Sec. 94-113. Underground electric and communication utilities.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Undergrounding utilities. Utilities, including telephone, electric power, and cable television in both public and private rights-of-way, shall be placed underground for all new developments with total floor areas 20,000 square feet or over. This requirement does not apply to high voltage power lines.
(b) Fee in lieu. Except when extreme conditions of underlying rock, the expense to bury overhead utilities is deemed to be unreasonably costly due to the complexity of the work, or other conditions prevent this requirement from being met, the developer may request approval from the zoning official a fee-in-lieu arrangement with the project developers.
(1) Developer shall contribute toward the city's utility conversion fund in lieu of requiring burial of the utilities. Such fee-in-lieu arrangement shall be based on a cost per linear foot of such underground relocation of utilities established by the city council, and it may be adjusted from time to time by city ordinance.
(2) A city fund, known as the "The City of Jasper Utility Conversion Fund" is hereby created. The purpose of said fund is to accept deposits as described herein, along with other funds or grants apportioned by the mayor and city council, and the use of such funds shall be restricted for the sole purpose of offsetting the cost of projects undertaken by the city that bury or relocate power lines from streets and sidewalks.
(c) Sequencing. Fee in lieu or burial of utilities shall be done prior to issuance of any certificate of occupancy being issued for structures in any phase abutting the right-of-way within which the overhead utilities are situated.
(d) New residential dwellings shall be attached to a permanent foundation constructed in accordance with the building code or State of Georgia regulations, as applicable. The area beneath the ground floor of the dwelling shall either be a slab foundation or shall be enclosed around the exterior of the dwelling with a foundation wall of masonry at least four inches thick, penetrated by openings only for installed vents or access doors. No new residential dwelling shall be permitted connection to municipal water or sewer systems unless it is attached to a permanent foundation.
(e) In all single and multi-family residential developments:
(1) Individual systems for water, fuel/gas, and HVAC shall be required for each unit.
(2) Individual metering shall be provided for water, electric, and fuel/gas.
(3) Easements for utility lines shall be provided in the common ownership area where lateral service connections shall take place.
(4) The zoning official is authorized to grant an administrative variance allowing relief to this subsection (d) in accordance with division 8.3.
History
(Ord. No. 2021-01, § 1(Attch.), 2-1-2021; Ord. No. 2023-07, § 1(a)(Exhs. 1—3), 6-5-2023)