policies that allow the reimbursement of certain costs of off-site trunk sewer extensions and over sizing lines. The installation of a lift station increases the cost of providing sewer service and transfers the burden of extending trunk sewers and/or repairing, improving, and replacing the lift station to the city and its sewer customers. Lift stations, if deemed necessary, must be carefully integrated into the city's overall plan for providing wastewater service to its customers. (2) Detailed plans and specifications. Design drawings and specifications for the lift station shall be reviewed by the city concurrently with the overall development plans. This submittal shall contain: 1) design and operational information, 2) detailed design drawings, and 3) technical specifications. (3) Lift station requirements. Lift stations must be designed by a professional engineer licensed in the State of Georgia, and shall be designed and constructed in accordance with the city's standards in affect at the time. These standards, in conjunction with the standard details in the Appendix of Section 8.6, shall include, but not be limited to the following: (a) The lift station shall be located, whether inside or outside of the proposed development, to service ten-times the developed area. The maximum required service area shall be 1,000 acres or no more than 5,000 feet of gravity sewer outside the development, whichever is less. The service area can include area served by any existing public sewer system; however, any area served by an existing lift station that will not be eliminated according to the below requirements must be excluded from the service area for the proposed lift station. Note that this requirement affects the location of the lift station only, not the sizing. (b) The lift station must be located at or beyond the nearest downstream confluence outside the development. The maximum required amount of gravity sewer outside the development to meet this requirement shall be 100 linear feet per developed acre or 5,000 feet, whichever is less. This requirement may be waived if the lift station located within the proposed development area will serve more than two-times the service area requirement. (c) The lift station cannot be located upstream of an existing lift station. If the proposed lift station is upstream of an existing lift station, the developer shall install a gravity sewer line from the proposed development to convey flows to the existing lift station and upgrade the existing lift station as necessary. The maximum amount of gravity sewer line required outside the development shall be 100 linear feet per developed acre or 10,000 feet, whichever is less. (d) The lift station cannot be located downstream of an existing lift station. If the proposed lift station is downstream of an existing lift station, the developer shall install a gravity sewer line to convey the flow from the existing lift station to the proposed lift station, thus eliminating the existing lift station. The maximum amount of gravity sewer line required outside the development shall be 100 linear feet per developed acre or 10,000 feet, whichever is less. (e) A waiver of any or all of the above requirements, subsections (1)—(4), may be considered in the sole discretion of the city in any of the following cases: (i) The proposed lift station will eliminate two or more existing lift stations. (ii) The proposed lift station will be eliminated by a future project or projects known to the city. (iii) The total amount of gravity sewer required outside of the development (both upstream and downstream together) to satisfy all of the applicable requirements above, subsections (1)—(4), is greater than 100 linear feet per developed acre or 10,000 feet. In this case, the city, on a case-by-case basis and at its discretion, will determine the best combination of requirements to locate the proposed lift station. In no case will the developer be required to install more than one 100 linear feet per developed acre or 10,000 feet, whichever is less, outside the development. (iv) The city is compensated for the difference in cost to locate the lift station at a site that satisfies the applicable requirements above, subsections (1)—(4), versus locating the lift station on the project site or another site proposed by the developer. The cost difference shall be determined by the city. (f) If the proposed developed area covers more than one drainage area (e.g. parts of the development naturally drain to more than one location), the area shall be divided by its respective drainage pattern(s) and treated as separate developments where each lift station must meet these requirements separately. (g) No lift station will be permitted for a proposed development of less than 40 Equivalent Residential Units (E.R.U.) or a watershed having an estimated ultimate development of less than 80 E.R.U. (h) The lift station and incoming manholes shall be outside the 100-year flood zone wherever possible. If not reasonable and/or the city determines installation within the 100-year flood zone is acceptable, the lift station and incoming manholes shall be designed and constructed according to all applicable FEMA, NFIP, EPA, EPD, State, and local ordinances. (i) The deeded lot size shall be minimum 40 feet by 40 feet. The lift station shall be fenced minimum 30 feet by 30 feet with six inches of crushed stone extending six inches outside fence. (j) The lift station layout shall be such that a driveway will access the pump loading point. The lift station access drive shall be paved with either concrete or asphalt. The pump station driveway slope shall not exceed ten percent. Drives shall be minimum 15 feet wide and in accordance with Georgia D.O.T. standards and Carroll [Troup] County standards for industrial roads. The sub-base shall be compacted to 95 percent standard proctor per ASTM D698 standards. For driveways over 50 feet in length, a turnaround will be required and shall be 20 feet off the fence, 16 feet deep with a 15-foot radius to the driveway. (k) The pump station layout shall be configured so the station can be expanded to the ultimate size to pump the ultimate upstream flow. Initial and future land requirements including access for the pump station shall be obtained by the developer and donated to the city in fee simple. (l) A debris manhole is required inside the fence. (m) An odor control system, designed by a licensed, professional engineer, shall be provided on all lift stations. The odor control system shall meet the following minimum requirements: (i) Air shall be removed via applicable fan and induced through carbon media canister unit or other treatment device/method approved by the city. (ii) Ductwork shall be plastic material and shall be UV rated or painted with UV rated paint. (iii) Treatment unit (i.e. carbon canister) and fan shall be sized to treat air volume. (iv) Fan shall be sized to create negative pressure within wetwell to prevent air escaping. (v) Air volume treated shall be considered the volume displaced by the peak sewerage flows served by the lift station. (vi) Assume area for potential air seepage into and out of the wetwell (i.e. around pump hatch openings, vents, cracks, etc.). Assume !" thick. (vii) At a minimum, air velocity shall be assumed at 100 feet/minute. (viii) For safety factor, assume one of the largest hatches remains open at all times. (n) Lift stations shall have a six-foot high security fence topped with standard three strand barbed wire on angled extension arms. Fences shall be installed using nine gauge fabric with one and one-half-inch top rails and bottom tension wires; two-inch line posts and three-inch corner posts set in concrete ten feet apart; 16-foot gate with nine gauge cross-tension wires installed on four-inch gate posts. A vegetative screen shall be installed outside of the security fence such that the lift station will not be visible from off the lift station property except for penetrations required for access. The base of the vegetative screen shall be mulched. (o) A potable water supply line and backflow preventer is required on all lift stations. The water supply line must be capable of delivering a minimum of 20 gpm through a yard hydrant located within the lift station fence. (p) The backflow preventer shall be installed above grade, piped with brass or hard copper, inside a freeze protection cover certified to ASSE Standard 1060 Classes I, II, III with drain flap to allow a minimum discharge of 60 gpm. Cover shall be anchored to suitably sized concrete pad as specified by the manufacturer. (q) The yard hydrant shall be Simmons 800 Series freeze-proof with " hose connection or approved equal. The base of the yard hydrant shall be installed in an adequately sized bed of #57 stone with a two-foot by two-foot splash pad at grade. (4) Wet well requirements. Design calculations, signed by a professional engineer, must be submitted to the authority for review and shall contain the following computations: (a) Capacity at peak flow. (b) System head—Tabulated and plotted on pump performance curve. (c) Cycle time—Including starts per hour for peak flow and average flow conditions. (d) Buoyancy calculations. (e) Storage volume—Volume available in the event of a power outage. (5) Drainage basin flow shall be calculated for the natural drainage basin area flowing into the proposed lift station. Flow calculations shall be based upon acreage, usage per established zoning, anticipated densities and development type if there is evidence of potentially greater wastewater flow being generated in excess of established zoning. (6) The lift station shall be sized based upon the anticipated upstream flow that will be realized in a seven-year period of basin development. The amount of development in a basin is judgmental and shall be determined by the city based on land use and zoning maps or other appropriate information. (7) Generally, the following minimum average daily flow rates and peaking factors are used for calculating estimated usage in the basin: (a) Residential areas. 400 gpd per equivalent residential unit, with a peaking factor of 2.5. (b) Commercial and industrial areas. 2,000 gpd per acre of developed land, with a peaking factor of 3.0. (c) These values may increase depending on the actual development in the basin, as determined by the city on a case-by-case basis. (8) The lift station influent line invert shall be set so that all upstream gravity flow into the lift station can be achieved. The influent pipe shall be sized at a minimum slope per "10 State standard" for basin flow with a peaking factor of 2.5 (or greater as specified by the city). ## History (Ord. No. 23-0605, § 1(Exh. A), 6-5-2023)