(a) Business signs, accessory to and on the same premises as uses permitted in this district, provided that no sign shall project more than three feet from the main building, nor shall any sign hang lower than eight feet to any sidewalk. (b) Customary accessory uses and structures when located on the same lot as the main structure, excluding, however, open storage. 74.3 Off-street parking requirements. Off street parking shall be provided as required in article VI, section 62 of this ordinance. Furthermore, all nonresidential parking areas shall be so located and designed as to avoid undue interference with the use of public streets and alleys and shall be graded and paved within one year of the completion or conversion of a building for nonresidential uses. 74.4 Dimensional requirements. Within any P-R professional residential district as shown on the zoning map the following requirements shall be complied with: (a) Minimum required lot area for the first dwelling unit—7,200 square feet. (b) Minimum additional lot area per dwelling unit for each unit in excess of one—3,000 square feet. (c) Minimum required lot width—60 feet at the front building line for the first dwelling unit plus an additional five feet of lot width for each unit in excess of one. (d) Minimum required building setback line—25 feet. (e) Minimum required side yard—Eight feet each. Corner lots must have an additional ten feet along the side street line. (f) Minimum required rear yard—25 feet. (g) Maximum permissible lot coverage. The total ground area covered by the principal building and all accessory buildings shall not exceed 50 percent of the total lot area. (h) Height of buildings shall not exceed 50 feet. (i) Open space: A minimum of 20 percent of the total area of a parcel shall be maintained as open space when that parcel of property is developed or redeveloped. This requirement shall apply to the following zoning classifications: P-R, C-2, C-3 and LI. (j) Upon proof of hardship, said occupancy will be allowed to open when all requirements are met, except green space requirements. A bond equal to one percent of total cost of project will be required before opening with forfeiture of 90 days after occupancy. Upon extreme hardships, such as drought and other natural occurrences, could warrant an extension of a 90-day period when approved by building inspector and city manager.