Skip to content
Georgia Commons
Menu

Hogansville · Zoning Ordinance

Part II - CODE OF ORDINANCES / Chapter 102 - UNIFIED DEVELOPMENT ORDINANCE / Article IX - SUBDIVISIONS

Sec. 102-C-9-18. As-builts.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

"As-built" drawings shall be submitted to the city engineer prior to street acceptance.

These shall include all information contained on the approved construction drawings in the "as-built" state, including, but not limited, to the following:

(1) Drainage system pipes and channels.

(2) Storm water detention/retention and water quality facilities with full design specifications.

(3) Streets, including street centerlines showing angles of deflection and standard curve data of intersection, radii, length of tangents and arcs, and degree of curvature with basis of curve data.

(4) Other utilities as required by the utility provider of record.

(5) All "as-built" drawings shall be submitted in both hard copy and digital format and be on the state plane coordinate system, USA, GA, NAD 83, West. The digital copy shall be in a format acceptable to the city.

History

The history line the source prints at the end of the section.

(Ord. No. 23-0605, § 1(Exh. A), 6-5-2023)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:hogansville/zoning/102-c-9-18@2026-11-11-7a14356b97

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Hogansville Zoning Ordinance, Sec. 102-C-9-18. As-builts | Georgia Commons