--- title: Homerville Zoning Ordinance, Section 11.3. Application for Building Permit collection: local-codes id: local-code:homerville/zoning/11.3 cite_as: Homerville, Ga., Zoning Ordinance ยง 11.3 canonical_url: https://georgiacommons.org/code/local/homerville/zoning/11.3 md_url: https://georgiacommons.org/code/local/homerville/zoning/11.3.md text_url: https://georgiacommons.org/code/local/homerville/zoning/11.3/text source_url: https://cityofhomerville.com/wp-content/uploads/2024/05/Zoning-Ordinance-COMPLETE.pdf date: 2026-11-11 status: active jurisdiction: city:homerville jurisdiction_name: Homerville place_fips: "1339748" corpus_version: local-codes-homerville-f0e042dc62dd publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/homerville/zoning/~article-xi.md previous: https://georgiacommons.org/code/local/homerville/zoning/11.2.md next: https://georgiacommons.org/code/local/homerville/zoning/11.4.md index: https://georgiacommons.org/code/local/homerville.md branch: zoning edition: As posted on the city's website, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: city website version_id: local-code:homerville/zoning/11.3@2026-11-11-a682fd1039 --- # Homerville Zoning Ordinance, Section 11.3. Application for Building Permit > As posted on the city's website, retrieved 2026-11-11 > Read by OCR from a scanned page: a character, a name, or a number may be misread. Part of: Article XI - ADMINISTRATION, ENFORCEMENT AND PENALTIES The applicant for a building permit shall submit a Site plan at a suitable scale showing the shape, size, and location of the lot to be built upon and the Shape, size, height, use and location of the buildings to be erected, altered, or moved and of any buildings already on the lot, the number of dwelling units the building is designed to accommodate, the setback line of buildings on adjoining lots and any other information needed to determine whether the provisions of this Ordinance are being observed. If the application conforms. with the provisions of this Ordinance, the City building codes and other Ordinances of the City, the permit shall be issued upon payment of the required fee, If not, the building permit shall be.refused by the Building Inspector in writing Stating the cause of the refusal. If no substantial Progress on construction has been made within six (6) months beginning with the date the permit is issued, the permit becomes invalid. The Building Inspector may renew the permit. A renewal fee is required to be paid by the applicant before the permit is renewed.