(1) Scale. Residential site plans shall be drawn to scale and may be shown on a certified boundary survey of the lot or any other drawing showing the information required below. The department may accept a residential site plan drawn to the same scale as shown on the final plat where sufficient detail can be shown to support an adequate review and approval. (2) Accuracy. It is not the intent of the department that the residential site plan be prepared by a registered surveyor or engineer, but may be done by the individual proposing the improvements on the lot. It is the intent, however, to receive a drawing with sufficient readability and accuracy to ensure that the proposed improvements will be constructed on the lot in conformance with the requirements of these regulations, the zoning ordinance, or other regulations, as applicable. (3) Residential site plan checklist. The residential site plans shall conform to checklists maintained by the department of community development. (4) Chattahoochee River Corridor. If a lot is located in the Chattahoochee River Corridor, a certificate of occupancy shall not be issued for the structure or other improvements until conformance to the provisions or other requirements of the residential site plan have been field verified by a city inspector. A certified as-built survey prepared by registered land surveyor may be required where, in the opinion of the director, the river corridor requirements may not have been met.