Homerville · Zoning Ordinance
Article XI - ADMINISTRATION, ENFORCEMENT AND PENALTIES
Section 11.6. Administration for Industrial Districts
About this text
- As posted on the city's website, retrieved 2026-11-11
- Read by OCR from a scanned page: a character, a name, or a number may be misread.
All provisions of Article XI of this ordinance shall apply to all proposed development to be located in an industrial district, except as amended as follows:
(a) Administration Requirements of Industrial Districts.
(1) Building Permit. The procedure for a proposed use subject to the standards and limitations of this Section follow:
(a) Application. An application for a building permit within any Industrial District shall be submitted to the City Clerk in duplicate on the form supplied, and shall be referred to the City Clerk to the Clinch County
Development and Industrial Authority for development. The applicant shall also
submit in duplicate a plan of the proposed construction or development which should include the following:
(1) a plot plan of the lot showing the location of all present and proposed buildings, drives, parking lots, waste treatment or disposal facility and other constructional features on the lot; and all buildings, streets, alleys, highways, streams, and other topographical features outside of the lot and within 200 feet of any lot line;
(2) architectural plans for any proposed building;
(3) a description of the industrial operations proposed in sufficient detail to indicate the effects of those operations in producing traffic congestion, noise, glare, air pollution, water pollution, fire hazards or safety hazards;
(4) engineering plans for the treatment and disposal of sewage and any other (b) (c) (d) industrial wastes;
(5) the proposed number of shifts to be worked and the maximum number of employees on each shift; and
(6) any other data or evidence the Building Inspector and/or the Clinch County Industrial Development Authority or the Industrial Committee may require.
Special reports. The Authority, depending on the case, may require any person, firm or corporation to retain an expert
consultant(s) to study and report to compliance or noncompliance with requirements of this Ordinance and to advise how a proposed use can best be brought into compliance with the standards and
limitations of this Ordinance. ~ Such consultant(s) shall make such report within 30 days after receipt of such application.
A copy of this report shall be promptly furnished to the applicant.
No applicant will be required to reveal any secret processes, and any information
submitted will be indicated as confidential if requested.
Decision of the Industrial Authority.
At the next regular meeting of the authority the reviewer shall decide whether the
proposed construction or development will conform to the applicable standards and
limitations of this Ordinance and no such basis shall refuse or authorize the issuance of a building permit, or require
modification of the proposed plan of construction or development. Such decision of the Authority shall be in the form of a written report addressed to the City Clerk.
Failure of the Authority to act no later than 30 days after the receipt of the
application shall be deemed approval of the application and in such case the City Clerk is directed to issue the building permit.
o39n (e) (£) Appeals from decisions. The procedures for appealing a decision of the Industrial
Authority, with respect to the authorization of a building permit shall be as stated in Section 11.8 of this ordinance.
Assurance of compliance. [In acting upon an application for a building permit for any construction or development in an Industrial District, the Industrial Authority is
directed to assure itself that all of the requirements of this Ordinance are met and that all of the standards and limitations of this Section will be observed.
(2) Continued Enforcement.
(a) Building inspector. The duties of the Building inspector with respect to this section shall include, but not limited to the following:
(1) conduct field inspections to determine that the building or structure being
constructed, reconstructed or used is being pursued in accordance with the site plan for which a building permit has been issued;
(2) insuring that all construction has been completed in accordance with all applicable City Code requirements prior to allowing occupancy.
(3) investigate any alleged violation of the requirements of this Ordinance on
the part of any new industrial use, and if there are reasonable grounds to believe that a violation exists, shall notify the City Clerk of the occurrence or; existance of a probable violation thereof. The Industrial Authority, shall then investigate the alleged violation, and for such investigation may employ qualified experts. If after public hearing on notice, the Authority finds that a violation occurred or exsists, a copy of said finding shall be forwarded to the City Council. The services of any qualified experts employed by the City to advise in establishing a violation Shall be paid by the violator, if a violation is proved, and otherwise by the City.
REMEDIES AND PENALTIES
(A) Applicable penalties and remedies are as stated in Section 11.4 and Section 11.5 of the Ordinance.
Read this code where it is posted (city website) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.