Sec. 94-3. Permits required.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

(a) Required permits include, but are not limited to the following:

(1) Building permit. A building permit, to indicate and ensure compliance with all provisions of this chapter, shall be required for any proposed use of lands or building before any improvements or grading of lands or any alteration or construction of buildings commences.

(2) Development permit. Before any improvements or grading of the land commences, a development permit shall be required.

(b) Site plan requirements. All applications for development and building permits shall be made to the city. Land disturbance permits will not be issued until a site plan and an erosion, sedimentation and pollution control plan have been approved by the local issuing authority or Georgia Soil and Water Conservation Commission (if applicable). Site plans shall include all the following information, unless determined to be unnecessary by the zoning official based on the scale and scope of the project:

(1) Name. Name of the proposed development, names, addresses, and phone number of the owners, and the professional who drafted the site plan and their seal.

(2) Date and scale. Date, north arrow, and graphic scale.

(3) Survey boundaries. Surveyed boundaries of the entire tract and their relationship to adjoining properties, public rights-of-way, and easements.

(4) Location map. A general location map, indicating existing zoning on or adjacent to the site, adjoining roads, and the adjacent areas.

(5) Building locations. Location of all proposed buildings, their shape, size, and set back in appropriate scale.

(6) Parking and loading. All required parking and loading facilities for nonresidential uses.

(7) Right-of-way. Show the location, with lengths and widths, and the name or purpose of all rights-of-way of streets, roads, alleys, railroads, public crosswalks, and applicable easements. Both public and private roads shall be constructed to current Georgia Department of Transportation standards at the time of application.

(8) Buffers. Show the location and design of proposed and required buffers and landscaping.

(9) Environmentally sensitive areas. Show building or development proximity to water supply watershed protection district, wetlands protection district, mountain protection district and the boundary and elevation of the 100-year floodplain as determined by the past history of flooding or the best available data.

(10) Proposed improvements. The names, where appropriate, and locations and dimensions of proposed streets, alleys, sidewalks, easements, buildings, parking and loading, dumpsters, recreation areas and facilities, yards, landscaping, and other open spaces.

(11) Existing and proposed utilities. The locations of any existing and proposed utilities (i.e., gas/fuel, electric, water, sewer, or telecommunication infrastructure) together with any private wells, septic tanks, and septic drainage fields, as applicable.

(12) Adjacent developments. All other information concerning the lot or adjoining lots may be essential to determine whether the proposed development meets the provisions of this chapter shall be included in the sketch plan.

(13) Stormwater management plan. This plan shall comply with the current Georgia Stormwater Management Manual (GSMM) for water quality and quantity and be prepared by a registered professional Engineer licensed in the state of Georgia. Stormwater detention/retention shall be on the property being developed unless stormwater management can be provided by city stormwater infrastructure and capacity can be illustrated by the plan as determined by the city.

(14) Additional information as required to enable staff to adequately determine that the site standards of the following related chapters have been met:

a. Chapter 26, Environment; and,

b. Chapter 34, Flood damage prevention; and,

c. Chapter 66, Streets, curbs, and sidewalks; and,

d. Chapter 70, Subdivisions; and,

e. Chapter 82, Utilities and,

f. Chapter 86, Vegetation.

(15) Additional information requested by staff to adequately determine if all conditions of the zoning ordinance or other approvals have been met.

(c) Building plan requirements. All commercial building plans shall be prepared by a professional engineer or professional architect licensed to practice in the State of Georgia. Boundary surveys and plats shall be prepared by a professional engineer or surveyor licensed to practice in the State of Georgia. All professionals shall be registered under Georgia laws regulating the practice of building design, architecture, or engineering and shall affix their official seal and signature to said drawings and specifications.

(d) Issuance of building permit. If the proposed building or development activity as set forth in the application are in conformity with the provisions of this chapter and other City of Jasper Ordinances and Codes, then the zoning official shall issue a permit upon payment of the required fee. If a permit is denied, the zoning official shall state such refusal, in writing, with cause. The zoning official shall not issue any permit if the land or building as proposed to be used, constructed, or altered would be in violation to any provisions of this chapter or any codes and laws of the city, state, or federal government, except as provided herein.

(e) Duration of permit validity/expiration.

(1) If the work authorized in any permit has not begun within 180 days from the date of permit issuance, the permit expires and has no further effect.

(2) If the work described in any permit has not been substantially completed within two years of the date of permit issuance, the permit expires and has no further effect.

(3) There shall be no reimbursement of any payment made to the City of Jasper to cover fees incurred during the plan review or permit issuance process, unless it is found by the zoning official that the original fee incurred was the result of a clerical error.

(4) The zoning official is authorized to revoke any permit previously issued if upon site inspection the zoning official finds evidence that certain site improvements have been made or land uses have been performed which are outside authorized scope of the approved permit; or, which are in violation of municipal ordinances applicable to the project; or, which are in violation of any condition of approval tied to the permit at the time of its issuance.

(f) Certificate of occupancy required.

(1) A certificate of occupancy/completion issued by the zoning official is required in advance of the occupancy or use of:

a. Any building, structure, land, or premises.

b. Any building or structure hereafter erected or moved.

c. Any building hereafter altered, so as to affect the front, side, or rear yards thereof, or its height.

d. Any building, structure, or premises in which there is a change of occupancy or use.

(2) The zoning official shall sign and issue a certificate of occupancy/completion if the proposed use of land or building, as slated on the certificate of occupancy/completion, is found to conform to the applicable provisions of this chapter, and if the building, as finally constructed, complies with the plans submitted for the building and/or development permits.

History

The history line the source prints at the end of the section.

(Ord. No. 2021-01, § 1(Attch.), 2-1-2021; Ord. No. 2023-07, § 1(a)(Exhs. 1—3), 6-5-2023; Ord. No. 2024-10, §§ 1(a), 1(b), 5-6-2024)

Meetings that refer to this section

Found 2: meetings of this government whose minutes or machine transcripts name this section, or an ordinance in its history line, newest first. Found by rule from those records' own words. A reference is a pointer to another record, not a statement that the section applies or was changed.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:jasper/zoning/94-3@2026-11-11-665581079c

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Jasper Zoning Ordinance, Sec. 94-3. Permits required | Georgia Commons