Jasper · Zoning Ordinance
Part II - CODE OF ORDINANCES / Chapter 94 - ZONING / Article VI - BUILDING REGULATIONS / Division 6.3 - SUSTAINABILITY REQUIREMENTS
Sec. 94-99. Calculation and evaluation.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(a) Minimum points required.
(1) All commercial, multi-family, and mixed-use projects, unless otherwise noted, shall achieve a minimum of four points from any combination of the sustainable development measures as valued in Table 94-100, Sustainability measures.
(2) Single-family developments shall achieve a minimum of one point per lot.
Individual lot development or redevelopment is not required to fulfill sustainability requirements of this division.
(b) Minimum requirements of the measure. All points shall be awarded based on meeting the minimum requirements of each sustainability measure, as indicated in this section.
(c) Required documentation. The following documentation is required:
(1) Documentation of which measures and total number of points the applicant will achieve shall be indicated on the development permit application submitted to the city.
(2) Documentation is required to clearly illustrate the extent to which the minimum requirements of each of the selected measures is to be met through permanent construction or policies.
History
(Ord. No. 2021-01, § 1(Attch.), 2-1-2021)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.