Chapter 105 DEVELOPMENT STANDARDS AND REGULATIONS Secs. 105-165—105-192. Reserved. ARTICLE I. IN GENERAL* Sec. 105-1. Authority and delegation. The power of a local government to enact an ordinance such as the one from which this chapter is derived, which is intended to protect the public health, safety, and welfare, is provided by Georgia Constitution article 9, § 2, ¶ 4 and article 9, § 2, ¶ 3, the county's general police powers and other local and state law applicable hereto. These regulations are adopted pursuant to powers vested in counties by the State of Georgia Constitution and pursuant to state administrative rules for the adoption and implementation of comprehensive plans and the protection of vital areas of the state. The Jasper County Board of Commissioners or their designee is vested with the authority to review, approve, conditionally approve, and disapprove sketch plats, and to grant variances from the requirements of chapter 105, chapter 107 and chapter 119 of this Code when applications for variance(s) are submitted simultaneously with a sketch plat application and pertain to the same property as the sketch plat application. The director of planning and zoning is vested with the authority to review, approve, conditionally approve or disapprove minor subdivision plats and minor re-subdivisions, lot combination plats, lot line adjustments, construction plans of major subdivisions when such sketch plat approval of construction plans has been obtained. The director of planning and zoning shall also be authorized to review major subdivisions and major re-subdivisions for conformity to the requirements of this Code, and to make reports and recommendations to the planning commission and board of commissioners on major subdivisions and major re-subdivisions, and to administer, interpret, and enforce the provisions of this chapter. The director of planning and zoning shall further be authorized to administratively approve variances where expressly authorized in this Code. (Ord. of 11-7-2022, § VIII) Sec. 105-2. Jurisdiction. This chapter applies to all land within the unincorporated areas of the county. (Ord. of 11-7-2022, § VIII) Sec. 105-3. Applicability and prohibitions. (a) The subdivision regulations of Jasper County shall apply to all real property within unincorporated Jasper County, but specifically excluding the subdivision of property. (b) Effect of prior subdivision regulations. At the subdivider's request, a plat that received preliminary approval under prior subdivision requirements may be processed through the final plat process under such requirements. (c) No person shall sell, advertise, or offer to sell, by deed, map, plat or other instrument, any parcel of land not subdivided under the requirements of this chapter. (d) No plat of land subdivision shall be entitled to be recorded in the Office of the Clerk of the Superior Court of Jasper County, and it shall be unlawful to record such a plat of land subdivision, unless and until it shall have been approved in accordance with the requirements of this chapter. (e) It shall be unlawful for any person to transfer or sell land by reference to, or by exhibition of, or by other use of, a plat of a land subdivision that has not been approved and recorded in accordance with the requirements of this chapter. The description of such land by metes and bounds in the instrument of transfer shall not exempt the transaction. (f) No person shall commence construction of any improvements on any land, prior to the approval of construction plans and engineering plans for said improvements. (g) No building permit or certificate of occupancy shall be issued for a building, structure, or use, nor shall any excavation, grading, or land disturbance applications be approved, on any parcel of land created by subdivision after the effective date of this Code that has not been approved in accordance with the provisions of this chapter. (h) No land dedicated as a public street or for other public purpose shall be opened, extended, or accepted as a public street or for other purpose unless such improvements are constructed in accordance with the specifications of this chapter and formally approved and accepted as public improvements by the board of commissioners. (i) No street or road will be accepted for maintenance by the county unless the property owner(s) first constructs the road to county standards. (Ord. of 11-7-2022, § VIII) Sec. 105-4. Purposes. This chapter seeks to encourage the development of desirable land use patterns within the county in accordance with the county zoning ordinance set forth in chapter 119 and the Jasper County Future Land Use Plan. The promotion of sound land use patterns and practices is intended to reduce or eliminate the occurrence of certain conditions that can threaten the general health, safety, and welfare of the residents of the county. This chapter serves the following purposes: (1) To establish procedures for the subdivision and re-subdivision of land in order to further the orderly development of land and encourage the development of economically sound and stable communities. (2) To promote the orderly, planned, efficient, and economic development of the unincorporated portions of Jasper County and to guide future growth in accordance with the Japer County Comprehensive Plan. (3) To ensure that lands subdivided are of such character that they can be used for building purposes without danger to the health or safety of its residents, and to secure safety from fire, flood, or other menace. (4) To provide for the proper documenting of subdivided land and proper legal descriptions. (5) To ensure the proper provision of improvements such as drainage, water, sewerage, and capital improvements such as schools, parks, playgrounds, recreational facilities, and transportation facilities. (6) To ensure the adequate protection of safe and convenient traffic access and circulation in new land development. (7) To help eliminate the costly maintenance problems which develop when streets and lots are established without proper consideration given to various public purposes. (8) To establish the provision of appropriate open spaces and building sites in new land developments through the dedication or reservation of land for recreational space, buffer areas, or other conservation purposes through the most efficient design and layout of the land. (9) To prevent the pollution of air, streams, and ponds; to encourage the wise use and management of natural resources throughout the unincorporated portions of Jasper County, and to preserve the topography and beauty of the community and the value of land. (10) To accommodate low-impact stormwater best management practices, where appropriate, to improve water quality and infiltration. (11) To offer protection of natural resources through required buffers and undisturbed areas that minimize land disturbance and protect existing vegetation while allowing for the removal of non-native, invasive species at the discretion of the approval of the county. (12) To facilitate and inform lot purchasers who generally lack the specialized knowledge needed to evaluate subdivision improvements and design. (Ord. of 11-7-2022, § VIII) Sec. 105-5. Content. This chapter: (1) Defines certain terms used in this chapter. (2) Establishes minimum standards for lots, streets, and other facilities associated with land development. (3) Provides procedures for administering and amending this chapter. (4) Provides penalties for violation of this chapter. (5) Repeals conflicting ordinances. (Ord. of 11-7-2022, § VIII) Secs. 105-6—105-26. Reserved. ARTICLE II. DEFINITION OF TERMS Sec. 105-27. Interpretation of certain common terms. When used in this chapter, the following words and phrases have the meaning as defined in this article. Terms not defined here have the same meaning as is found in most dictionaries, where consistent with the context. The terms "must," "will," and "shall" are mandatory in nature, indicating that an action has to be done. The term "may" is permissive and allows discretion regarding an action. When consistent with the context, words used in the singular number include the plural, and those used in the plural number include the singular. Words used in the present tense include the future. The word "developer" includes a firm, corporation, co-partnership, association, institution, or person. The word "lot" includes the words plot and parcel. The word "building" includes the word structure. The words "used" or "occupied" as applied to any land or building include the words intended, arranged, or designed, to be used, or occupied. (Ord. of 8-8-2005(2), § 201) Sec. 105-28. General definitions. The following words, terms and phrases, when used in this chapter, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Acceleration lane means a speed change area or lane consisting of added pavement at the edge of through traffic lanes to permit vehicles to accelerate before merging with the through-traffic flow. Alley or service drive means a minor, permanent, public service-way which is used primarily for vehicular service access to the back or the side for properties otherwise abutting on a street. Applicant means a person, either the owner or the bona fide representative of the owner of land or structures governed by these regulations, who seeks authority to use, develop, construct upon or otherwise enjoy the use of property through any of the procedures established under these regulations. As-built survey, also commonly referred to as record drawings, means a survey to provide formal documentation of exactly how a project was installed. It documents the actual results of the construction project rather than the planned layout shown in the project design and are critical for project closeout. Block means a unit or area of land bounded by public highways or streets, other than alleys, or a combination of streets, public lands, railroad rights-of-way, waterways or any other barrier to the continuity of development. Buffer means natural vegetated and/or landscaped areas used to physically and visually separate land uses to mitigate adverse impacts from adjacent permitted uses including, but not limited to, noise, odor, dust, fumes, glare, unsightly construction or unsightly activity or unsightly storage of merchandise and/or materials. This pertains to all buffers. Buffer, disturbed means a buffer that is allowed to be altered through grading and/or clearing of vegetation during the development of a site. Buffer, exterior means an existing and/or augmented buffer, where prescribed, that may be minimally disturbed for grading and/or development of a site. Where required, exterior buffers shall abut all lot lines and rights-of-way. Buffer, large-scale non-residential means an existing and/or augmented buffer that meets country buffer standards and shall remain undisturbed as applied to large scale nonresidential when the subject property abuts a residential or agricultural zoning district. Buffer, side and rear means an undisturbed and/or augmented buffer as applied to commercial, industrial, and mining zoning districts when subject property abuts a residential, agricultural, or zoning district. Buffer, stream means an undisturbed buffer located on both sides of all state waters, measured horizontally from the top of the bank. Buffer, undisturbed means a buffer that is unaltered from clearing and grading processes except for removal of invasive and non-native plants. Building line means a line parallel to a specified minimum distance from the front, side, or rear property lines or the centerline of a right-of-way beyond which no foundation wall or part of the structure of any building projects with the exception of roof overhang, steps, and the subsurface projection of footings. Centerline, right-of-way, means the line running midway between the edges of a surveyed or mapped dedicated right-of-way. Where the edges of right-of-way have not been established by subdivision plat or public purchase, the centerline shall be the line running midway between any adjoining drainage ditches or other publicly maintained road improvements. Centerline, street, means that line surveyed and monumented by the board of county commissioners as the centerline of a street, or if such a centerline has not been surveyed, it is the line running midway between the outside curbs or ditches of the street. Cluster mailbox units (CBU) means a structure or shelter housing multiple mailbox units to serve each residential dwelling of the development for the expressed purpose of regular mail delivery provided by the United States Post Office (USPS) Commercial and industrial (aka non-residential) subdivision means a subdivision of land into two or more non-residential lots. Comprehensive plan means any part or element of the overall plan for development adopted by the county commission, as amended. Conservation area, primary, means the area with existing, regulatory restrictions on development potential, including but not limited wetlands, riverfront areas, and floodplains regulated by state or federal law, and steep slopes greater than 25 percent grade that are set aside as permanent open space on a development parcel. Conservation area, secondary, means the unprotected landscapes or elements of the landscape with environmental or cultural significance, including but not limited to upland buffers to wetlands, woodlands, farmland, meadows and/or pastures of at least three contiguous acres, orchards, existing forests of three contiguous acres or more, wildlife habitat including corridors for wildlife movement, historic and archaeological sites, mature trees, scenic views, aquifer recharge areas, slopes between 25 percent and 35 percent, historic and archeological sites, trails, and trailheads constructed with pervious materials connecting to identified county trails, and existing dwelling units of historical significance. Master and open space and recreation plan conservation goals are to be considered when identifying secondary conservation areas. Conservation easement means a legally enforceable agreement between a property owner and the holder of the easement, in a form acceptable to the county attorney and recorded in the office of the Clerk of the Superior Court of Jasper County. A conservation easement restricts the existing and future use of the defined tract or lot to conservation use, agriculture, passive recreation, or other use approved by the Jasper County Board of Commissioners and prohibits further subdivision or development. Such agreement also provides for the maintenance of open spaces and any improvements on the tract or lot. Such agreement cannot be altered except with the express written permission of the easement holder and any other co-signers. A conservation easement may also establish other provisions and contain standards that safeguard the tract or lot's special resources from negative changes. Conservation residential subdivision (aka conservation subdivision) means a subdivision, as defined by this Code, where open space is the central organizing element of the subdivision design and that identifies and permanently protects all primary and all or some of the secondary conservation areas within the boundaries of the subdivision. Construction plans means a set of plans, consistent with the approved preliminary plat, which show street horizontal design and profile, grading, and drainage plans, utility construction plans, sediment and erosion control plans, and other design information which may be required by the director of planning. It is submitted to the director of planning and requires approval following review by individuals or entities specified by the county. Contiguous common parcels means parcels adjoining or touching other land at a common point and having a common owner, regardless of whether or not portions of the parcels have separate tax lot numbers, or were purchased in different land lots, or were purchased at different times. Crosswalk means a right-of-way within a block dedicated to public use, intended primarily for pedestrian use, and designed to provide access to adjacent roads and lots. Curb cut means the point at which vehicular access is provided to an adjoining street from a lot. Cul-de-sac means a dead-end street of limited length having a primary function of serving adjoining land, and constructed with a turnaround at its end. Cul-de-sac, temporary means a nonpermanent vehicular turn around located at the termination of a street or alley. Culvert means a structure designed to convey water from one side of a public right-of-way to the other. Cut means a portion of land surface or area from which earth is removed by excavating; the depth below original ground surface to excavated surface. Cutoff fixture means an outdoor light fixture shielded or constructed in such a manner that it emits up to, but no more than, two and one-half percent light spillage above the horizontal plane of the fixture. Deceleration lane means an added roadway lane, of a specified distance and which may include a taper, as approved by the director of engineering, that permits vehicles to slow down and leave the main vehicle stream. Dedication means the deliberate appropriation of land by an owner for any general and public use or purpose, reserving to himself no other rights than such as are compatible with the full exercise and enjoyment of the public uses to which the property has been devoted. Dedication plat means a plat that indicates property to be dedicated for public right-of-way or land for public use. Design standards means required specifications for the preparation of plats and construction plans—both preliminary and final. Developer means any individual, firm, association, syndicate, co-partnership, corporation, trust, or other legal entity having sufficient proprietary interest in the land sought to be subdivided to commence and maintain proceedings to subdivide the same under this chapter. Development means all activities associated with the conversion of land or the expansion or replacement of an existing use to any new use intended for human operation, occupancy or habitation, other than for agricultural purposes devoted strictly to the cultivation of the land, dairying or animal husbandry. Such activities include land disturbance (clearing and grubbing the land of vegetation and stumps, and grading) and the construction of improvements such as but not limited to streets, driveways or parking areas, water or sewer mains, storm water drainage facilities, sidewalks or other structures permanently placed on or in the property. Where appropriate to the context, the term "development" also may be used to denote a specific subdivision or project which is a single entity or intended to be constructed as in interrelated whole, whether simultaneously or in phases. Development agreement means a written contract between the county and a property owner or developer that specifies the system improvements to be provided by the developer for a specific project. Development permit means an official authorization issued by the department permitting clearing, grubbing, grading, or construction of storm drainage facilities, access drives, streets, parking or other improvements exclusive of buildings. Development plans means the detailed and professional plans showing the layout and design, site work and construction activities proposed for a project (other than architectural building plans) and including the preliminary plat or site plan (as applicable), grading plan, tree preservation/replacement plan, erosion and sediment control plan, buffer and landscape plan, and construction drawings for streets, storm water drainage facilities, sanitary sewers, water supply facilities, and other site improvements. Director of planning means the person, officer, or official and his authorized representative, whom the county commission has designated as its agent for the administration of this chapter. Drainageway means an open river, stream, gully, ditch, or swale—either natural or manmade—which serves as a collector and free-flowing channel for accumulated stormwater. Easement means the right or privilege of using another's property for purposes such as constructing and maintaining sanitary sewers, water mains, electric lines, telephone lines, storm sewers, gas lines, bicycle paths, pedestrian ways, and other purposes. Elevation, front, means the view of a building or group of buildings as seen from directly in front of the structure. Existing grade means the vertical location of the existing ground surface prior to cutting, excavation, or filling. Final plat means a recordable map of a subdivision, meeting all of the requirements of this chapter, and complying with the Georgia Plat Act, which is used to transfer portions of a property to others after development of a property has been completed. Finished grade means the final grade or elevation of the ground surface forming the proposed design. Flag lot means a lot, the main portion of which is located away from the public street, with a connecting strip to the public street, in conjunction with a cul-de-sac. Flood boundary means that area in the county threatened by possible flood under normal to severe circumstance as defined by Federal Emergency Management Agency maps or engineering studies. Footcandle means a unit of measure for illuminance on a surface that is everywhere one foot from a point source of light of one candle, and equal to one lumen per square foot of area. Full cutoff fixture means an outdoor light fixture shielded or constructed in such a manner that it emits no light above the horizontal plane of the fixture. Georgia DOT means the Department of Transportation of the State of Georgia. Government agency means any department, commission, independent agency, or instrumentality of the United States or of the State of Georgia, or any county, city, authority, district, or other governmental unit. Grading means the stripping, cutting, filling, stockpiling, or any combination thereof, and activities where the land itself is cut or filled. Grading permit means a permit issued to authorize earth work to be performed under the terms of this Code. See "land disturbing permit." Grading plan means a plan showing existing and proposed contour lines at an interval of no more than two-feet and shall outline the areas, including dimensions, that are required to remain undisturbed (i.e. tree protection areas, buffer, etc.) and shall indicate protective fencing or staking to be placed surrounding such areas. Grading for roads and improved ditches shall be shown as well as all storm water detention facilities. Green space means that portion of a tract that is set aside for the protection of natural features, farmland, scenic views, and other unique features. Green space may be accessible to the residents of the development and/or the public or it may contain areas of conservancy lots that are not accessible to the public. Green space consists of all primary and secondary conservation areas. See "open space." Health department means the Environmental Health Services Division of the Georgia Department of Human Resources for Jasper County. Hearing means an official session of the planning commission or the county commission held to afford a developer or his agent and the public an opportunity to present information and confer on a proposed subdivision with the planning commission or the county commission. Homeowners association means a community association in which membership of all the owners of property within the subdivision is mandatory, which holds title to certain common property, manages and maintains the common property, and enforces certain covenants and restrictions. The association shall have the duty and the authority to assess its members for such maintenance and improvements as set forth in the instrument creating the association. House location drainage plan (HLDP) means a drawing showing lot information and all proposed improvements with a proposed method for detaining rainwater on your property, so that it doesn't pool up at your foundation, or run off onto your neighbor's property in a damaging way, perhaps even causing flooding. House location and drainage plans are required on all lots marked "HLDP" on a final plat, on lots subject to periodic flooding, and on all lots which the development staff determines have a drainage problem. An HLDP shall be prepared by a qualified professional civil engineer, architect, landscape architect, or surveyor, and will be required before issuance of a building permit. A review period is required before permitting and therefore the HLDP should be submitted at least ten working days prior to the building permit request. (1) House location and drainage plans shall be drawn to scale and may be shown on a certified boundary survey of the lot or any other drawing showing the information required below. The planning department may accept a house location and drainage plan drawn to the same scale as shown on the final plat where sufficient detail can be shown to support an adequate review and approval. (2) The house location and drainage plan shall be a drawing with sufficient readability and accuracy to ensure that the proposed improvements will be constructed on the lot in conformance with the requirements of these development regulations, the zoning ordinance, or other regulations as applicable. (3) House location and drainage plans shall show the following, as applicable: a. Boundary lines of the lot, giving distances to the nearest one-tenth of a foot and bearings to the nearest minute. b. Location and names of all abutting streets or other rights-of-way. c. Minimum required front, side, and rear building setback lines with dimensions and notation of the existing zoning on the property. d. The approximate outline of all buildings, driveways, parking areas, swimming pools, recreational courts, patios, accessory structures and other improvements existing or proposed on the property, and dimensions of buildings and distances between all structures and the nearest property lines. e. All easements, public water, sewer or storm drainage facilities traversing or located on the property, septic tank, and septic tank drain field. f. Subdivision name, lot designation, land lot, and district. g. North arrow and scale. h. Limit of the 100-year floodplain, wetland areas, streams, historic structures and any applicable buffers or special building setback lines. i. All other applicable requirements of the zoning ordinance or conditions of zoning approval. j. Name, address, and telephone number of the owner and the person who prepared the house location and drainage plan. k. A two-foot contour map of the proposed final grading. (4) A certificate of occupancy shall not be issued for the structure or other improvements until conformance to the provisions or other requirements of the house location and drainage plan with an as-built certification. (5) The house location and drainage plan shall contain the following signature block: "This House Location and Drainage Plan has been reviewed for general compliance with the Zoning Ordinance and Development Regulations of Jasper County, Georgia, and is approved for issuance of a building permit for the residential structure and other improvements shown hereon. This approval is granted with the provision that no Certificate of Occupancy shall be issued for the completion of construction until conformance to this House Location and Drainage Plan has been field verified with an as-built certification." (6) An updated "as built certification" must be submitted prior to final inspection and issuance of a certificate of occupancy, in the following form: "I, , a qualified registered Professional in the State of Georgia, hereby certify with my signature and seal, that I have made sufficient visits to the construction site and to the best of my knowledge, the structures located on Lot of the project known as , and located in land lot , of the district, section of Jasper County, Georgia, have been constructed in substantial compliance with the approved House Location and Residential Drainage Plan for the above listed project. This day of , 20 . [Signature] [Seal] GA Registration No. Impervious surface means a man-made structure or surface which prevents the infiltration of storm water into the ground below the structure or surface. Examples include but are not limited to buildings, roads, driveways, parking lots, decks, swimming pools, or patios. Land disturbance permit means any permit other than a building permit issued by the county that authorizes clearing or grading activities on a site or portion of a site. Said permit may be a clearing, clearing and grubbing, a grading, or development permit as defined and authorized herein. Land-disturbing activity means any grading, scraping, excavating, or filling of land, clearing of vegetation, and any construction, rebuilding, or alteration of a structure. Land-disturbing activity shall not include activities such as farming, ordinary maintenance and landscaping operations, individual home gardens, yard and grounds upkeep, repairs, additions or minor modifications to a single-family dwelling, and the cutting of firewood for personal use unless regulated by other local, state or federal regulations. Landscape plan means a plan that identifies areas of tree preservation and methods of tree protection within the protected zone, as well as all areas for replanting. Within replanting areas, the common and botanical names of the proposed species, the number of plants of each species, the size of all plants, the proposed location of all plants, and any unique features of the plants shall be indicated. Landscaped areas means areas devoted to the installation and permanent maintenance of trees, shrubs, ground covers, turf grasses, mulch, and other similar materials. At least 75 percent of a landscaped area must be covered by live plant material at the time of plant maturity and must consist of at least three of the following elements: vegetative ground cover, herbaceous ornamentals, shrubs, trees. Examples of landscaped areas include landscape strips and landscaped open space. Left turn lane means a lane placed between opposing lanes of traffic for the purpose of allowing traffic from either direction to make left turns off of a roadway. Lot means a parcel of land occupied or capable of being occupied by a building and customarily incidental accessory buildings or uses, including such open spaces as are required by this chapter. Lot, corner, means a lot located at the intersection of two streets. Lot, multiple frontage, means a lot, other than a corner lot, which has frontage on more than one street. Lot of record means a lot which is part of a subdivision, the plat of which has been recorded in the office of the clerk of the superior court of the county; or a parcel of land described by metes and bounds, the plat or description of which has been recorded in said office; or a leased lot that has remained in a consistent configuration and has been depicted on the tax assessor's maps as a discreet parcel, with or without a recorded legal description, since the year 2000. If a portion of a parcel has been conveyed at the time of the adoption of the ordinance from which this chapter is derived, the remaining portion of the lot or parcel will be considered a lot of record. Lot remnant means any portion of a lot not suitable for building upon because of size or topography and remaining after the transfer of other portions of the lot to adjoining lots. Lot width means the distance between side lot lines measured at the front building setback. Minor division plat means divisions of land into no more than three lots, where no new streets are platted, constructed, or opened, no publicly-owned or central sewerage or water facilities are constructed, and no improvements of existing roads are planned. A minor division does not include the further subdividing of a lot within a platted and recorded subdivision. This definition does not include land zoned O-I, C-1, C-2, or M as defined by section 119-48 of part II of this Code, further dividing of land approved through the minor division process within a 36-month period where the total number of lots would exceed the three-lot limit previously approved shall follow the process for a minor division plat and require the review and approval of the planning commission and board of commissioners. Mixed use subdivision means a complementary mix of residential, commercial, and/or industrial uses in a single district. Mulching means the application of plant or other suitable materials on the soil surface to conserve moisture, hold soil in place, and aid in establishing plant cover. Natural conditions means the flora, fauna, soil and water conditions that would develop on a specific tract of land if all human interference were to be removed. The tract of land must have been undisturbed for a sufficient period of time for natural processes to dominate the tract. This period of time will vary among environments. Natural ground surface means the ground surface in its original state before any grading, excavation or filling. Nonstructural stormwater management practice means any natural or planted vegetation or other nonstructural component of the stormwater management plan that provides for or enhances stormwater quantity and/or quality control or other stormwater management benefits, and includes, but is not limited to, riparian buffers, open and green space areas, overland flow filtration areas, natural depressions, and vegetated channels. Open space means, within the context of this chapter, any combination of primary conservation areas and secondary conservation areas, as defined, that together form a permanent, undivided or relatively undivided, undeveloped area. Easements for electric transmission lines or any other above-ground improvement shall not be considered open space. Within the context of other chapters of this Code, "open space" shall have more liberalized meaning to include buffers and areas not containing any man-made structures or pavements except for low impact stormwater designs that incorporate elements such as vegetated bioretention basins or community amenity features as expressly allowed elsewhere in this Code. For all zoning districts requiring open space, including conservation subdivisions, structural stormwater control practices shall not be counted toward the required open space except for low impact stormwater designs that satisfy requirements elsewhere in this Code. Nonstructural stormwater control practices may count toward required open space. An active recreational facility may not be located in the required open space. Passive amenities, such as walking trails, may be located in required open space, but passive amenities may not comprise more than 25 percent of the required open space and may not include impervious materials. Areas dedicated to land application shall not be counted toward required open space unless the application is above ground and the area affected can be utilized for such activities as ball fields, golf courses, park areas, etc. Open space, public means within the context of chapter 105, an area within a development or subdivision designed and intended for the use and enjoyment of all residents or for the use and enjoyment of the public in general. Original tract means a unit of land which the owner holds under single or unified ownership, or which the owner holds controlling interest on the effective date of this Code, where all land abutting said tract is separately owned by others, not related to or associated by business partnership with the owner. Owner of record means the owner of property as specified on the deed of the lot of record. Parks and playgrounds means public or community land, open spaces, or recreation areas represented on a subdivision plat as dedicated, reserved, or intended to be reserved, for recreational purposes. Pedestrian way means a public right-of-way or private easement across a block or within a block to provide access for pedestrians and which may, in addition to providing pedestrian access, be used for the installation of utility lines. Percentage of grade means, measured down the street centerline, the change in elevation as it relates to horizontal distance, usually expressed as vertical change in elevation per 100 feet of horizontal distance. Planned development means a coordinated large-scale or comprehensive group development designed and constructed according to a development plan that has been approved by the county commission. Performance bond means a type of developmental improvement guarantee in the form of a bond, secured by the developer from a bonding company, in an amount specified by the board to cover the costs of required improvements, and payable to the county. The county may call in the performance bond in the event the developer defaults on required improvements. Permanent stabilization (soil) means all soil disturbing activities at the site have been completed, and that a uniform and evenly distributed cover of perennial vegetation with a density of at least 90 percent has been established, without large bare areas, for unpaved areas of the site not covered by permanent structures. Permit means any written authorization for building, construction, alteration, occupancy, or other matter required by this Code to be approved by a designated commission, board, official, or employee. The person to whom such permit is issued shall be known as the "permittee." Planning commission means the Jasper County Planning and Zoning Commission. Pole-mounted light means any luminaire set on a pole which raises the source of light off of the ground. The height of any pole-mounted light shall be measured from the base at grade after installation and include the pole, luminaire, and all structural and decorative components. Pre-application review means an initial and informal stage of subdivision review at which the developer may present the sketch plat and the director of planning may discuss the applicable subdivision regulations. Preliminary plat means a map of the proposed subdivision meeting the requirements of this chapter and showing the proposed layout in sufficient detail to show the intent of the developer. Prescriptive easement means a road or right-of-way jointly or severally owned by the adjacent landowners. In the case of county roads, the county has the right to use and maintain the roadway from ditch to ditch. Subdivision roads are not allowed to exit into county roads that are limited to prescriptive easement rather than dedicated right-of-way with ownership in the county. Private drive means a non-public, privately owned accessway. Private street means any street within a planned development which meets appropriate public street design standards, but, for purposes of controlled access or privacy, is not dedicated to the county and is not public. Property owners association means a community association in which membership of all the owners of property within the subdivision which hold title to certain common property, manages and maintains the common property and enforces certain covenants and restrictions. The association shall have the duty and authority to assess its members for such maintenance and improvements as set forth in the instrument creating the association. Protected zone means all lands that fall outside of the buildable area of a parcel, all areas of the parcel required to remain in open space, and all areas required as landscaping strips according provisions of the Jasper County zoning regulations, or conditions of the zoning approval. Protective private covenants means private contracts made between private parties, or conditions recorded with an approved plat and running with the title to the land, specifying the manner in which land may be used, developed, or improved with the intent of protecting and preserving the physical and economic integrity of a given area. Public hearing means an official session of the planning commission or the county, advertised according to law and called for purposes specified in the public notice. Reclamation plan means a written proposal for reclamation of mined or disturbed areas including land uses, maps, and documents as required to describe reclamation, and where relevant, grading specifications and manner and type of revegetation. Redevelopment means a development on a previously developed site; but excludes ordinary maintenance activities, remodeling of existing building interiors, resurfacing of paved areas, and exterior building changes or improvements which do not materially increase or concentrate storm water runoff, or cause additional nonpoint source pollution. Reserve strip means a strip or parcel of land along, around, or between properties for the purpose of restricting access. Responsible party means in the context of enforcement procedures, a person (as defined above) who is alleged to have committed, caused, continued or created a violation of the terms, requirements, regulations, or provisions of these regulations whether as a direct act, through lack of action or neglect, or at the direction of or on behalf of others. A responsible party may be the owner of a premises where a violation has occurred; an occupant whether through ownership, lease or other tenancy; a contractor, builder or developer; an agent of or person otherwise acting on behalf of the aforementioned parties; or other person acting in violation of these regulations. Retaining wall means a wall, terraced combination of walls, or similar structure located at a grade change to hold the soil on the up-hillside from slumping, sliding, or falling. Retaining walls are not integral to the structure and do not provide direct physical contact for the support of a building or structure. Review agency means any so designated entity other than the planning commission or the county commission, which may review appropriate parts of plat submissions by reason of technical capability, authority, or interest. Right-of-way means a fee simple strip of land designated, reserved, dedicated, or purchased for the purpose of pedestrian access, vehicular access, or utility line installation. Road: See "street/road." Scenic corridor means any corridor paralleling both sides of a public road that has been formally identified by resolution of the Jasper County Board of Commissioners as a scenic corridor worthy of special protection through an overlay district or other special provisions governing land uses and development and their aesthetic effects on road travelers. Scenic views and sites means those geographic areas containing visually significant or unique natural features, as identified in the Jasper County Comprehensive Plan, or by an applicant of a conservation subdivision if such information is accepted by the planning commission in the sketch plat review process. Semi-cutoff fixture means an outdoor light fixture shielded or constructed in such a manner that it emits up to, but no more than, five percent light spillage above the horizontal plane of the fixture. Setback means a minimum distance from the front property line, side property line, or rear property line, for any construction except septic systems, storm drainage structures, private drives, sidewalks, on grade-patios without foundations, fences, retaining walls, and cantilevered roof overhangs. No parking for non-residential uses shall be allowed within front setbacks. Measurement shall be perpendicular to the property line or centerline of the prescriptive easement. Site means any plot or parcel of land, or a combination of contiguous lots or parcels of land, where grading, building, construction, or alteration is performed or permitted. Site plan means a drawing showing the following information: Proposed layout of streets and lots; lot or tract dimensions with required setbacks shown; buffers and natural areas proposed; buffer fences where appropriate; areas reserved for future construction; proposed structures with dimensions and square footages (except for single-family subdivisions); proposed uses for each structure (i.e. retail sales, offices, single-family residence, etc.); current zoning district of the subject property and abutting property, and the proposed zoning district, as applicable; location and use of all structures on abutting property; right-of-way locations and dimensions and names of all roads and streets bounding the property in question; driveways and parking areas with number of parking spaces, where appropriate; loading and unloading facilities, where appropriate; storm drainage and structures, where appropriate; water, gas and electric utility lines preliminary locations plus points of utility access; and wastewater facilities including preliminary areas reserved for drain fields and septic tanks or point of access. Sketch plat means a draft drawing of a proposed subdivision meeting requirements of this chapter and showing the proposed layout in sufficient detail, although not completely computed, to indicate the developer's intent. Slope means a degree of deviation of a surface from the horizontal, usually expressed in percent or degree; the ratio of the difference in elevation between two points on the ground, and the horizontal distance between these two points. For purposes of determining steep slopes eligible for current use assessment under Georgia state law, slope shall be measured between two points on the ground separated by 500 feet or more. State waters means any and all rivers, streams, creeks, branches, lakes, reservoirs, ponds, drainage systems, springs, wells, and other bodies of surface or subsurface water, natural and artificial, lying within or forming a part of the boundaries of the state which are not entirely confined and retained completely upon the property of a single individual, partnership or corporation. Street/road. (1) County street/road means a road, paved or unpaved, which is maintained by the county. (2) Local street/road means a street used primarily for access to the abutting properties and serves travel demands in the immediate area, and designated as such on the county street classification system map. (3) Collector street/road means a street which usually serves to either provide direct access to lots or distribute traffic from individual lots to major streets. It may also connect neighborhoods with one another. It should be designed to discourage excessive speeds and through traffic. It is designated as such on the county street classification system map. (4) Arterial street/road means a primary road connecting distant cities, towns, or regions exhibiting higher speeds, greater volumes, and fewer direct access points than collector streets. (5) Dead-end street (cul-de-sac) means a local street designed to have one end permanently closed. Subdivision. (l) The term "subdivision" means the division of a parcel of land that is a lot of record at the time of enactment of the ordinance from which this chapter is derived into three or more lots, building sites, or other divisions, for the purpose, whether immediate or future, of sale, legacy, or building development. This definition includes all of the following: a. All divisions of land involving a new street. b. All divisions of land involving a substantial change in existing streets. (2) The term "subdivision" does not include the following: a. The combination or recombination of portions of previously platted lots where the total number of lots is not increased and the resultant lots are equal to the standards set forth in this chapter. b. The transfer of unsubdivided land or the transfer of a lot or parcel of land established by deed or plat recorded in the office of the clerk of the superior court of the county prior to the initial effective date of the ordinance from which this chapter is derived. c. The division of land among heirs by judicial decree. d. The division of land into parcels of five or more acres where no new road is involved. (3) All residential subdivisions in zoning district RES may comply with the provisions indicated in this chapter, article VI, conservation subdivisions. Visual quality means the appropriate design, arrangement, and location of any structure in relation to the built or natural environment to avoid abrupt or severe differences. Yard means an area of a lot between the principal structure and adjoining lot lines, unoccupied and unobstructed by any portion of a non-exempted structure from the ground upward. Yard, required means the minimum landscaped area with a slope no greater than 5 to one for the purpose of a front, side and rear yard (Ord. of 8-8-2005(2), § 202; Ord. of 3-2-2020, § 1; Ord. of 12-6-2021, § 7; Ord. of 11-7-2022, § I; Ord. of 1-9-2023, § I; Ord. of 3-6-2023, § I; Ord. of 9-11-2023, § I; Ord. of 05-06-2024(1); Ord. of 5-5-2025(2)) Secs. 105-29—105-59. Reserved. ARTICLE III. RESERVED* Secs. 105-60—105-82. Reserved. ARTICLE IV. GENERAL PROCEDURES Sec. 105-83. Initial information. (a) This article outlines the procedures to be followed in order to comply with the requirements of this chapter. The developer, who initially may not be familiar with this chapter, first visits the office of the director of planning to get information concerning ordinances affecting his proposed development. (b) The director of planning will show the developer a copy of this chapter. The developer may either review the document in the office or he may purchase a copy for his own use. (Ord. of 8-8-2005(2), § 401) Sec. 105-84. Compliance with chapter required. (a) Approval of subdivision plats. Any person proposing to subdivide land within the county must submit to the county plans and plats of the proposed subdivision which conform to all regulations set forth in this chapter. Application for approval of the documents must be made to the director of planning under procedures contained in this article. (b) Platting authority. The Jasper County Board of Commissioners are the official platting authority of the county. No subdivision plat may be recorded in the office of the clerk of the superior court of the county unless the director of planning has verified its compliance with a preliminary plat that has first been approved by the Jasper County Board of Commissioners. The filing or recording of a subdivision plat without the approval of the director of planning as required by this chapter is a violation of this chapter and is punishable as provided by this article. (c) Physical development. No developer or person may proceed with any construction work on a proposed subdivision before a preliminary plat and construction plan have been approved and a land disturbance permit has been obtained. (d) Use of final plat. The transfer of, sale, agreement to sell, or negotiation to sell land by reference to, exhibition of, or other use of a final subdivision plat that has not been given approval by the director of planning and recorded in the office of the clerk of the superior court of the county is prohibited. The description in the instrument of transfer or other documents does not exempt the transaction from this prohibition. (e) Acceptance and maintenance of roads. Land designated, reserved, proposed, or dedicated as a public road by a developer on a subdivision plat will be accepted and perpetually maintained by the county if any of the following conditions exist: (1) The proposed street has been constructed according to a set of construction plans, preliminary plat, and final plat that have been properly approved according to this chapter and the intent of such dedication has been indicated on the final plat and the required maintenance bonds have been received as specified herein. (2) The street has been accepted as a public road or otherwise received the legal status of a public road by the county prior to the adoption of the ordinance from which this chapter is derived. (f) Erection of structures. No building permit will be issued, no building may be erected, and no factory-manufactured building may be installed on any lot in any subdivision unless the road giving access to the lot and all utilities serving the lot have been approved as meeting the standards required by this chapter, or unless such a street has attained the status of a public road prior to the effective date of the ordinance from which this chapter is derived. (Ord. of 8-8-2005(2), § 402; Ord. of 12-6-2021, § 2) Sec. 105-85. General overview of subdivision plat review and approval procedures. (a) Five stages of subdivision review and approval. The procedure for the review and approval of a subdivision consists of five required stages. These are as follows: (1) Pre-application review. (2) Preliminary plat. (3) Construction plans. (4) Final plat. (5) Recording of final plat. (b) Summarization of stages. These five steps are summarized in subsections (b)(2) through (6) of this section. Details of each step are provided in sections 105-86 through 105-93. (1) Pre-application review stage. Whenever the subdivision of a tract of land is proposed, the developer is to consult early and informally with the director of planning. The developer will submit sketch drawings and basic data reflecting existing conditions at the site and in its vicinity and the proposed development layout of the subdivision. The purpose of the pre-application review stage is to facilitate the subsequent preparation of plans and plats by discussing matters relating to the proposed subdivision, the county zoning ordinance set forth in chapter 119, and this chapter. (2) Preliminary plat stage. a. The developer must submit to the planning commission for recommendation and to the Jasper County Board of Commissioners for approval a preliminary plat of the proposed subdivision prepared in accordance with the provisions of this chapter. If the proposed subdivision abuts a state highway, a letter of tentative approval by the state department of transportation must accompany the preliminary plat submission. b. If any lots are smaller than three acres and on-site sewage disposal systems are proposed for those lots, the county health department must have reviewed the project prior to planning commission review and signed the preliminary plat indicating which lots are acceptable for conventional or alternative sewage disposal systems. The developer must also furnish a copy of the preliminary plat to the utility company that serves water to the immediate area if applicable. c. Approval of the preliminary plat by the Jasper County Board of Commissioners will be indicated on the face of the preliminary plat following a vote of approval at the meeting by the signature of the chairperson of the board of commissioners. (3) Construction plan stage. Prior to the issuance of a land disturbance permit, the developer must submit to the director of planning a set of construction plans of the proposed subdivision prepared in accordance with the provisions of this chapter. The design presented in the construction plans must conform to the preliminary plat. The construction plans shall include street profiles, topography, utility plans, drainage plans, sediment and erosion control plans, construction details, and other information as may be required by the director of planning. The construction plan stage requires the approval of the director of planning and any other review entities specified by the county commission. It is the responsibility of the director of planning to ensure that the plans are reviewed and approved by the appropriate entities for compliance with technical requirements of this chapter prior to issuance of the land disturbance permit. (4) Final plat stage. After completion of the physical development of all or a phase of the area shown on the preliminary plat as approved by the Jasper County Board of Commissioners, and before selling any lots, a final plat together with the required certificates must be submitted to the director of planning for approval. (5) Recording and dedication. After the final plat is signed by the chairman of the board of commissioners, it is to be recorded in the office of the clerk of the superior court of the county. After recording, the appropriate deeds and documents must be presented to the county commission for dedication and acceptance if applicable. (Ord. of 8-8-2005(2), § 403; Ord. of 12-6-2021, § 2; Ord. of 11-7-2022, § IX) Sec. 105-86. Pre-application review stage. Before the submission of any plats to the director of planning, the developer must submit a sketch plat showing the proposed development layout of the subdivision. The developer and director of planning should informally discuss what this chapter requires and what the developer proposes to do. This will assist the developer in preparing a preliminary plat and construction plans that meet from the very beginning the intent and standards specified by this chapter so as to reduce undue time and expense in preparing plans that cannot be approved by the Jasper County Board of Commissioners. (Ord. of 8-8-2005(2), § 404(intro. ¶); Ord. of 12-6-2021, § 2) Sec. 105-87. Submission and approval of preliminary plat. (a) Preliminary plat submission. After completing the pre-application review stage, and at least 60 days before the regularly scheduled monthly meeting of the planning commission at which the developer desires planning commission recommendation, the developer must submit the following: (1) A letter requesting review and approval of a preliminary plat and giving the name and address of a person to whom the notice of hearing and action on the preliminary plat is to be sent. (2) Seven copies of the preliminary plat and one digital copy. (3) If the proposed subdivision abuts a state highway, a letter of tentative approval of the proposed subdivision by the state department of transportation. (b) Additional information. The director of planning may ask for any additional information he feels is necessary for the planning commission and the Jasper County Board of Commissioners to properly evaluate the preliminary plat. (c) Official date of submission. The official date of submission of the preliminary plat will be the date of the next regularly scheduled monthly meeting of the planning commission that is more than 60 days following proper preliminary plat submittal to the director of planning. (d) Preliminary plat review. The planning commission will review the preliminary plat for conformance to this chapter including compliance to section 105-4, Purposes, the county zoning ordinance set forth in chapter 119, and other relevant regulations and will consider the comments or suggestions of other appropriate review agencies, persons, or entities in regard to the plat. The planning commission or director of planning will indicate on the preliminary plat, or by a written memorandum attached to the preliminary plat, any comments or suggested changes that are necessary to meet the intent of this chapter or to serve the best interests of the county. (e) Public hearing. Before acting on the preliminary plat, the planning commission will hear public input on the preliminary plat. Notice of the hearing must be published in a newspaper of general circulation in the county at least 15 days before the hearing stating the date both the planning commission meeting and the Jasper County Board of Commissioners hearing dates. (f) Action of the planning commission. No more than 60 days after the official date of submission of the preliminary plat, the planning commission will either recommend approval of the plat, conditionally recommend conditional approval of the plat (noting the conditions of approval on the plat), recommend disapproval of the plat, or table the plat for further consideration. Action may be taken on the entire preliminary plat or any portion of it. (g) Failure of Jasper County Board of Commissioners to act. If the Jasper County Board of Commissioners fails to act within 90 days of the official date of submission of the preliminary plat, the preliminary plat will be deemed automatically approved by the Jasper County Board of Commissioners. (h) Approval of preliminary plat. Approval of a preliminary plat is effective and binding upon the Jasper County Board of Commissioners for a period of no more than two years. Before the two-year period expires, the developer may submit to the Jasper County Board of Commissioners a request in writing for an extension of time. If the Jasper County Board of Commissioners grants such an extension, final subdivision construction drawings must be submitted, approved, and work must begin within the limits of the extension. If no extension is sought prior to two-year time period, the preliminary plat is deemed void and the developer must start the process over. (Ord. of 8-8-2005(2), § 404A; Ord. of 12-6-2021, § 2; Ord. of 11-7-2022, § IX) Sec. 105-88. Specifications for preliminary plat. The preliminary plat must meet the minimum standards of design set forth in this chapter and must include the following: (1) Generally. a. Title block including the proposed name of subdivision and name of former subdivision, if any or all of the proposed subdivision has been previously subdivided. b. Plat key including: 1. Name and address of person in charge of plat preparation. 2. Date of plat preparation with space for revision dates. 3. Graphic scale of one inch equals 200 feet or smaller. 4. North point, identified as magnetic, true, or grid north. 5. Area of proposed subdivision in acres. 6. Appropriate legend of symbols used on plat. c. Location sketch map locating the subdivision in relation to the immediately surrounding area and showing generally: 1. Well-known landmarks such as railroads, highways, bridges, creeks, etc. 2. Zoning district classification of land to be subdivided and adjoining properties. 3. Government jurisdictional boundaries and land lot lines, if applicable. d. Entire tract. The developer shall submit a preliminary plat of his entire tract, even though his present plans may call for the actual development of only a small portion of the property. Regardless of the area covered by the preliminary plat, any unit divisions or phasings of unit divisions intended in the future must be generally represented on the preliminary plat. e. Resubdivision. In the case of resubdivision, a copy of the existing plat with the proposed resubdivision superimposed on it must be provided. f. Elevations. All elevations must refer to mean sea level datum. g. Sheet size must be no larger than 36 inches wide and 24 inches long. A margin one inch wide must be on the left side for binding purposes, and margins of one-half inch must be on the other three sides. If the complete plat cannot be shown on one sheet of this size, it may be shown on more than one sheet with an index map on a separate sheet of the same size. (2) Existing features of site to be shown on plat. a. Bearings (to nearest degree, minute, and second) and dimensions (to nearest 1/100 of a foot) of all existing exterior property boundary lines of the parcel to be developed as determined by a field-run boundary survey. b. A level three soils map and soil descriptions in areas where lots smaller than three acres will be proposed with on-site sewage disposal. c. A field-run topographic survey or aerial mapping using standard photogrammetric methods is required for all major subdivisions. In areas where lots of less than three acres are proposed, a contour interval of two feet is required. If all lots will be larger than three acres, the topography requirements of section 105-90(2)a will apply. d. Location and size of existing cultural features on or adjacent to the proposed subdivision including: 1. Right-of-way, pavement widths, and names of existing and platted streets. 2. Railroads and railroad rights-of-way. 3. Bridges, buildings, and other structures. 4. All surface utility lines within easements or rights-of-way on or adjoining the tract (showing the location of towers or poles). 5. Existing wells, sewers, water mains, drains, culverts, and other underground facilities or utilities within easements or rights-of-way on or adjoining the tract (grades and invert elevations of manholes must also be shown). 6. All other easements and rights-of-way. 7. Cemeteries. (3) Proposed conditions and facilities. a. Layout of all streets and other accessways with right-of-way and pavement widths, as well as proposed street names. b. Layout of all lots, including all building setback lines; approximate dimensions of interior proposed property lines; utility easements with width and use; block numbers; and lot numbers. c. A description of proposed sewage disposal systems (individual, community, or public), with approval by the county health department or other applicable agency shown by type of system proposed. d. A description of the proposed water supply system (individual, non-public, or public). Where an EPD-approved public water supply will not be utilized, lots shall be sized to accommodate individual wells. e. A general indication of proposed drainage provisions. f. Designation of lands to be reserved or dedicated to public use. g. All land uses, including areas to be occupied by uses other than single-family dwellings, including the following non-single-family residential uses: 1. Multifamily residential. 2. Commercial. 3. Industrial. 4. Recreation, open space, conservation, and areas for other such uses. h. All roads, utilities and other infrastructure will be shown as required in article VIII of this chapter. (4) Certificates of approval. The following certificates shall be inscribed on the preliminary plat: a. Certificate of approval of the preliminary plat by the Jasper County Board of Commissioners. b. Signed seal of a state-registered land surveyor, certified landscape architect or state professional engineer. c. Certificate of approval of the preliminary plat by the county health department. d. Owner's certificate stating property ownership, consenting to development, and that all appropriate taxes have been paid. (Ord. of 8-8-2005(2), § 405; Ord. of 12-6-2021, § 2) Sec. 105-89. Submission and approval of construction plans. (a) Construction plan submission. After the preliminary plat of the proposed subdivision has been given approval by the Jasper County Board of Commissioners, the developer may submit construction plans to the director of planning. (b) Format. Six copies of the construction plans must be submitted to the director of planning. The scale on the construction plans must be at least 100 feet to the inch. (c) Approval of construction plans. Approval of the construction plans and issuance of a land disturbance permit constitutes authorization to proceed with the installation of planned improvements. (d) Materials testing fee. The developer is responsible for the cost of construction materials testing and inspection as approved by the county. Testing will be accomplished by a registered testing firm approved by the director of planning. All required testing will be paid for by the developer. Test results will be submitted to the county and maintained by the county. (e) Inspection reports. A copy of the NPDES inspection reports will be furnished by the developer to the director of planning at the time they are submitted to EPD. All inspection reports submitted by the developer will be maintained by the county. (Ord. of 8-8-2005(2), § 406; Ord. of 12-6-2021, § 2) Sec. 105-90. Specifications for construction plans. The construction plans must include the following: (1) A copy of the preliminary plat or equivalent information including proposed centerline and horizontal curve data, and all proposed easements. (2) Grading and drainage information to include at a minimum: a. Existing and proposed contour lines at a contour interval no greater than two feet in all areas of proposed land disturbance. A minimum 200-foot-wide field-run strip topo is required for all proposed roads. In areas where lots will exceed three acres and no disturbance is proposed LIDAR topo is acceptable. b. Locations and types of all proposed stormwater drainage structures to include inlets, junction boxes, flumes, headwalls and outlet structures. (State DOT specification concrete inlets and headwalls are required.) c. A pipe chart indicating the diameter, length, slope, design flow, maximum flow capacity, and maximum flow velocity for each pipe proposed. (Asphalt-coated, corrugated metal pipe or approved equivalent or reinforced concrete pipe is required.) d. Profiles of all proposed storm pipe runs. e. Grassed swales along property lines to facilitate drainage where appropriate. A 20-foot easement must be provided for these features. f. All stormwater structures and facilities shall be designed to accommodate the 100-year storm event. g. One or more permanent stormwater detention basins shall be required if determined appropriate to mitigate negative impacts of increased off-site flow. (3) Erosion and sediment control plan with appropriate detail sheets if necessary. The county has adopted the Manual for Erosion and Sediment Control in Georgia. Any specifications and details required by this chapter shall be adhered to and exhibited on plans submitted by the developer. (4) Proposed road cross-section to comply with county minimum standards. Curb and gutter shall be constructed in any development where the majority of lots (excluding cul-de-sac lots) have less than 125 feet of road frontage or where specifically required by the zoning district. (5) Road centerline profiles showing existing and proposed grade. (6) Utility plans to include proposed water and sewer line locations if applicable. Locations of proposed water meters and sewer laterals shall be indicated. Profiles for all proposed sewer lines are required. Locations of all hydrants, valves, tees, plugs, and bends shall be identified. (7) Locations and details of proposed road striping and signage. (8) Landscaping plans as required. (9) Hydrology report to include narrative summarizing site conditions, assumptions made, and all hydrograph and flow calculations required to properly design the site drainage features including detention basin routing data for two-year and 100-year storm events. (10) Construction details shown in construction plans shall conform to county-approved construction plan details as amended. County-approved construction plan details may be amended by the director of planning in conjunction with the public works director and other appropriate reviewers. In the event that information shown in an approved construction detail conflicts with information in the text of this chapter, the chapter shall govern. (11) Certifications. The following certifications must be in a form and substance approved by the planning commission and inscribed directly on the construction plans: a. Construction plans for residential subdivisions must bear the signed seal of a state registered professional engineer or state registered surveyor. Construction plans for commercial subdivisions must bear the signed seal of a professional engineer. b. Statement of approval of the water system in the proposed subdivision obtained from the Jasper County Water Authority, the City of Monticello, the City of Shady Dale, Turtle Cove, or Alcovy Shores Water Authority, as applicable, for extensions of those systems or the environmental protection division of the state department of natural resources. c. The erosion control plan must include the required National Pollutant Discharge Elimination System certification statement signed by a professional engineer, surveyor, or landscape architect. (Ord. of 8-8-2005(2), § 407; Ord. of 11-7-2022, § IX) Sec. 105-91. Submission and approval of final plat. (a) Final plat submission. After the preliminary plat of the proposed subdivision has been given approval by the Jasper County Board of Commissioners, the construction plans have been approved by the director of planning and the appropriate reviewers, and required improvements have been completed and approved by the road building inspector, the developer may, within two years from the date of the preliminary plat approval, apply for final plat approval. The developer must submit to the director of planning the following: (1) A letter requesting review and approval of a final plat and giving the name and address of the person to be notified of the action on the final plat. (2) Seven copies of the final plat and other documents as may be specified. The scale of the plat must be at least 200 feet to the inch. If more than one sheet (maximum size 17 inches by 22 inches) is required, a cover sheet index shall be included. (b) Official date of submission. The official date of submission of the final plat will be the date that all required documents have been received by the director of planning. (c) Final plat review. The director of planning will review the final plat for conformance with the approved preliminary plat and construction plans and with this chapter and other relevant regulations. (d) Action of the director of planning. No more than 60 days after the official date of submission of the final plat, the Jasper County Board of Commissioners will either certify the final plat for recording, conditionally approve the plat (noting the conditions of approval on the plat), or disapprove the plat. If the final plat is conditionally approved, once the developer has complied with the conditions indicated, the Jasper County Board of Commissioners will certify the plat, or disapprove the plat. If the final plat is disapproved, the planning commission will cause the developer to be notified in writing, stating the reasons for the disapproval. One copy and the original of the plat will be returned to the developer, and one copy will be made part of the records of the planning office. Action may be taken on the entire final plat or any portion of it. (e) Failure of director of planning to act. If the Jasper County Board of Commissioners fails to act within 60 days of the official date of submission of the final plat, the final plat will be deemed automatically approved by the Jasper County Board of Commissioners. (f) Approval of final plat. Following recommendation for approval of the final plat by the planning commission, the final plat shall be submitted to the Jasper County Board of Commissioners for review at its next available meeting. Using the same review standards as the planning commission, Jasper County Board of Commissioners shall review the plat for sufficiency and may also inquire from various county departments as to whether all improvements shown on the final plat have been satisfactorily completed and installed as required. Failure of the owner to satisfactorily complete such improvements as are shown on the plat shall result in disapproval of the plat. The board of commissioners may approve, disapprove or defer action on the plat if required improvements have not been satisfactorily completed. Once the final plat has been approved by the Jasper County Board of Commissioners, the owner may record the plat which shall constitute acceptance by the county of all roads and other public improvements shown on the final plat. Only after such approval and recordation of the final plat may building permits be issued on the properties described by the plat. (Ord. of 8-8-2005(2), § 408; Ord. of 12-6-2021, § 2; Ord. of 11-7-2022, § IX) Sec. 105-92. Specifications for final plat. The final plat must meet the minimum standards of design set forth in this chapter and must include the following: (1) Generally. a. Title block including: 1. Name and address of owner of record. 2. Proposed name of subdivision and name of former subdivision, if any or all of the proposed subdivision has been previously subdivided. 3. Land lot, land district, and state militia district. b. Plat key including: 1. Name and address of person in charge of plat preparation. 2. Date of plat preparation with space for revision dates. 3. Graphic scale of one inch equals 100 feet or larger. 4. North point, identified as magnetic, true, or grid north. 5. Area of proposed subdivision in acres. 6. Appropriate legend of symbols used on plat. 7. Zoning of adjoining properties. c. Location sketch map locating the subdivision in relation to the immediately surrounding area and showing generally: 1. Well-known landmarks such as railroads, highways, bridges, creeks, etc. 2. Government jurisdictional boundaries and land lot lines, if applicable. d. Sheet size must be no larger than 17 inches wide and 22 inches long and margins of one-half inch must be on all sides. If the complete plat cannot be shown on one sheet of this size, it may be shown on more than one sheet with an index map on a separate sheet of the same size. (2) Features of site to be shown on plat. a. Exact boundary lines of the tract, to be indicated by a heavy line, giving distances to the nearest 1/100 foot and bearings to the nearest second, which must be balanced and closed with an error of closure not to exceed one to 10,000. The error of closure must be stated. b. Location of natural features, including streams and watercourses with direction of flow and appropriate buffers, water bodies, swamps, and floodplains. c. Location of adjoining property lines and names of owners of record and/or the location of adjoining subdivision lines and names. d. All existing buildings and structures within the proposed subdivision. e. Exact locations, widths, and names of all streets and public accessways within and immediately adjoining the platted property. All horizontal curves shall depict chord bearing and length, curve radius, and curve length. f. Lot lines with dimensions to the nearest 1/100 foot area, necessary internal bearings, arcs, chords, tangents, and radii. g. Labeled building setback lines. h. Lots or sites numbered in numerical order and blocks lettered alphabetically if appropriate. i. Locations of all drainage structures and of any easements (including slope easements if required) and public service utility right-of-way lines; any areas to be reserved, donated, or dedicated to public use; any sites for other than single-family residential use, with designations stating purpose or proposed use, area, any use limitations; any areas to be reserved by deed covenants for common use of all property owners. j. Location of cemeteries within the developed area. k. A reference to any private covenants to be recorded with the plat. l. Existing wells. (3) Certifications. a. The following certifications must be in a form and substance approved by the Jasper County Board of Commissioners and inscribed directly on the final plat: 1. The certification of a state-registered land surveyor, certified landscape architect or the state professional engineer. 2. An owner's certification. 3. A certificate of approval for recording by the Jasper County Board of Commissioners. 4. A certificate of approval by the county health department, if applicable. b. The following certificates or statements must be attached to the final plat when applicable: 1. Certificate or statement of guaranty to dedicate. 2. Certificate or statement of approval of streets by the director of planning, whether or not the streets are to be dedicated to the public. (Ord. of 8-8-2005(2), § 409; Ord. of 12-6-2021, § 2) Sec. 105-93. Recording and dedication. (a) Recording of final plat. Upon approval of a final plat, the developer must have the final plat recorded in the office of the clerk of the superior court of the county. The developer will be responsible for the payment of the recording fee at the time of recording of the final plat. (b) Dedication of platted streets, other public spaces, and utilities. At the time of final plat approval by the Jasper County Board of Commissioners, the developer must prepare appropriate documents and plans as constructed, if required, and request that the county board of commissioners accept dedicated streets, other public spaces, and utilities as presented on the final plat. (Ord. of 8-8-2005(2), § 410; Ord. of 12-6-2021, § 2) Sec. 105-94. Appeals and variances. The minimum design standards and minimum improvements as described in article V of this chapter are hereby declared to be mandatory and non-appealable. These provisions shall not be waived by any commission, agent, or employee of the county. Only the board of county commissioners can modify the minimum design standards and minimum improvements by modification of this chapter. (Ord. of 8-8-2005(2), § 411) Sec. 105-95. Chapter amendments. (a) If a developer or landowner finds that a proposed subdivision of land does not meet the requirements of this chapter, he may request that this chapter be amended. The developer or owner wishing to request an amendment must have at least 51 percent ownership of the subject property or be the duly authorized agent of such a person, possessing notarized authorization in writing under the owner's signature. The planning commission or the county commission may also propose an amendment. However, the power to approve and enact an amendment rests with the county commission. (b) Application for an amendment may be made with the director of planning. The director of planning will take the required information and transmit it to the planning commission for its consideration. No application is to be accepted from any person in violation of this chapter. If an applicant for an amendment or any other action by the planning commission or county commission is, at the time of such an application, determined by the director of planning to be in violation of this chapter, then the director of planning will be prohibited from accepting or processing any application from that applicant until the applicant does one of the following: (1) He must voluntarily remove or change the cause of the violation and cease to be in violation. The applicant must notify the director of planning that he has ceased the violation and obtain a release from the director of planning as to the violation. (2) He must be tried before a court of competent jurisdiction and acquitted of charges and present a certified copy of the court order to the director of planning within 30 days of the final order of the court. (c) All applications for amendment must first be reviewed by the planning commission. The planning commission will study the proposed amendment and determine if it furthers the goals and intent of this chapter, as well as other applicable ordinances of the county. Prior to the review, the director of planning may review the proposed amendment and make written recommendations to the planning commission. (d) The planning commission must then conduct a public hearing on the amendment. Notice of the hearing must be published in a newspaper of general circulation in the county at least 15 days but not more than 45 days before the hearing. The time, place and purpose of the hearing, the location of the property, name of subdivision and the present zoning classification must be indicated in the newspaper notice. (e) The following policies and procedures will be observed in conducting the required public hearing: (1) The hearing will be held in the planning commission meeting room or county courthouse. (2) Written comments on the subject of the hearing may be submitted by any citizen or property owner at any time prior to the adjournment of the hearing. (3) Persons desiring to be heard orally may present their views at the hearing. The length of time of oral presentations permitted to each speaker will be governed by the planning commission chairperson, depending upon the number of persons present and desiring to speak, provided that the minimum time allotted proponents and opponents shall be no less than ten minutes per side. Remarks of a personal nature will not be tolerated during the hearing. (4) Any person desiring a transcript of the hearing must arrange for a court reporter at their expense. (5) Cross examination of persons making oral presentations by non-commission members will not be permitted. (6) All questions will be addressed to the chairperson of the planning commission or the planning commission member then presiding. (f) The planning commission will, when considering a proposed amendment to this chapter, determine whether the amendment is substantially related to promote the public health, safety, or general welfare. In considering the proposed amendment, the planning commission will balance the benefit to the public of the regulations against the limitations it may impose upon property owners, and scrutinize the application in light of the character of the land to which it may apply. (g) The planning commission will make a written record of the comments received at the public hearing. After the public hearing, and at an official meeting of the planning commission, the planning commission will formulate its recommendations to the county commission, recording them in the minutes for that meeting. The planning commission must send the written record of comments received at the public hearing along with its recommendations on the proposed amendment in writing to the county commission within 30 days of the close of the public hearing. If the planning commission fails to send its recommendations to the county commission within 60 days of the close of the public hearing, it will mean that the planning commission approves. (h) After reviewing the record of the public hearing and considering recommendations from the planning commission, the county commission will then make an official decision on the proposed amendment. The decision need not concur with the recommendation of the planning commission. (i) If the county commission denies a proposed amendment, a minimum period of 12 months must pass before the same amendment proposal is again submitted for consideration. (Ord. of 8-8-2005(2), § 412) Sec. 105-96. Appealing an action of the county commission. If the county commission executes an action that the developer or other aggrieved party believes to be contrary to law, that action may be appealed to the superior court of the county. Findings of fact, however, may not be appealed. Such an appeal must be filed within 30 days of the date on which the action of the county commission was taken. (Ord. of 8-8-2005(2), § 413) Sec. 105-97. Penalties. (a) Any person who violates any of the provisions of this chapter must face penalties. If a developer or landowner exhausts the decision and appeals procedures contained herein and is still dissatisfied with the decision, he must then comply with the final decision or face penalties. Anyone who violates any of the provisions of this chapter, upon conviction, will be fined no more than $1,000.00 for each offense. In addition, he must pay all costs and expenses involved in the case. Each week such a violation continues constitutes a separate offense. (b) The owner or tenant of any building, structure, premises, or part thereof, and any architect, builder, contractor, agent, or other person who commits, participates in, assists in, or maintains such a violation may each be found guilty of a separate offense and suffer the penalties provided here. (Ord. of 8-8-2005(2), § 414) Sec. 105-98. Remedies. If any building or land is used or maintained in violation of this chapter, anyone, including the county, who would be harmed by such a violation may initiate legal proceedings to obtain an injunction or other appropriate remedy to stop the violation or to prevent any act that would constitute such a violation. Other legal remedies are also available as provided by state law. (Ord. of 8-8-2005(2), § 415) Secs. 105-99—105-124. Reserved. ARTICLE V. GENERAL REQUIREMENTS Sec. 105-125. Development standards in general. (a) Suitability of land. Land on which there is a danger to health, safety, or property must not be platted for residential use or other use that will continue or increase such danger, unless such hazards can be and are corrected. Examples of such conditions are as follows: (1) Land subject to flooding or improper drainage. (2) Land with excessive slope or other physical constraints that make it unsuitable for development. (b) Name of subdivision. The name of the subdivision must have the approval of the planning commission. The name must not duplicate or closely approximate the name of an existing subdivision. (c) Access. Access to every subdivision must be provided over a paved public road, and every lot within a subdivision must be served by a publicly dedicated street or a private street meeting the standards of a public street and approved by the planning commission. (d) Density development. The planning commission will consider proposals from developers concerning conservation subdivision (the reduction of minimum lot sizes in exchange for the setting-aside of public space or undisturbed space) or other smart-growth proposals. Regulations for conservation subdivisions are set forth in article VI of this chapter. (e) Community assets. In all subdivisions, reasonable best efforts shall be utilized by the developer to maintain and preserve all natural features such as large trees, watercourses, historical sites, and similar community assets which add attractiveness and aesthetic value to the property if preserved. In addition the developer shall comply with all county ordinances and state and federal laws which govern the development and construction activities undertaken by the developer regarding the subdivision. (f) Vegetative buffer. A vegetative buffer with a minimum width of 50 feet shall be maintained on the public road access street of the subdivision in order to preserve a rural appearance. This buffer shall consist of a combination of trees, shrubs, and grass. This buffer shall not be occupied with structures. (Ord. of 8-8-2005(2), § 501) Sec. 105-126. General standards for streets. All streets established in the county after the effective date of the ordinance from which this chapter is derived must comply with the following development standards. Specific, technical requirements are found in section 105-221. (1) Continuation of existing streets. Wherever slope will permit, the arrangement of streets in a subdivision must provide for the alignment and continuation or projection of existing streets into adjoining areas. (2) Street names. Streets or roads that are extensions of or obviously in alignment with existing streets should have the same name as the existing street. The names of new streets and roads are subject to the approval of the planning commission and must not duplicate or be similar in sound to existing names—even if the suffix (street, avenue, drive, etc.) is different. (3) Development along arterial and major collector streets. Where a subdivision abuts or contains an arterial street or major collector street (where street classification exists) the planning commission may require a driveway or road approximately parallel to and on either side of the right-of-way of the arterial street to provide access to lots along the arterial street while avoiding direct driveway access on the arterial street. Such a road shall be at least 20 feet from the major road or railroad. The planning and zoning commission may require a turn lane in the center of the arterial or major collector streets to facilitate traffic flow and ensure the safety of entering into the subdivision. (4) Intersections. The centerlines of no more than two streets may intersect at any one point. Streets must be laid out so as to intersect as nearly as possible at right angles. No street may intersect at any other street at an angle of less than 80 degrees. The angle of intersection is to be measured at the intersection of the street centerlines. (5) Offset intersections (street jogs). Offset intersections with centerline offsets of less than 100 feet are not permitted. (6) Cul-de-sac streets. a. The maximum permitted length of a cul-de-sac street (street with no outlet) is 1,000 feet. Cul-de-sac street length is measured from the nearest intersection of street centerlines or the nearest paved, fire-marshal-approved emergency vehicle turnaround. b. Cul-de-sac streets must be provided with a turnaround at the closed end having a right-of-way of at least 116 feet in diameter. The paved area of the turnaround shall be an uninterrupted area of pavement at a minimum diameter of 85 feet and a right-of-way of at least 116 feet in diameter. However, with the consent of the director of planning, the paved area of the turnaround may be a circular street with an outside diameter of at least 80 feet, a pavement width of at least 24 feet, and a right-of-way diameter of 100 feet, with an unpaved interior area to allow for the planting of trees and shrubs. c. The developer is encouraged to provide bikeways and trails to connect the homes on the cul-de-sac to other parts of the neighborhood. (7) Private streets. The planning commission may permit private streets in planned developments where controlled access or privacy is desired by the developer. Such streets must meet the development standards for public streets and shall be maintained by the developer or homeowners' association. Private street planned developments shall have temporary and permanent accommodation for ingress and egress of public safety, utilities, U.S. mail and garbage disposal during construction and post development. (8) Half streets. Half streets are prohibited. Whenever a street is planned adjacent to the proposed subdivision tract boundary, the entire street right-of-way must be platted within the proposed subdivision. (9) Split-level streets. Streets which are constructed so as to have two traffic ways (each at a different level within the same right-of-way) must provide any additional right-of-way required by this chapter when cut and fill techniques have been used in the construction of the street. (10) Alleys. Alleys or service drives may be required at the rear of all lots used for multifamily, commercial, or industrial developments, but are not required for one- or two-family residential development unless the alley or service drive is to provide secondary access to a lot whose natural grade is more than six feet above the finished street grade, or unless the developer shows the need for an alley or service drive to the satisfaction of the planning commission. (11) Marginal access streets. These are streets which are constructed so as to provide secondary access only. No more than six lots may abut any such street, and no such street may exceed 1,000 feet in length. Such streets may not be used as through streets and should be permitted only when lots abut an arterial or major collector street. (12) Minimum required street right-of-way width. The right-of-way is the perpendicular distance across a street from property line to property line. Minimum required street right-of-way is as follows: a. Arterial street: 80 feet. b. Collector street: 80 feet. c. Local street: 60 feet (50 feet is acceptable with curb and gutter). d. Marginal access: 30 feet. e. Alley/service: 24 feet. f. Cul-de-sac: 116 feet diameter. (13) Curb and gutter. Curb and gutter construction is required for developments where the majority of lots (excluding cul-de-sac lots) have less than 150 feet road frontage. (14) Culvert installation. The developer is required to install a driveway culvert at the time of construction for each lot when constructing new roads without curb and gutter construction on streets where the majority of lots have less than 200 feet of road frontage. Culverts are only required on cul-de-sac lots if the requirement holds for remainder of the street. (15) Striping. Streets shall be striped as required by the applicable ordinances and regulations of the county as well as the applicable provisions of state law and the applicable regulations of the Georgia Department of Transportation (GDOT). Local streets with speed limits of 30 miles per hour or less shall not require striping. All remaining streets shall be striped in accordance with GDOT standard specifications. (16) Minimum required street pavement width. Pavement widths listed here do not include curb and gutter width, which is four feet minimum. Minimum required asphalt pavement width is as follows: a. Arterial street: 24 feet. b. Collector street: 22 feet. c. Local street: 22 feet. d. Marginal access: 12 feet. e. Alley/service: 12 feet. f. Cul-de-sac: 85 feet diameter. (17) Additional right-of-way on existing streets. In subdivisions that abut existing streets, the developer must provide additional rights-of-way to meet stated minimum right-of-way requirements on the existing street as follows: a. Where any part of the subdivision is on both sides of the street, the entire right-of-way must be provided. b. When the subdivision is located on one side of an existing street, one-half of the required right-of-way measured from the centerline of the existing roadway must be provided. (18) Grading and paving standards for roads. Grading associated with road construction must be performed as specified in article XIII of this chapter. All roads must be paved according to the specifications outlined in articles XIV and XV of this chapter. (Ord. of 8-8-2005(2), § 502; Ord. of 12-6-2021, § 4) Sec. 105-127. Development standards for lots. All lots established in the county after the effective date of the ordinance from which this chapter is derived must comply with the development standards contained in this section. However, where provisions of chapter 119 apply and are stricter, those provisions take precedence. Development standards for lots are as follows: (1) Lot lines. As far as practical, side lot lines must be roughly perpendicular or radial to street lines. (2) Lot frontage arrangements. Land must be subdivided in a manner that provides each lot in the subdivision with direct abutting access to an existing public street or to an approved street contained within the proposed subdivision. Each non-cul-de-sac lot must meet the minimum buildable width by zoning district as outlined in chapter 119. (See flag lots in subsection (6) of this section.) Lots fronting on cul-de-sac must maintain at least 60 feet of frontage. (3) Adequate building sites. Each lot must contain an adequate building site not subject to flooding and outside the limits of existing easements or building setback lines required by this chapter or any existing ordinance as is appropriate. (4) Double frontage lots. Double frontage lots are prohibited unless required by the planning commission. (5) Reverse frontage lots. Reverse frontage lots may be included in major subdivisions and private street subdivisions abutting a minor collector, major collector or arterial road provided the following standards are satisfied: a. An easement of at least 25 feet in width, across which there shall be no right of access, shall be provided along the line of lots abutting any minor collector, major collector or arterial road or local street. b. The backs of the adjacent houses must be screened from view as follows: 1. The easement may retain its natural, undisturbed vegetation if existing trees and understory shrubs will adequately screen the view of the backs of the adjacent houses. 2. Supplemental vegetation may be added within the easement to provide adequate screening. 3. The easement may be improved with a landscaped earthen berm of no less than four feet in height. (6) Flag lots. A flag lot is a lot, the main portion of which is located away from the public street with a connecting strip of land at least 60 feet wide providing a minimum of 60 feet of frontage on the public street and which does not have a buildable site (exhibiting minimum lot width) within 300 feet of a public road. Flag lots are prohibited in subdivisions unless topographic conditions or the shape and orientation of the property to be subdivided make the inclusion of some flag lots necessary in the judgment of the planning commission. A flag lot is not intended to provide access to other properties so as to circumvent the street and right-of-way requirements of this chapter. A flag lot is intended only to provide a means of using a portion of a property for residential purpose that might not be accomplished through conventional street development and is limited to no more than two flag lots per division of the parent property unless approved by a variance to this Code. (7) Lot remnants. Lot remnants are prohibited. Such remnant areas must be added to adjacent lots, rather than remain as unusable parcels. Cemeteries are excepted. (8) Monuments. All lot corners must be marked with solid steel rods no less than one-half inch in diameter, and at least two and one-half feet long, driven into the ground such that no more than two inches protrudes from the ground surface. (9) Cemeteries. The area within cemeteries shall not contribute to the minimum required lot area. (10) Off-street parking. Each lot is required to provide a minimum of two spaces, and a maximum of four spaces for off-street parking of passenger cars and light trucks. A minimum of two of these spaces must be either a carport or a garage that is complementary to the principal structure erected on the lot. (11) Driveways. Each lot shall have a driveway connecting the required off-street parking to the street. The driveway must be constructed of concrete, asphalt, or brick pavers. (12) Storage shed/utility buildings. Storage sheds and utility buildings are used to store lawn and garden equipment/tools, small household items. Only one such building is permitted on a subdivision lot. It must be complementary to the principal structure. (Ord. of 8-8-2005(2), § 503; Ord. of 11-7-2022, § X) Sec. 105-128. Development standards for utility installations. (a) Utility easements. When it is found to be necessary and desirable to locate public utility lines in other than street rights-of-way, easements must be shown on the plat for such purposes. Such easements must not be less than 20 feet wide and, where possible, must be centered on rear or side lot lines. (b) Installation of utilities. After grading is completed and approved and before any base is applied, all of the underground work within the street right-of-way (water mains, gas mains, etc.) must be installed completely and approved throughout the length of the road and across the flat section. At the same time, all service connections must be stubbed out to each lot. (c) Water supply systems. (1) Public water system. If a state environmental protection division (EPD) approved public water supply is available to a proposed subdivision and connection to it is permitted, water mains, fire hydrants, and stub connections to each lot within the subdivision must be provided as shown on approved construction plans. If an EPD-approved public water supply is not available, the developer must size all lots to accommodate a well and an on-site septic system in accordance with county health department specifications. In order to meet minimum fire protection needs, all water mains must be six inches or greater (as required by the applicable water authority), with approved hydrants at not more than 500-foot intervals. Systems shall be tested by county fire services. (2) Individual water supply. When an EPD-approved public water supply is not available, the developer must carefully consider the capability and suitability of the general area of the subdivision to support individual water supplies and on-site septic systems on each lot. The planning commission must consider the recommendation of the county health department and county fire services (see hydrant requirement in subsection (c)(1) of this section) regarding any proposed private water supplies in considering approval of a plat. (d) Sanitary sewerage disposal systems. (1) Public sewage system. If an EPD-approved public sewage system is available to a proposed subdivision and connection to it is permitted, sewage mains and lateral connections to each lot within the subdivision must be provided as shown on approved construction plans. (2) Community sewage system. If an EPD-approved public sewage system is not available, the developer may install a central sewage system developed according to plans and specifications shown on the approved construction plans and approved by the EPD or the county health department, as applicable. (3) Individual sewage system. When an EPD-approved public sewage system is not available and a community sewage system is not proposed by the developer, the developer must carefully consider the capability and suitability of the general area of the subdivision to support individual sewage systems (septic tanks). A level three soil study will be required and the proposed sewage system must be approved by the county health department. (Ord. of 8-8-2005(2), § 504; Ord. of 11-7-2022, § XI) Sec. 105-129. Development standards for drainage facilities. (a) Watercourse and drainage easements. Where a proposed subdivision is traversed by a watercourse, drainageway, or stream, appropriate provisions must be made to accommodate stormwater and drainage through and from the proposed subdivision. Such an easement must conform substantially with the lines of the watercourse and be wide enough and of adequate construction to be satisfactory for the purpose. Proposed road construction shall be designed to cross existing waterways roughly perpendicularly to minimize disturbance near the waterway. All state and federal regulations regarding wetlands and stream crossings shall be followed. (b) Storm drainage. An adequate drainage system, including necessary grassed open swales, pipes, culverts, drains, drop inlets, bridges, etc., must be provided for the proper drainage of all surface water. Cross-drains must be provided to accommodate 100-year flow and must be long enough to traverse the full width of the roadway and required slopes. All such facilities must be profiled and must also be shown on road profiles. Outfall ditching must follow property lines on a 20-foot easement to rear property line or natural drainage course. (c) Additional regulations. For additional drainage standards, see section 105-227. (Ord. of 8-8-2005(2), § 505) Sec. 105-130. Surety for completion of improvements. (a) Guarantee and maintenance bond. The developer shall guarantee to the county, for a period of four years after completion and acceptance of the public improvements, all material and workmanship of such improvements. The developer shall post a maintenance bond in the amount of 20 percent of the value of such improvements with the county director of planning, conditioned upon the faithful performance of such guaranty. In lieu of furnishing the developer's bond, the developer may assign to the county an approved contractor's guaranty and bond in the amount of ten percent of the value of improvements. Such guaranty and bond shall be posted prior to acceptance of the improvements by the planning commission. The developer shall have the duty and obligation to maintain all streets, rights-of-way, easements and drainage facilities (including detention ponds and basins) within the subdivision for four years after completion and acceptance and to insure complete coverage of permanent grassing. Should the developer fail to maintain the improvements within this four-year period, the bond may be forfeited and the proceeds used to maintain the improvements. (b) Violations and penalties. (1) Violations. a. It shall be unlawful to convey or improve property by the construction of buildings on lots of any land subdivision which has not been approved and recorded as provided in these regulations, except those parcels recorded prior to the effective date of the ordinance from which these regulations are derived. b. It shall be unlawful to record a subdivision plat, or once recorded, to make any changes thereon whatsoever which have not been approved by the planning commission and in accordance with the provisions of these regulations. c. Each week's violation is a separate offense. Each and every week's violation of any provision of this chapter shall constitute a separate offense. (2) Penalties. For penalties, see section 105-97. (Ord. of 8-8-2005(2), § 506) Secs. 105-131—105-158. Reserved. ARTICLE VI. SUBDIVISION DESIGN STANDARDS* Sec. 105-159 Types of subdivisions. (a) Minor plat. (b) Land division plat. (c) Conservation residential subdivision. (d) Mixed use subdivision. (e) Commercial and industrial (aka non-residential) subdivision. (Ord. of 11-7-2022, § II; Ord. of 9-11-2023, § II) Sec. 105-160. Minor plat design. (a) Application requirements. (1) Submit two copies or a digital copy of the minor plat and supporting data to be reviewed by the Jasper County Planning and Zoning Office and applicable review agencies. The plat shall meet the minimum standards for plat preparation including, but not limited, to: a. General. a. Name, address, and phone number of the designer of subdivision plat. b. Name, address, and phone number of the owner and developer (if applicable) of subdivision. c. Name of subdivision or address of project location. (b) Minor subdivisions on state routes require GDOT comments to be submitted to the planning department of planning and zoning along with the minor (aka final) plat. (c) Approval of a minor plat shall be deemed an expression of approval of the layout submitted, pending fulfillment of the requirements of these regulations and the conditions of the minor plat, if any. (d) If the minor plat is not recorded within six months of approval, the approval shall expire, unless a request for an extension of time has been submitted to and is subsequently approved by the planning commission in a public hearing. (Ord. of 11-7-2022, § III; Ord. of 1-9-2023, § II) Sec. 105-161. Land division plat. Prior to submitting construction plans for any street, utility, or other site improvements (as applicable), the developer shall submit to the director of planning and zoning to forward for review and recommendation by the planning commission and review and final decision by the Jasper County Board of Commissioners, a plat showing any combination or subdivision of the proposed lot/s prepared in accordance with these regulations. (1) Pre-application review stage. Before the submission of any plats to the director of planning, the developer must submit a sketch plat showing the proposed development layout of the subdivision. The developer and director of planning should informally discuss what this chapter requires and what the developer proposes to do. This will assist the developer in preparing a land division plat that meet from the very beginning the intent and standards specified by this chapter so as to reduce undue time and expense in preparing plans that cannot be approved by the planning commission. (2) Application requirements. a. Submit seven paper copies and one digital copy of the plat and supporting data. The plat shall meet the minimum standards for plat preparation including, but not limited, to: 1. General. i. Name, address, and phone number of designer of subdivision plat. ii. Name, address, and phone number of developer of parcel. iii. Date of plat preparation with space for revision dates. iv. North point, identified as magnetic, true or grid. v. Minimum graphic scale of one inch equals 200 feet. vi. Appropriate legend of symbols used on plat. vii. List any conditions of zoning, rezoning, variance and date of approval, if applicable. viii. Certificates of approval. The following certificates shall be inscribed on the land division plat: (A) Certificate of approval of the preliminary plat by the board of commissioners. (B) Signed seal of a state-registered land surveyor, certified landscape architect or state professional engineer. (C) Certificate of approval of the plat by the county health department for lots less than five acres. (D) Owner's certificate stating property ownership, consenting to development, and that all appropriate taxes have been paid. ix. A table showing each lot's total amount of road frontage. 2. Existing conditions. i. Zoning district of land to be subdivided and zoning classification of adjoining properties. ii. Exact boundary lines of the tract indicated by a heavy line giving lengths and bearings. The boundary lines should include the entire tract to be developed. Provide date and source of survey. iii. Location map showing the parent parcel in relation to the surrounding area at a minimum scale of one inch to 2,000 feet. Include well-known landmarks such as railroads, highways, bridges, creeks, etc. and city and/or county jurisdictional boundaries and land lot lines, if applicable. iv. Location of natural features including streams and watercourses with direction of flow on the proposed project. v. Location and/or size of existing cultural features on or adjacent to the proposed subdivision. vi. Limits of 100-year floodplain. If none, note indicating such with data source and date. vii. Location and square footage of wetland areas. viii. Note as to provision of water supply and sewer disposal. ix. Existing sewers, water mains, drains, culverts, and other underground facilities or utilities within easements or rights-of-way on or within 300 feet of the tract to be subdivided, as relevant. x. Adjoining property information, lot arrangement and/or adjoining property owners' names, rights-of-way and easements within 300 feet of subdivision. xi. Total acreage, minimum dwelling size and minimum lot size of project. b. Land division plats on state routes require GDOT comments to be submitted to the planning department of planning and zoning along with the land division (aka final) plat. c. A letter requesting review and approval of a land division plat and giving the name and address of a person to whom the notice of hearing and action on the land division plat is to be sent. d. Official date of submission. The official date of submission of the land division plat will be the date of the next regularly scheduled monthly meeting of the planning commission that is more than 60 days following proper land division plat submittal to the director of planning. e. The planning commission will review the land division plat for conformance to this chapter, the county zoning ordinance set forth in chapter 119, and other relevant regulations and will consider the comments or suggestions of other appropriate review agencies, persons, or entities in regard to the plat. The planning commission or director of planning will indicate on the land division plat, or by a written memorandum attached to the land division plat, any comments or suggested changes that are necessary to meet the intent of this chapter or to serve the best interests of the county. f. Public hearing. Before acting on the land division plat, the planning commission will hear public input on the plat. Notice of the hearing must be published in a newspaper of general circulation in the county at least 30 days before the hearing. g. Action of the board of commissioners. No more than 60 days after the official date of submission of the land division plat, the board of commissioners will either approve the plat, conditionally approve the plat (noting the conditions of approval on the plat), disapprove the plat, or table the plat for further consideration. Action may be taken on the entire land division plat or any portion of it. h. Failure of board of commissioners to act. If the board of commissioners fails to act within 90 days of the official date of submission of the land division plat, the plat will be deemed automatically approved by the board of commissioners. (3) Approval of a land division plat shall be deemed an expression of approval of the layout submitted, pending fulfillment of the requirements of these regulations and the conditions of the land division plat, if any. (4) If the land division plat is not recorded within six months of approval, the approval shall expire, unless a request for an extension of time has been submitted to and is subsequently approved by the planning commission in a public hearing. (Ord. of 11-7-2022, § IV; Ord. of 9-11-2023, § IV) Sec. 105-162. Conservation subdivision design. (a) Purposes. The purposes of conservation subdivisions are as follows: (1) To provide flexibility of design in order to promote environmentally sensitive and efficient uses of the land when developing as a residential subdivision. (2) To preserve in perpetuity unique or sensitive natural resources such as groundwater, floodplains, wetlands, streams, steep slopes, woodlands and wildlife habitat. (3) To preserve important historic and archaeological sites. (4) To permit clustering of houses and structures on less environmentally sensitive soils which will reduce the amount of infrastructure, including paved surfaces and utility easements, necessary for residential development. (5) To reduce erosion and sedimentation by minimizing land disturbance and removal of vegetation in residential development. (6) To promote interconnected greenways and corridors throughout the community. (7) To promote contiguous green space with adjacent jurisdictions. (8) To encourage street designs that reduces traffic speed and reliance on main arteries. (9) To promote construction of convenient landscaped walking trails and bike paths both within the subdivision and connected to neighboring communities and businesses. (10) To conserve scenic views and reduce perceived density by maximizing the number of houses with direct access to and views of open space. (11) To protect prime agricultural land and preserve farming as an economic activity. (b) Applicability.This district is to be used to preserve conservation space and to protect natural resources. For properties which are submitted for a conservation subdivision, the applicant shall declare the intent to preserve conservation space at the time of application. The application shall be accompanied by an existing features site analysis plan, and a map that clearly indicates what is found on site according to the existing features site analysis plan. The conservation district shall not be used on property that has been timber harvested within seven years prior to adoption filing an application for a conservation subdivision. (c) General regulations. (1) Applicability of regulations. The conservation subdivision option is available as a use by right in RES zoning districts. An applicant shall comply with all other provisions of this chapter, chapter 119 and all other applicable laws, except those that are incompatible with the provisions contained herein. Where there is any conflict in language, these regulations shall supersede. (2) Ownership of development site. The tract(s) of land to be subdivided may be held in single and separate ownership or in multiple ownership. If held in multiple ownership, however, the site shall be developed according to a single plan with common authority and common responsibility. (3) Housing density determination. The housing density determination will be determined by subtracting all the roads and right-of-way, required exterior buffers, and all conservation areas, and meeting the minimum lot size for each new lot as shown in the chart below: Zoning District RES Lot Size 5 Acre Minimum Lot Size Allowed 3 Acre (4) Required buffers. a. A 50-foot buffer shall be maintained around the perimeter of the subdivision adjoining outside parcels. This shall be counted toward the total required greenspace. b. A 100-foot buffer shall be maintained adjacent to existing public county streets and a 150-foot natural buffer along all state routes that abut the subdivision. This should be counted toward total required greenspace. c. A buffer of not less than 50 feet at rear property line that is outside the buildable lot. (d) Application requirements. (1) Site analysis map required. Concurrent with the submission of a site concept plan, the applicant shall prepare and submit a site analysis map. The purpose of the site analysis map is to ensure that the important site features have been adequately identified prior to the creation of the site design, and that the proposed open space will meet the requirements of this article. The preliminary site plan shall include the following features: a. Property boundaries; b. All streams, rivers, lakes, wetlands and other hydrologic features; c. Topographic contours of no less than ten-foot intervals; d. All primary and secondary conservation areas labeled by type, as described in section 105-162(e), Open space; e. General vegetation characteristics; f. General soil types; g. The planned location of protected open space; h. Existing roads and structures; i. Potential connections with existing green space and trails. (2) Open space management plan required. An open space management plan, as described in section 105-162(e), Open space, shall be prepared and submitted prior to the approval of the preliminary plat. (3) Instrument of permanent protection required. An instrument of permanent protection, such as a conservation easement or permanent restrictive covenant and as described in section 105-162(e), Open space, shall be placed on the open space concurrent with the issuance of a land disturbance permit. (4) Other requirements. The applicant shall adhere to all other applicable requirements of the underlying zoning and this chapter. (e) Open space. (1) Definition. Open space is the portion of the conservation subdivision that has been set aside for permanent protection. Activities within the open space are restricted in perpetuity through the use of an approved legal instrument. (2) Standards to determine open space. a. The minimum restricted open space shall comprise at least 40 percent of the gross tract area. b. The following are considered primary conservation areas and are required to be included within the open space, unless the applicant demonstrates that this provision would constitute an unusual hardship and be counter to the purposes of this article: 1. The 100-year floodplain. 2. Riparian zones of at least 100 feet in width along all perennial and intermittent streams. 3. Slopes above 25 percent of at least 5,000 square feet contiguous area. 4. Wetlands that meet the definition used by the Army Corps of Engineers pursuant to the Clean Water Act. 5. Populations of endangered or threatened species, or habitat for such species. 6. Archaeological sites, cemeteries and burial grounds. (3) The following are considered secondary conservation areas and should be included within the open space to the maximum extent feasible: a. Important historic sites. b. Existing healthy, native forests of at least one acre contiguous area. c. Individual existing healthy trees greater than eight inches caliper, as measured from their diameter breast height (DBH). d. Other significant natural features and scenic view such as ridge lines, peaks and rock outcroppings, particularly those that can be seen from public roads. e. Prime agricultural lands of at least five acres contiguous area. f. Existing trails that connect the tract to neighboring areas. (4) Aboveground utility rights-of-way and small areas of impervious surface may be included within the protected open space but cannot be counted towards the 40 percent minimum area requirement (exception: historic structures and existing trails may be counted). Large areas of impervious surface shall be excluded from the open space. (5) At least 25 percent of the open space should consist of land that is suitable for building. (6) Open space should be in a contiguous tract to every extent possible. The open space shall adjoin any neighboring areas of open space, other protected areas, and non-protected natural areas that would be candidates for inclusion as part of a future area of protected open space. (7) The open space shall be directly accessible to the largest practicable number of lots within the subdivision. Non-adjoining lots shall be provided with safe, convenient access to the open space. (8) Permitted uses of open space. Uses of open space may include the following: a. Conservation of natural, archeological or historical resources. b. Meadows, woodlands, wetlands, wildlife corridors, game preserves, or similar conservation-oriented areas. c. Walking or bicycle trails, provided they are constructed of porous paving materials. d. Passive recreation areas, such as open fields. e. Active recreation areas, provided that they are limited to no more than ten percent of the total open space and are not located within primary conservation areas. Active recreation areas may include impervious surfaces. Active recreation areas in excess of this limit must be located outside of the protected open space. f. Agriculture, horticulture, silviculture or pasture uses, provided that all applicable best management practices are used to minimize environmental impacts, and such activities are not conducted within primary conservation areas. g. Landscaped stormwater management facilities, community wastewater disposal systems and individual wastewater disposal systems located on soils particularly suited to such uses. Such facilities shall be located outside of primary conservation areas. h. Easements for drainage, access, and underground utility lines. i. Other conservation-oriented uses compatible with the purposes of this chapter. j. Cluster box units. (9) Prohibited uses of open space. a. Golf courses; b. Roads, parking lots and impervious surfaces, except as specifically authorized in subsections (b) and (c) of this section; c. Agricultural and forestry activities not conducted according to accepted best management practices; d. Impoundments; e. Other activities as determined by the applicant and recorded on the legal instrument providing for permanent protection. (10) Ownership and management of open space. a. Ownership of open space. A homeowners' or property owners' association representing residents of the conservation subdivision shall own the open space. Membership in the association shall be mandatory and automatic for all homeowners of the subdivision and their successors. The homeowners' association shall have lien authority to ensure the collection of dues from all members. The responsibility for maintaining the open space and any facilities located thereon shall be borne by the homeowners' or property owners' association. b. Management plan. The applicant shall submit a plan for management of open space and common facilities ("plan") that: 1. Allocates responsibility and guidelines for the maintenance and operation of the open space and any facilities located thereon, including provisions for ongoing maintenance and for long-term capital improvements; 2. Estimates the costs and staffing requirements needed for maintenance and operation of, and insurance for, the open space and outlines the means by which such funding will be obtained or provided; 3. Provides that any changes to the plan be approved by the board of commissioners; and 4. Provides for enforcement of the plan. c. Maintenance responsibility. In the event the party responsible for maintenance of the open space fails to maintain all or any portion in reasonable order and condition, the county may assume responsibility for its maintenance and may enter the premises and take corrective action, including the provision of extended maintenance. The costs of such maintenance may be charged to the homeowners' association, or to the individual property owners that make up the homeowners' association, and may include administrative costs and penalties. Such costs shall become a lien on all subdivision properties or through a special tax district encompassing the subdivision and levy an ad valorem property tax annually in an amount adequate to fund maintenance and operations of the open space. (11) Legal instrument for permanent protection. a. The open space shall be protected in perpetuity by a binding legal instrument that is recorded with the deed. The instrument shall be one of the following: 1. A permanent conservation easement in favor of either: i. A land trust or similar conservation-oriented nonprofit organization with legal authority to accept such easements. The organization shall be bona fide and in perpetual existence and the conveyance instruments shall contain an appropriate provision for retransfer in the event the organization becomes unable to carry out its functions; or ii. A governmental entity with an interest in pursuing goals compatible with the purposes of this chapter. If the entity accepting the easement is not the county, then a third right of enforcement favoring the county shall be included in the easement. 2. A permanent restrictive covenant for conservation purposes in favor of a governmental entity. 3. An equivalent legal tool that provides permanent protection, if approved by the county. b. The instrument for permanent protection shall include clear restrictions on the use of the open space. These restrictions shall include all restrictions contained in this article, as well as any further restrictions the applicant chooses to place on the use of the open space. (12) Tax assessment of open space. Once a legal instrument for permanent protection has been placed upon the open space, the board of tax assessors may be requested to reassess the open space at a lower value to reflect its more limited use. (f) Reserved. (g) Entrance. Historic and rural Jasper County seeks to protect its most precious resource, its land, and further protect the viewshed to maintain a small town feel by establishing a required 100-foot natural buffer adjacent to existing public county streets and a 150-foot natural buffer along all state routes that abut exterior road frontage at the entrance of the interior subdivision roads. (h) Other design standards. (1) Lot layout design. a. Circulation is desired. In order to create a more walkable environment, streets shall be interconnective and block style whenever possible. (2) Road design. a. Required number of entrances, decel, left-turn lane, road improvements required (explain when). 1. Entrances. i. All new subdivision road entrances shall provide a deceleration lane of at least 150 feet. Depending on the number of lots, there may be other requirements such as a left turn lane and/or acceleration lane. Additional traffic calming devices shall be decided by the director of the road department or their designee. ii. For subdivisions with up to 30 lots there shall be one entrance required. iii. For subdivision with up to 99 lots there shall be two entrances required. iv. For subdivisions over 100 but less than 200 lots there shall be three entrances and shall have road frontage on at least two existing roads. v. For subdivisions over 200 lots there shall be at least four entrances and shall have road frontage on a least two existing roads. 2. Road improvements required. i. When a new subdivision accesses from an existing county road that is substandard and not consistent with good transportation engineering practices (for example, dirt or gravel road, inadequate width of pavement or right-of-way, improper angel of approach), provides the primary means of access to a development, the developer shall enter into a contract with the county regarding the upgrading of the substandard street. Said contract shall specify the improvements to be completed by the developer and the improvements, if any, to be completed by the county. Any such contract shall be approved by the board of commissioners. (A) All new roads shall be paved to county standards found in chapter 20, Roads and Bridges, article V, Paving Roads. (B) Minimum width of right-of-way for all new roads shall be 60 feet. (C) All new roads shall have street signage including but not limited to stop signs, road name signs, and other public safety signage. (D) Driveways shall not exceed a slope of 15 percent. (3) Health, safety, welfare. a. Reserved. (4) Stormwater and development runoff shall be required. Some lots with the potential for drainage to an adjoining lot or right-of-way may be deemed as an HLDP lot. (5) Required amenities. a. Cluster box units. 1. All cluster box units shall be designed out of the public right-of-way and capable of being accessed in compliance with ADA standards. 2. Required parking spaces. i. There shall be a minimum of two parking spaces for up to the first 50 lots and an additional parking space for every 50 lots within the subdivision. There shall be at least one ADA parking space provided. 3. Cluster box units shall accommodate the following: i. A minimum of one box per residence and four large parcel units, two at each end of at least three feet by four feet. ii. A shelter or covering shall be provided for all mailbox units that includes at least three feet of space to walk around the mailbox unit. 4. Security lights shall be provided. (Ord. of 11-7-2022, § V; Ord. of 3-6-2023, § II; Ord. of 05-06-2024(1)) Sec. 105-163. Mixed use subdivision (reserved). Sec. 105-164. Commercial and industrial (aka non-residential) subdivision design. Prior to making any street improvements or clearing or grading a site planned for development, installing any utilities or selling any parcels, the developer shall submit to the director of planning and zoning for review and recommendation by the planning commission and review and final decision by the board of commissioners, a plat, showing any combination or subdivision of the proposed lot/s prepared in accordance with these regulations. (1) Pre-application review stage. Before the submission of any plats to the director of planning, the developer must submit a sketch plat showing the proposed development layout of the subdivision. The developer and director of planning should informally discuss what this chapter requires and what the developer proposes to do. This will assist the developer in preparing a residential subdivision plat that meet from the very beginning the intent and standards specified by this chapter so as to reduce undue time and expense in preparing plans that cannot be approved by the planning commission. (2) Application requirements. a. Submit seven paper copies and one digital copy of the plat and supporting data. The plat shall meet the minimum standards for plat preparation including, but not limited, to: 1. General. i. Name, address, and phone number of designer of subdivision plat. ii. Name, address, and phone number of developer of parcel. iii. Date of plat preparation with space for revision dates. iv. North point, identified as magnetic, true or grid. v. Minimum graphic scale of one inch equals 200 feet. vi. Appropriate legend of symbols used on plat. vii. List any conditions of zoning, rezoning, variance and date of approval, if applicable. viii. Certificates of review of the environmental health department and/or water authority (as applicable). 2. Existing conditions. i. Zoning district of land to be subdivided and zoning classification of adjoining properties. ii. Exact boundary lines of the tract indicated by a heavy line giving lengths and bearings. The boundary lines should include the entire tract to be developed. Provide date and source of survey. iii. Location map showing the parent parcel in relation to the surrounding area at a minimum scale of one inch to 2,000 feet. Include well-known landmarks such as railroads, highways, bridges, creeks, etc. and city and/or county jurisdictional boundaries and land lot lines, if applicable. iv. Location of natural features including streams and watercourses with direction of flow on the proposed project. v. Location and/or size of existing cultural features on or adjacent to the proposed subdivision. vi. Limits of 100-year floodplain. If none, note indicating such with data source and date. vii. Location and square footage of wetland areas. viii. Note as to provision of water supply and sewer disposal. ix. Existing sewers, water mains, drains, culverts, and other underground facilities or utilities within easements or rights-of-way on or within 300 feet of the tract to be subdivided, as relevant. x. Adjoining property information, lot arrangement and/or adjoining property owners' names, rights-of-way and easements within 300 feet of subdivision. xi. Total acreage, minimum dwelling size and minimum lot size of project. b. Commercial and industrial subdivisions on state routes require GDOT comments to be submitted to the planning department of planning and zoning along with the commercial and industrial subdivision (aka final) plat. c. A letter requesting review and approval of a commercial and industrial subdivision plat and giving the name and address of a person to whom the notice of hearing and action on the commercial and industrial subdivision plat is to be sent. d. Official date of submission. The official date of submission of the commercial and industrial subdivision plat will be the date of the next regularly scheduled monthly meeting of the planning commission that is more than 60 days following proper commercial and industrial subdivision plat submittal to the director of planning. e. The planning commission will review the commercial and industrial subdivision plat for conformance to this chapter, the county zoning ordinance set forth in chapter 119, and other relevant regulations and will consider the comments or suggestions of other appropriate review agencies, persons, or entities in regard to the plat. The planning commission or director of planning will indicate on the commercial and industrial subdivision plat, or by a written memorandum attached to the commercial and industrial subdivision plat, any comments or suggested changes that are necessary to meet the intent of this chapter or to serve the best interests of the county. f. Public hearing. Before acting on the commercial and industrial subdivision plat, the planning commission will hear public input on the plat. Notice of the hearing must be published in a newspaper of general circulation in the county at least 15 days before the hearing. g. Action of the board of commissioners. No more than 60 days after the official date of submission of the commercial and industrial subdivision plat, the board of commissioners will either approve the plat, conditionally approve the plat (noting the conditions of approval on the plat), disapprove the plat, or table the plat for further consideration. Action may be taken on the entire commercial and industrial subdivision plat or any portion of it. h. Failure of board of commissioners to act. If the board of commissioners fails to act within 90 days of the official date of submission of the commercial and industrial subdivision plat, the plat will be deemed automatically approved by the board of commissioners. (3) Approval of a commercial and industrial subdivision plat shall be deemed an expression of approval of the layout submitted, pending fulfillment of the requirements of these regulations and the conditions of the residential plat, if any. (4) If the commercial and industrial subdivision plat is not recorded within six months of approval, the approval shall expire, unless a request for an extension of time has been submitted to and is subsequently approved by the planning commission in a public hearing. (Ord. of 11-7-2022, § VII) Secs. 105-163—105-192. Reserved. ARTICLE VII. POWERS AND DUTIES OF VARIOUS OFFICIALS CONCERNING THIS CHAPTER Sec. 105-193. Purpose. This article formalizes the powers and duties of the director of planning, the planning commission, and the county commission where this chapter is concerned. It should also provide a convenient list of services provided by each official to aid in complying with the requirements of this chapter. (Ord. of 8-8-2005(2), § 701) Sec. 105-194. Powers and duties of the director of planning. The director of planning has the power and duty to provide the following services related to this chapter: (1) Provide initial information about this chapter upon request. (2) Advise how to contact members of the planning commission, the county building inspector, the public works director, fire services, board of health and the county commission for services provided by those bodies. (3) Offer to the developer practical suggestions and guidance on how to comply with the requirements of this chapter. (4) Maintain complete records concerning this chapter and related matters, and make such records available to the public upon request. (5) Propose amendments to this chapter if appropriate. (Ord. of 8-8-2005(2), § 702) Sec. 105-195. Powers and duties of the planning commission. The planning commission has the power and duty to provide the following services related to this chapter: (1) Review preliminary plats and hold appropriate public hearings as directed by this chapter. (2) Advise the county commission on applications for amendment to this chapter by examining amendment applications and providing written recommendations with reasons for the recommendations to the county commission as specified in section 105-95. (3) Dispense general information about this chapter to the public upon request. (4) Propose amendments to this chapter if appropriate. (5) Approve preliminary and final plats. (Ord. of 8-8-2005(2), § 703) Sec. 105-196. Powers and duties of the county commission. The county commission has the power and duty to provide the following services related to this chapter: (1) Accept applications for amendment of this chapter and render official decisions on them after referring them to the planning commission for review and recommendations as specified in section 105-95. (2) Propose amendments to this chapter. (3) Accept streets utilities and other authorized offers of dedication as property of the county. (Ord. of 8-8-2005(2), § 704) Secs. 105-197—105-215. Reserved. ARTICLE VIII. INFRASTRUCTURE IMPROVEMENTS Sec. 105-216. Purpose; applicability. The purpose of this article is to establish additional standards and requirements for the provision of infrastructure by all development in the county. All of the regulations of this chapter shall apply in addition to these additional standards. If these standards conflict with the subdivision standards, the subdivision standards shall apply. (Ord. of 8-8-2005(2), § 801) Sec. 105-217. Transportation system standards generally. (a) No person shall do any paving work, or any other related or similar roadwork, on, or adjacent to, a county road without a permit. (b) All transportation system design, street design, and construction shall comply with Georgia Department of Transportation (GDOT) requirements. The latest edition of the GDOT manual, entitled "Standard Specifications, Construction of Roads and Bridges," shall apply. (c) Where conflict arises between GDOT standards and this article, the stricter standard shall apply. (d) All materials, equipment, labor and other matters related to street construction shall be provided by the applicant. The following is a summary of the improvements required: (1) All streets, roads, and alleys shall be graded to their full width right-of-way by the applicant so that the pavements and sidewalks, when installed in the future, can be constructed on the same level plane. The preparation of the right-of-way before grading is started and the construction of cuts and fills shall be accomplished according to the specifications of the county (see section 105-221(9) and (11)). (2) An adequate drainage system, including necessary curb, pipes, culverts, headwalls, intersectional drains, drop inlets, bridges, swale ditches, and detention areas, shall be provided for the proper drainage of all surface water. The drainage system shall be designed by a registered professional engineer, licensed in the state. (3) After preparation of the subgrade, the roadbed shall have base material and paving applied according to county specifications (see section 105-221(9) and (11)). (e) Roadways may be created by: (1) Dedication; (2) Prescription; (3) Express grant of an easement; (4) Deed; (5) Special statutory proceeding; or (6) Condemnation. (f) Upon compliance with all of the provisions of this chapter and all other county applicable regulations, building permits may be issued for building on public roads upon the applicant signing a "statement of understanding" that said roadway is a public road and that the county assumes no responsibility for the maintenance of said road until such time as it becomes feasible and advisable to accept said roadway as a county road. The county at such time shall accept said road as a county road provided that the property owners along said road convey a right-of-way to the county conveying the minimum width required by the county. (g) Upon compliance with the provisions of this chapter and all other applicable county regulations, building permits may be issued on county roads. (Ord. of 8-8-2005(2), § 802) Sec. 105-218. Access requirements. (a) Requirements for connection to existing street system. (1) All proposed development shall provide a street system that is connected to the existing or planned street system as shown in the comprehensive plan. All proposed streets shall be continuous and in alignment with existing, planned or platted streets. (2) Whenever there exists adjoining the tract to be subdivided a dedicated or platted half-width street or alley, the other half-width shall be platted. (b) Frontage on a state highway or arterial street. (1) When a tract fronts on a state highway, major arterial street, or minor arterial street, a frontage street may be required for access to individual lots. (2) All residential lots in a subdivision shall take direct access only from a frontage street, collector street, or local street. (3) Any access to a state highway shall be consistent with the requirements of the state department of transportation. (c) No approval shall be granted for a subdivision, or subsequent phase or addition to an existing subdivision, unless the property is served by a paved county road, with right-of-way sufficient to meet the requirements of Table 105-218. (d) Following is a table of street access requirements and sidewalk requirements by zoning district: Table 105-218 Zoning District Minimum street access classification Paved Road Sidewalks Agricultural Local* Pavement required Not required Rural Residential Local Pavement required Not required R1-40 Residential Local Pavement required Required R3 Residential Local Pavement required Required R2-15 Residential Local Pavement required Required PM/PR Arterial Pavement required Required Office/Institutional Arterial Pavement required Required Commercial C-1, 2, 3 Arterial Pavement required Required Manufacturing Arterial Pavement required Required *Unless road is designated otherwise, see section 105-28. (e) Specific access requirements for subdivisions. (1) Emergency vehicle access shall be provided to all lots within a subdivision. (2) In order to ensure emergency vehicle access, every subdivision with 20 or more lots must contain two or more points of ingress/egress from the existing street system. Every development with less than 20 lots shall not be required to provide two points of ingress/egress. (3) Where two or more entrances take access from the same street, the entrances shall be located not closer than 125 feet. (4) Where a subdivision is providing two or more connections to the existing street system pursuant to subsection (e)(2) of this section, the requirement for two points of ingress/egress is met. The requirement for access shall not be satisfied by a stub-out to a future, planned, or platted street that has not been constructed. (5) A subdivision containing 19 or fewer lots shall not be required to provide two points of ingress/egress as otherwise required in subsection (e)(2) of this section. (6) Where a subdivision is allowed one point of access pursuant to subsection (e)(5) of this section, that entrance street shall be designed with a three-lane divided entrance street, as shown in Figure 7 of article XV of this chapter. (f) Limitations on curb cuts. Within any zoning district where the lowering or cutting away of any curbs for purposes of ingress and egress is required, such curb cut shall be subject to the following provisions: (1) Any parcel of property with frontage of more than 200 feet on any one street shall be permitted additional entrances or exits after showing of actual requirements of convenience and necessity and upon approval of the planning commission. (2) At street intersections, no curb cut shall be located within 50 feet of the intersections of two curblines or such lines extended, or within 15 feet of the intersection of two property lines extended. When a culvert is required it shall receive approval from the county department of transportation. (3) The distance between any two curb cuts on the same side of the street and located on one property shall be not less than ten feet. Curb cut distance shall be measured between the points of tangency of the curb return radii and the established curbline of the abutting street. (4) All driveways shall be constructed so as to be at least two feet from any property line. (5) The maximum width of any driveway shall not exceed 40 feet measured at the right-of-way line. (6) The maximum width of any curb cut including curb returns shall not exceed 50 feet. (7) The sum of the two-curb return radii for any one curb cut shall not exceed 15 feet. (Ord. of 8-8-2005(2), § 803) Sec. 105-219. Joint access driveways and cross access easements. Joint access driveways and cross access easements shall be required in commercial development areas according to the following provisions: (1) Adjacent commercial or office properties shall provide a cross access drive and pedestrian access to allow circulation between sites through a system of joint use driveways and cross access easements. The design of the joint or cross access area shall incorporate the following: a. A continuous service drive or cross access corridor extending the entire length of each block served to provide for driveway separation; b. Stub-outs and other design features to make it visually obvious that the abutting properties may be tied in to provide cross access via a service drive; and c. Sufficient separation between side street access to the property and the major road to ensure safety. (2) In order to ensure continuous availability of access to all properties, all property owners shall: a. Record an easement with the deed allowing cross access to and from other properties served by the joint use driveways and cross access or service drive; b. Record an agreement with the deed that remaining access rights along the thoroughfare shall be dedicated to the county and preexisting driveways shall be closed and eliminated after construction of the joint-use driveways; and c. Record a joint maintenance agreement with the deed defining maintenance responsibilities of property owners. (Ord. of 8-8-2005(2), § 804) Sec. 105-220. Design and construction standards for streets. (a) Location. (1) The location, arrangement, extent, width, and grade of all streets shall conform to the types of uses and densities reflected in the comprehensive plan and shall be considered in relation to existing and planned streets, topographical conditions, public safety and convenience, and proposed use of land to be served by the streets. The layout of a subdivision shall conform to the requirements and design principles described in this chapter. (2) The location of all streets and roads shall conform to the comprehensive plan. Provision shall be made in developments for the construction of streets at locations shown in the comprehensive plan. (3) Whenever a tract to be subdivided includes any part of a major arterial, minor arterial, major collector, or minor collector street designated on the comprehensive plan, such part of said street shall be installed by the applicant in the location and at the full width indicated by the functional classification for right-of-way and pavement widths indicated in this article. (b) Design and construction standards for curb cuts. (1) Curbs shall be required in all residential subdivisions as specified in this chapter. (2) Curbs may be required for streets in commercial and industrial subdivisions. (3) Curbs in all subdivisions shall be L-back curbs 24 inches long, six inches thick, with an 18-inch gutter. Rollback curbs may be installed in the R-R zoning district. (4) All curbs shall be constructed of Portland cement concrete. (5) Curbs shall be designed to provide handicapped access at street intersections, wherever sidewalks are constructed. (c) Street grade standards. (1) Grades on major and minor arterials shall not exceed five percent and grades on local residential streets shall not exceed 12 percent. (2) All changes in grade shall be connected by vertical curves, which adhere to the design criteria as set forth by the more restrictive of the 2000 AASHTO Guide, A Policy on Geometric Design of Highways and Streets. (d) The radius of horizontal curves on local residential streets within a subdivision shall be no less than 150 feet. The horizontal radius for collector and arterial streets or any streets with a design speed of more than 25 miles per hour shall comply with American Association of State Highway and Transportation Officials (AASHTO) standards. (e) Street intersection standards. (1) Street intersections shall be as nearly at right angles as possible. (2) In residential subdivisions no intersection shall be at an angle of less than 80 degrees or more than 100 degrees. (3) Street intersections in commercial and industrial subdivisions shall be at an angle of not less than 90 degrees. (4) The minimum curb radius at street intersections shall not be less than 20 feet in residential subdivisions. A minimum 25-foot radius shall be required at intersections with existing collector and arterial roads maintained by the county. (5) The minimum curb radius of street intersections for industrial and commercial subdivisions shall be 50 feet. (6) Pedestrian ramps shall be designed for all intersections in accordance with standard drawings for subdivisions and residential developments designed to include sidewalks and shall meet the minimum standards of the Georgia Accessibility Code, Ga. Comp. Rules & Regs. ch. 120-3-20, of the Rules and Regulations of the Georgia Safety Fire Commissioner. The curb shall be depressed to accommodate future installations at the same time as the curb. (7) Street intersections shall have a minimum centerline offset of at least 100 feet. (f) A tangent of at least 100 feet long shall be introduced between reverse curves on major and minor arterial streets, or on any street where the posted speed limit shall be 35 miles per hour or greater. (g) Local streets designed to have one end permanently closed and not connected with any existing street, proposed future street, or not intended to extend to the property line of an adjacent tract, shall be no longer than 1,000 feet unless necessary due to the topographic or other physical conditions of the property. In no event shall a cul-de-sac street exceed a distance of 1,000 feet. (1) Permanent dead-end streets shall be joined by a cul-de-sac with a paved turnaround having an outside diameter of 85 feet and a right-of-way of at least 116 feet in diameter. Dead-end streets designed to be permanent and that exceed more than 800 feet in length may be required to have a cul-de-sac turnaround midway between the entrance intersection and the end of the street to provide maneuvering for emergency vehicles, when the dead-end street is the only street in a subdivision. (2) Stub streets which are intended to provide access for future development within a tract of land or adjacent tracts shall be required to have a temporary turnaround area having a diameter of at least 85 feet, consisting of six inches of graded aggregate base. (3) For subdivisions with a temporary turnaround, it shall be required of the applicant to provide a letter of credit equal to the cost of permanent cul-de-sac construction, in accordance with the standards of subsection (g)(1) of this section. (h) Alleys may be provided at the rear of lots in residential, commercial, and industrial subdivisions. (Also see section 105-126(10).) (i) Right-of-way and pavement width standards. Table 105-220.1 Right-of-Way and Pavement Width Standards Required Pavement Width (feet) Street type Minimum Required Right-of-Way (feet) With curb Without curb Collector 80 28 24 Local street Residential 60 22 Prohibited Industrial 80 30 Prohibited Commercial 80 30 Prohibited Cul-de-sac Residential 116 85* Prohibited Commercial/industrial 150 110 Prohibited Rural Residential & Agricultural 116 85 85 Alley 0 10 10 *See section 105-126(6)b. *The county may not require curbs in certain residentially zoned areas. (j) Additional street system requirements for major subdivisions. (1) Private streets are permissible where access to subdivisions is limited. (2) Subdivisions that adjoin existing streets shall dedicate additional right-of-way if needed to meet the minimum street right-of-way requirements. (3) Half streets shall be prohibited except where essential to the reasonable development of the subdivision. (4) Where it is determined to be practical to require the dedication of the additional half when adjoining property is subdivided, the other half of the street shall be platted to create a full width right-of-way serving the adjoining tracts of land. (5) Any subdivision shall provide lanes for acceleration/deceleration, ingress, and egress, according to Table 105-220.2. Any subdivision on a state highway or arterial road (as shown in the current comprehensive plan) shall provide lanes for acceleration/ deceleration, ingress, and egress regardless of traffic counts. Design requirements of the state department of transportation shall be met. Table 105-220.2 Minimum Volumes Requiring Right Turn Lanes 2 Lanes on Main Road 40 MPH or less Greater than 40 MPH Estimated traffic volume 2,000 1,000 Daily right turning volume 75 40 (6) Proposed streets which are obviously in alignment with other already existing and named streets shall bear the names of the streets with which they align. The names of proposed streets shall not duplicate existing street names, irrespective of the use of the word street, avenue, boulevard, drive, place, court, etc., in the naming of the street. (k) No-parking areas shall be established for the use of fire equipment and emergency vehicles to ensure access to the premises in cases of emergency. Said areas shall be marked "Fire Lane - No Parking." (Ord. of 8-8-2005(2), § 805) Sec. 105-221. Construction requirements for residential, industrial, and commercial subdivision streets. The grading, base, and pavement for street construction shall be as follows: (1) Grading. All streets shall be graded to the elevations shown on the approved construction plans. a. The contractor may begin clearing and grubbing the project after: 1. A development permit has been issued by the county; 2. A pre-construction conference has been held, the director of planning duly notified; and 3. In conjunction with installation of required silt and erosion control measures and compliance with all applicable provisions of the Georgia Manual for Sediment and Erosion Control and the applicable provisions of state law. b. Clearing and grubbing. 1. All trees, stumps, logs, roots, grass, weeds, poles, and other objectionable matter shall be cleared and grubbed from within the construction limits of the project. 2. A minimum 30-foot undisturbed buffer shall be maintained on all property lines. Reference should be made to ordinance requirements of the county which require a buffer of greater width than the minimum stated herein. 3. No rubbish or other material resulting from the clearing and grubbing of the roadway shall be buried on site. 4. If burning is permitted, all burn pits shall be located outside of the roadway construction limits. After burning, the pit shall be cleared out. A county inspection is required prior to backfilling. Burn pits will be annotated on as-built drawing and furnished to the county on sheet not larger than 17 inches by 22 inches. c. Excavation. 1. All grading operations shall be planned and executed by the contractor in such a manner as to provide suitable subgrade material for the roadway with the top 12 inches compacted to 100 percent maximum dry density, 95 percent below the top. (Standard Proctor) 2. In areas where the material in place is not suitable for subgrades, these areas shall be undercut a minimum of 12 inches and backfilled with suitable material. 3. All rock and boulders in the roadbed shall be excavated and the space backfilled to the correct grade with suitable material. 4. Any stones, broken rock, or boulders resulting from the grading of the roadway may not be placed in any roadway fill area except when approved by the director of planning and then under his supervision. 5. During the construction of the roadway on a day-to-day basis, the roadbed edges shall be kept lower than the center and the grading shall be done so that the surfaces of the excavated areas and fill shall be kept reasonably smooth and well drained. Adequate surface ditches shall be cut at the tops of cut slopes, extending to each end of the cuts in order to carry the water from the side hill. Side ditches or gutters emptying from cuts to fill areas shall be turned outward so as to prevent erosion of the fill slopes. d. Placement of fill. 1. Fill construction shall not begin until all clearing and grubbing of the fill area has been completed. 2. All depressions in the ground shall be filled level with the adjacent surface using suitable material and compacted to the approximate density of the surrounding soil before placement of the fill is begun. 3. The entire area upon which fill is to be placed shall be plowed, scarified, and finely broken up to a depth of a minimum of six inches. 4. Before the placement of fill material is begun, all loosened soil shall be compacted the approximate density of the underlying soil. 5. Where a depth of fill and surfacing is three feet or less, the original ground shall be compacted a minimum 12 inches deep to at least 95 percent of the maximum laboratory dry density as determined from representative samples of the material being compacted. 6. In areas where layers of organic or other unstable materials exist, the existing ground shall be excavated, for the full width of the fill area, to an underlying stable material. The subgrade thus created shall then be compacted to the approximate density of the underlying material. 7. All fill material shall be deposited and spread in uniform horizontal layers, not more than six inches thick, for the full width of the fill area, and these layers shall be kept uniform by the use of graders, bulldozers or other approved equipment. 8. Each layer shall be compacted within the range of optimum moisture content necessary to achieve the compaction required. Material containing too much water shall be dried to the correct moisture content. If the material is too dry, water shall be added and uniformly mixed with the soil before it is compacted. Moisture content shall be maintained to within plus or minus three percent of optimum. 9. Fill shall be compacted to at least 95 percent of the maximum dry density to within the top 12 inches of the fill. The top 12 inches of the fill shall be compacted to at least 100 percent of the maximum dry density. A minimum of one compaction test per 300 square yards of every 24 inches of lift shall be taken and results provided to the director of planning. 10. The entire roadbed shall be scarified and compacted with a sheep's foot or other approved rollers. 11. While the work is in progress, the contractor shall maintain the surface in a manner so that the excavation, fills, subgrade, base course, and ditches always present a smooth and even surface. 12. The contractor shall have available on the job at all times at least one motor grader with adequate power to blade and maintain the roadbed. Suitable scarifiers shall also be available for use whenever necessary. 13. All density testing will be in accordance with ASTM D-698. e. Final finishing of roadway. 1. After all excavation has been completed and all fills have been placed, the entire roadbed surface shall be finally shaped with a grading machine supplemented with hand work whenever required, to secure a smooth surface and uniform cross section. 2. Slopes of cuts and fills shall also be carefully shaped to the true section specified. 3. When final shaping is finished, the road surface shall conform accurately to the line, grade and cross section shown of plans, and no roots, sod, grass, stones, or other unsuitable material shall remain in the top 12 inches of the finished roadbed. 4. All ditches and drains shall be opened to effectively drain the roadway. (2) Placement of curb and gutter. a. After sanitary sewer lines have been installed, all storm drainage in place, and the final finishing of the roadway has been approved by the director of planning, and the centerline profile has been approved, the installation of the concrete curb and gutter may begin. b. All concrete curb and gutter shall be in accordance with Figure 12 of article XV of this chapter, which provides for either a roll-back curb and gutter or a square back curb and gutter. The design shall be subject to the approval of the director of planning. c. Any curb and gutter which does not conform to a true section, texture, line, and grade shall be removed and replaced as directed by the director of planning. d. Water lines shall be installed after installation of the curb and gutter. (3) Subgrade. a. Before placing any pavement base the entire surface of the subgrade shall be plowed, harrowed, and mixed to a depth of at least six inches. If a subgrade stabilization material is required it shall be incorporated into the subgrade at this time. b. After the material has been thoroughly mixed the subgrade shall be brought into a proper line and grade and compacted to 100 percent of maximum dry density just prior to placing the base material. c. The centerline profile shall conform to the established elevations with an acceptable tolerance of six inches. d. The acceptance crown tolerance shall be one-half inch. (4) Base construction. a. The director of planning or a designee shall be notified 24 hours prior to the placing of any base material. b. The director of planning or a designee may authorize the placing of the base material after all equipment necessary for the proper construction of road base is on the project and the subgrade has been brought to the proper line, grade and crown, and compacted to the required density. c. The director of planning or a designee shall check the completed base course after the base material has been placed and compacted to the required density. All areas found to be deficient shall be marked and corrected before any asphalt pavement is placed. Areas where the crown is found to exceed that which is specified or the exposed edge of the concrete gutter is less than the minimum depth required shall be reshaped and rolled to obtain the required cross section. d. After the compacted material has been approved, cores shall be taken as directed by the director of planning to determine the thickness of the constructed base course. Areas found to be deficient in thickness shall be corrected as directed by the director of planning. e. All work and materials shall be in accordance with the pertinent graded aggregate construction sections of the state department of transportation's "Standard Specifications," latest edition. (5) Soil cement. a. A soil cement base may be used to improve the subgrade, but shall not be used as a substitute for base construction. b. Where allowed, the soil cement base shall be a minimum of five inches in thickness, while the thickness of the surface course shall remain at two inches. c. All soil cement construction shall be in accordance with the soil cement construction sections of the state department of transportation's "Standard Specifications," latest edition. d. The preparation of the soil cement base shall be done under the supervision of a professional engineer registered in the state. A letter stamped and signed by the engineer attesting to the construction of the soil cement base shall be submitted to the county. Core tests of the surface course shall also be submitted to the county for approval. (6) Paving. a. The contractor shall begin the construction of the asphaltic concrete pavement upon approval of the road base by the director of planning or a designee. b. All asphaltic concrete material and construction shall be in accordance with the hot mix asphaltic concrete construction sections of the state department of transportation's "Standard Specifications," latest edition. c. The director of planning or a designee shall check the cross section of the finished pavement. Any area found to be deficient shall be marked and a record of deficiencies made by the director of planning. d. If, in the opinion of the director of planning or a designee, the extent of deficiencies will impair the performance of the pavement, he shall direct that an overlay of a minimum thickness of one inch be placed before the roadway is opened to traffic. e. A copy of the delivery tickets for the asphaltic concrete material used shall be furnished to the director of planning at the time of completion of the work. If the delivery tickets indicate a shortage in the material used from the quantity estimated, the director of planning may require a minimum one-inch overlay of the roads. f. The applicant shall have core tests made to verify the thickness of the street base and asphalt pavement complies with state department of transportation standards, upon acceptance of the surface course by the director of planning. If these indicate a deficiency in thickness of the street base and asphalt pavement, an overlay shall be required when the following deficiencies occur: 1. When the number of cores deficient in thickness within the allowable one-quarter of an inch tolerance exceeds 35 percent of the total cores taken on one road. 2. When two or more consecutive tests show a deficiency of more than one-quarter of an inch allowable tolerance. When a core shows a deficiency in excess of the allowable tolerance, additional cores shall be taken to delineate the area of the deficient thickness. g. The applicant shall correct any deficiency with an overlay extending a minimum of 150 feet beyond the outer limits of the deficient area for the full width of the street. Smooth, neat joints shall be saw cut normal to the roadway for full depth of asphalt pavement, removing the original pavement for a minimum of ten feet at each end of the overlay. The thickness of the overlay shall be determined by the depth of the deficient area and shall not be less than one inch in compacted thickness. The county engineer shall specify the type of material used in the overlay. (7) Shoulder and drainage improvements. After the paving has been inspected and approved, the pavement edges or behind the curb and gutter shall be backfilled and compacted and the ditches and back slopes properly graded, shaped, seeded and mulched. An 80 percent stand of grass shall be obtained. All swales and ditches excavated below required depth shall be backfilled and compacted to 95 percent of maximum dry density. (8) Road design and construction for residential subdivisions. Road design and construction for residential subdivisions shall comply with the minimum standards shown in Table 105-221.1. Acceleration and deceleration lane construction shall comply with the standards set forth in Table 105-221.2. (9) Table of residential subdivision street construction standards. Table 105-221.1 Residential Subdivision Street Construction Standards Construction Standards Specifications Surface topping (plant mix)1 11 /2 inch 9.5 mm superpave mix with hydrated lime (level B), 165 pounds per square yard Tack coat1 0.04—0.06 GAL/YD Asphalt (binder course) Two-inch 12.5mm superpave mix with hydrated lime (level A) asphalt topping, 220 pounds per square yard Curbs/shoulder and ditch construction 24-inch by six-inch concrete "L" back curb 18 inch gutter; six inches high six-inch curb width Base construction Six-inch base (graded aggregate); 100 percent dry density compaction Subgrade Top 12-inch subgrade compacted to 100 percent dry density Pavement width See section 105-126(16) and Table 105-220.1 Street grade 12 percent maximum on subdivision streets; Four percent maximum grade at intersections - 100 feet from curbline Turnaround area 42.5 feet radius cul-de-sac pavement; 85 feet diameter Intersections 25-foot pavement radius at intersection within subdivision; 25-foot pavement radius required where intersecting existing county or state roads Right-of-way 60-foot right-of-way minimum for local streets (Additional right-of-way and/or slope easements may be required for cut and fill areas); 110 feet diameter right-of-way for cul-de-sac. A five-foot utility easement is required along all street rights-of-way Fill areas and back slopes 2:1 maximum slope allowed Storm sewers and cross drains GDOT materials specifications; RCP or asphalt coated metal pipe required or as approved by the county DOT; pipe location and size shall be approved by county building department Grassed areas Shall comply with article XII of this chapter Construction Standards Specifications Core testing Core samples shall be taken as directed (at applicant's expense) to determine thickness of base and pavement Letter of credit Four-year maintenance letter of credit on all improvements within public right-of-way (streets, sidewalks, sanitary and storm sewer, catchbasins, cross drains) and stormwater detention facilities; on phased developments, certain sections may require a renewed letter of credit if used for construction access on newer phases (see section 105-130(a)). 1 Surface topping and tack coat shall be applied before the subdivision build out is 75 percent complete, and no later that six months prior to the maintenance letter of credit being released (10) Design and construction requirements for county arterial roads. The design and construction requirements for subdivision developments for industrial, commercial, or office use and streets which are to be county arterial roads shall: a. Be required to have concrete curb and gutter along each side in accordance with Figure 6 of article XV of this chapter. b. Comply with the minimum standards shown in Table 105-221.2. (11) Table of industrial, commercial, and office subdivision street construction standards. Table 105-221.2 Industrial, Commercial, and Office Subdivision Street Construction Standards Surface topping plant mix 11 /2 inch 9.5 mm superpave mix with hydrated lime (level B) asphalt topping, 165 pounds per square yard or 12.5 mm (level A) with hydrated lime, at 165 pounds per square inch Tack coat 0.04—0.06 GAL/YD Binder Three-inch 19 mm superpave mix with hydrated lime (level B) - 330 pounds per square yard Curb and gutter required 24-inch by six-inch concrete "L" back curb; 18 inch gutter; six inch high; six-inch curb width Base construction Eight-inch base (graded aggregate), compacted to 100 percent maximum dry density Street width 26 feet wide with curb and gutter; 30 feet back of curb to back of curb Pavement width 26 feet Street grade Eight percent maximum on industrial/commercial streets; two percent maximum grade at intersections; 100 feet from curbline Turnaround area 55-foot radius cul-de-sac pavement; 110-foot diameter Intersections 50-foot pavement radius at intersections; 50 feet straight section from curved streets required Driveway entrances GDOT specifications Right-of-way 80 feet right-of-way minimum; additional rightof-way or slope easement may be required for cut and fill areas; 150 feet diameter right-ofway for cul-de-sac. A five-foot utility easement is required along all street rights-of-way Fill areas & back slopes 2:1 maximum slope allowed Storm sewers & cross drains GDOT materials specifications: RCP or asphalt coated metal pipe required, or as approved by the county DOT, pipe location and size approved by the director of planning Grassed areas Shall comply with the erosion and sedimentation control requirements forth in article XII of this chapter Core testing Core samples shall be taken as directed to determine thickness of base and pavement (at applicant's expense) Maintenance letter of credit Four-year maintenance letter of credit on all improvements within public right-of-way (streets, sidewalks, sanitary and storm sewer, catchbasins, cross drains) and stormwater detention facilities. On phased developments, certain sections may require a renewed letter of credit if used for construction access on newer phases (Ord. of 8-8-2005(2), § 806) Sec. 105-222. Improvements to existing streets and rights-of-way for subdivisions. (a) Existing unpaved road. Any unpaved road upon which a subdivision has frontage and/or access shall be paved and widened, according to the functional class of the road, as set forth in Table 105-221.1 along the frontage of the subdivision to the nearest intersection with a paved county road. The minimum right-of-way required according to Table 105-221.1 shall be dedicated along the entire frontage of the subdivision. (b) Existing paved road. Any existing paved county road upon which a subdivision has frontage and/or access and which is deficient relative to county specifications (see Tables 105-221.1 and 105-221.2) shall be resurfaced and widened as determined by the county department of transportation for the entire frontage of the subdivision. The minimum right-of-way required according to Table 105-221.1 shall be dedicated along the entire frontage of the subdivision. (Ord. of 8-8-2005(2), § 807) Sec. 105-223. Visibility at intersections. (a) Corner lots. On corner lots within all zoning districts, no fence, shrubbery or other obstruction to the traffic sight vision shall exceed a height of 21 /2 feet within a triangular area formed by the intersection of the right-of-way line, and a diagonal line which intersects the right-of-way lines at two points, each 20 feet distant from the intersection of the right-of-way lines, or, in the case of a rounded corner, from the point of intersection of their tangents. (b) Centerline sight distance for local and collector streets. (1) Minimum street centerline sight distances shall be designed relative to the designed speed of the street and shall be measured above the street centerline using a driver-eye height of 3.5 feet and an object height of six inches. (2) Following is a table of minimum centerline stopping site distances relative to design speed posted on streets: Table 105-223.1. Local and Collector Street Sight Distance Speed (MPH) 25 30 35 40 45 50 55 Intersection sight distance (stopping distance in feet) 280 335 390 445 500 555 610 Source: 1990 AASHTO Guide, A Policy on Geometric Design of Highways and Streets. (3) The minimum stopping distance for streets shall be no less than 200 feet. (c) Sight distance. For intersections with collector streets and minor/major arterials, use an intersection sight distance measured from a driver's-eye height of 3.5 feet to an object height of 3.5 feet. Table 105-223.2 Arterial Sight Distance Speed (MPH) 0—30 40 50 55 Centerline sight distance (stopping distance in feet) 375 580 840 990 Source: 1990 AASHTO Guide, A Policy on Geometric Design of Highways and Streets. (Ord. of 8-8-2005(2), § 808) Sec. 105-224. Pedestrian access and facilities requirements. (a) Sidewalks shall be at least four feet in width and four inches in thickness and shall be constructed of Portland cement concrete. Sidewalks shall be installed no closer than four feet to the back of curbline and shall not be constructed over any underground gas, electric, communications, or water and sewer utilities. Sidewalks and curbs, at street intersections, shall be designed to permit handicapped access (see construction standard detail for location of sidewalks). (b) Typically, sidewalks shall be installed by the builder before the issuance of a certificate of occupancy. However, all sidewalks are required to be complete throughout the subdivision (by the applicant) before the end of the four-year maintenance period. Broken curbing and sidewalk after this four-year period shall be repaired by the builder before the issuance of a certificate of occupancy. (Ord. of 8-8-2005(2), § 809) Sec. 105-225. Street names and signs requirements. (a) Street names. (1) All proposed street names within the county for new roads or roads within commercial, industrial, or residential subdivisions shall be approved by the director of planning during the preliminary plat review process or prior to recording of the road and its right-of-way deed. (2) Any request to change the name of an existing road shall be submitted to the director of planning for review and approval. (b) Street signs. (1) The county DOT shall determine the need and location of street signs within a subdivision. The location of the street signs shall be determined during the review of the preliminary plat. (2) The county's standard steel street posts or wooden four-inch by four-inch posts with horizontal reflectorized street name plates with four-inch letters shall be furnished and installed by county DOT. (3) The cost of street signs and their installation shall be paid by the applicant at a fee determined by the county DOT. All funds collected for these signs shall be deposited into the county general fund account. (4) The required fee shall be paid by the applicant when submittal of a final plat is made to the county. (5) The request for an invoice and the ordering of signs shall come from the director of planning to the county DOT. (Ord. of 8-8-2005(2), § 810) Sec. 105-226. Streetlight requirements. (a) In order to ensure adequate illumination of public rights-of way and promote safety and security, The American National Standard Practice for Roadway Lighting of the Illumination Engineering Society (RP-8-00), as approved by the American National Standards Institute (1993), as from time to time amended, is hereby adopted as the standard for the installation and operation of lighting in new subdivisions. (b) Approval of lighting plan. (1) A lighting plan, which may be prepared by the streetlight provider, shall be provided to the director of planning for the erection, construction, or installation of street light fixtures or equipment upon which the illumination thereof falls upon public rights-ofway. This shall include security lights of all kinds and nature. (2) Lighting plans shall be submitted with the final plat and any additions. (3) Plans shall demonstrate how the proposed lighting meets the standards of this section and include a drawing showing the exact location of streetlights. (4) No lighting shall be installed or operated without approval of the director of planning. (c) Streetlight fixtures or equipment shall be erected, constructed, or installed by the applicant in such a manner to insure that the lateral light distribution which causes a glare does not inhibit the users of the rights-of-way from safely traversing and using the rights-ofway. (d) Streetlight requirements for new development. (1) Streetlights shall be provided in new subdivisions, except in the A-G and RR zoning districts, where new streets are required to be dedicated to the county or which allow lot access to existing county roads. (2) New residential subdivisions shall install streetlights with underground wiring. It shall be the responsibility of the applicant to coordinate the installation of the streetlights with the appropriate utility and the county consistent with the standards contained in this article. (3) Each property owner shall be assessed a rate based on the total cost of annual lighting charge within the district divided by the number of properties within the district. Unit cost of street lighting charges shall be based on fees provided by electric utility companies of both overhead and underground installation. (4) The rates or charges for street light service shall constitute assessments on the property so served. Those assessments shall be added to tax bills at the end of each year and shall constitute a lien upon the property. Said lien shall have the same priority as tax assessments and an execution may issue for the purpose of enforcing the lien including foreclosure and/or judicial sale. (e) Streetlight requirements in existing residential development. (1) Individuals owning real property in an existing residential area desiring to install streetlights may apply with the county to establish a streetlight district. (2) The application shall be supported by a petition signed by property owners representing more than 75 percent of the property owners in the district, which is sought to be established. (3) Upon receipt of a complete streetlight application, the director of planning will contact the utility provider to request a layout, price, and contract, if necessary, for the streetlights. (4) Up to three additional streetlights may be added to an existing streetlight district by the director of planning. If four or more additional streetlights are required, the request must follow the procedure in subsection (e)(2) of this section. (Ord. of 8-8-2005(2), § 811) Sec. 105-227. Drainage standards for streets. (a) The size, length, and location of all surface drainage pipe or structures shall be shown on all final plats. All storm drain pipes or culverts carrying stormwater from the street and adjacent property or through lots in the subdivision shall be extended to at least 30 feet behind the rear of the structure to be located on the lot. Stormwater shall be released into a channel or swale without causing scouring, erosion, or resulting in sedimentation of the receiving channel. The outlet channel shall include structural and vegetative measures to assure non-erosive velocities of stormwater. All channels and swales shall be lined with concrete or mat jutting, as approved by the county. (b) Installations, backfilling, and compaction around drainage pipes shall be in accordance with state department of transportation specifications. All pipes shall have a minimum cover of 18 inches from the bottom of the road base, and head walls or inlet basins constructed at the ends of the pipes. (c) All cross drain pipes within public rights-of-way for the purpose of providing storm drainage shall be coated metal pipe, concrete, or other material approved by the county. Ninety-five percent compaction shall be required around all pipes. (d) The design of drainage structures shall be based on recognized hydrological formulae. (e) Piped collection systems for public streets (catchbasins, inlets, cross drains, longitudinal piping), shall be designed for the 50-year storm. (f) Road culverts, which carry live streams, and off-site drainage, shall be designed for the 100-year storm. (Ord. of 8-8-2005(2), § 812) Secs. 105-228—105-247. Reserved. ARTICLE IX. RESERVED Secs. 105-248—105-272. Reserved. ARTICLE X. STANDARDS FOR UTILITY INFRASTRUCTURE Sec. 105-273. General compliance to standards. (a) All development shall include adequate provision for utility infrastructure in full compliance with the standards of this article. (b) All potential utilities shall be identified on the development plan in order to indicate compliance with placement standards set forth in section 105-274. (c) All construction drawings shall be prepared and sealed by a professional engineer registered in the state. (Ord. of 8-8-2005(2), § 1001) Sec. 105-274. Placement standards for all utilities. (a) The standards for the placement of all utilities are shown on the detail drawings located in section 105-528. (b) Utilities shall be located within six inches, plus or minus, of the specified plan locations shown on the approved drawings. (c) All utilities must be underground unless exempted herein or approved by the planning commission. (d) All utilities other than storm drains and sewage shall be sleeved under paved roadways. (Ord. of 8-8-2005(2), § 1002) Sec. 105-275. Potable water system requirements. (a) Compliance with state standards. All potable water systems shall comply with the design and construction standards of the state EPD. (b) Extension within subdivisions. The applicant shall be responsible for the material and labor cost of extending water systems within a subdivision as directed and inspected by the entity approved by the state EPD which provides water to the subdivision in question. (1) The extensions of water mains within a subdivision shall be designed to provide adequate hydraulic capacity for future extensions to the surrounding area and shall be connected to existing surrounding water mains to accomplish desirable hydraulic looping. (2) Dead-end mains within a subdivision shall be avoided, based on a determination by the entity approved by the state EPD to provide water to the subdivision in question. Water mains in dead-end streets shall have a fire hydrant installed at the end of the line on a common lot corner according to the standard details provided by said entity approved by state EPD. (c) Hydrants. (1) Hydrants shall be placed to ensure free and clear access from the nearest public right-of-way. No equipment, landscaping, mail boxes, or other structures shall be placed in such a manner as to obstruct clear access from the right-of-way to the fire hydrant. (2) Hydrants will be as approved by county fire services. Hydrants shall be of the standard three-outlet type, shall be not more than 500 feet apart, and not more than 500 feet from any structure. Hydrants must pass a minimum flow rate of 500 GPM. (Ord. of 8-8-2005(2), § 1003; Ord. of 11-7-2022, § XI) Sec. 105-276. Wastewater system requirements. All wastewater systems shall comply with the design and construction standards of the county health department and, if applicable, the state EPD. (Ord. of 8-8-2005(2), § 1004) Sec. 105-277. Other utilities. (a) Certificate of occupancy. A certificate of occupancy shall not be issued for structures in a subdivision or development until all necessary utilities have been installed in full compliance with the design, construction, and placement standards set forth in this article. (b) Exemptions. The following specific facilities shall be exempt from the requirements of this section, provided that the placement of these facilities complies with the requirements for free and clear access to fire hydrants as set forth in section 105-275(c): (1) Poles used exclusively for street lighting, provided that the street lighting standards set forth in section 105-226 are met. (2) Existing poles, overhead lines, and associated overhead structures owned by a utility company crossing over any portion of an area from which overhead wires are allowed. (3) Overhead lines in commercial and industrial areas attached to the exterior of a building by means of a bracket or similar device and extending from one location on the building, or to an adjacent building without crossing any street or right-of-way. (4) Radio antennae and associated structures and equipment used for furnishing communications service. (5) Service terminals and necessary pad-mounted electric transformer equipment installed above ground, used to distribute communications and electric service in underground systems. (c) Electrical substations. Electrical substations are permissible in any zoning district, subject to the approval of the county. The utility company shall obtain an easement for these installations. The easement shall be clearly indicated on the preliminary and final plats. (Ord. of 8-8-2005(2), § 1005) Secs. 105-278—105-302. Reserved. ARTICLE XI. STANDARDS FOR STORMWATER MANAGEMENT Sec. 105-303. Intent; purpose. (a) Intent. It is the intent of this article to provide standards and criteria to protect, maintain, and enhance the public health, safety, environment, and general welfare by establishing minimum requirements and procedures to control the adverse effects of increased post-development stormwater runoff and nonpoint source pollution associated with new development and redevelopment. It has been determined that proper management of post-development stormwater runoff will minimize damage to public and private property and infrastructure, safeguard the public health, safety, environment, and general welfare of the public, and protect water and aquatic resources. (b) Purpose. (1) Require that new development and redevelopment maintain the pre-development hydrologic response in their post-development state as nearly as practicable in order to reduce flooding, stream bank erosion, nonpoint source pollution, increases in stream temperature, and maintain the integrity of stream channels and aquatic habitats. (2) Establish minimum post-development stormwater management standards and design criteria for the regulation and control of stormwater runoff quantity and quality. (Ord. of 8-8-2005(2), § 1101; Ord. of 6-4-2007, § 1(1101)) Sec. 105-304. Applicability, exemptions, and compliance. (a) Applicability. (1) An adequate drainage system, including necessary ditches, pipes, culverts, drains, inlets, bridges, etc., shall be provided for the proper drainage of all surface water. (2) All persons proposing the residential or commercial subdivision of property as defined in the county zoning ordinance set forth in chapter 119 shall prepare a stormwater management plan. No final subdivision plat shall be approved and no development or building permit shall be issued until and unless the stormwater management plan, consisting of a hydrology study report and engineering plans and specifications, has been reviewed and approved by the director of planning or his appointed reviewing entity, and has been installed, except as exempt in subsection (b) of this section. (3) This article is applicable to new development and/or redevelopment that disturbs one acre or more. (b) Exemptions from storm drainage requirements. The following development activities are exempt from the provisions of this section and the requirement of providing a stormwater management plan: (1) Agricultural land management. (2) Additions or modifications to existing single-family detached dwellings. (c) Compliance. (1) Georgia Department of Transportation (GDOT) Standard Specifications and Details shall be used for construction of all stormwater management structures and appurtenances. (2) Erosion control practices shall comply with county development regulations and the Georgia Manual for Sediment and Erosion Control. (Ord. of 8-8-2005(2), § 1102; Ord. of 6-4-2007, § 1(1102)) Sec. 105-305. Hydrologic and hydraulic study required. (a) Permanent stormwater detention facilities providing for the storage and controlled release of stormwater runoff shall be required for any residential or commercial development activity that will increase the peak rate of discharge from pre-development conditions, except: (1) The subdivision of property for residential purposes where no new roadway construction is proposed and all the lots exceed three acres in size. (2) The subdivision of property for residential purposes where all lots exceed five acres. (3) The re-development of existing commercial sites where the post-development peak stormwater discharge from the site can be shown to be less than 110 percent of the pre-development discharge for the two-, five-, ten-, and 25-year storm return frequencies. (b) Calculations shall he provided to demonstrate existing and proposed conditions for stormwater conveyance, stormwater detention and routing, and site discharge. A hydrology and hydraulic study shall be required for all stormwater detention facilities. (c) Hydrology studies shall be prepared and sealed by a design professional registered to practice in the state and must include the following: (1) A narrative of site description. (2) A summary showing existing and developed conditions and allowable release rate, including any bypass or off-site sub-basins, for the two-, five-, ten-, 25-, 50-, and 100-year storm events. (3) An explanation of the methodology used for hydraulic and hydrologic calculations. (4) The following exhibits: a. Drainage area maps for existing and proposed conditions. b. Sub-basin delineation and identification. c. Drainage area, hydrologic data/parameters. d. Detail of outlet control structure. e. All hydrology and hydraulic studies shall meet the standards and employ the methods listed here: 1. The reservoir routing method or an equivalent method shall be used in sizing detention ponds (the bowstring method is not acceptable.) 2. Output from this routing is required for each design storm. 3. Runoff from areas that bypass detention, when combined with discharge from detention basins, must be shown to be less than or equal to predeveloped flow rates in the receiving waterway. 4. The minimum time of concentration used for hydrologic calculations shall be five minutes. 5. Appropriate intensity-duration-frequency curves for the study area shall be used in rainfall calculations. 6. The maximum drainage area for use of the rational method is five acres. Drainage areas exceeding five acres should be analyzed by the soil conservation service method or other appropriate technique. (Ord. of 8-8-2005(2), § 1103; Ord. of 6-4-2007, § 1(1103)) Sec. 105-306. Standards to be used in designing detention facilities. Permanent detention facilities will be required, except where exempt as listed in section 105-305(a), and shall be designed so that the following standards shall apply: (1) All stormwater detention facilities shall be designed to accommodate the two-, five-, ten-, 25-, 50-, and 100-year storm events. (2) Detention facilities shall be subject to the provisions of Georgia Safe Dam Program, and the Georgia EPD Rules for Dam Safety (Ga. Comp. Rules & Regs. ch. 391-3-8). (3) Detention facilities shall provide a minimum of one foot of freeboard between the maximum water surface elevation and the top of the detention berm. (4) Ponds shall be designed to discharge to defined drainage ditches or natural drainage pathways. (5) All closed drainage systems (i.e., culverts, pipes, etc.) must have a headwall, or safety end section when appropriate, on their inflow and outflow ends meeting state department of transportation standards, along with the required riprap or other erosion and sediment control device found in the Manual for Erosion and Sediment control in Georgia. As part of the hydrology study, consideration should be given to the flow capacity of downstream drainage structures. (6) The steepest fill slopes shall be 3:1, and cut slopes shall be no steeper than 2:1. Slopes proposed to be steeper shall be reviewed and conditionally approved on a case-by-case basis by the director of planning or other engineering reviewer approved by the county. (7) A ten-foot-wide access road shall be required along the top of the berm and around the circumference of the pond where topography does not prohibit its construction. (8) A fence of high quality, durable material, including wood, iron, or other metal, shall be required for all detention facilities having a maximum water storage depth of more than four feet. The fence must also comply with the following standards: a. The fence shall be at least six feet high. b. Fence posts shall be set in concrete ten feet on centers. c. There shall be a minimum ten-foot-wide locked gate for access. d. The fence shall not be installed across the slope of a dam or dike, but installed completely around the pond and containing the dike and access road. (Ord. of 6-4-2007, § 1(1104)) Sec. 105-307. Grading and drainage plans. Grading and drainage plans shall be a part of all stormwater management plans and shall include the following items and meet the following standards: (1) The location, size and length of all existing drainage structures shall be shown on a topographic layout with two-foot contour intervals. Existing and proposed contours shall be shown. (2) The 25-year storm event shall be used in designing the stormwater collection and conveyance system. (3) Calculations showing how the sizing of each drainage structure was determined (drainage area, runoff coefficient, flow path for inlet time, etc.). (4) Storm sewer catchbasins, drop inlets, manholes, and junction boxes shall be designed by the developer's engineer to state department of transportation standards. (5) Catchbasins shall be located outside of intersection radii unless unusual circumstances cause undue hardship, in which case the director of planning may waive this requirement. (6) Inlet spacing shall be designed for a maximum gutter spread of eight feet for the 25-year storm. (7) Off-street inlets will be installed to prevent excessive flow over curbs or between house lots where such conditions exist. (8) Bridges shall be designed for a 100-year storm event. (9) Energy dissipation devices, such as splash pads, riprap, and stilling basins, shall be provided at the outlet of every culvert and piped discharge system. The size and type of energy dissipation device to be used shall be designed in accordance with sound engineering practices. If riprap is used, the length, shape, and size of riprap shall be designed in accordance with the Manual for Erosion and Sediment Control in Georgia and shall be detailed on the plan for all outlet locations. (Ord. of 6-4-2007, § 1(1105)) Sec. 105-308. Cross drain pipes. (a) Cross drains under streets shall not be less than 18 inches in size. (b) Minimum clearances: (1) 18 inches between the bottom of the street base and the exterior crown of the culvert. In all cases at least 24 inches of cover shall be provided. (2) A minimum of six inches between underground utilities and exterior crown of culverts. (3) The inlet and outlet end of all storm drain pipes including driveway pipe shall have either flared-end sections or concrete headwalls that meet the standards of GDOT Standard 1120 or 1125. (4) All storm piping or surface swales shall extend to the detention facility. (5) Maximum continuous length of pipe shall be 300 feet for pipes less than 42 inches. (6) Junction boxes having access to the pipe shall be constructed to meet the requirements of GDOT Standard 1030D, current edition. (Ord. of 6-4-2007, § 1(1106)) Sec. 105-309. Storm drain profiles. All stormwater management plans shall include storm drain profiles that show: (1) Existing and proposed grade. (2) Vertical factor of five to ten with respect to horizontal scale. (3) Structure identification corresponding to grading and drainage plan. (4) Hydraulic grade line (HGL). (5) Pipe material. (6) Pipe length. (7) Invert elevations for all pipes. (8) Construction drawings shall include a pipe chart showing the following information: a. Upstream structure ID. b. Inlet drainage area. c. Inlet runoff coefficient. d. Sub-basin time of concentration. e. System time of concentration. f. Rainfall intensity. g. Incremental flow at each basin. h. Cumulative flow conveyed in the system to that point. i. Pipe diameter, material, length and slope. j. Maximum velocity of ten feet per second at the 25-year design flow. k. Minimum velocity of two feet per second at the two-year design flow. l. Upstream and downstream invert elevations. (9) Elevation of throat of inlet. (10) Provide a minimum of 0.1 foot drop between inverts across the structure. (11) When pipe sizes increase, match crowns of pipes. (Ord. of 6-4-2007, § 1(1107)) Sec. 105-310. Open channels. Construction drawings shall include a typical section of surface conveyance channels, provided for each reach if the cross section changes. Open channels shall be protected from erosion by seeding or lining with riprap as defined in the Manual for Erosion and Sediment Control in Georgia. (Ord. of 6-4-2007, § 1(1108)) Sec. 105-311. Materials and installation. (a) GDOT Standard 1030D, current edition, shall be used in determining class (concrete) or gauge of pipe under fill, method of backfilling and pipe installation. (b) Only reinforced concrete pipe shall be used within street rights-of-way for arterial roads and major collectors. Concrete pipe shall not be used on grades exceeding ten percent. Metal pipe may be used within the rights-of-way of local streets and for driveway culverts. Metal pipe shall either be corrugated steel (AASHTO M-36) with aluminized Type II or bituminous coating, or corrugated aluminum alloy pipe (AASHTO M-196). (c) Corrugated high-density polyethylene (HPPE) pipe, smooth lined Type 5, may only be used for residential driveway applications and must be manufactured and installed in strict compliance with GDOT Standard 1030-P. HDPE applications shall not exceed 36 inches in diameter. (d) Pipe installation shall conform to GDOT Standard Specifications for Construction of Transportation Systems, current edition. Before any traffic over a storm drain is allowed, the developer shall provide an adequate depth and width of compacted backfill to protect the structure from damage or displacement. The developer shall remove any debris or silt that constricts the flow through a pipe as often as necessary to maintain drainage. All pipe structures shall be cleaned before the work is accepted. Any damage or displacement that may occur due to traffic or erosion shall be repaired or corrected at the developer's expense. (Ord. of 6-4-2007, § 1(1109)) Sec. 105-312. Driveway culverts. (a) Driveway culverts may be aluminum, steel, or corrugated plastic pipe approved by the county road department. (b) The inlet and outlet end of all driveway culverts shall have either flared-end sections or concrete headwalls that meet the standards of GDOT Standard 1120 or 1125. (Ord. of 6-4-2007, § 1(1110)) Sec. 105-313. Field changes. (a) Minor changes in construction plans caused by field conditions shall be made at the direction and with the approval of the road superintendent and the director of planning with the cost of such changes to be paid by the developer. (b) A complete set of as-builts shall be kept on site at all times and made available to county personnel as requested. At the conclusion of the project, a clean set of as-builts, reflecting constructed conditions, shall be submitted to the county in both hard copy and electronic form. (Ord. of 6-4-2007, § 1(1111)) Secs. 105-314—105-344. Reserved. ARTICLE XII. EROSION AND SEDIMENTATION CONTROL Sec. 105-345. Applicability. (a) See chapter 113 for regulations pertaining to soil erosion and sedimentation control. (b) Except for construction of single-family residences, where compliance with section 105-346 is required, the director of planning shall enforce compliance with the minimum requirements as if a permit had been issued. (Ord. of 8-8-2005(2), § 1201) Sec. 105-346. Minimum requirements for erosion and sedimentation control using best management practices. (a) See chapter 113 for regulations pertaining to soil erosion and sedimentation control. (b) The construction of single-family residences otherwise exempted from the requirements of this article shall be subject to issuance of a residential land disturbance permit. Such permit shall be used to ensure compliance with the minimum requirements set forth herein. (Ord. of 8-8-2005(2), § 1202) Secs. 105-347—105-365. Reserved. ARTICLE XIII. EARTHWORK SPECIFICATIONS DIVISION 1. GENERALLY Sec. 105-366. Definitions. The following words, terms and phrases, when used in this article, shall have the meanings ascribed to them in this section, except where the context clearly indicates a different meaning: Satisfactory soil material means clean subsoil, free from debris, roots, topsoil, frozen material, and shall contain no rock larger than three inches in diameter. Unsuitable soil material means soil material not capable of being compacted to the density required, rock material larger than three inches in diameter, debris, and organic material or soil with high organic content. (Ord. of 8-8-2005(2), § 1301) Sec. 105-367. Job conditions. The applicant shall be required to: (1) Verification. Verify existing grades and layouts grade stakes for building and appurtenances. If existing grades are at variance with drawings, notify the engineer and receive instructions prior to proceeding. (2) Protection. a. Protect benchmarks and monuments; if disturbed or destroyed, notify the surveyor to replace in original position. b. Protect existing facilities and adjacent property. Prevent ponding or washing of water on site and on adjacent property. Erect silt fences as indicated on drawings and where existing site conditions require. c. Protect areas outside limits of construction from encroachment by construction personnel or equipment. d. Protect active utilities and remove or relocate active utilities encountered but not shown on plans. e. Identify and protect utilities for duration of project. (Ord. of 8-8-2005(2), § 1302) Secs. 105-368—105-392. Reserved. DIVISION 2. PRODUCTS Sec. 105-393. Materials. The applicant shall use the following fill materials: (1) Structural fill. Satisfactory soil materials for use under structures, slabs and pavement are defined as those complying with ASTM D 2487 classifications GM, GC, SW, SP, SM, SC, ML, and CL. Unsuitable soils for these purposes are those classified as Pt, OH, OL, CH and MH. Soils classified as CH may be suitable for constructing cutoff trenches and cores of berms at stormwater detention basins. (2) General fill materials. a. Fill materials shall be conhesionless or display low plasticity, shall be free of organic or other perishable material and shall not contain stones larger than three inches in diameter or rubble. No material shall be placed when frozen. b. If additional material, other than that to be obtained from excavation, is required for backfilling and grading, the contractor shall use appropriate material. (Ord. of 8-8-2005(2), § 1311) Secs. 105-394—105-414. Reserved. DIVISION 3. EXECUTION Sec. 105-415. Excavation. The applicant shall adhere to the following requirements for excavations: (1) If unsuitable soil material, including rock or muck is encountered, clearing away earth to expose suitable material. (2) Protect excavations against cave-ins, and freezing. Provide bracing, shoring, and sheeting to contain excavations. Slope embankments over five feet zero inches in height at 45-degree angle away from excavation or shore. Shoring design shall be by a registered engineer engaged by and paid by the contractor. When freezing can be anticipated prior to placing of concrete, protect excavations or delay carrying excavations to full depth until concrete can be placed. (3) Maintain excavations free of surface water. Provide pumps if required to drain excavations. Provide and maintain temporary drainage ditches as required. (4) Notify the engineer immediately of subsurface water encountered and await instructions. (5) Trench excavation. Excavate trenches to a maximum width equal to pipe diameter plus two feet zero inches for pipe two feet six inches and smaller; or pipe diameter plus two feet six inches for pipe exceeding two feet six inches diameter. (Ord. of 8-8-2005(2), § 1321) Sec. 105-416. Fill and backfill. The applicant shall adhere to the following requirements when performing fill and backfill operations: (1) Provide satisfactory soil material to perform earthwork operations indicated, including filling and backfilling to bring grade to elevations indicated. (2) Preparation of surfaces to receive fill: a. Remove vegetation, debris, unsuitable soil materials, obstructions, and deleterious materials from ground surface prior to placement of fills. Break up sloped surfaces steeper than one vertical to four horizontal so that material will bond with existing surface. b. All areas shall be proof-rolled prior to receiving fill. Proof rolling shall be accomplished with overlapping passes in each of two perpendicular directions with a full loaded tandem axle dump truck so similarly loaded rubber tires vehicle. All areas judged to rut excessively or pumping shall be over-excavated and backfilled with suitable fill and compacted as specified in this section. (3) Placement and compaction. Place fill material in lifts not exceeding eight inches loose thickness. Before compaction, moisten or aerate each layer to provide the optimum moisture content. Compact each lift to specified percentage of maximum density for area classification. Place no backfill or fill material on surfaces that are muddy, frozen, or contain frost or ice. (4) Backfill against pipe in lifts not exceeding four inches loose thickness. Place backfill along pipe haunches by hand and compact using hand tamper to specified density. Place backfill evenly along both sides of pipe for full length. Compact each lift to specified percentage of maximum density. (Ord. of 8-8-2005(2), § 1322) Sec. 105-417. Compaction. The applicant shall adhere to the following requirements when performing compaction operations: (1) Perform compaction of soil materials for fills using proper mechanical soil compaction equipment for type and size materials to be compacted. (2) Percentage of maximum density requirements. All soil density testing shall be conducted in accordance with ASTM D-698, Standard Proctor Compaction Test. Compaction shall conform to the following requirements: Structural fill. Place soil in lifts of eight inches loose measure and compact to 95 percent of the standard proctor maximum dry density. (3) Soil material that has been removed because it is too wet to permit compaction may be stockpiled or spread where directed by the engineer and permitted to dry. Assist drying by dicing, harrowing, or pulverizing until moisture content is reduced to satisfactory value, as determined by moisture-density relation tests. (Ord. of 8-8-2005(2), § 1323) Sec. 105-418. Grading. The applicant shall adhere to the following requirements when performing grading operations: (1) Grade areas to lines and elevations indicated, including adjacent transition areas. Smooth finished surface within specified tolerances, compact and bring to uniform levels or slopes between points where elevations are shown, or between such points and existing grades. (2) Finished surfaces shall be free from irregular surface changes, and as follows: a. Surfaces under walks and pavements. Shape surface of areas under walks to line, grade, and cross section, with finish surface not more than 0.1 foot above or below required subgrade elevation. b. Grassed areas. Shape areas to receive topsoil to within 0.3 foot above or below required subgrade elevation. (3) Compaction. After grading, compact subgrade surfaces to depth and percentage of maximum density for each area classification. (4) Grade areas adjacent to buildings to drain away from building and to prevent ponding. Finish grades shall be within 0.3 foot of indicated elevations. (5) Where compacted areas are disturbed by construction operations, scarify surfaces, reshape and re-compact to required density. (6) Redistribute stockpiled topsoil to uniform depth over graded areas. (7) Remove excess topsoil and other soil matter and debris on site at approved location. (8) At completion of finish grading operation, the site shall be ready for landscaping. (9) Protection of graded areas. Protect newly graded surfaces from traffic and erosion. Keep free of debris. Where graded or compacted surfaces are damaged by subsequent operation, return to indicated grade and state of compaction. (Ord. of 8-8-2005(2), § 1324) Secs. 105-419—105-449. Reserved. ARTICLE XIV. ASPHALT PAVING SPECIFICATION; LOCAL ROADS DIVISION 1. GENERALLY Sec. 105-450. Submittals. The applicant shall submit the following documentation: (1) Certificates. Provide certificates stating that materials supplied comply with specifications. Certificates shall be signed by the asphalt producer and the contractor. (2) Mix design. Submit mix design for each course to the engineer for acceptance. (Ord. of 8-8-2005(2), § 1401) Sec. 105-451. Job conditions. The applicant shall adhere to the following requirements when performing asphalt paving under the following job conditions: (1) Weather limitations. a. Do not conduct paving operations when surface is wet or contains excess of moisture which would prevent uniform distribution and required penetration. b. Construct asphalt courses only when atmospheric temperature is above 55 degrees Fahrenheit for one-inch lift or 45 degrees Fahrenheit for 11 /2-inch lift, when the underlying base is dry and when weather is not rainy. c. Place base coat when the temperature is above 35 degrees Fahrenheit and rising. (2) Grade control. Establish and maintain the required lines and grades for each course during construction operations. (3) Traffic control. a. Maintain vehicular and pedestrian traffic during paving operations, as required for other construction activities. b. Provide flagmen, barricades, warning signs, and warning lights, as applicable, for movement of traffic and safety and to cause the least interruption of work. (4) Standards. For materials and methods of construction, conform to the state department of transportation's Standard Specifications for Construction of Roads and Bridges, 2001 edition, including modifications, amendments, and supplements. (5) All cutting and paving shall match existing pavement and shall form a smooth, even transition. (Ord. of 8-8-2005(2), § 1402) Sec. 105-452. Testing. (a) Asphalt paving testing will be performed by an independent testing agency paid by the county. A testing fee will be charged to the developer prior to issuance of the grading permit to cover testing costs. The independent testing agency shall report directly to the road building inspector. The amount of the testing fee shall be as established by the board of commissioners from time to time. (b) Testing shall include in-place courses for compliance with specified density, thickness, and surface smoothness requirements. (c) Testing agency shall take one four-inch diameter core per 1,000 square yards of paved surface at locations selected by the engineer for density and thickness test. The contractor shall repair holes resulting from coring to matching existing paving prior to placing surface course. (d) Density. The testing shall compare density of in-place material against a laboratory specimen of the same mixture subjected to 50 blows of a Standard Marshall hammer on each side of the specimen. Minimum acceptable density of in-place material shall be 97 percent of recorded laboratory specimen density. (e) Allowable variation in thickness shall be as follows: Base course ± 1 /2 inch Binder course ± 1 /4 inch Surface course ± 1 /4 inch (f) Surface smoothness. Test finished surface of each asphalt course for smoothness using a ten-foot straight edge. Intervals of tests shall be as directed by engineer. Surfaces will not be acceptable if exceeding the following: Base course ± 1 /2 inch in ten feet Binder course ± 1 /4 inch in ten feet Surface course ± 1 /4 inch in ten feet (g) Contractor's duties relative to testing include: (1) Notifying laboratory of conditions required testing. (2) Coordinating with laboratory for field testing. (3) Paying costs for all testing including that performed beyond scope of that required and for retesting where initial tests reveal nonconformance with specified requirements. (Ord. of 8-8-2005(2), § 1403) Secs. 105-453—105-472. Reserved. DIVISION 2. PRODUCTS Sec. 105-473. Paving materials. The applicant shall use the following paving materials: (1) Aggregate base course or soil cement base. a. Crushed stone base. The base course shall consist of at least six inches of graded aggregate base material compacted to 100 percent maximum dry density. b. Soil cement base. The minimum base course shall consist of at least six inches of suitable soil (high mica content is not suitable) stabilized with ten percent of Portland cement by volume (approximately 42.3 pounds per square yard). (2) Surface course: Meeting GDOT Specification, section 400, for Type "E" or "F" hot-mix asphalt (12 mm and 9 mm Superpave), as indicated on the drawings. (3) Bituminous prime coat: Meeting GDOT Specification, section 413. (4) Bituminous tack coat: Meeting GDOT Specification, section 413. (Ord. of 8-8-2005(2), § 1411) Secs. 105-474—105-499. Reserved. DIVISION 3. EXECUTION Sec. 105-500. Subgrade preparation. The applicant shall undertake the following subgrade preparations: (1) Prior to beginning of pave work, inspect subgrade for loose or soft material, rock or excess moisture. (2) Proof roll cut subgrade using loaded, 20-ton dump truck or similar weight construction equipment to verify that subgrades are stable and to identify loose or soft areas requiring undercutting or stabilization. Proof rolling shall be under surveillance of the testing agency. (3) Stabilization or soft or unstable subgrades shall be accomplished to minimum depth of 12 inches. Stabilizing aggregate shall be of type specified for base course material. (4) After the earthwork has been completed, all storm drainage, water, and sanitary sewer utilities have been installed within the right-of-way as appropriate, and backfill in all such ditches thoroughly compacted to the satisfaction of the county engineer or road building inspector, the subgrade shall be brought to the lines, grades and typical roadways section shown on the construction plans. (5) Utility trenches cut in the subgrade shall be backfilled and compacted properly. Compaction tests at the rate of one per 150 feet of trench shall be provided to verify compaction. (6) If requested by the road building inspector, a surveyor must certify the subgrade to within six inches of the design grade prior to base placement. (Ord. of 8-8-2005(2), § 1421) Sec. 105-501. Placing asphalt paving. The applicant shall adhere to the following requirements when placing asphalt paving: (1) Aggregate course. Place, grade, and compact to minimum thickness as indicated on the drawing and in accordance with ASTM D1557-78 and GDOT Specification, section 815. (2) Bituminous prime coat. Apply primer coat after base course has been compacted and brought to grade. Select material and proper application temperature as specified in GDOT Specification, section 412. (3) Bituminous tack coat. Apply tack coat immediately prior to surface course application. Tack coat material and application procedure shall comply with GDOT Specification, section 413. (4) Surface course. Apply surface course to minimum compacted thickness as indicated on the drawing and in accordance with GDOT Specification, section 400. (5) Placing asphalt concrete paving. Place asphalt at proper temperature and compact to at least 95 percent of laboratory density in accordance with ASTM D1559-76. While hot, compact mixture by rolling. Asphalt temperature at time of application shall be in accordance with GDOT Specification, sections 400 and 424. (Ord. of 8-8-2005(2), § 1422) Sec. 105-502. Cleaning and protection. The applicant shall adhere to the following requirements at the completion of the operations: (1) At completion of each operation, remove excess or spilled materials from site. Sump or spread on excess asphalt material on project site. (2) After placement of surface course, no vehicular traffic shall be allowed on pavement until it has cooled and hardened and in no case sooner than 12 hours. (Ord. of 8-8-2005(2), § 1423) Secs. 105-503—105-527. Reserved. ARTICLE XV. APPROVED CONSTRUCTION DETAILS Sec. 105-528. Figures. (Ord. of 8-8-2005(2), art. 15) Secs. 105-529—105-547. Reserved. ARTICLE XVI. LEGAL STATUS PROVISIONS Sec. 105-548. Conflict with other ordinances. Portions of other ordinances that conflict with portions of this chapter are repealed. Non-conflicting parts of those ordinances remain in effect. The zoning provisions of chapter 119 shall take precedence over this chapter where zoning issues conflict. (Ord. of 8-8-2005(2), § 1601) ARTICLE III. ZONING POWER STANDARDS Sec. 109-40. Zoning ordinance amendments. The planning and zoning commission and the board of county commissioners will, when considering a proposed amendment to the zoning ordinance, first determine whether the limitation imposed by such an amendment, if any, on the right to unrestricted use of property which might result from the proposed amendment is necessary to promote the public health, safety, morality or general welfare. In considering whether to recommend a change in the zoning classification of any particular property, the planning and zoning commission will balance the benefit to the public of the present zoning classification of the property against the detriment to the property owner, and scrutinize the application in light of the character of the land in question and the effect of the zoning decision upon the property owner's rights. In making these determinations, the following standards must be considered: (1) The existing land uses and zoning classification of nearby property. (2) The suitability of the property for the proposed rezoning. (3) The length of time the property has been vacant. (4) The threat to the public health, safety, morality, and welfare if rezoned. (5) The extent to which the value of the subject property is diminished by the present zoning, as compared to its potential value under the proposed zoning. (6) The balance between the hardship on the property owner and the benefit to the public in not rezoning. (7) Whether the subject property has a reasonable economic use as currently zoned. (8) Whether the proposed zoning will be a use that is suitable in view of the uses and development of nearby property or will adversely affect the existing use or usability of nearby property. (9) Whether there are other existing or changing conditions affecting the use and development of the property which give supporting grounds for either approval or disapproval of the zoning proposal. (10) Whether the zoning proposal is in conformity with the policies and intent of the land use plan. (11) Whether the zoning proposal would overburden the public utilities, schools, and streets presently existing to serve the site. (12) Whether the zoning proposal would have a substantial adverse impact on the environment, including, but not limited to, drainage, soil erosion and sedimentation, flooding, air quality, and water quality and quantity. (Code 2000, § 46-71; Res. of 3-3-1994) Secs. 109-41—109-68. Reserved. Chapter 119 ZONING* ARTICLE I. IN GENERAL Sec. 119-1. Preamble and enactment. (a) The zoning regulations and districts herein established have been made for the purpose of promoting the health, safety, morals, convenience, order, prosperity and the general welfare of present and future inhabitants of the county; of lessening congestion in the streets; to secure safety from fire, panic and other dangers; to provide adequate light and air; to prevent the overcrowding of land; to avoid undue concentration of population; to facilitate the adequate provision of transportation, water, sewerage, schools, parks and other public requirements. The regulations have also been made with reasonable consideration among other things to the character of the district and its peculiar suitability for particular uses, and with a view to promoting desirable living conditions and the sustained stability of neighborhoods, protecting property against blight and depreciation, securing economy in governmental expenditures, conserving the value of buildings, and encouraging the most appropriate use of land, buildings and other structures throughout the county. (b) The comprehensive land use plan herein established has been made for the following purposes: to control, guide and direct development in the county; to protect, preserve and enhance the county's cultural, environmental, economic and social resources; to identify current land uses in order to assist the county in making decisions regarding budgets, finances, utilities and other resources; to enable the county to predict future land uses for planning purposes; to stabilize the land uses in the county; to assist in fulfilling the purposes of the county's zoning regulations; to assist the county in fulfilling its statutory and other legal obligations; and to provide a public document which will serve as a means of general information on land use and development for the citizens of the county. (Ord. of 7-20-2009, § 1) Sec. 119-2. Definitions. For the purpose of this chapter, certain terms and words are hereby defined. Words used in the present tense shall include the future; the singular number shall include the plural and the plural the singular; the word "building" shall include the word "structure" and the word "shall" is mandatory and not directory. The words "used" or "occupied" as applied to any land or building include the words intended, arranged, or designed to be used or occupied. Any words not herein defined shall be construed as defined otherwise in this Code. Where definitions in this Code are in conflict with those herein, the definitions herein shall prevail. All other words or phrases shall be given their common ordinary meaning unless the context clearly requires otherwise. Accessory structure means a structure detached from a principal building on the same lot and customarily incidental and subordinate to the principal building or use. Administrative officer means the person, officer, or official and his authorized representative, whom the board of county commissioners has designated as its agent for the administration of this chapter. The administrative officer is also called the zoning administrator. Adult service facility means a commercial establishment in which the patron directly or indirectly is charged a fee to engage in private, personal contact with employees, patrons, or personnel primarily for entertainment purposes, using steam rooms or other devices or equipment provided by the establishment, and that is not otherwise regulated as an adult entertainment establishment or massage establishment. Agriculture means the production, keeping or maintenance, for sale, lease or personal use, of plants and animals useful to man, including but not limited to: forages and sod crops; grains and seed crops; dairy animals and dairy products, poultry and poultry products; livestock, including beef cattle, sheep, swine, horses, ponies, mules, or goats, or any mutations or hybrids thereof, including the breeding and grazing of any or all of such animals; bees and apiary products; fur animals; trees and forest products; fruits of all kinds, including grapes, nuts and berries; vegetables; nursery, floral, ornamental and greenhouse products; or lands devoted to a soil conservation or forestry management program. Airport means a transportation terminal facility where aircraft take off and land. Airstrip, private, means an area designated for the takeoff and landing of private, noncommercial aircraft, with no terminal facilities and no scheduled takeoffs and landings. Alley means a secondary way which affords access to the side or rear of abutting property. Alteration means any change in the supporting members of a building, any modification or change in construction, any addition which increases the area or height, any change in use from that of one district classification to another, or movement of a building from one location to another. Antenna, dish, means a structure intended for receiving audio or video signals via a satellite orbiting the earth. It is constructed of a round or square surface, which is parabolically curved focusing on a low-noise signal amplifier and the apparatus is mounted on a base. Bed and breakfast means a detached dwelling in which rooms are rented to transient guests on an overnight basis and meals may be served only to overnight guests. Block means a unit or area of land bounded by public highways or streets, other than alleys, or a combination of streets, public lands, railroad rights-of-way, waterways or any other barrier to the continuity of development. Boardinghouse or roominghouse means a building other than a hotel used or intended for use as a place for lodging or feeding or both, for compensation, of three or more persons but not exceeding 20, customarily rented for a weekly or monthly basis. Buffer means land area used to visibly separate one use from another or to shield or block noise, lights, or other nuisances. Buffer strips do not include buildings but may include fences or berms, as well as trees and shrubs. Buildable area means the area of a lot remaining after the minimum yard, setback and open space requirements have been met. Building means any structure having a roof and intended for shelter, housing, or enclosure of persons, animals, or property of any kind. Building envelope. See Buildable area. Building height means the vertical distance of a building, measured from the average elevation of the finished grade at the front of the building to the highest point of the building. Building inspector means the designee of the administrative officer responsible for issuing building permits and related duties. Building line means a line parallel to a specified minimum distance from the front, side, or rear property lines or the right-of-way beyond which no foundation wall or part of the structure of any building projects with the exception of roof overhang, steps, and the subsurface projection of footings. Building setback means the line parallel to a property line or right-of-way, which represents the minimum distance a building must be set back from the property line or right-of-way measured at the foundation of the building. Building, accessory, means a building used for a purpose that is customarily incidental and subordinate to the principal use or structure, and located on the same lot as such a principal use or structure. Building, principal, means the building on a lot in which the principal use of the lot is conducted. In a residential district, a dwelling shall be deemed to be the principal building on the lot. Cemetery means land reserved for burial plots or occupied by grave sites for the deceased, or which may, in the future, be so reserved; it may be maintained either by a family, a church or other place of worship, or a private corporation. Centerline, right-of-way, means the line running midway between the edges of a surveyed or mapped dedicated right-of-way. Where the edges of right-of-way have not been established by subdivision plat or public purchase, the centerline shall be the line running midway between any adjoining drainage ditches or other publicly maintained road improvements. Centerline, street, means the line running midway between the edges of pavement of a street. Clinic means an establishment where patients are admitted for examination and treatment by physicians, dentists, psychologists, or social workers but where there is usually no overnight lodging. Club or lodge, private, means a group of people organized for a common purpose including religious, fraternal, recreational, cultural, civic, social, or educational meetings that are conducted on a regular nonprofit basis, operated for the benefit of members and not open to the general public. Fraternal organizations must show that they have received recognition and sanction from a parent group or organization. A private club's membership is limited by either: (1) The use and operation of an amateur athletic facility including but not limited to golf courses, tennis courts, shooting ranges or swimming pools; or (2) Residency in a particular subdivision, condominium, multifamily apartment, or other residential development. Clubhouse means a building, or portion thereof used by a club. Comprehensive plan means the overall plan for development for the county, or any part or element of that plan, adopted by the county commission, as amended. Condominium means a building, or group of buildings in which units are owned individually, and the structure, common area and facilities are owned by all the owners on a proportional, undivided basis under the Georgia Condominium Act. Conservancy lot means a lot not held in common ownership within a conservation subdivision and that is limited to use for one principal dwelling unit and that contains a designated permanent green space area protected by conservation easement that contributes to the green space requirements of the county code. Conservation area, primary, means all 100-year floodplains, wetlands, and steep slopes greater than 25 percent grade that are set aside as permanent open space on a development parcel. Conservation area, secondary, means lands that are set aside as permanent open space on a development parcel, that are not primary conservation areas. Conservation subdivision means a subdivision planned using the conservation subdivision design method as outlined in article VI of chapter 105 of these ordinances. Conservation subdivision design means a type of residential development planning which complies with the requirements of article VI of chapter 105 of these ordinances. Conspicuous means noticeable from the nearest public street. The term "conspicuous" also means readily visible to the general public. Construction plans means the maps, drawings, and analyses that conform with an approved preliminary plat that show the specific location and design of improvements to be installed including street design and profile, grading and drainage, utility construction, sediment and erosion control, and other design information which may be required by the director of planning to show conformance with all ordinances, laws, and regulations. Conventional construction means a building constructed on the building site from basic materials delivered to the site; and which is constructed in accordance with the current edition of the International Building Code or International Residential Code produced by the International Code Council as adopted and amended by the state. Crosswalk means a right-of-way within a block dedicated to public use, intended primarily for pedestrian use, and designed to provide access to adjacent roads and lots. Curb cut means the opening along the curbline where vehicles may access an adjoining lot and enter or leave the roadway. Day care center means a private establishment enrolling seven or more persons for group care, without transfer of custody, for less than 24 hours per day and which is licensed to operate as a day-care center. Day care, home, means an establishment operated by any person with or without compensation, providing care for up to six children, without transfer of custody, for less than 24 hours a day. All children not yet of school age who are related to the person operating the facility and who reside in the home shall be included in computing the number. DCA means the state department of community affairs. Density means the number of people, households, or dwelling units per unit of land or conversely, the number of acres of land per dwelling unit, etc. Unless otherwise stated, residential density is calculated based upon the gross acreage of a site or tract of land. Design standards means criteria that set forth specific improvement requirements. Developer means the person, corporation, firm, association, partnership or other legal entity that is the legal owner of land or is the owner's agent or who holds an option to purchase land and who is seeking to obtain a building permit, a development permit, to subdivide land or to rezone land for a proposed development. Development plan. See Construction plans. Director of planning means the official, or his designee, responsible for the administration of this chapter. Double wide means an obsolete term used to describe a mobile home or manufactured home having a width of generally between 20 and 28 feet. In the context of this chapter the term "double wide" has no specific meaning. See Manufactured home. Drainageway means any surface watercourse, river, stream, gully, ditch, or swale—either natural or manmade—which serves as a collector and free flowing channel for accumulated stormwater. Dwelling means a building or portion thereof designed, arranged, or used principally for residential occupancy, not including motels, hotels, boardinghouses, or roominghouses. Dwelling, condominium, means an individually owned dwelling unit in an attached, detached, or multifamily structure, with joint ownership of common areas of the buildings and grounds. Dwelling, multifamily apartment, means a dwelling containing three or more adjoining dwelling units, typically occupied by renters, and the area immediately surrounding the dwelling is landscaped and may contain recreation facilities for the private use of dwelling occupants. Dwelling, patio, means a single-family dwelling in which all or a portion of the area required for side and rear yards may be consolidated into one or more garden court spaces within the walls of the dwelling unit. Dwelling, single-family attached, means a building containing two or more single-family dwelling units joined at one or more points by one or more party walls or other common facilities (not including the walls of an enclosed courtyard or similar area) and with property lines separating each dwelling unit. A single-family attached dwelling is also called a townhouse dwelling. Dwelling, single-family detached, means a single residential detached building designed for or containing one dwelling unit. Dwelling, two-family, means a detached dwelling designed, constructed, altered, or used for two adjoining dwelling units, with each dwelling unit having a party wall connecting it with the other dwelling unit, located on one lot; a two-family dwelling is also known as a duplex. Dwelling unit means one or more rooms within a dwelling forming a separate, independent housekeeping establishment for use of one family involving owner or renter occupancy, with provisions for cooking, eating, and sleeping, and which is physically set apart from other rooms or dwelling units in the same building. Easement means the right or privilege of using another's property, for purposes such as ingress and egress or for constructing and maintaining sanitary sewers, water mains, electric lines, telephone lines, drainageways, storm sewers, gas lines, bicycle paths, vehicle or pedestrian ways, and other purposes. Elevation, front, means the view of a building or group of buildings as seen from directly in front of the structure. Entertainment business, adult, means any one or any combination of the following: (1) Adult bookstore means an establishment having a substantial or significant portion of its stock in trade books, printed materials, magazines or other periodicals or novelty items which are distinguished or characterized by their emphasis on matter depicting, describing or relating to specified sexual activities or specified anatomical areas or an establishment with a segment or section, comprising at least five percent of its total floor space, devoted to the sale or consisting of said printed material or novelty items which are distinguished or characterized by their emphasis on matter depicting, describing or relating to specified sexual activities or specified anatomical areas. (2) Adult business means an establishment, other than those expressly specified in this section, where employees or patrons expose specified anatomical areas or engage in specified sexual activities. (3) Adult motion picture theater means an enclosed building with a capacity of 50 or more persons, used for presenting material distinguished or characterized by an emphasis on matter depicting, describing or relating to specified sexual activities or specified anatomical areas for observation by patrons therein. (4) Adult mini-motion picture theater means an enclosed building, or enclosed or semi-enclosed room or booth within an enclosed building, with a capacity of less than 50 persons, used for presenting material distinguished or characterized by an emphasis on matter depicting, describing or relating to specified anatomical areas for observation by patrons therein. (5) Adult motion picture arcade means any place to which the public is permitted or invited wherein coin or slug-operated or electronically, electrically or mechanically controlled still or motion picture machines, projectors or other image-producing devices are maintained to show images to five or fewer persons per machine at any one time and where the images so displayed are distinguished or characterized by an emphasis on matter depicting or describing specified sexual activities or specified anatomical areas. (6) Adult video store means an establishment having a substantial or significant portion of its stock in trade, videotapes, movies, CD-ROMs, or other reproductions, whether for sale or rent, which are distinguished or characterized by their emphasis on matter depicting, describing or relating to specified sexual activities or specified anatomical areas or an establishment with a segment or section, comprising at least five percent of its net sales from said videos which are characterized or distinguished by their emphasis on matter depicting, describing or relating to specified sexual activities or specified anatomical areas. (7) Erotic entertainment/dance establishment means a nightclub, theater or other establishment which features live performances by dancers, entertainers, strippers or similar entertainers, where such performances are distinguished or characterized by an emphasis on specified sexual activities or specified anatomical areas. (8) Escort bureau, introduction services means any business, agency or persons who, for fee, commission, hire, reward, profit or other consideration furnishes or offers to furnish names of persons or who introduces, furnishes or arranges for persons who may accompany other persons to or about social affairs, entertainments or places of amusements, or who may consort with others about any place of public resort or within any private quarters. (9) Lingerie modeling studio means an establishment wherein a patron directly or indirectly is charged a fee or required to make a purchase in order to view entertainment or activity which consists of persons exhibiting or modeling lingerie or similar undergarments. Factory-built housing means an obsolete term used to describe an industrialized home. See Industrialized home. Family means one or more persons related by blood, marriage, or by act of law, including up to three additional unrelated individuals, living as a single household unit. A family may also consist of no more than four unrelated individuals living as a single household unit. Farm means any tract of land which is devoted to agriculture, including, but not limited to, the production of row crops, livestock, fish, fowl, bees, commercial timber and forest products, fruits, grapes, nuts, berries, ornamental flowers and greenhouse products, or lands devoted to soil conservation or forestry management regardless of the quantity or value of production. See Agriculture. Flag lot means a lot, the main portion of which has no frontage on a public road except for a narrow connecting strip of land providing access to the public road. Flood boundary means the limit of the floodplain consisting of the floodway and the flood fringe area shown on the most current edition of the flood hazard boundary map, published by the Federal Emergency Management Agency (FEMA). Floor area, commercial, means the gross leasable floor area for any business or industry based on interior dimensions measured from the inside perimeter of the exterior walls or the centerline of any wall separating two attached buildings or units and without deduction for corridors, stairways, closets, the thickness of interior walls, columns or other features. Floor area, residential, means the total heated area within a dwelling of all floors having floor-to-ceiling height not less than 61 /2 feet measured from the exterior face of the exterior walls of the dwelling but not including any unoccupied or unheated attic, basement, garage, carport, patio, and open porch. Food bank means an organization that subcontracts with other organizations throughout the state, like food pantries and soup kitchens. Some food banks distribute food through brown bag programs to the elderly. Food pantry means any organization that distributes food to low income and unemployed households for home consumption. A food pantry generally receives commodity foods from the local food bank in their area for a small handling charge. Garage or carport, private, means a covered space for the storage of one or more motor vehicles belonging to the occupants of the principal building on the lot. Garage, public, means any garage, other than a private garage, which is used for storage, rental, servicing, washing, adjusting, or equipping of automobiles or other motor vehicles, but not including the storage of wrecked or junked vehicles. Garage, repair, means a public garage intended to be used to make automobile, motorcycle, lawn mower, or other motor vehicle repairs. Gasoline service station means a land use where fuel, gasoline, oils, greases, batteries, tires, and general automobile accessories and service may be provided, but where no part of the premises is used for the storage or dismantling of or vehicles or for painting or major repair. Green space means that portion of a tract that is set aside for the protection of sensitive natural features, farmland, scenic views, and other unique features. Green space may be accessible to the residents of the development and/or the public or it may contain areas of conservancy lots that are not accessible to the public. Green space consists of all primary and secondary conservation areas. Guest house means an accessory building subordinate to a principal single-family dwelling used as a dwelling only for family members or guests. Guest house shall not have a separate driveway coming off of the county or state road from the principle residence and a secondary driveway coming off the principle driveway shall be a minimum of 100 feet from the right-of-way of the county or state road. The guest house will have to share the same electrical service as the principle single-family dwelling. The guest house will only be for non-commercial boarding of guests. The maximum size for a guest house is 750 heated square feet. A guest house is only allowed in Agricultural (AG). See section 119-269 (table of permitted uses) for info for guest house also. Home occupation means an occupation for gain or support conducted only by members of a family residing on the premises and entirely within the principal dwelling or within an accessory building as provided in this chapter. Hotel means a facility in which overnight accommodations are provided to the public and which may offer additional services such as restaurants, meeting rooms, and recreation facilities. The term "hotel" includes the terms "motel" and "tourist court." HUD means U.S. Department of Housing and Urban Development. Impervious surface means a manmade structure or surface that prevents the infiltration of stormwater into the ground below the structure or surface. Examples of impervious surfaces are buildings, roads, driveways, parking lots, decks swimming pools, or patios. Industrialized building means any structure or component thereof, which is, wholly or substantially, made, fabricated, formed or assembled in manufacturing facilities for installation or assembly and installation on a building site and has been manufactured in such a manner that all parts or processes cannot be inspected at the installation site without disassembly, damage to, or destruction thereof; and which bears the insignia of approval issued by the commissioner of the state department of community affairs. Industrialized home means a dwelling manufactured in accordance with the Georgia Industrialized Building Act and the rules of the commissioner of the state department of community affairs issued pursuant thereto. State-approved buildings meet the state building and construction codes and bear an insignia of approval issued by the commissioner. Inn means a commercial facility for the housing and feeding of travelers and transient persons containing ten or fewer units for rent. Institutional use means a nonprofit corporation or quasi-public use or facility such as a church or other place of worship, library, museum, public or private school, hospital or a governmentally-owned or operated building, structure, or land used for public purpose. Junked vehicle means any wrecked or non-operable automobile, truck, or other vehicle that does not bear a current license plate. Junkyard means any use involving the parking, storage or disassembly of junked vehicles, or wrecked or non-operable automobiles, machinery, trucks, or other vehicles; storage, bailing, or otherwise dealing in bones, animal hides, used tires, scrap iron and other metals, used paper, used cloth, used plumbing fixtures, old household appliances, and used brick, wood, or other building materials. These uses are considered junkyards whether or not all or part of these operations are conducted inside a building or in connection with, in addition to, or accessory to other uses of the premises. Kennel means any establishment, other than an animal shelter, where dogs, cats, or other small domestic animals are maintained for boarding, holding, training, or similar purposes for a fee or compensation. Landfill means a disposal site where solid wastes, other than putrescible wastes or hazardous wastes, are disposed of on land by placing an earth cover thereon, sometimes referred to as a dry landfill. Landfill, hazardous waste, means a disposal site where hazardous wastes are disposed. Landfill, sanitary, means a disposal site where solid wastes, including putrescible wastes other than hazardous wastes, are disposed of on land by placing an earth cover thereon. Loading space means space logically and conveniently located for pickup and delivery service, scaled for the delivery vehicles anticipated and accessible to such vehicles at all times. Lot means a designated parcel, plot, tract or area of land established by plat, subdivision, or as otherwise permitted by law, to be used, developed or built upon as a unit. Lot coverage means that portion of a lot that is covered by buildings, structures, driveways, turnarounds, and/or other impervious surfaces. Lot frontage means the length of the front lot line measured at the street right-of-way line. Lot of record means a lot which exists as shown on a plat or described in a deed which has been recorded in the office of the clerk of the superior court of the county, or a leased lot that has remained in generally consistent configuration and has been depicted on the tax assessor's maps as a discreet parcel, with or without a recorded legal description, since the year 2000. Lot remnant means any portion or portions of a lot not suitable for building upon because of size or topography and remaining after the transfer of other portions of the lot to adjoining lots. Lot, corner, means a lot located at the intersection of two or more streets or located on a curve formed by a single street forming an interior angle of less than 135 degrees. Lot, double frontage, means a lot, other than a corner lot, which has frontage on two streets. Lot, multiple frontage, means a lot, other than a corner lot, which has frontage on more than two streets. Lot, reverse frontage, means a through lot which fronts a different direction from the ordinary or primary frontage of other adjoining lots along the same street or in the same block. Lot width means the horizontal distance between side lines of a lot measured along a line parallel to the road at the required front building setback line. Manufactured (mobile) home means a structure, transportable in one or more sections, which is built on a permanent chassis and designed to be used as a dwelling with or without a permanent foundation when connected to the required utilities, and includes the plumbing, heating, air-conditioning and electrical systems contained herein. There are three classes of manufactured homes (Class A, Class B, and Class C) that are regulated by the U.S. Department of Housing and Urban Development (HUD). Manufactured home, Class A, means a manufactured home bearing a label certifying it is constructed in compliance with the Federal Manufactured Home and Standards Act 42 USC 5401—5445 (the HUD Code, which became effective on June 15, 1976), and satisfying each of the following additional criteria: (1) The home has a length not exceeding four times its width; (2) The pitch of the home's roof has a minimum vertical rise of four feet for each 12 feet of horizontal run. The home shall have eaves with a minimum projection of 12 inches; (3) The entry to the home facing the road shall have a porch, deck, or entry area extending at least six feet out from the home, and having a minimum width of eight feet; (4) All other entrances shall have a deck or landing at least four feet by four feet or the size of the opening; (5) The exterior siding consists of wood, hardboard, vinyl, or plastic siding material comparable in composition, appearance, and durability to exterior siding commonly used in standard residential construction; (6) A continuous foundation wall or skirt, unpierced except for required ventilation and access, and constructed of brick, block, or stone, installed so that it encloses the area located under the home to the ground level. Such wall must meet the standards specific in ANSI A225.1; (7) The tongue, axles, transporting lights, and towing apparatus are removed after placement on the lot and before occupancy. (8) At the time of installation, the home shall not be greater than ten years old. Manufactured home, Class B, means a dwelling unit fabricated in an off-site facility for installation or assembly at the building site, bearing a label certifying it is constructed in compliance with the Federal Manufactured Home and Standards Act 42 USC 5401—5445 (the HUD Code, which became effective on June 15, 1976), but does not satisfy the criteria necessary to qualify the unit as a Class A manufactured home. All manufactured homes must be installed in accordance with ANSI A225.1. Manufactured home, Class C, means any manufactured home that does not meet the definitional criteria of a Class A or Class B manufactured home (not constructed to the HUD code). Manufactured home space means an area of land within a planned manufactured home community designed to accommodate one manufactured home. Manufactured housing means a general term used to describe a type of housing which is produced, either completely or partially in a factory, including manufactured homes, modular homes, and industrialized homes. In the context of this chapter, the term "manufactured housing" has no specific meaning. Mobile home. See Manufactured home. Mobile home park is an obsolete term used to describe a manufactured home park. In the context of this chapter, the term "mobile home park" has no specific meaning. See Planned manufactured home park. Modular home means a type of industrialized building that is a factory-fabricated single-family dwelling constructed in one or more sections. At the time of installation the home shall not be greater than ten years old. Multi-section home is an obsolete term used to describe a manufactured home finished in two or more sections. In the context of this chapter, the term "multi-section home" has no specific meaning. See Manufactured home. Nonconforming lot means a lot of record lawfully existing at the effective date of the ordinance from which this chapter is derived (and not created for the purpose of evading the requirements of this chapter or chapter 105, development standards and regulations) but which fails by reason of the adoption or amendment of this chapter to conform to the present requirements for area, dimensions, or location of the zoning district. Nonconforming structure or building means a structure or building the size, dimensions or location of which was lawful prior to the adoption or amendment of the ordinance from which this chapter is derived, but which fails by reason of such adoption or amendment, to conform to the present requirements of the zoning district in which it is located. Nonconforming use means a use or activity which was lawful prior to the adoption or amendment of the ordinance from which this chapter is derived, but which fails, by reason of such adoption or amendment, to conform to the present requirements of the zoning district. Nursing home means a facility which admits patients on medical referral or for whom arrangements have been made for continuous medical supervision. It maintains the services and facilities for skilled nursing care, rehabilitative nursing care, and has a satisfactory agreement with a physician and dentist who will be available for any medical and/or dental emergency and who will be responsible for the general medical and dental supervision of the home. It otherwise complies with the rules and regulations of the state. Owner of record means the owner of property as specified on the deed of the lot of record. Parking space means the storage space for one motor vehicle. Parks and playgrounds means public, private or common area land, open spaces, or recreation areas represented on a subdivision plat as dedicated, reserved, or intended to be reserved, for recreational purposes. Pedestrian way means crosswalk or other areas designed and marked specifically for pedestrian traffic. Percentage of grade means the change in elevation as it relates to horizontal distance, usually expressed as vertical change in elevation per 100 feet of horizontal distance. For streets, it is measured down the street centerline. Personal care home means a building or group of buildings, a facility, or place in which is provided two or more beds and other facilities and services, including rooms, meals, and personal care for non-family ambulatory adults. It otherwise complies with the rules and regulations contained in chapter 290-5-35 (Ga. Comp. Rules & Regs. ch. 290-5-35): Personal Care Homes (Rules of the Georgia Department of Human Resources). For the purpose of this chapter, personal care homes are classified as follows: (1) Family personal care home means a home for adults in a family type residence, non-institutional in character, which offers care to two through six persons. (2) Group personal care home means a home for adult persons in a residence or other type of building, non-institutional in character, which offers care of seven through 15 persons. (3) Congregate personal care home means a home for adults which offers care to 16 or more persons. Plan, conceptual, means a draft drawing of a proposed development, either residential or nonresidential or both, showing the proposed layout in sufficient detail, although not completely computed, to indicate the developer's intent. Planned apartment community means a residential community of multifamily apartment dwellings conforming to an approved development plan; with appropriate and adequate formal green space, community services, recreation facilities, utilities, streets, parking and sidewalks provided by the developer. Planned development means a coordinated large-scale or comprehensive development designed and constructed according to a development plan that has been approved by the county commission. Planned manufactured home community means a lot used or intended for use as a residential area occupied by manufactured homes; and conforming to an approved development plan with appropriate and adequate community services, recreation facilities, utilities, streets, and sidewalks provided by the developer; where the resident owns or rents the manufactured home and rents the manufactured home space. All manufactured home parks must be designed and constructed in accordance with ANSI A225.1 (NFPA 501A), Manufactured Home Installations 1982, as amended. Planning commission means the county planning and zoning commission. Plat means a map, plan, or layout of a county, city, town, section, subdivision, or parcel indicating the location and boundaries of properties. Plat, final, means a recordable map of a subdivision, meeting all of the requirements of county ordinances and complying with the Georgia Plat Act, which is used to transfer portions of a property to others after development has been completed. Plat, preliminary, means a map of a proposed subdivision meeting the requirements of this Code and showing the proposed layout in sufficient detail to show the intent of the developer and that, upon approval, becomes the plan governing construction of the subdivision. Plat, sketch, means a draft drawing of a proposed subdivision prefatory to the preliminary plat meeting requirements of this Code and showing the proposed layout in sufficient detail, although not completely computed, to indicate the developer's intent. Pre-application review means an initial and informal stage of subdivision review at which the developer may present the sketch plat and the director of planning may discuss the applicable subdivision regulations. Pre-engineered metal building means a structure which includes a pre-engineered and shop-fabricated structural steel building frame, metal wall and sloped roof system, and exterior doors and windows, which has been manufactured so as to facilitate erection at a location other than where it was fabricated. The term "pre-engineered metal building" does not include greenhouses, garden sheds and similar structures not exceeding 150 square feet of floor area. Detached metal garages are permitted subject to placement upon a permanent foundation with concrete flooring in RES districts. Pre-fabricated home means a general term used to describe any home constructed in a factory setting including manufactured homes, modular homes, and industrialized homes. In the context of this chapter, the term "pre-fabricated home" has no specific meaning. Prescriptive easement road means a road or right-of-way owned jointly or severally by the adjacent landowners. In the case of county roads, the county has the right to use and maintain the roadway from ditch to ditch. Subdivision roads are not allowed to exit into county roads that are limited to prescriptive easement rather than dedicated right-of-way with ownership in the county. Prime farmland means the land best suited to producing food, feed, forage, fiber and oilseed crops as defined in the Soil Survey of Jasper County Georgia (published by the USDA and the UGA College of Agriculture Experiment Station). Prime farmland can now be in cropland, pastureland, woodland or other land uses but not in urban land, built-up land, or in water areas. It is either currently used for producing food or fiber or is available for these uses. Private driveway means a non-public, privately owned accessway. Private street means any street within a subdivision that meets appropriate public street design standards, but, for purposes of controlled access or privacy, is not dedicated to the county and is not public. Professional office building means a building used primarily for conducting the affairs of a business, profession, service, industry or government, or like activity, that may include as accessory uses services for office workers such as a restaurant, coffee shop, newspaper stand or candy stand. Protective covenants means private contracts made between private parties, or conditions recorded upon an approved plat and running with the title to the land, specifying the manner in which land may be used, developed, or improved with the intent of protecting and preserving the physical and economic integrity of a given area. Public hearing means an official meeting of a public body announced and advertised in advance and open to the public, at which the public has the opportunity to speak and participate. Recreational vehicle means a vehicle which is: (1) Built on a single chassis; (2) Designed to be self-propelled or permanently towable by a light-duty truck; and (3) Designed primarily not for use as a permanent dwelling but as temporary living quarters for recreational, camping, travel, or seasonal use. Reserve strip means a strip or parcel of land along, around, or between properties for the purpose of restricting access. Right-of-way means a strip of land designated, reserved, dedicated, or purchased for the purpose of pedestrian or vehicular access or utility line installation. Road classification means the categories for each street, roadway, highway, and right-ofway in the county based upon their location in the respective zoning districts, their present and estimated future traffic volume and their function as specified in the county comprehensive plan for the purpose of providing for their development and future improvement. The following are the main classes of roads in the county: (1) Marginal access street. A marginal access street is a loop street designed so as to provide secondary access only. (2) Local street. A local street is a street used primarily for access to the abutting properties, serving travel demands in the immediate area, and designated as such on the Jasper County Rural Thoroughfare Network Map. (3) Collector street. A collector street is a street which usually serves to either provide direct access to lots or distribute traffic from individual lots to arterial streets. It may also connect neighborhoods with one another. It should be designed to discourage excessive speeds and through traffic. It is designated as such on the Jasper County Street Classification System Map. (4) Arterial street. An arterial street is a primary road connecting distant cities, towns, or regions designed for higher speeds, greater volumes, and fewer direct access points than collector streets. Road, county, means any street or right-of-way, paved or unpaved, which is owned or maintained by the county. SBCCI means Southern Building Code Congress International. Sectional home is a general term used to describe any home constructed in a factory setting, especially manufactured homes. In the context of this chapter, the term "sectional home" has no specific meaning. Setback means the shortest distance between a building and any road right-of-way line adjoining the lot on which the building is located. Setback line means the line that is the required minimum distance from the street right-of-way line or any other lot line that establishes the area within which the principal structure must be erected or placed. See Building line. Short-term rental means an accommodation for transient guest, where in exchange for monetary compensation, a residential dwelling unit is provided for the purpose of overnight lodging for a specified period of time; and where any person (including owners of private residences, cabins, or cottages and rental agents who rent such accommodations to transients on behalf of the owner) who make a sale or charges for any room, lodging or accommodation is considered a retailer and dealer for purposed of administering the Georgia sale and use tax laws (GA Department of Revenue Bulletin SUT 2018-08 03/08/2018). This definition does not include bed and breakfast. Single wide is an obsolete term used to describe a mobile home or manufactured home having a width of between eight and 14 feet. In the context of this chapter, the term "single wide" has no specific meaning. See definition of Manufactured home. Site-built home. See Conventional construction. Stable means any building, structure, pasture, or other enclosure where equines are maintained for boarding, holding, training, breeding, riding, pulling vehicles or other similar purposes. Story means that portion of a building, not including a basement, between the surface of any floor and the surface of the floor next above it, or if there is no floor above, then the space between the floor and the ceiling next above it. Stream means a watercourse having a source and terminus, banks, and channel through which water flows at least periodically. Street means any vehicular way which: (1) Is an existing state, county, or municipal roadway; (2) Is shown upon a plat approved pursuant to law; (3) Is approved by other official action; (4) Is shown on a plat duly filed and recorded in the office of the county clerk of superior court prior to the appointment of a planning commission and the grant of subdivision review powers to said commission. The term "street" includes the land between the right-of-way lines, including those of prescriptive easements, whether improved or unimproved or if said lines are not established by survey, then it includes the land between the adjoining drainage ditches. Street, cul-de-sac, means a local street designed to have one end permanently closed with a turnaround area for vehicles. Structure means anything constructed or erected for use, occupancy, or ornamentation whether installed on, above, or below the surface of land or water. Subdivision. (1) The term "subdivision" means the division of a tract of land into two or more lots, building sites, or other divisions, for the purpose—whether immediate or future—of sale, legacy, or building development. This definition includes all of the following: a. All divisions of land involving a new street. b. All divisions of land involving a substantial change in existing streets. c. Any re-subdivision of land into two or more lots if any lot is smaller than ten acres. (2) The term "subdivision" does not include the following: a. The combination or recombination of portions of previously platted lots where the total number of lots is not increased and the resultant lots are equal to the standards set forth in this chapter. b. The transfer of unsubdivided land or the transfer of a lot or parcel of land established by deed or plat recorded in the office of the clerk of the superior court of the county prior to the initial effective date of the ordinance from which chapter 105, pertaining to development standards and regulations, is derived. c. The division of land among heirs by judicial decree. Subdivision, major, means all subdivisions not classified as minor subdivisions, including but not limited to subdivisions of four or more lots, or any size subdivision requiring any new street or extensions of local government facilities or the creation of any public improvements. Subdivision, minor, means any subdivision containing not more than three lots fronting on an existing street, not involving any new street or road, or the extension of local government facilities or the creation of any public improvement, and not adversely affecting the remainder of the parcel or adjoining property, and not in conflict with any provision or portion of the comprehensive plan, official map, or this chapter. Total tract area means the area within the boundaries of any tract of land proposed for development less the area of any water bodies and any rock outcrops. Trailer is an obsolete term used to describe a mobile home. In the context of this chapter, the term "trailer" has no specific meaning. Trailer court means an obsolete term used to describe a planned manufactured home community. See Planned manufactured home community. Trailer park means an obsolete term used to describe a planned manufactured home community. See Planned manufactured home community. Travel trailer means a vehicle designed as a temporary dwelling for travel or recreational uses, not more than eight feet in width and not more than 30 feet in length. Travel trailer park means a lot on which are parked and used two or more travel trailers for a period of less than 30 days. Use means any purpose for which a building, lot, or tract of land may be designed, arranged, intended, maintained, or occupied; or any activity, occupation, business, or operation carried on, or intended to be carried on, in a building or structure or on a tract of land. Use, accessory, means a use customarily incidental and subordinate to the principal use, and located on the same lot as the principal use. Use, conditional, means a use, which is permitted in a particular zoning district, but only under certain specified conditions. Use, principal, means the main purpose for which a lot is intended and for which it is used. Variance means a permit issued by the board of appeals which allows use of a parcel of land in a way that does not meet the literal requirements for the district in which the property is located. Yard means a required open space on a lot that is left unoccupied with structures, except as permitted in this chapter. Yard, front, means the open space of a lot located between the right-of-way boundary of the abutting street and the front building setback line projected to the side lot lines. Yard, rear, means the open space between the rear property line and the rear building line projected to the side lot lines. Yard, side, means the open space between the side property line and the side building line extending from the rear line of the front yard to the front line of the rear yard. Zoning administrator means the director of planning or his authorized designee. (Ord. of 7-20-2009, § 3; Ord. of 3-2-2020, § 2; Ord. of 8-3-2020, § 3; Ord. of 1-4-2021, § 1; Ord. of 12-6-2021, § 5; Ord. of 9-11-2022, § 1; Ord. of 08-05-2024(2); Ord. of 05-06-2025(1)) Secs. 119-3—119-22. Reserved. ARTICLE II. DISTRICTS, MAP, AND PLAN DIVISION 1. GENERALLY Secs. 119-23—119-47. Reserved. DIVISION 2. ESTABLISHMENT OF ZONING DISTRICTS Sec. 119-48. Conventional zoning districts. In order to carry out the intent and purpose of this chapter, the county is divided into the following zoning districts: Abbreviation Name Density (Minimum Lot Size) AG Agricultural 5 acres RES Single-Family Residential 2 acres O-I Office-Institutional 1.2 acres/10,000 sq. ft.** C-1 Neighborhood Commercial 1.2 acres/5,000 sq. ft.** C-2 General Commercial 1 acre Abbreviation Name Density (Minimum Lot Size) M Manufacturing 1.2 acres *=With public water or sewer as approved by the county health department **=Must have public water and sewers (Ord. of 7-20-2009, § 4; Ord. of 11-7-2022, § XII; Ord. of 3-6-2023, § III; Ord. of 05-06-2025(2)) Sec. 119-49. Overlay districts. In addition, overlay districts apply additional standards to specific areas that lie within any of the districts listed in section 119-48. Those districts are as follows: Abbreviation Name S-2 Sensitive Land — Watershed Protection S-B Scenic Byway (Reserved) PRC Parks, Recreation, Conservation (Reserved) (Ord. of 7-20-2009, § 5) Secs. 119-50—119-71. Reserved. DIVISION 3. ZONING DISTRICT MAP Sec. 119-72. Official zoning map. The boundaries of zoning districts are shown upon the map designated as the "Official Zoning Map of Jasper County" and all the notations, references and other information shown thereon are hereby made a part of this chapter and have the same force and effect as if the zoning map and all the notations, references and other information shown thereon were all fully set forth or described herein, which zoning map is properly attested and is on file with the director of planning. (Ord. of 7-20-2009, § 6) Sec. 119-73. District boundaries. The district boundary lines in general are intended to follow either streets or alleys or lot lines, and where the districts designated on said map are bounded approximately by such street, alley or lot lines, the centerline of the street or alley or the lot lines shall be the boundary of the district unless such boundary is otherwise indicated on the map. In all other cases the district boundary lines shall be determined by use of the scale appearing on the zoning district map. (Ord. of 7-20-2009, § 7) Sec. 119-74. Annexed property. Any territory hereafter annexed by a municipality in the county shall continue to be subject to the county zoning district classifications and regulations as such territory was subject at the time of annexation until such territory shall have been zoned by the municipality. (Ord. of 7-20-2009, § 8) Secs. 119-75—119-91. Reserved. DIVISION 4. LAND USE PLAN AND DISTRICTS Sec. 119-92. Establishment and adoption of comprehensive land use plan. The comprehensive land use plan is hereby established as the official policy of the county concerning proposed land uses and how land in the county should be used. The county is hereby divided into the following land use districts: Comprehensive Plan Land Use Districts Agricultural, Forestry, Fishing, and Hunting Education, Public Administration, Health Care, and Other Institutions Commercial District Neighborhood Activity Center Industrial Workplace Community Activity Center Residential Growth Transportation, Communication, Information, and Utilities Gateway Corridor Ocmulgee River Corridor (Ord. of 7-20-2009, § 9) Sec. 119-93. Comprehensive land use plan distinguished from zoning. The comprehensive land use plan does not alter or affect the existing zoning districts in the county, does not effectuate an amendment to the official zoning map, and does not itself permit or prohibit any existing land uses. The comprehensive land use plan does not create any rights or privileges in any land or landowner. (Ord. of 7-20-2009, § 10) Sec. 119-94. Land use districts. The boundaries of the various land use districts are shown upon the map contained in the comprehensive plan designated as the future land use map. Where uncertainty exists as to the boundaries of any of the land use districts shown on the future land use map, the rules set forth in section 119-73 shall apply. The comprehensive land use plan and all notations, references and other information shown thereon are hereby made a part of this chapter and have the same force and effect as if the comprehensive land use plan and all the notations, references and other information shown thereon were all fully set forth or described herein, which comprehensive land use plan is properly attested and is on file with the director of planning. All other writings concerning the comprehensive land use plan are for guidance and informational purposes only, and are not a part of this chapter. (Ord. of 7-20-2009, § 11) Sec. 119-95. Relationship between land use and zoning districts. The land use districts established by the comprehensive land use plan shall be implemented by the appropriate zoning districts assigned to each category. The zoning districts that are permitted within each land use district are restricted to the following: Land Use District Description Permitted Zoning Districts Parks/ Recreation/ Conservation This category is for land dedicated to passive or active recreational uses. These areas may be either publicly or privately owned and include, but are not limited too, playgrounds, public parks, nature preserves, wildlife management areas, national forests, golf courses, and recreation centers. All zones Agricultural, Forestry, Fishing, and Hunting Defined as lands in a natural, agricultural, or rural character throughout the planning horizon. Generally refers to areas lacking the infrastructure necessary to accommodate suburban growth. Actual uses may include, but are not limited to: farming, raising of livestock, timber production and harvesting, or any other use compatible with the surrounding environment. AG Agriculture Land Use District Description Permitted Zoning Districts Education, Public Administration, Health Care, and Other Institutions Includes certain state, federal or local government or institutional land uses, including but not limited to city halls and government building complexes, police, fire and emergency medical services stations, libraries, prisons, post offices, schools, military installations colleges, churches, cemeteries, and hospitals. Areas designated as public/ institutional reflect the current use. Such future developments are likely to occur within proximity to highly populated areas and should be accommodated within residential districts where appropriate. O-I Office-Institutional; C-1 Neighborhood Commercial Commercial Larger scale commercial development that is more oriented to the automobile traveler and requires major road access and higher visibility. Developed at higher intensities and requires access to supportive infrastructure. C-2 General Commercial; O-I Office-Institutional Neighborhood Activity Center Smaller-scale commercial development that should be compatible with surrounding land uses. Designed to provide limited convenience shopping and services only for surrounding residential areas. Need to be located at intersections of collector roads, or higher functional class, within close proximity to populated residential areas. Less reliant on automobile traffic for customers; may be internally linked with sidewalk networks. C-1 Neighborhood Commercial; O-I Office-Institutional Land Use District Description Permitted Zoning Districts Industrial Workplace Includes both light and heavy industrial uses. Light industrial includes, warehousing and distribution, trucking, and small-scale manufacturing. Heavy industrial is generally defined as manufacturing that converts raw materials to finished products, storage of bulk materials, natural resource extraction, or any other process that could produce high levels of noise, dust, smoke, odors, or other emissions. Heavy industrial uses have adverse impacts on surrounding areas and should be isolated as much as possible within proximity to the required community facilities. M Manufacturing; C-2 General Commercial Community Activity Center Area providing a mixture of uses and developed in a traditional neighborhood fashion. Community Centers offer a wide variety of employment opportunities in retail, service, office and professional sectors. Various housing opportunities may be provided within planned developments as well as parks, green space, and other recreation areas. Must be served by supportive infrastructure and have access to major transportation thoroughfares. C-1 Neighborhood Commercial; O-I Office-Institutional Residential Growth Areas capable of developing as residential neighborhoods. Higher densities may be allowed if supportive infrastructure is available. May be suitable for neighborhood level commercial uses if developed within the character and scale of the neighborhood. These areas are intended to accommodate recreation, education, and civic or religious land uses that support neighborhoods. RES Land Use District Description Permitted Zoning Districts Transportation, Communication, Information, and Utilities This category includes such uses as power generation plants, radio towers, public transit stations, telephone switching stations, airports, and port facilities as well as all streets, highways, and railroads. All zones Gateway Corridor The roadways with this designation are scenic byways. Development within the corridor should be in accordance with the design and landscaping requirements set forth in the Scenic Byways corridor management plan. Scenic Byway Overlay Ocmulgee River Riparian Zone The intent of this designation is to protect the river's water quality by preventing erosion, to provide corridors for wildlife habitat and movement and to preserve scenic views for property owners. AG (Ord. of 7-20-2009, § 12; Ord. of 3-6-2023, § IX; Ord. of 05-06-2025(3)) Sec. 119-96. Consistency between land use plan and zoning map amendments. No amendment to the zoning map shall be permitted or shall take effect unless the zoning district is permitted within the comprehensive land use district shown in section 119-95 that is the subject of the proposed zoning map amendment. Nothing in this provision shall prohibit the county commission from amending the comprehensive plan or the future land use map. (Ord. of 7-20-2009, § 13) Secs. 119-97—119-120. Reserved. ARTICLE III. GENERAL PROVISIONS Sec. 119-121. Nonconforming uses, structures and lots. (a) Nonconformities in general. (1) The provisions that protect uses, structures, and lots that lawfully existed prior to the adoption of the ordinance from which this chapter is derived or a subsequent amendment, but no longer conform to the new regulations. The primary intent of the treatment of nonconformity is to allow continuation of these uses, structures and lots until the end of their useful life, while encouraging conformance to the new regulations when it becomes reasonable to do so. (2) Lawful nonconforming uses, structures and lots are declared by this chapter to be incompatible with land uses, structures, and lots that conform to the requirements of the zoning districts in which the nonconformity exists. However, such nonconforming uses, structures, and lots may continue as set forth in this provision. (b) Nonconforming uses. (1) Nonconforming uses, defined. A use or activity which was lawful prior to the adoption or amendment of the ordinance from which this chapter is derived, but which fails, by reason of such adoption or amendment, to conform to the present requirements of the zoning district. (2) Continuance of nonconforming uses. To avoid undue hardship, the lawful but nonconforming use of any structure or land at the time of the enactment of the ordinance from which this chapter is derived or any subsequent amendment may be continued even though the use does not conform to the provisions of this chapter, except that the nonconforming use shall not be: a. Changed to another nonconforming use; b. Reestablished after discontinuance for one year; c. Extended except in conformity with this chapter; d. Rebuilt, altered or repaired if not commenced within one year after damage by fire, windstorm or other disaster when the damage exceeds 75 percent of the fair market sales value of the building immediately prior to the damage. (c) Nonconforming structures. (1) Nonconforming structures defined. A nonconforming structure is a structure or building whose size, dimensions, location on a property or other features were lawful prior to the adoption, revision or amendment of the ordinance from which this chapter is derived, but which, by reason of such adoption, revision or amendment, no longer meets or conforms to one or more such requirements of this chapter. (2) Continuance of nonconforming structures. A nonconforming structure may continue to be occupied and used, except that: a. A nonconforming structure shall not be repaired, rebuilt or altered after damage or destruction of 75 percent or more of its fair market value, unless the structure is a residence. b. If a nonconforming residential building or structure suffers damage, the building or structure may be reconstructed and reused as before if commenced within 12 months from the time such damage occurred; a damaged residential building or structure may be reconstructed to its original size and dimensions, even if nonconforming under this chapter, provided that the reconstruction adhere to current building codes and architectural guidelines requirements in effect at the time of reconstruction. (3) A nonconforming structure, which is not a residence, shall not be enlarged or altered in a way that increases its nonconformity, but it may be repaired to the extent necessary to maintain it in a safe and sanitary condition. (4) A nonconforming manufactured structure may be replaced with another nonconforming manufactured structure provided the structure is a residence and meets the current HUD requirements, and the zoning districts heated square footage requirements. (5) The strengthening or restoration to a safe condition of any nonconforming structure or part thereof declared to be unsafe by an official charged with protecting the public safety or health shall be allowed upon order of such official. (d) Nonconforming lots. (1) Nonconforming lots, defined. A lot lawfully existing at the effective date of the ordinance from which this chapter is derived (and not created for the purpose of evading the requirements of this chapter or chapter 105, development standards and regulations) but which fails by reason of the adoption or amendment of the ordinance from which this chapter is derived to conform to the present requirements for area, dimensions, or location of the zoning district. (2) Continuation of nonconforming lots. a. Where the owner of a lot at the time of the adoption of the ordinance from which this chapter is derived or the owner's successor in title thereto does not own sufficient land to enable such person to conform to the dimensional requirements of this chapter, either: 1. Such lot may be used as a building site for a single-family residence in a district where residences are permitted; or 2. Such lot may be used as a building site for any other use permitted in the zoning district; provided that said lot requirements or building setbacks are not reduced below the minimum specified in the appropriate district by more than 50 percent; and provided that the minimum requirements of the county board of health can be met for lots on septic systems. b. Lot dimensional reductions greater than the 50 percent maximum reduction set forth in this section may be approved upon appeal, provided that: 1. The reduction is approved as a variance under the appeals procedure. 2. The decreased requirements conform as closely as possible to the required dimensions. (e) Hardships and extenuating circumstances. If the loss or destruction of a nonconforming structure places an extreme hardship, or there are extenuating circumstances that will not allow the rebuild to commence within the 12-month allowed timeframe, the owner may apply to the county director of planning for an extension. Extensions are allowed up to 24 months, allowing the owner additional time to place his affairs in order. (f) Enforcement. (1) Intermittent or illegal use. The casual, intermittent, temporary or illegal use of land or buildings shall not be sufficient to establish the existence of a nonconforming use, and the existence of a nonconforming use on part of a lot or tract shall not be construed to establish a nonconforming use on the entire lot or tract. (2) Existence of a nonconforming use. Determination of whether a nonconforming use exists shall be a question of fact and shall be decided by the zoning administrator. (3) Buildings nonconforming in height, area or bulk. A building nonconforming only as to height, area or bulk requirements may be altered or extended, provided such alteration or extension does not increase the degree of nonconformity in any respect. (4) Nonconforming uses not validated. A nonconforming use in violation of a provision of the ordinance which this chapter amends or replaces, shall not be validated by the adoption of the ordinance from which this chapter is derived. (5) Discontinuance of a nonconforming use. All nonconforming signs, billboards, junkyards and nonconforming uses of land where no buildings are employed in connection with such use of land shall be discontinued. (6) Restoration of local historic properties or contributing buildings in local historic districts. Notwithstanding the limits established in this section, a nonconforming use, structure or building which is designated as a local historic property or which is listed as a contributing structure in a local historic district under the provisions of this Code may be rebuilt after damage by fire, windstorm or other disaster regardless of the extent of damage for the purpose of restoring the original structure. (Ord. of 7-20-2009, § 14) Sec. 119-122. Use of buildings. No building shall be erected, converted, enlarged, reconstructed, moved, structurally altered or used, except for a use permitted in the district in which such building is located. (Ord. of 7-20-2009, § 15) Sec. 119-123. Use of land. No land shall be used except for a purpose permitted in the district in which it is located. (Ord. of 7-20-2009, § 16) Sec. 119-124. Conformity to lot requirements required. (a) All lots created after enactment of the ordinance from which this chapter is derived shall conform in all respects to the minimum requirements set forth in the district in which such lot is located, to all other applicable requirements of this chapter, and the requirements of the development regulations set forth in chapter 105. (b) Every building hereafter erected, converted, enlarged, reconstructed, moved or structurally altered shall be located on a lot conforming in all respects to the minimum requirements set forth in the district in which such lot is located except as otherwise provided for in this chapter. (c) In no case shall more than one principal building be located on a residential lot except as otherwise provided for in this chapter. (d) Multiple agricultural use principal and accessory buildings are allowed on separate parcels within the AG zoning district. (Ord. of 7-20-2009, § 17) Sec. 119-125. Height of buildings. No building shall be erected, converted, enlarged, reconstructed, moved or structurally altered to exceed the height limit herein established for the district in which such building is located. (Ord. of 7-20-2009, § 18) Sec. 119-126. Dimensional regulations. No building shall be erected, converted, enlarged, reconstructed, moved or structurally altered except in conformity with the lot area, floor area, and building height regulations of the district in which such building is located. (Ord. of 7-20-2009, § 19) Sec. 119-127. Encroachments prohibited. The minimum yards, parking spaces and open spaces required by this chapter for each building existing at the time of passage of the ordinance from which this chapter is derived, or for any building hereafter erected or structurally altered, shall not be encroached upon or considered as part of the yard or parking space or open space required for any other structure. (Ord. of 7-20-2009, § 20) Sec. 119-128. Off-street parking and loading. No building shall be erected, converted, enlarged, reconstructed, moved or structurally altered except in conformity with the off-street parking and loading regulations of article VI of this chapter. (Ord. of 7-20-2009, § 21) Sec. 119-129. Use of accessory structures and buildings. No accessory structure shall be located, constructed or moved upon a lot until the construction of the principal building has actually been commenced. No accessory building shall be used unless the principal building is in place. (Ord. of 7-20-2009, § 22) Sec. 119-130. Home occupation standards in residential zoning districts. No occupation shall be carried on within a dwelling or the curtilage thereof in any residential district unless such occupation and its conduct complies with the definition of "home occupation" and with the following standards: (1) Residents of the dwelling and up to a maximum of one full-time permanent and four temporary employees may be engaged in the home occupation. (2) The home occupation shall be subordinate and incidental to the residential use of the dwelling and must not change the essentially residential character of the building. No internal or external alteration inconsistent with the residential use of the building is permitted. (3) No display of products can be visible from the street. (4) The home occupation shall not exceed 25 percent of the principal dwelling. (5) Outside storage cannot be used in connection with the home occupation. (6) Only vehicles designed and used primarily as passenger vehicles (including pickup trucks and vans) may be used in connection with the conduct of the home occupation. In addition, all vehicles associated in connection with the home occupation must have adequate off-street parking and shall not place an increase traffic flow to the residential area. (7) The person conducting the home occupation shall obtain a business license from the county. (8) The home occupation may occupy up to 25 percent of the floor area of the principal dwelling up to a maximum of 1,000 square feet. (9) Home occupations must have the same address as the principal residence; additional or secondary addresses for the home occupation are not permitted. (10) In the application for business license, the applicant shall include complete information regarding the scope of the business and its possible impacts on surrounding properties, and shall also evidence its compliance with all requirements of this section. (Ord. of 7-20-2009, § 23) Sec. 119-131. Home occupation standards in the AG agriculture district. The following standards shall apply to home occupations in the AG district: (1) Only residents and not more than two full-time permanent employees may be engaged in the home occupation. For purposes of this chapter, two temporary part-time employees shall be considered as one full-time permanent employee. (2) The home occupation shall be subordinate and incidental to the residential and/or agriculture use of the property. No internal or external alteration inconsistent with the residential use of the principal dwelling is permitted. (3) Display of products may be visible from the street but are limited to display along no more than 60 feet of frontage of the lot. No products may be displayed within the public right-of-way. (4) The home occupation may occupy up to 25 percent of the floor area of the principal dwelling up to a maximum of 1,000 square feet. If the home occupation is located within an accessory building, the home occupation shall not exceed the floor area of the primary dwelling or 1,000 square feet, whichever is greater. If the home occupation is located in both the primary residence and an accessory building, the total floor area in use by the home occupation in both structures combined shall not exceed a total of 1,000 square feet. (5) Only vehicles designed for use primarily as passenger vehicles or farm vehicles may be used in the conduct of the home occupation. Trucks used in connection therewith are limited to one-ton class trucks. (6) Home occupations must have the same address as the principal residence; additional or secondary addresses for the home occupation are not permitted. (7) Signage is restricted to one non-illuminated sign no large than eight square feet in total area, with a maximum of two sides. (8) Vehicles used in connection with the home occupation, including customer vehicles, shall park only in the rear of buildings used in the home occupation. (9) The person conducting the home occupation shall obtain a business license from the county prior to the conduct of any business. In the application for such license, the applicant shall include complete information regarding the scope of the business and its possible impacts on surrounding properties, and shall also evidence its compliance with all requirements of this section. (Ord. of 7-20-2009, § 24) Sec. 119-132. Metal exterior buildings restricted. No manufactured home with metal exterior walls and no pre-engineered metal building shall be permitted for use as a principal dwelling or as an accessory dwelling in any residential zoning district. Detached metal garages are permitted in RES residential districts subject to placement upon a permanent foundation with concrete flooring. No other pre-engineered metal building shall be permitted in any zoning district except the AG agriculture, C-2 general commercial and the M manufacturing zoning districts. All pre-engineered metal buildings permitted in a commercial zoning district shall be modified by the architectural application of wood, stone, brick, ceramic tile, stucco or similar materials to the exterior facades that are viewed from a public street. (Ord. of 7-20-2009, § 25; Ord. of 5-6-2024(4)) Secs. 119-133—119-162. Reserved. ARTICLE IV. DISTRICT REGULATIONS DIVISION 1. GENERALLY Secs. 119-163—119-192. Reserved. DIVISION 2. AGRICULTURAL AND RESIDENTIAL DISTRICTS Sec. 119-193. Designation; intent. The following district is hereby designated as agricultural: AG. The following district is hereby designated as residential: RES. The aforementioned district is designed and intended to secure for the persons who reside there a comfortable, healthy, safe, and pleasant environment in which to live, sheltered from incompatible and disruptive activities that properly belong in nonresidential districts. Other objectives and purposes of these districts are explained in the following sections of this division. The primary standards for development within each of the following zones are given in division 4 of this article. (Ord. of 7-20-2009, § 26; Ord. of 3-6-2023(2); Ord. of 05-06-2025(4)) Sec. 119-194. AG Agricultural District. (a) The purpose of the agricultural (AG) district is to maintain an area of agricultural use and rural character within the county, to preserve a working agricultural economy and rural landscape in these areas, to conserve environmentally sensitive resources, to stabilize and protect single-family characteristics of the district, and to promote and encourage a suitable environment for family life. (b) Application of this zone will ensure that the farming, pasture, and forestry uses, and the scenic values associated with these and the single-family residential character of these areas are protected from incompatible development that could result in the degradation of these values. For all major subdivisions of land for residential purposes in this district, conservation design is required leaving large amounts of land in agricultural use or as natural green space protected by conservation easement. Recreational, institutional, and limited commercial uses are also appropriate for these districts as provided in the table of uses in section 119-269. (Ord. of 7-20-2009, § 27) Sec. 119-195. Reserved. Sec. 119-196. RES Single-Family Residential District. The RES Single-Family Residential District is intended to provide for single-family residential development at low-intensity (not over one principal dwelling unit per five acres) along with such public buildings, schools, churches, recreational facilities and accessory uses as may be necessary to support such communities and are normally compatible with such surroundings. For all major subdivisions of land for residential purposes in this district, conservation design is required leaving large amounts of land as green space protected by conservation easement. The RES district is designed to accommodate development in areas that are served by public water. (Ord. of 7-20-2009, § 29; Ord. of 11-7-2022, § XII; Ord. of 3-6-2023, § V; Ord. of 05-06-2025(4)) Secs. 119-197—119-221. Reserved. DIVISION 3. NONRESIDENTIAL DISTRICTS Sec. 119-222. C-1 Neighborhood Commercial District. The C-1 Neighborhood Commercial District is designed to accommodate a limited variety of commerce: those firms and services that are pedestrian-oriented or that serve the needs of nearby residential neighborhoods and farms. The C-1 Neighborhood Commercial District is intended to accommodate smaller scale business firms and commercial services that have a lower impact upon and are compatible with nearby residences in terms of vehicular traffic, noise, odors, lighting, the amount of solid waste produced, and hours of operation. (Ord. of 7-20-2009, § 33) Sec. 119-223. C-2 General Commercial District. The C-2 General Commercial District is designed to accommodate commercial development on a more intensive scale than the C-1 district. The types of uses permissible in this zone include those kinds of firms and services found in the C-1 district but also include additional automobile-oriented businesses such as drive-in banks and restaurants and other uses that require locations on arterial roads. The C-2 zoning district allows shopping centers that serve a wider geographic market than adjoining neighborhoods. (Ord. of 7-20-2009, § 34) Sec. 119-224. O-I Office Institutional District. The O-I Office Institutional District is designed to accommodate office and institutional land uses necessary for the residents and business and professional practitioners within the county that are of a scale that is inappropriate for location in neighborhood commercial districts or for uses that need locations along arterial roads. It is intended that this zoning district provide locations for the development of cultural, recreational, educational, and health service facilities for the county and be applied to public or private institutions such as hospitals, schools, and colleges; libraries, museums or theatres that might be developed, and to public fire stations or law enforcement facilities. (Ord. of 7-20-2009, § 35) Sec. 119-225. M Manufacturing District. The M Manufacturing District is designed to accommodate proper sites for industrial enterprises engaged in the manufacturing, processing, creating, repairing, renovating, painting, cleaning or assembly of goods, merchandise or equipment or enterprises engaged in the extraction of natural resources. (Ord. of 7-20-2009, § 36) Secs. 119-226—119-243. Reserved. DIVISION 4. DEVELOPMENT STANDARDS—ALL DISTRICTS Sec. 119-244. Development standards—Agriculture and residential districts. Item AG RES Minimum heated floor area per dwelling 1,200 s.f. 1,500 s.f. Minimum lot area without public water or sewer 5 acres 5 acres Minimum lot area with public/private water * 5 acres 5 acres Minimum lot area with public/private water and sewer* 5 acres 5 acres Minimum lot area conservation design subdivision N/A 3 Acres Minimum lot width 300 ft. 200 ft. Minimum road frontage 300 ft. 200 ft. Minimum front yard/setback arterial road 80 ft. 80 ft. Minimum front yard/setback major collector road 80 ft. 80 ft. Minimum front yard/setback minor collector road 80 ft. 80 ft. Minimum front yard/setback local road 80 ft. 80 ft. Minimum side yard 30 ft. 30 ft. Minimum rear yard** 50 ft. 30 ft. Compliance with architectural standards required No No N/A — Not allowed. * Water and sewage must meet approval of the county health department. ** Rear yards that adjoin Jackson Lake will be measured from Georgia power easement 525 feet seal level plus 50 feet. (Ord. of 7-20-2009, § 37; Ord. of 1-4-2021, § 2; Ord. of 12-6-2021, §§ 1, 9; Ord. of 11-7-2022, § XII; Ord. of 3-6-2023, § IX; Ord. of 05-06-2024(3)) Sec. 119-245. Same—Nonresidential districts. O-I C-1 C-2 M Maximum floor area per building 10,000 4,000 60,000 Unlimited Minimum lot area Unsewered area 1.2 acres 1.2 acres 1 acre 1.2 acres Sewered or water 10,000 sq. ft. 5,000 sq. ft. 1 acre 1.2 acres Minimum lot width 40' 40' 80' 100' Minimum road frontage**** 40' 40' 80' 100' Minimum front yard Arterial roads 80' 80' 80' 100' Major collector 60' 60' 80' 100' Minor collector 30' 30' 60' 60' Local roads 20' 20' 50' 50' Minimum side yard 10' 10' 10' 10' Minimum rear yard 20' 20' 20' 20' Compliance with architectural standards required? No No Yes No (Ord. of 7-20-2009, § 38; Ord. of 05-06-2025(5)) Secs. 119-246—119-268. Reserved. DIVISION 5. TABLE OF PERMITTED USES BY ZONING DISTRICT Sec. 119-269. Table of permitted uses. The table of permitted uses should be read in close conjunction with the definitions of terms set forth in section 119-2 and the other interpretive provisions set forth in this chapter. All uses not shown or purposely left as a (Blank space) as a permitted use or a special use within each district by this section are specifically prohibited in that district. All uses shown as an accessory use are specifically permitted only as an accessory to some other lawful principal use. However, not all accessory uses are indicated and the absence of a designation as an accessory use does not necessarily prohibit it. X = Permitted Use; S = Special Use Permit Required; A = Accessory Use Only Use AG RES O-I C-1 C-2 M Adult Entertainment business Agriculture X X Airport, heliport S S Ambulance/emergency service S Animal hospital X S X Animal shelter S X Antique shop A X X Appliance, hardware store X Armory S S X Art studio A X X X Auto auctions S Auto parts (new) and tires X X Auto repair, service and body work garage X X Auto sales and service X Bakery sales A X X X X Baking establishment (3000+s.f.) X X Banks/financial institutions X Bar (separate from restaurant) 2,000 s.f. maximum floor area X Bar, brew pub X X Beer and wine sales X X Bicycle shop (sales and repair) X X Boardinghouse/roominghouse X Bottling/canning plant X Bowling alley X Building supply yard (lumber, electric, plumbing, etc.) X X Bus terminal, passenger S Use AG RES O-I C-1 C-2 M Business or commercial school X X X Cabinet shop A X X Campgrounds or recreational vehicle park S S Car wash X Carnival, rodeo, tent revival, not to exceed 10 days S S X X Carpet, rug sales and storage X Cement/lime/gypsum/ plaster paris mfg. S Cemetery S X S S Central mixing plant — Cement, mortar, plaster, asphalt S Ceramic products mfg. (electrical kiln) S Chemical storage and manufacturing X Church, religious institution S S X X X Clinic, public or private X Clothing/dry goods store X X Club or lodge S X X Cold storage/ice plant/ freezer locker X Colleges or universities X X X Commercial livestock processing S Commercial silo/grain elevator S Concrete, cement, clay products mfg. S Cosmetic and pharmaceutical products mfg. X Crematory X X S Dairy plant, ice cream mfg. X Dance studio S X X Use AG RES O-I C-1 C-2 M Day care center/kindergarten/ nursery school S X X X Day care, home S S Deer processing S S S Department store X Distribution of products or merchandise X Drive-in theater Drugstore X X X Dry cleaning or laundering plant X X X Dwelling, condominium Dwelling, multifamily apartment Dwelling, single-family attached, Town House Dwelling, single-family detached X X Dwelling, two-family (duplex) Education or training facility X X X X Electric repair (commercial) X X X Electronic mfg. and assembly plant X Experimental laboratory S S Fabricating shop (wood, upholstery, sheet metal) X X Farm (with livestock) X Farmers market X X Feed/grain/fertilizer storage X S Feed, seed, fertilizer, retail X X Florist X X Food processing plant S Foundry or forging plant S Freight express office S X Funeral home X X Furniture store X X Furniture upholstery shop X X Game room, arcade X Use AG RES O-I C-1 C-2 M Gasoline service station X X General auction S Go-cart/motorbike track X Golf course S S Golf course, miniature X X Greenhouse, commercial X X Guest house, 750 s.f. maximum A Gunsmith X X Health/athletic club X Heavy agricultural equip. sales and repair X X Home occupation A A Homeowners' recreation area X X Horseback riding facility, commercial S Hospital X Hotel X X Ice, mfg. and sales X Industrialized home X X Intermediate care home X Jewelry store X X Junkyard S Kennel, commercial S S S Liquor store Live bait sales X X X Livestock auction S Local/state/fed. government bldg. X X X X Locksmith X X Machine shop X X Manufactured home—Class A X Manufactured home—Class A, with New Urban Guild Seal of Approval X Manufactured building— temporary construction office X X X X X X Use AG RES O-I C-1 C-2 M Manufactured home sales and display X X Manufacturing X Mini storage warehouse X Mining/ quarry Motion picture or other theater X X X Motorcycle shop, sales and repair X X Museum X X X Music teaching studio X X X Newspaper or printing plant X Nursing home X Off-street parking lot/ garage X X Office equipment sales/ service X X Pawnshop X Pers. service (beauty, shoe repair, laundry drop, etc.) X X Personal care home, congregate X Personal care home, family X Personal care home, group X Pest control X X Petroleum refinery or bulk storage distributor S Photography studio X X Planing mill or sawmill X S Planned apartment community Planned manufactured home community Poultry houses on conforming lots X S Printing, copying shop X Professional office bldg. X X X Public park or recreation area X X X Public storage garage X Use AG RES O-I C-1 C-2 M Radio/TV station X Railroad passenger station S S X Railroad spur tracks X Railroad yard X Recycling center S Research lab, commercial X Restaurant X X Restaurant, delicatessen or sandwich shop A X X X Restaurant, drive-in X Retail food stores X X Roadside stand X Rock/sand/gravel (distribution/storage) S Sanitary landfill S School, private— Elementary, middle, high S S X Short Term Rental S S Sign painting and fabricating shop X X Skating rink (roller, ice) X Small motor repair shops X Solar Farm Souvenir/curio shop X X Specialty shop (gift, jewelry, etc.) A X X Storage tank (above ground) gas S Storage tanks (agricultural, nonflammable) X S Tailor A X X Taxi station X Taxidermist X Textile mfg. plant X Trailer, or truck rental X X Transmission tower S S Truck terminal X Utility substation X X X X X X Warehousing, not premises sales X Washeteria X X Use AG RES O-I C-1 C-2 M Welding shop X (Ord. of 7-20-2009, § 39; Ord. of 3-1-2021; Ord. of 1-3-2022; Ord. of 4-4-2022; Ord. of 3-6-2023, § X; Ord. of 08-05-2024(3)) Secs. 119-270—119-286. Reserved. DIVISION 6. RESERVED* Secs. 119-287—119-322. Reserved. ARTICLE V. OVERLAY DISTRICTS Sec. 119-323. Overlay districts established; applicability. There are hereby established two overlay district as described in the following sections of this article. The overlay districts are intended to apply additional regulations and standards to supplement the underlying zoning districts when the location and proposed land uses require such regulation to promote the public interest. Overlay districts apply to all land, structures, and land uses that either: (1) Fall within the boundaries of the overlay zone shown on the official zoning maps; or (2) Meet the criteria defined in this chapter. (Ord. of 7-20-2009, § 56) Sec. 119-324. S-2 Sensitive Land—Watershed Protection Overlay Zone. (a) The purpose of the S-2 district is to protect watersheds, which are vital to public water supplies and therefore have a unique environmental importance to the county; to prevent development from contaminating water sources to a point where they cannot be treated to meet drinking water standards. The S-2 district is intended to maintain a high level of quality for all surface water (rivers, creeks, streams, and springs) and underground water, and to help assure that a high quality of water is maintained in the future. The district is intended to provide for certain permitted uses, and to protect the area from the polluting effects of more intense development and from encroachments of those uses that are not compatible with a protected watershed. (b) The S-2 watershed protection overlay zone applies additional standards to defined watershed areas that may lie within any other zoning district. In each zoning district located within the boundaries of the S-2 district, both the regulations of that underlying district and the regulations of the S-2 overlay district apply. However, the more restrictive standard shall govern. (Ord. of 7-20-2009, § 57) Sec. 119-325. Applicability and boundaries of S-2 districts. Areas that lie within watersheds, which are vital to area public water supplies and have a unique environmental importance to the county are included within the S-2 district. S-2 districts and their boundaries are delineated on the "S-2 Sensitive Land — Watershed Protection Map," which is made a part of this chapter by reference. (Ord. of 7-20-2009, § 58) Sec. 119-326. Prohibited and restricted uses. (a) Each zoning district of this chapter specifies a list of permitted principal uses, and accessory uses. That list of permitted uses given for each primary zoning district must be adhered to on land to which the S-2 overlay district is also applied. However, the list of prohibited uses given in subsection (b) of this section applies to all S-2 land, regardless in which primary zoning district it lies. (b) Prohibited uses. The following uses are specifically prohibited within the S-2 district: (1) Sewage treatment facility. (2) Commercial business, which causes, sells, stores, or maintains any toxic chemicals, toxic wastes, or toxic products. (3) Agricultural activity that does not strictly comply with Georgia Pesticide Act of 1976, Georgia Pesticide Use and Application Act of 1976, and Georgia Laws. 1982, House Bill 1780 (O.C.G.A. § 2-1-4). (4) Industry, business or facility which uses, makes or creates as a product or byproduct any toxic wastes, heavy materials, grease, animal fat, or organic loading. (5) Dumping, discharging, releasing, spraying, distributing any toxic or other harmful products onto the land, into the atmosphere, or in a stream or body of water. (6) Livestock feedlots. (Ord. of 7-20-2009, § 59) Sec. 119-327. Development standards for S-2 districts. (a) The S-2 overlay district applies additional standards to specific areas that may lie within any zoning district. If required development standards are specified for the same item in both district regulations, the more stringent standard governs. (b) The developer/owner must comply with the county soil erosion and sedimentation control ordinance set forth in chapter 113, as well as any other applicable development regulations. (c) Any setback measurements stated in this section are measured from and are used only on the side abutting the outer edge of any river, creek, stream, spring, or body of water that is located with the S-2 district—or the outer property line of any property owned, operated, managed, or maintained by any government agency in the county as an existing reservoir or designated by a government agency in the county as a future reservoir. (d) For any property located within 1,000 feet of any property owned, managed, maintained, or operated by any government in the county as a reservoir or designated by a government agency in the county as a future reservoir, the following development standards are required: Agricultural Uses: Minimum lot area Five acres Minimum front yard 100 feet Minimum side yard 250 feet Minimum rear yard 250 feet Minimum setback from a reservoir for cultivation 250 feet Residential Uses: Minimum lot area Five acres Minimum front yard 100 feet Minimum side yard 50 feet Minimum rear yard 250 feet Commercial Uses: None permitted. Industrial Uses: None permitted. (e) For other properties located within the S-2 district, but not located within 1,000 feet of any property owned, managed, maintained, or operated by any government in the county as an existing reservoir or designated by a government agency in the county as a future reservoir, the following development standards are required: Agricultural Uses: Minimum lot area Five acres Minimum front yard 100 feet Minimum side yard 50 feet Minimum rear yard 100 feet Minimum setback for cultivation 100 feet Residential Uses: Minimum lot area —5 acres for single-family dwellings Minimum front yard 50 feet Minimum side yard 25 feet Minimum rear yard 100 feet Minimum setback for nitrification lines 50 feet Commercial Uses: Minimum lot area 1.2 acres, except in C-2 zoning where 1 acre is minimum Minimum front yard 50 feet Minimum side yard 50 feet Minimum rear yard 100 feet (f) No principal or accessory buildings may be constructed any lower than the maximum flood elevation for a distance of one mile downstream from any existing or designated planned reservoir dam. (g) Should the owner of a lot, parcel or tract of land included in the S-2 district propose to subdivide any portion of such property, the owner or his authorized agent must submit to the director of planning a plat or drawing to scale showing the exact location of any surface water that is located on or within 250 feet of the subject property prior to a request for rezoning or for any permit. (h) Variances may be considered by the board of appeals as to lot sizes and yards provided that sewage generated by the facility located on the property is serviced by an approved public sewage facility. However, variances may not be made as to any residential, commercial, agricultural, or industrial facilities which use, make, or create as a product or a by-product any toxic substance or waste. (i) All other yard requirements of the primary zoning district in which a specific parcel of property lies must be complied with where they are either more restrictive than or not addressed by S-2 development standards. (Ord. of 7-20-2009, § 60; Ord. of 05-06-2025(6)) Sec. 119-328. S-B Scenic Byway Overlay (Reserved). Sec. 119-329. PRC Parks, Recreational, Conservation Overlay (Reserved). Secs. 119-330—119-346. Reserved. ARTICLE VI. OFF-STREET PARKING AND LOADING REQUIREMENTS Sec. 119-347. Application of parking requirements. (a) As a minimum, an off-street parking space shall consist of 180 square feet (nine feet by 20 feet) of storage space for one automobile, plus adequate space for maneuvering and parking one automobile. For compact vehicles only, as a minimum, an off-street parking space shall consist of 127.5 square feet (eight feet, six inches by 15 feet) of storage space for one automobile, plus adequate space for maneuvering and parking of one automobile. Adequate space for maneuvering and parking one automobile shall mean the following: Two-way aisles between parking spaces shall be at least 24 feet in width. One-way aisles between parking spaces shall be at least 14 feet in width for 45-degree angle parking, at least 18 feet, six inches in width for 60-degree parking, and at least 24 feet in width for 90-degree angle parking. (b) Parking spaces for one-family dwellings, two-family dwellings and townhouse dwellings shall be on the same lot as the building to be served except as otherwise provided in this article. No parking space shall be permitted between the front building line and the front property line except on a bona fide paved or graveled driveway leading to a garage, carport or other permanent parking space located to the rear of the front building line. However, garages and carports may be located in front of the dwelling if attached to the principal building and if their parking bay entrances are perpendicular to the public road fronting the dwelling. In all nonresidential zones, paved parking areas will not be permitted between the front building line and the front property line except where a variance permitting such parking has been approved by the zoning board of appeals according to the requirements of this chapter. (c) Parking spaces for multiple-family dwelling shall be located on the same lot as the building to be served and not more than 150 feet from each dwelling unit along the nearest pedestrian way. (d) Parking spaces for nonresidential buildings shall be located on the same lot as the building to be served except where additional spaces are required by enlargement of use or, where facilities are provided and maintained collectively, the required spaces may be located no more than 300 feet from each building served. No more than 50 percent of the parking requirements for uses in commercial and industrial zoning districts may be provided in off-site public or private parking facilities located not more than 300 feet from principal entrances to buildings where uses are located. (e) No more than 50 percent of the parking requirements for theaters, auditoriums, restaurants or similar uses may be provided and used jointly by office and retail uses not normally open for business during the same hours. Up to 100 percent of the parking requirements for churches and other places of worship may be provided by and used jointly with office and retail uses not normally open for business during the hours of religious and similar services. (f) Parking requirements for uses in institutional districts may be provided in common parking areas that shall be approved by condition of zoning approval or as part of the institution's comprehensive site development plan. (g) Parking requirements for developments with more than one use shall be determined by adding the parking requirements for the different uses within the development. (h) No more than 25 percent of the parking spaces required for multiple-family residential, institutional, commercial, and industrial uses may be designed for the use of compact vehicles. Parking spaces for compact vehicles shall be clearly designated by signs or other special markings for the exclusive use of such vehicles. (i) Parking spaces for use by handicapped persons shall be provided as required by the state handicapped accessibility law (O.C.G.A. § 30-3-1 et seq.). (j) Required parking for personal storage facilities, mini-warehouses and similar temporary storage facilities shall not be permitted in aisles and driveways between storage buildings and facilities, but shall be located in a separate parking area on the same property as the facility to be served. Use of aisles and driveways shall be limited to driving, standing, loading and unloading. (k) Except for spaces designated for handicapped persons, parking and loading shall not be permitted within any front yard for nonresidential buildings when located on the same lot as the building to be served. Parking shall not be permitted within the front yard of any agricultural or residential districts, except upon a driveway or within a carport or garage that is part of the principal building. (Ord. of 7-20-2009, § 63; Ord. of 3-6-2023, § XII) Sec. 119-348. Minimum requirements for off-street parking. Minimum requirements for off-street parking shall be as follows: Single-family dwellings, in general Two parking space per dwelling unit. Two-family dwellings One and one-half spaces per dwelling unit. Multiple-family dwellings, in general One and one-half spaces per dwelling unit. Roominghouses, lodginghouses and boardinghouses One space per each two bedrooms. Personal care homes One space per each two beds. Churches and other places of worship One space per each eight seats in the sanctuary or meeting room where seating is fixed or one space per 50 square feet of gross floor area of sanctuary or meeting room where seating is not fixed. Schools, public or private, elementary and middle Two spaces per classroom, plus one space per each eight seats in auditorium or assembly area where seating is fixed or one space per 50 square feet of gross floor area of auditorium or assembly area where seating is not fixed. Hotels, motels, tourist homes One and one-quarter spaces per guestroom. Conference and meeting facilities associated with a hotel or similar place of lodging: One space per 40 square feet of floor area of largest assembly room where seating is not fixed. Fraternity and sorority houses One space per bed. Homes for the elderly One space per 21 /4 dwelling units. Clubs, social organizations and fraternal lodges One space per 100 square feet of gross floor area. Government and business offices; office buildings One space per 400 square feet of gross floor area. Retail sales and service establishments One space per 200 square feet of gross floor area. Restaurants, nightclubs, taverns and similar establishments serving food and beverages One space per 100 square feet of gross floor area. Theaters, auditoriums, funeral homes, community centers and other places of assembly One space per each four seats where seating is fixed; one space per 25 square feet of gross floor area of assembly area where seating is not fixed. Nursery schools, kindergartens, day care centers Two spaces per classroom. Hospitals, sanitariums, nursing homes, convalescent homes, and similar uses One space per two beds. Bowling alleys Five spaces per alley. Manufacturing, warehousing, and storage facilities; distribution centers; wholesale facilities One space per 600 square feet of gross floor area. Vehicle repair garages, paint and body shops, welding shops, and similar establishments One space per 200 square feet of gross floor area. Vehicle service stations Three spaces per service bay. (Ord. of 7-20-2009, § 64; Ord. of 3-6-2023, § XIII) Sec. 119-349. Application of loading requirements. Where required, one or more off-street loading berths or spaces shall be provided on the same or adjoining lot with the facility it serves, either inside or outside a building. A loading berth shall have minimum dimensions of 12 feet by 35 feet by 14 feet overhead clearance. A loading space need not be a full berth but shall be sufficient to allow normal loading operations appropriate to the property served. The zoning administrator shall determine the sufficiency of the space, but in no case shall this space or its use hinder the free movement of vehicles and pedestrians over a street or sidewalk. (Ord. of 7-20-2009, § 65) Sec. 119-350. Minimum requirements for off-street loading. (a) Retail operations, including restaurants within hotels and office buildings, with a total gross floor area of 20,000 square feet devoted to these purposes: One loading space for every 20,000 square feet of gross floor area or fraction thereof; one loading berth for every 40,000 square feet of gross floor area or fraction thereof. (b) Retail operations and all first floor nonresidential uses with a gross floor area of less than 20,000 square feet; all wholesale and light industrial operations with a gross floor area that is less than 10,000 square feet: One loading space. (c) Office buildings and hotels: One loading berth for every 100,000 square feet of floor area or fraction thereof. (d) Industrial and wholesale operations with a gross floor area of 10,000 square feet or more shall meet the requirements in the following table: Size of facility (gross floor area) Required loading berths 10,000—40,000 square feet 1 40,000—100,000 square feet 2 100,000—160,000 square feet 3 160,000—240,000 square feet 4 240,000—320,000 square feet 5 Size of facility (gross floor area) Required loading berths 320,000—400,000 square feet 6 Each 100,000 square feet over 400,000 1 (Ord. of 7-20-2009, § 66) Sec. 119-351. Curb cut requirements. Within any zoning district where the lowering or cutting away of any curbs for purposes of ingress and egress is required, such curb cut shall be subject to the following provisions: (1) No more than two combined entrances and exits shall be allowed any parcel of property, the frontage of which is less than 200 feet on any one street. Additional entrances or exits for parcels of property having a frontage in excess of 200 feet shall be permitted after showing of actual requirements of convenience and necessity and upon approval of the planning commission. Where frontage is 50 feet or less, only one combined entrance-exit shall be permitted. (2) At street intersections, no curb cut shall be located within 50 feet of the intersections of two curblines or such lines extended, or within 15 feet of the intersection of two property lines extended, whichever is least restrictive. When a culvert is required it must be approved by the county. (3) The distance between any two curb cuts on the same side of the street and located on one property shall be not less then ten feet. Such distance shall be measured between the points of tangency of the curb return radii and the established curbline of the abutting street. (4) All driveways shall be constructed so as to be at least two feet from any property line. (5) The maximum width of any driveway shall not exceed 40 feet measured at the right-of-way line. (6) Maximum width of any curb cut including curb returns shall not exceed 50 feet except that a bona fide truck stop may exceed the maximum figure as determined by the zoning administrator. (7) The sum of the two curb return radii for any one curb cut shall not exceed 15 feet. (Code 2000, § 46-215; Ord. of 5-2-1994(4), § 107) Secs. 119-352—119-375. Reserved. ARTICLE VII. SUPPLEMENTAL REGULATIONS AND MODIFICATIONS Sec. 119-376. Scope. The regulations set forth in this article supplement or modify the district regulations appearing elsewhere in this chapter. (Ord. of 7-20-2009, § 67) Sec. 119-377. Use modifications. (a) Temporary buildings used in conjunction with construction work only may be permitted in any district but shall be removed immediately upon completion of the construction work. (b) Recreational vehicles on private lots in AG zoning. Individual recreational vehicles occupied temporarily by a guest of the owner or tenant of the property on which the recreational vehicle is located, shall be allowed, not to exceed 15 consecutive calendar days in any 30 day period. No recreational vehicle shall be used as a permanent residence on any private lot in all zoning districts. Recreational vehicles shall not be attached in any way to a permanent foundation or other structure, and shall not have any permanent connections to utilities. (1) Exceptions. When building a personal home in the AG zoning district with an active building permit and all building and construction related permits for the principle dwelling have been secured, and construction will commence within 90 days. Allowed up to 12 months. If an extension is needed the planning and zoning commission will hear the request and make the final decision. All units must be hooked up to sanitary facilities. (Ord. of 7-20-2009, § 68; Ord. of 08-05-2024(2)) Sec. 119-378. Height limit exceptions. The height limitations of this chapter shall not apply to church spires, belfries, cupolas and domes not intended for human occupancy, monuments, water towers, observation towers, transmission towers, chimneys, smokestacks, radio towers, television towers, masts and aerials. (Ord. of 7-20-2009, § 69) Sec. 119-379. Area modifications and utility services for lots of record. Where a lot of record at the time of the effective date of the ordinance from which this chapter is derived had less area or less width than herein required for the district in which it is located, said lot may nonetheless be used for a single-family dwelling, provided that all yard and other requirements of the district are complied with. If two or more adjoining and vacant lots with continuous frontage are in a single ownership at any time after the adoption of the ordinance from which this chapter is derived and such lots individually are less than the lot width requirements for the district in which they are located, such groups of lots shall be combined and recorded as a single lot of conforming size and the lot or lots in one ownership shall be subject to the requirements of this chapter. Prior to transfer of the fee title of a lease lot of record, the lease lot of record must satisfy the requirements of the Jasper County Health Department relative to water supply and sewage treatment. (Ord. of 7-20-2009, § 70; Ord. of 3-2-2020, § 3) Sec. 119-380. General yard modifications. (a) Every part of a required yard shall be open to the sky and unobstructed except for the ordinary projections of sills, belt courses, cornices, eaves, chimneys, buttresses and other ornamental and architectural features; provided, however, that such features do not project more than 11 /2 feet into any required yard. The term "open to the sky and unobstructed" does not pertain to trees and bushes. (b) More than one institutional, commercial or industrial building may be located upon a lot or tract, but such buildings shall not encroach upon the front, side and rear yards required by the district regulations and for multiple dwellings the open space between buildings measured at the closest point shall not be less than 20 feet for one-story buildings, 30 feet when one or both are two-story buildings, and 40 feet when one or both are three- or more story buildings. (c) Where an open space is more than 50 percent surrounded by a residential or institutional building, the minimum width of the open space shall be at least 20 feet for one-story buildings, 30 feet for two-story buildings and 40 feet for three-story or more story buildings. (d) In a residential district, no required yard except the rear yard shall be used for the location of a private swimming pool. (e) Wherever yards are provided between commercial or industrial structures, they shall have a minimum width of not less than ten feet. (Ord. of 7-20-2009, § 71; Ord. of 12-6-2021, § 3) Sec. 119-381. Front yard modifications. The required front yards heretofore established shall be modified in the following cases: (1) Where 40 percent or more of the frontage on the same side of a street between two intersecting streets is presently developed with buildings that have (with a variation of five feet or less) a front yard greater or lesser in depth than therein required, new buildings shall not be erected closer to the street than the average front yard so established by the existing buildings. (2) Where 40 percent or more of the frontage on one side of a street between two intersecting streets is presently developed or may hereafter be developed with buildings that do not have a front yard as described in subsection (1) of this section, then: a. Where a building is to be erected on a parcel of land that is within 100 feet of existing buildings on both sides, the minimum front yard shall be a line drawn between the two closest front corners of the adjacent buildings; or b. Where a building is to be erected on a parcel of land that is within 100 feet of an existing building on one side only, such building may be erected as close to the street as the existing adjacent building. (3) Double frontage lots shall provide the required front yard on both streets. (4) Corner lots shall provide a front yard on each street side; provided, however, that the buildable width of a lot of record at the time of the passage of the ordinance from which this chapter is derived need not be reduced to less than 25 feet. (5) Permitted signs may extend into a front yard or the required yard abutting a side street not to exceed 18 inches. (6) Accessory buildings. In residential zoning districts, a detached accessory building shall not be located closer to the street right-of-way line than the principal building to which it is accessory. (Ord. of 7-20-2009, § 72; Ord. of 12-6-2021, § 3) Sec. 119-382. Rear yard modifications and regulations. The rear yards heretofore established shall be modified in the following cases: (1) An unenclosed balcony, porch steps or fire escape may project into a rear yard for a distance not exceeding ten feet. (2) Accessory buildings shall be located in a rear yard and shall not occupy more than 30 percent of the required rear yard. (3) On corner lots, accessory buildings shall not be located closer to the side street right-of-way line than the principal buildings to which it is accessory or closer to the rear lot line than the side setback requirements for principal buildings located on adjoining lots with side yards contiguous to said rear lot line. (4) When an accessory building is attached to the principal building by breezeway, passageway or similar means, it shall comply with the yard requirements of the principal building to which it is accessory. (5) Satellite dish antennas are permitted as accessory structures in residential zoning districts and may be no greater than 3.5 feet in diameter. (Ord. of 7-20-2009, § 73; Ord. of 12-6-2021, § 3) Sec. 119-383. Walls, fences and planting. Walls and fences and ornamental trees and shrubs may be located within the yards except: (1) In the RES district, no wall or fence in a front yard shall exceed a height of four feet and shall not exceed eight feet in height in any side or rear yard. (2) In all districts, no fence, wall, shrubbery, sign, marquee, or other obstruction to vision between the heights of three feet and 15 feet shall be permitted within 20 feet of the intersection of the right-of-way lines of two streets or of a street intersection with a railroad right-of-way line. (Ord. of 7-20-2009, § 74; Ord. of 3-6-2023(3); Ord. of 05-06-2025(7)) Sec. 119-384. Residential and institutional districts. (a) Churches and other places of worship, clubs, sororities and fraternities shall comply with the following regulations in all residential zoning districts: (1) Shall comply with the minimum front and rear yard requirements for the zoning district in which they are located and shall have a 25-foot side yard in all residential zoning districts. (2) No front yard shall be used for the purpose of parking. (3) Coverage of property shall be limited to 50 percent. In addition to coverage by buildings, coverage by parking areas, drives, walkways and other paved or graveled surfaces shall be included in determining the percentage of coverage. (b) The following conditions apply to hospitals, sanitariums and nursing homes in all districts permitting such uses: (1) Shall have prior approval of the county health department. (2) Shall provide a visually solid fence or dense planted buffer on any side abutting residential use. (3) Shall be supplied with secure source of emergency electrical power so as to provide electricity for all hospital services for no less than 48 hours in the event of an interruption in the power supplied by the electric utility company. (c) No front yard for multiple-family dwellings shall be used for the purpose of parking or loading. (d) Within any residential district, not more than 25 percent of the total area between the street right-of-way line and the front of the principal building shall be paved. (Ord. of 7-20-2009, § 75; Ord. of 12-6-2021, § 3) Sec. 119-385. Commercial and industrial districts. (a) A visually dense planting screen with a minimum height of eight feet shall be provided along any property line of a commercial or industrial use that adjoins a residential district. (b) No required yard in C-1, C-2, and O-I districts shall be used for the purpose of parking or loading. (c) Animal hospitals. Such uses shall be operated so as to prevent objectionable odors. Any boarding and kennel space shall be contained within the building and is limited to no more than 25 percent of the total building area of the hospital. No pens, cages or other area for the overnight confinement of animals shall be permitted outside the building or buildings. Any areas used for boarding shall be adequately soundproofed and located at least 50 feet from any off-site residence. (Ord. of 7-20-2009, § 76) Sec. 119-386. Nursery schools, kindergartens and day care centers. Nursery schools, kindergartens and day care centers shall comply with the appropriate rules and regulations of the state department of human resources. When such a facility is to be located in a zoning district where such facility requires a public hearing by the planning and zoning commission and approval of the board of commissioners, the following items shall be considered in determining whether the facility shall be approved: (1) The suitability of the proposed facility in view of the use and development of adjacent and nearby properties. (2) The impact that the proposed facility will have on the public safety, traffic on the public streets, transportation facilities, utilities, and other public services. (3) The impact that the proposed facility will have on established property values and on the health, safety, comfort and general welfare of the residents of the county. (Ord. of 7-20-2009, § 77) Sec. 119-387. Supplemental regulations and modifications applicable to homes for the elderly. Supplemental regulations and modifications applicable to homes for the elderly are as follows: (1) Lot shall have a minimum width of 100 feet and a minimum depth of 150 feet. (2) Minimum floor area, one-bedroom apartment: 550 square feet. Minimum floor area, efficiency apartment: 350 square feet. (3) Maximum building coverage shall not exceed 60 percent of total land area. (4) One parking space shall be provided for each 21 /4 dwelling units. (Ord. of 7-20-2009, § 78) Sec. 119-388. Determination of separate dwelling units. The presence within an accessory building or within any part of a principal building of any of the following features and equipment shall be considered prima facie evidence that such accessory building or such part of the principal building is a separate and distinct dwelling unit: utility services; utility meters; mailboxes; and kitchen equipment such as sink, stove, oven, and/or cabinets. Said dwelling unit shall be subject to the regulations of the zoning district in which it is located. (Ord. of 7-20-2009, § 79) Sec. 119-389. Personal care homes. Personal care homes may be established and operated in the county in accordance with the following policies and procedures: (1) Personal care homes shall be operated only in zoning districts in which such homes are allowed as permitted uses or special uses as described in section 119-269, table of permitted uses. (2) Persons seeking to operate a personal care home in the county must file a permit application with the development department along with any fees established by the board of commissioners. Each permit application shall include an affidavit that the applicant either has applied for or will immediately apply for the corresponding permit or authorization for the operation of a personal care home from the state department of human resources in accordance with its rules and regulations and the affidavit shall also certify that the proposed personal care home will meet and be operated in conformance with all applicable state and federal laws and regulations and with all codes and regulations of the county. All application forms and information submitted to the state department of human resources or any amendment thereto shall be submitted with the county permit application. The director of planning may require clarification or additional information from the applicant that is deemed necessary to determine whether operation of the proposed home will meet applicable laws, regulations and development standards. (3) If the director of planning determines that an application to operate a personal care home is in compliance with the applicable requirements, the director shall approve the application for a permit, but the permit for operation shall not be issued until the applicant has obtained the corresponding permit or authorization for operation of such a home from the state department of human resources. (4) No permit for the operation of a personal care home shall be transferable. (5) No personal care home shall be operated without both a valid permit from the county and a valid license from the state department of human resources. (Ord. of 7-20-2009, § 80) Sec. 119-390. Standards for approval of residential uses and personal care homes. When a residential use or personal care home is to be located in a zoning district where such use or personal care home requires a public hearing by the planning and zoning commission and approval of the board of commissioners, the following items shall be considered in determining whether the residential use or personal care home shall be approved: (1) The suitability of the proposed residential use or personal care home in view of the use and development of adjacent and nearby properties. (2) The impact that the proposed residential use or personal care home will have on the public safety, traffic on the public streets, transportation facilities, utilities, and other public services. (3) The impact that the proposed residential use or personal care home will have on established property values and on the health, safety, comfort and general welfare of the residents of the county. (Ord. of 7-20-2009, § 81) Sec. 119-391. Required buffer areas. Buffer areas shall be established and maintained by the property owner under the following provisions: (1) A 50-foot-wide buffer area which provides visual screening and may be required to provide a screening fence or wall on the interior edge of the buffer shall be established and maintained by the owner in any required side or rear yard when a development in a C-1, C-2 or M district adjoins RES zoning district. Minimum fence or wall height shall be six feet. (2) The requirements for a fence or wall may be waived by the director of planning upon presentation of field survey analysis prepared by a licensed architect, landscape architect, or engineer demonstrating that construction of the fence or wall would destroy existing vegetation which, in itself, provides visual screening between the development and the adjoining residential district. (3) Required buffer areas shall be maintained as a planted area, using existing vegetation or, when required, additional plantings as provided in this section. (4) Required buffer areas shall be appropriately landscaped with trees and shrubs and may be enhanced with flowers, grass, stone, rocks and other natural landscaping materials. (5) Required buffer areas shall not be used for parking or a structure other than a fence or drainage improvements required by the county. However, a buffer area may be used for vehicular access and utility easements if these are constructed approximately perpendicular to the greater distance of the buffer area. Buffers may also contain drainage improvements required by the county based upon competent engineering studies showing the improvements to be necessary, if approved by the county engineer. (6) Except as otherwise provided, the natural topography of the land shall be preserved and natural growth shall not be disturbed beyond that which is necessary to prevent a nuisance, to thin natural growth where too dense for normal growth, or to remove diseased, misshapen or dangerous and decayed timbers. However, a slope easement may be cleared and graded where required to prevent soil erosion upon approval of the public works director; this easement may cover no more than 20 percent of the required buffer space, and shall be immediately replanted upon completion of easement improvements. (7) Where the conditions described in subsection (6) of this section cannot be met by reason of the topography of the land or due to the prior removal or lack of vegetation and foliage, the owner of the buffer area shall install a permanent screen of evergreen plantings, so designed and developed to provide visual screening between the property described herein. These plantings shall consist of a mix of hardwoods and evergreens indigenous to the state's Piedmont area in order to mirror what is native and will sustain life in the Piedmont area. These plantings shall not be less than six feet in height, or trees or shrubs what will, in normal growth, attain a height of six feet within three years. The following plants are suggested, but not limited to, for this purpose: Southern Magnolia, Eastern Red Cedar, Sassafras, Maple, and Poplar. A certified master gardener, landscape architect, or the UGA Extension Service may be consulted for additional planting recommendations. Other plants may be suitable, provided they can form a hardy screen, dense enough and high enough both to interrupt vision and diffuse the transmission of sound. Plants selected should not be exotic or invasive. (8) Any grading, improvements or construction adjacent thereto shall be conducted far enough from the buffer area so as not to disturb or encroach upon trees within the buffer area. (9) Required buffer areas shall be designated on each subdivision plat, concept plan, or construction plan and shall be recorded as a permanent easement. (Ord. of 7-20-2009, § 82; Ord. of 3-6-2023(4); Ord. of 05-06-2025(8)) Sec. 119-392. Communications towers and antennas. Communications towers and antennas may be erected and operated in the county as permitted in the district regulations, and in accordance with the policies and procedures described in this section, and after review and approval as described in chapter 115, article IV. Except in the AG Agricultural District, and unless otherwise exempt, no communication tower or antenna shall be erected in or within 300 yards of a residential zoning district. (1) Development standards. a. All districts. Towers shall be located no closer to any existing off-site dwelling than a distance equal to the height of the tower or 100 feet, whichever is greater. On properties located adjacent to any residentially zoned property, towers shall be located no closer to the residentially zoned property than a distance equal to the height of the tower or 200 feet, whichever is greater. Cables and structures designed to anchor towers and antennas shall be set back a minimum of 20 feet from all property lines. b. Antennas in O-I Office Institutional Districts, C-1 Neighborhood Commercial Districts, C-2 General Commercial Districts, and in M Manufacturing Districts. Antennas may be located on existing structures, including but not limited to buildings, light poles, water towers, communications towers or other freestanding structures, provided that the existing structure is at least 50 feet in height and the antenna is no more than 20 feet higher than the highest point of the existing structure. c. Exemptions. These regulations shall not apply to the following: 1. Towers and/or antennas less than 70 feet in height and owned and operated by a federally licensed amateur radio operator. 2. Receive-only antennas. 3. Satellite dish antennas. 4. Towers and antennas operated by local, state or federal government. (2) Standards for approval of communications towers. When a communications tower is to be located in a zoning district where a tower requires a public hearing by the planning and zoning commission and approval of the board of commissioners, the following standards shall be considered in determining whether the tower shall be approved: a. Is the proposed tower suitable in view of the use and development of adjacent and nearby property? b. Does the proposed tower adversely affect the existing use, usability, or unreasonably reduce the value of adjacent or nearby property? c. Does the proposed tower result in impacts that will or could cause an excessive or burdensome use of existing streets, transportation facilities, utilities or other public facilities? d. Are there other existing or changing conditions that, because of their impact on the public health, safety, morality and general welfare of the community, give supporting grounds for either approval or disapproval of the proposed tower? e. Communications towers may be approved subject to such reasonable conditions necessary to mitigate impacts that may be expected without the imposition of such conditions. (Ord. of 7-20-2009, § 83) Sec. 119-393. Private elementary, middle and secondary schools. The purpose of this regulation is to provide standards for private elementary, middle and secondary schools in residential zoning districts. (1) Development standards. a. Minimum lot area: 1. Elementary schools: two acres. 2. Middle or junior high schools: four acres. 3. High schools: ten acres. b. Minimum frontage: 100 feet. c. Minimum building setbacks from property lines from adjoining residential uses: 50 feet. d. Minimum setbacks from property lines for parking areas and driveways: 25 feet. An exception to any of these minimum development standards may be approved as part of the school's comprehensive site development plan after consideration of the standards for approval described in section 119-449. (2) Supplemental standards for approval. In addition to the standards described in section 119-449, the following standards shall be considered in determining whether the proposed development shall be approved: a. Adequacy of site. Is the site adequate for the proposed development and use? b. Buildings. Are the scale and size of the proposed buildings appropriate in relation to the site and the adjacent and nearby properties? c. Vehicular access, circulation and off-street parking and loading. Is the public street on which the proposed development is to be located adequate to allow estimated traffic? Is ingress and egress to the proposed development adequate so as to minimize traffic congestion? Is parking located to the rear of the proposed development and effectively screened? Is there adequate access for fire and other emergency vehicles? d. Buffers. Are buffers and other screening measures adequate to protect adjacent residential uses from noise, lighting and other impacts? e. Solid waste disposal. Are garbage disposal and refuse collection areas adequate? Are they located and screened to minimize impacts on adjacent residential properties? (3) Standards for approval; conditional zoning. The standards described in this section shall be considered in determining whether the proposed use shall be approved. Such use may be approved subject to such conditions as may be imposed in order to mitigate impacts which may be expected without the imposition of conditions and may be regulated in the same manner as provided in, conditional zoning. (4) Supplemental application requirements. Each application shall be accompanied by plans that include the following: a. Written description of the proposed development. At a minimum, such description shall provide a summary of the scope and main features of the proposed development, including hours and manner of operation, and shall address standards for approval described in this article. b. Comprehensive site development plan. At a minimum, such plan shall include all existing and proposed buildings and structures and their location on the property, heights of proposed buildings, proposed use of each building, all driveways, parking areas and loading areas, location of garbage disposal facilities and proposed buffers. (Ord. of 7-20-2009, § 84) Sec. 119-394. Manufactured homes. All manufactured homes must be installed in accordance with ANSI A225.1. Manufactured homes are prohibited for use as storage buildings. (Ord. of 7-20-2009, § 85) Secs. 119-395—119-416. Reserved. ARTICLE VIII. BOARD OF APPEALS Sec. 119-417. Establishment and membership. (a) A zoning board of appeals is hereby established. The term "board," when used in this chapter, shall be construed to mean the county zoning board of appeals. The board shall consist of not more than five members nor less than three members each appointed by majority vote of the board of commissioners. All members shall be citizens of the county and no member shall be a member of the board of commissioners or an employee of the county. (b) The term of office of each member shall be three years except that of the three members first appointed, one shall be appointed for a term of one year, one for a term of two years, and one for a term of three years. Thereafter, as each term expires, the appointment shall be for three years except that a vacancy occurring in an unexpired term shall be filled by appointment for the unexpired portion of that term. The board of commissioners by majority vote shall have the authority to remove any member of the zoning board of appeals but only for cause and upon written charges and after public hearing. (c) At its first meeting of the calendar year, the board shall elect a chairperson and a vice-chairperson, and adopt rules governing the conduct of its affairs. Copies of the rules shall be made available to the public. The director of planning shall be the secretary to the board and maintain all minutes and records of actions taken by the zoning board of appeals. (Ord. of 7-20-2009, § 86) Sec. 119-418. Meetings, procedure and records. Meetings of the board shall be held at such times as the board may determine or upon call of the chairperson. Such chairperson or, in his absence, the vice-chairperson, may administer oaths and compel the attendance of witnesses. All meetings of the board shall be open to the public. The board shall keep minutes of its proceedings, showing the vote of each member upon each question, or if absent or failing to vote, indicating such facts, and shall keep records of its examinations and other official actions, all of which shall be immediately filed in the office of the board and shall be a public record. A board of appeals quorum shall be three members, and they must concur to pass any order or decree. (Ord. of 7-20-2009, § 87; Ord. of 12-6-2021, § 6) Sec. 119-420. Hearings. The board shall fix a date for the hearing of an appeal within the time specified by its rules, give public notice thereof, and decide the same within a reasonable time. It shall be the duty of the zoning administrator to post notices of the time and place of the hearing in a newspaper of general circulation and by placard on or within 300 feet of the property as measured along the street right-of-way line. Public hearing notices shall follow the procedures set forth in chapter 109, article IV., section 109-69. Upon the hearing of such appeal, any party may appear in person, or by agent or attorney, and shall be allowed to submit testimony or documentation. (Ord. of 7-20-2009, § 89; Ord. of 6-5-2023, § 8) Sec. 119-421. Powers and duties. The board shall have the following powers and duties: (1) Appeals. To hear and decide appeals where it is alleged there is error in any order, requirement, decision or determination made of the zoning administrator in the enforcement of this chapter. (2) Variances. To authorize upon appeal in specific cases a variance from the terms of this chapter such as will not be contrary to the public interest, where, owing to special conditions, a literal enforcement of the provisions of this chapter will result in unnecessary hardship, but where the spirit of the chapter shall be observed and substantial justice done. Such special conditions shall be limited to exceptional narrowness, shallowness or shape of a specific piece of property existing at the time of the enactment of the ordinance from which this chapter is derived, or exceptional topographic conditions or other extraordinary and exceptional situation or condition of such piece of property as would result in peculiar, extraordinary and practical difficulties. No variance shall be authorized unless the board finds that all of the following conditions exist: a. That the special circumstances or conditions applying to the building or land in question are peculiar to such premises and do not apply generally to other land or buildings in the vicinity. b. That the granting of the application is necessary for the preservation and enjoyment of a property right and not merely to serve as a convenience to the applicant. c. That the condition from which relief or a variance is sought did not result from action by the applicant. d. That the authorizing of the variance will not impair an adequate supply of light and air to adjacent property or unreasonably increase the congestion in public streets, or increase the danger of fire, or imperil the public safety, or unreasonably diminish or impair established property values within the surrounding areas, or in any other respect impair the health, safety, comfort, morals or general welfare of the inhabitants of the county. e. That the granting of the variance will be in harmony with the general purpose and intent and policies of the comprehensive plan. f. That the granting of the variance will not allow a structure or use in a district in which that structure or use is prohibited. (3) Conditional approval. In approving a variance or an appeal, the board may impose special conditions that it deems necessary in order to mitigate impacts, which may be expected without the imposition of those conditions. Such conditions may consist of a variety of requirements, including, but not limited to: a. Setbacks from any lot line; b. Specified or prohibited locations for buildings, parking, loading or storage areas or other land uses; c. Restrictions in the location of driveways and curb cuts; d. Maximum building heights and other dimensions; e. Landscaping requirements which may include location, type and maintenance of plant materials, fences, walls, earth berms or other buffer provisions; f. Screening or other protective measures; g. Preservation of existing trees and other vegetation; h. Special measures to alleviate undesirable views, light, glare, noise, dust or odor; i. Permitted hours of operation; j. A requirement that the existing building be retained; k. A requirement that development take place according to a site plan, development plan and/or building plan; l. A limitation on exterior modifications to existing buildings; m. Public facility improvements by the owner to address impacts attributable to the proposed use and the required improvements are proportional to those impacts; n. A time limit within which the property must either be used as allowed by the variance, special exception or other appeal; o. Any other requirement deemed appropriate and necessary as a condition of approval. Requirements imposed, as a condition of approval shall be required of the property owner and all subsequent owners as a condition of the use of the property and continuously enforced by the zoning administrator. (Ord. of 7-20-2009, § 90) Secs. 119-422—119-440. Reserved. ARTICLE IX. AMENDMENTS Sec. 119-441. Initiation of zoning amendments. (a) Amendments to the zoning map or to the comprehensive land use plan may be initiated by majority vote of the board of commissioners, by majority vote of the planning and zoning commission or by application by the owner of the property which is the subject of the proposed amendment or by the owner's authorized agent. (b) Amendments to the text of this chapter or to the comprehensive land use plan may be initiated by: (1) Any member of the board of commissioners; (2) Majority vote of the planning and zoning commission; or (3) Application by any citizen of the county who files an application and pays the required fee. Whenever an amendment is initiated by a county commissioner, by the board of commissioners, or by the planning and zoning commission, the required fee shall be waived. (Ord. of 7-20-2009, § 91) Sec. 119-442. Procedure for amendments. An application for an amendment to this chapter shall be filed with the zoning administrator at least 60 days prior to the date on which it is to be heard by the planning and zoning commission. Applications shall be submitted in compliance with the following: (1) Text amendment applications shall include the following: a. Name and address of applicant. b. Current provisions of the text to be affected by the proposed amendment. c. Proposed wording of the text amendment. d. Statement of reasons for the proposed text amendment. (2) Comprehensive land use plan amendment applications shall include the following: a. A map identifying the geographic area of the county proposed for a revised land use under the applicant's proposal. b. All land uses permitted for the subject area under the existing comprehensive land use plan. c. All changes to existing land use designations that are proposed by the application. d. All land uses immediately adjacent to the subject area under the existing comprehensive land use plan. e. Reasons for the proposed amendment. f. Names and addresses of the owners of land affected by the proposed amendment and their agents, if any, authorized to apply for an amendment and a notarized affidavit of that authorization. g. A written answer and explanation for each of the following standards: 1. Does the proposed amendment permit uses that are suitable in view of the use and development of adjacent and nearby property? 2. Does the proposed amendment adversely affect the existing use or usability of adjacent or nearby property? 3. Will the proposed amendment result in uses that will or could cause an excessive or burdensome use of existing streets, transportation facilities, utilities or schools? 4. Are there other existing or changing conditions affecting the use and development of the property which, because of their impact on the public health, safety, morality and general welfare of the community, give supporting grounds for either approval or disapproval of the proposed amendment? (3) Zoning map amendments applications shall include the following: a. The names and addresses of the owners of the property subject to the zoning map amendment and their agents, if any, authorized to apply for the amendment, and a notarized affidavit of such authorization. b. The present and proposed zoning classifications for the subject property. c. The present and proposed uses for the property. d. A plat of the subject property containing the following information: 1. All property lines with dimensions. 2. Locations of buildings or other structures, floodplains, drainageways, and easements. 3. All proposed street right-of-way lines. 4. A comprehensive concept plan of the proposed use of the property. 5. North arrow, scale, land lot, block and lot numbers. e. A written report providing an answer and analysis for each of the following standards: 1. Does the zoning proposal permit a use that is suitable in view of the use and development of adjacent and nearby property? 2. Does the zoning proposal adversely affect the existing use or usability of adjacent or nearby property? 3. Does the property to be affected by the zoning proposal have a reasonable economic use as currently zoned? 4. Does the zoning proposal result in a use that will or could cause an excessive or burdensome use of existing streets, transportation facilities, utilities or schools? 5. Does the zoning proposal conform to the policy and intent of the comprehensive land use plan? 6. Are there other existing or changing conditions affecting the use and development of the property which, because of their impact on the public health, safety, morality and general welfare of the community, give supporting grounds for either approval or disapproval of the zoning proposal? (4) Public hearings. Public hearings shall be held regarding proposed amendments to the text of this chapter, the comprehensive land use plan or the zoning map, and for any special use permit as follows: a. Prior to decision by the board of county commissioners which results in the adoption of a zoning ordinance, a comprehensive land use plan, or a zoning map, the adoption of an amendment to a zoning ordinance which changes the text of this chapter, the adoption of an amendment to the comprehensive land use plan, the adoption of an amendment to the official zoning map which rezones property from one zoning classification to another, or a special use permit request, the county planning and zoning commission and the board of county commissioners shall hold public hearings on the proposed action. b. At least 30 but not more than 45 days prior to the date of the public hearing by the county planning and zoning commission a notice of the public hearings will be placed in a newspaper of general circulation within the territorial boundaries of the county. The notice shall state the time, place and purpose of the public hearings and, if the zoning decision to be considered is for an amendment to the comprehensive land use plan or the rezoning of property and the amendment to the comprehensive land use plan or the rezoning is initiated by a party other than the county, the notice shall also include the location of the property, the present land use category or zoning classification of the property and the proposed land use category or zoning classification of the property. c. If the zoning decision to be considered is for an amendment to the comprehensive land use plan or the rezoning of property and the amendment to the comprehensive land use plan or the rezoning is initiated by a party other than the county, at least 30 days prior to the date of the public hearing by the county planning and zoning commission, a sign giving notice of the public hearings shall be placed in a conspicuous location on the property. The sign shall state the time, place and purpose of the public hearings and shall include the present land use category or zoning classification of the property and the proposed land use category or zoning classification of the property. d. In cases involving an amendment of the zoning map or the comprehensive land use plan, the zoning administrator shall post signs described in subsection (4)c of this section on or within 300 feet as measured along the street right-of-way line of properties affected by the amendment. For multiple amendments, posting of properties shall not be required. (Ord. of 7-20-2009, § 92; Ord. of 6-5-2023, § 5) Sec. 119-443. Action by planning and zoning commission. The planning and zoning commission shall submit its report to the board of commissioners. Applicants may submit to the zoning administrator any conditions, alterations, changes, or amendments to an application for approval of an amendment to the zoning map, the comprehensive land use plan or to the text of this chapter up to seven days prior to the date at which the application is to be considered by the planning and zoning commission. If such conditions, alterations, changes or amendments have not been submitted as required by this section, the planning and zoning commission may, at its discretion, defer action on the application until its next regular meeting. (Ord. of 7-20-2009, § 93; Ord. of 6-5-2023, § 6) Sec. 119-444. Action by the board of commissioners. The board of commissioners, after receiving the recommendation of the planning and zoning commission, shall take appropriate action on the application at a regularly scheduled meeting of the commission. If the zoning decision is for a rezoning of property and is denied, then the same property shall not be eligible to reapply for a rezoning for a period of six months from the date of the final decision denial by the board of commissioners. (Ord. of 7-20-2009, § 94; Ord. of 6-5-2023, § 7) Sec. 119-445. Conditional zoning. In approving an amendment to the zoning map, the planning and zoning commission may recommend and the board of commissioners may impose special conditions that it deems necessary in order to mitigate impacts that may be expected without the imposition of those conditions. Such conditions may consist of a variety of requirements, including, but not limited to, setbacks from any lot line; specified or prohibited locations for buildings, parking, loading or storage areas or other land uses; restrictions in the location of driveways and curb cuts; restrictions regarding what land uses or other activities may be permitted; maximum building heights and other dimensions; landscaping requirements which may include location, type and maintenance of plant materials, fences, walls, earth berms or other buffer provisions; screening or other protective measures; preservation of existing trees and other vegetation; special measures to alleviate undesirable views, light, glare, noise, dust or odor; permitted hours of operation; architectural style; a requirement that the existing building be retained; a requirement that development take place according to a site plan; a limitation on exterior modifications to existing buildings; public facility improvements by the owner; a time limit within which the property must either be used as rezoned or revert to the prior or other appropriate zoning status; or any other requirement deemed appropriate and necessary as a condition of rezoning. (1) Requirements imposed as a condition of rezoning shall be required of the property owner and all subsequent owners as a condition of the use of the property as rezoned. (2) Requirements imposed as a condition to rezoning shall be interpreted and continuously enforced by the zoning administrator in the same manner as any other provision of this chapter. (3) A conditional zoning shall be noted on the zoning map by adding the suffix "C" to the zoning district designation for the property so zoned. (Ord. of 7-20-2009, § 95) Sec. 119-446. Fee required. Each application for an amendment to zoning map, to the comprehensive land use plan or to the text of this chapter shall be accompanied by a fee in an amount set by the board of commissioners. Under no condition shall said fees or any part thereof be refunded for failure of proposed amendments to map or text to be enacted into law. An application for an amendment to the zoning map affecting the same property shall not be accepted more than once every 12 months, said interval to begin with the date of a final decision by the board of commissioners. The 12-month interval shall not apply to applications initiated by the board of commissioners or the planning and zoning commission. (Ord. of 7-20-2009, § 96) Sec. 119-447. Order of amendments. The permitted order in which amendments may be made to the text of this chapter, the comprehensive land use plan and the zoning map is as follows: (1) The text of this chapter may be amended without prior or subsequent amendment to comprehensive land use plan or the zoning map. (2) The zoning map may be amended without an amendment to the comprehensive land use plan if the proposed amendment would permit a use that is permitted by the comprehensive land use plan. (3) If a proposed amendment to the zoning map would permit a use that is not authorized within the land use category of the subject property as shown on the comprehensive land use plan, then the applicant must obtain an appropriate amendment to the comprehensive land use plan before applying for the rezoning, or the applicant may apply for an appropriate amendment to the comprehensive land use plan and at the same time apply for a zoning map amendment. (4) The comprehensive land use plan may be amended regardless of the zoning district in which the subject property is located. (5) Where an application to amend the comprehensive land use plan and an application to amend the zoning map each affect the same property and are scheduled to be heard at the same hearing, the application to amend the comprehensive land use plan shall be heard first and action authorized by this chapter taken before the application to amend the zoning map is heard and action taken with respect thereto. (Ord. of 7-20-2009, § 97) Sec. 119-448. Periodic review of the comprehensive land use plan. The comprehensive land use plan shall be reviewed periodically, and shall be reviewed annually by the planning and zoning commission, which shall recommend to the board of commissioners such changes as may be necessary or appropriate. (Ord. of 7-20-2009, § 98) Sec. 119-449. General standards for approval of special uses. Any use shown in the table of permitted uses as requiring a special use permit in any district may be permitted after a hearing by the planning and zoning commission and approval of the board of commissioners. The hearing shall follow all procedures required in section 119-442 for zoning amendments. The following standards shall be considered in determining whether the special use permit shall be approved: (1) Is the proposed use suitable in view of the use and development of adjacent and nearby property? (2) Does the proposed use adversely affect the existing use or usability of adjacent or nearby property? (3) Will the proposed use likely cause an excessive or burdensome use of existing streets, transportation facilities, utilities or other public facilities? (4) Is the subject site itself suitable for the proposed use in terms of area, topography, natural conditions, or existing land uses on the site? (5) Is the proposed use suitable in terms of the natural environment on the site and on adjacent and nearby property? (6) Are there other existing or changing conditions which, because of their impact on the public health, safety, morality and general welfare of the community, give supporting grounds for either approval or disapproval of the proposed use? (7) The proposed use may be approved subject to such conditions as may be imposed in order to mitigate impacts which may be expected without the imposition of conditions, and may be regulated in the same manner as provided in section 119-445. (Ord. of 7-20-2009, § 99) Secs. 119-450—119-466. Reserved. ARTICLE X. ADMINISTRATION, ENFORCEMENT, PENALTIES, AND REMEDIES Sec. 119-467. Administration. The duties related to administration and enforcement of this chapter are hereby conferred upon the zoning administration. It shall also be the duty and responsibility of each officer and employee of the county and especially of each member of the police and fire departments to assist the zoning administrator by reporting any new construction and reconstruction of buildings, new land uses and apparent violations of this chapter. (Ord. of 7-20-2009, § 100) Sec. 119-468. Building permit applications. (a) All applications for building permits for the construction of any building or for the alteration of any building where such alteration will cause an increase in the land coverage of such building shall be accompanied by an acceptable drawing or plat in duplicate drawn to scale showing the site plan, the location of the building on the lot as constructed or altered, accurate dimensions of the building and lot and such other information as may be necessary to enable the zoning administrator to determine that the proposed structure and use of land will conform to the provisions of this chapter. (b) Such plan shall be in accord with and accompanied by a boundary line survey made by a qualified surveyor duly registered to practice in the state. The original copy of such applications and plans shall be kept in the office of the zoning administrator and the duplicate copy shall be kept with the building permit at the building at all times during construction. (c) In addition to the requirements stated in subsections (a) and (b) of this section, plats and drawings accompanying an application for a building permit for construction or alteration in the O-I, C-1, C-2 and M districts shall show location, dimensions and identification of all existing and proposed structures, recreation areas, common open areas, landscaping, buffer areas, walls; walkways and similar features; location, layout, dimensions and turning radii of all streets, driveways, maneuver areas and parking areas; and any other information necessary to adequately portray proposed vehicular circulation, parking and other significant features of the development. (d) In those zoning districts requiring compliance with the architectural standards, adequate plans shall be submitted to determine compliance with those standards. Such documents shall include floor plans for each floor, architectural front and side elevation plans, and a section plan to determine compliance with roof slope and height requirements. The plans shall be drawn to scale and of professional quality. Permit applications that seek to introduce a new building type, lot layout, and/or massing that does not have a historical precedent in the county shall be executed by a registered architect. (Ord. of 7-20-2009, § 101; Ord. of 05-06-2025(9)) Sec. 119-469. Application for variance, interpretation or other appeals. (a) An application for a variance, interpretation or other appeal shall be filed with the office of the zoning administrator at least 60 days prior to the meeting of the board of appeals at which it is to be heard. Each application shall be accompanied by a plat drawn to scale containing the following information: (1) All property lines with dimensions. (2) Location of buildings and other structures, creeks and easements referenced to property lines. (3) North arrow, scale, lot and block numbers and land lot. (4) Topographic and drainage information if pertinent. (b) Each application for a variance, interpretation or other appeal shall be accompanied by a remittance of a fee in an amount set by the board of commissioners to partially cover the cost of advertising, field investigation and other expenses involved in processing the application. (c) After review and recording by the zoning administrator, the application for variance, interpretation or other appeal shall be processed in accordance with the appeals procedure in article VIII of this chapter. (d) When action is unfavorable on an application for variance, interpretation or other appeal or where appellant withdraws the application prior to final action by the board, the application may not be resubmitted at lesser intervals than one year. (Ord. of 7-20-2009, § 102; Ord. of 6-5-2023, § 9) Sec. 119-470. Certificate of zoning compliance. (a) No building permit shall be issued for any construction, reconstruction or alteration of a structure unless the zoning administrator has issued a certificate of zoning compliance for such construction, reconstruction or alteration. Such certificate shall be issued only when such use complies with all provisions of this chapter and all other county ordinances. (b) No existing structure or plot of land may be used or occupied for any purpose or use for which it is not presently being used unless a certificate of compliance shall have been applied for and issued by the zoning administrator. Such certificate shall be issued only when such proposed change of use complies with all provisions of this chapter. (c) No fee shall be charged for an original certificate of zoning compliance as required herein. For each copy of an original certificate there shall be a charge which shall be remitted to the county clerk. The amount of the fee charged for a copy of an original certificate shall be as established by the board of commissioners from time to time. (Ord. of 7-20-2009, § 103) Sec. 119-471. Violation and penalties. Any person violating any provision of this chapter or who shall fail to do anything required by this chapter shall be deemed guilty of an offense and upon conviction in magistrate's court shall be punished according to the penalties described in section 1-11. (Ord. of 7-20-2009, § 104) Sec. 119-472. Remedies. In case any building or structure is or is proposed to be erected, constructed, reconstructed, altered, converted or maintained, or any building, structure or land is or is proposed to be used in violation of any provision of this chapter, the zoning administrator, county attorney or other appropriate authority of the county or any adjacent or neighboring property owner who would be especially damaged by such violation may, in addition to other remedy, institute injunction, mandamus or other appropriate action or proceeding to prevent such unlawful erection, construction, reconstruction, alteration, conversion, maintenance or use or to correct or abate such violation, or to prevent the occupancy of such building, structure or land. Where a violation of these regulations exists with respect to a structure or land, the planning and zoning commission may, in addition to other remedies, notify all public utilities and county service departments of such violation and request that service be withheld therefrom until such time as the structure or premises are no longer in violation of these regulations. (Ord. of 7-20-2009, § 105) Sec. 119-473. Cumulative remedy. The remedies herein provided shall not be exclusive but shall be cumulative of all other remedies provided by law. (Ord. of 7-20-2009, § 106) Secs. 119-474—119-499. Reserved. ARTICLE XI. LEGAL STATUS PROVISIONS Sec. 119-500. Interpretation, purpose and conflict. In interpreting and applying the provisions of this chapter, they shall be considered as the minimum requirements for the promotion of the public safety, health, morals and general welfare. It is not intended by this chapter to interfere with or abrogate or annul any easements, covenants or other agreements between parties; provided, however, that where this chapter imposes a greater restriction upon the use of property or premises or upon the height of buildings, or requires greater space than is imposed or required by other resolutions, rules or regulations, or by easements, covenants or agreements, the provisions of this chapter shall govern. (Ord. of 7-20-2009, § 107) Sec. 119-501. Validity. Should any article, section or provision of this chapter be declared by a court of competent jurisdiction to be invalid, such action shall not affect the validity of the chapter as a whole or any part thereof other than the part so declared to be invalid, each article, clause and provision hereof being declared severable. (Ord. of 7-20-2009, § 108) A ACTIONS. See: SUITS, ACTIONS AND OTHER PROCEEDINGS ACTS. See: SPECIAL ACTS AND RELATED LAWS AD VALOREM TAXES (Generally). See: TAXATION AFFIRMATION. See: OATH, AFFIRMATION, SWEAR OR SWORN AGENCIES. See: DEPARTMENTS AND OTHER AGENCIES OF COUNTY AGENTS Development authority Water and sewer authority AGREEMENTS. See: CONTRACTS AND AGREEMENTS AMENDMENTS Development authority Powers; to adopt and amend a corporate seal and bylaws II-4(4) APPROPRIATIONS. See: FINANCES ARCHITECTURAL CONCERNS Water and sewer authority ASSESSMENTS Water and sewer authority ATTORNEYS Water and sewer authority AUTHORITIES, BOARDS AND COMMISSIONS Board of commissioners.......................................... I-1 et seq. See: BOARD OF COMMISSIONERS Development authority .......................................... II-1 et seq. See: DEVELOPMENT AUTHORITY Water and sewer authority ...................................... III-1 et seq. See: WATER AND SEWER AUTHORITY B BOARD OF COMMISSIONERS Bonds