Johns Creek · Zoning Ordinance
Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 113 - DEVELOPMENT REGULATIONS / Article XI - STREET DESIGN AND CONSTRUCTION REQUIREMENTS
Sec. 113-131. Sidewalks and multi-use trails.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
(1) General requirements.
a. The location where multi-use trails shall be installed in lieu of sidewalks is shown on the future sidewalk and trail network map maintained by the department of
public works. The director of public works may require the installation of additional sidewalks/multi-use trails where it may
be deemed appropriate to provide connectivity to existing or proposed multi-use trail segments.
b. Sidewalks/multi-use trails and curb ramps shall be constructed along the entire property frontage in all new development or redevelopment and along all abutting or internal streets, existing or new, private or public. Where a sidewalk or multi-use trail is not shown on the future sidewalk and trial network map the director of public works may
waive the required installation on the abutting street(s). Whenever a discrepancy occurs between the design and construction standards of this section and any state or federal regulation, then the most restrictive shall apply.
c. The director of public works may require the installation of sidewalks/multi-use
trails, where appropriate, to provided pedestrian connectivity to adjacent parcels or projects.
d. Sidewalks/multi-use trails shall be installed within the right-of-way or within an easement specifically designated for
sidewalk/multi-use trail use as approved by the city.
(2) Sidewalk/multi-use trail installation and timing. Sidewalks/multi-use trails shall be installed as follows:
a. Residential subdivision projects.
Sidewalks/multi-use trails shall be installed on both sides of new internal public or private streets (including "eyebrow" turnarounds) and along the entire frontage of all abutting external streets (abutting side). Sidewalks are
required on only one side of internal public or private streets in projects developed at densities of 1.5 units per acre or less or where it is determined by the director of public works that a
sidewalk on one side of the street meets the intent of these requirements, i.e. a cul-de-sac street serving less than ten
lots. Sidewalks/multi-use trails are required adjacent to cul-de-sac turnarounds in accordance with the standard drawings.
1. Residential subdivision developer responsibility. Developers shall install sidewalks/multi-use trails on abutting external streets as shown on the future sidewalk and trail network map, "passive" recreation area lots, and open space lots, and shall install intersection radius curb ramps at new street intersections, and L-shaped mid-block ramps at cul-de-sac turnarounds, prior to approval of the final plat.
Sidewalks/multi-use trails on "active" recreation area lots shall be installed prior to issuance of a certificate of occupancy or shall be installed by the developer prior to release of the subdivision maintenance surety agreement, whichever is earlier. Developers shall also install sidewalks/multi-use trails on any vacant lots remaining between developed lots (i.e.
dwellings under construction or completed) prior to release of the subdivision maintenance surety agreement.
2. Homebuilder responsibility.
Homebuilders shall install sidewalks/multi-use trails, and curb ramps not required to be installed by developers, on building lots prior to release of the certificate of occupancy for a home.
b. Nonresidential subdivision projects.
Sidewalks/multi-use trails shall be installed on both sides of new internal streets (including cul-de-sac and "eyebrow" turnarounds) and along the entire frontage of all abutting external streets (abutting side) prior to approval of the final plat.
c. Non-subdivision projects.
Sidewalks/multi-use trails shall be installed along the entire frontage of all abutting streets (abutting side) prior to the issuance of a certificate of
occupancy or completion.
d. Drainage. Where sidewalk/multi-use is required and no curb and gutter exists
the developer shall install all necessary drainage facilities, i.e. curb and gutter or swales. The facilities shall be constructed at the developers' expense to minimize
the flow of water on or over the sidewalk/multi-use trail section and to comply with allowable gutter spread requirements. Where drainage swales are used the swale shall be located between the roadway and sidewalk section.
e. Maintenance surety agreement.
Maintenance surety agreement provided to the city shall include the cost of sidewalk/multi-use trail construction in an amount acceptable to the city.
f. Escrow alternative.
1. The cost of sidewalk/multi-use trail installation may be set aside in escrow with the department of public works if proposed road improvements by the city or the Georgia Department of Transportation may impact the location of a sidewalk/multi-use trail.
2. Where the director of public works determines the topography of the road frontage is such that a special hardship exists on the property, he may authorize a payment to the city in lieu of the required installation of the sidewalk. Criteria shall be established for all such approved hardships by the director of public works to determine how the amount of payment will be calculated. Such criteria to determine the method of calculating such payment shall be approved by the city council and may be amended by the council thereafter upon recommendation of the director of public works or the city manager.
(3) Sidewalk/multi-use trail design and construction standards. Sidewalks/multi-use trails shall be constructed in accordance with the requirements of this section. The public works director is authorized to grant
modifications upon specific application due to topographic or drainage difficulty as well as alternative design proposals.
a. Width.
1. Sidewalks shall be at least five feet wide on new internal subdivision
streets. Sidewalks shall be at least five feet wide on abutting external streets.
2. Multi-use trails shall have a minimum width of ten feet.
3. If the street is part of an approved sidewalk, pathway or transportation plan then the width and location of the sidewalk shall conform to the requirements of the approved plan.
b. Shoulder. Sidewalk and multi-use trails shall be provided with a minimum graded
shoulder width of two feet. When required to support alternative uses, i.e.
equestrian, mountain bikes, etc., a five-foot graded shoulder may be required. The slope of the shoulder shall not exceed ± two percent.
c. Transitions. Where new sidewalks/multi-use trails tie in to existing sidewalks/multi-use trails of a different width or where the proposed
sidewalk/multi-use trail must change width then the transition shall be made in a gradual manner at a rate of 5:1. Where this transition is made to tie in to an
existing sidewalk/multi-use trail at a property boundary the full width sidewalk/multi-use trail shall extend along the entire length of the project site.
d. Non compliant sidewalks/multi-use trails.
1. All sidewalks/multi-use trails along a property frontage that do not meet the width standards as established in these regulations shall be brought in to compliance with these regulations.
2. When the public works director has determined that the existing sidewalk/multi-use trail is in satisfactory condition the additional width may be achieved by adding additional width to one side of the sidewalk/multi-use trail as approved. In no case shall this additional width be less than one foot.
3. In all areas where the condition of the sidewalk/multi-use trail is deemed unsatisfactory the existing sidewalk/multi-use trail shall be removed and replaced in conformance with these regulations.
e. Landscape strips.
1. Sidewalks/multi-use trails shall be located at least two feet from the back of curb. Sidewalks/multi-use trails in subdivisions in which street trees are provided shall be located at least five feet from the back of curb (bridges excepted). Where no curb exists, or if road improvements are proposed for installation by the city, sidewalks/multi-use trails, including appropriate drainage facilities, shall be constructed in a location acceptable to the department of public works.
2. In areas where a setback from the curb cannot be provided due to unusual site conditions the department of public works may approve the installation of the sidewalk/multi-use trail at the back of curb. In these areas the sidewalk/multi-use trail width may be increased to allow a minimum of four feet of clearance from any portion of an obstruction that must be located adjacent to the roadway, i.e. mailboxes, etc...
f. Meandering sidewalks/multi-use trails.
Meandering sidewalks/multi-use trails should be incorporated into the design when appropriate and when approved by the public works director. The design of the meanders shall be done in such a
manner that the travel distance is not significantly increased for the general public. The public works director may also require meanders when it is deemed to be in the best interest of the city or where necessary to avoid obstructions
in the right-of-way that may otherwise be too costly to relocate.
g. Cross slope. Sidewalks/multi-use trails shall be constructed with a maximum
cross slope of two percent.
Sidewalks/multi-use trails shall not exceed this cross slope at driveway crossings.
h. Running slope. The running slope of sidewalks/multi-use trails that are located adjacent to the roadway shall not exceed five percent. When the grade of the
adjacent roadway is in excess of five percent the running slope of the sidewalk/multi-use trail may follow the general grade established for the adjacent roadway.
i. Material.
1. Sidewalks shall be constructed of concrete at least four inches thick and six inches thick across driveway sections. Concrete shall be class "B" (as defined by GDOT) with a minimum strength of 3,000 PSI at 28 days.
2. Multi-use trails shall be constructed of concrete at least six inches thick.
Concrete shall be class "B" (as defined by GDOT) with a minimum strength of 3,000 PSI at 28 days.
3. Alternate materials may be required in special overlay or historic districts.
j. Final stabilization. Disturbed areas resulting from sidewalk/multi-use trail construction shall be backfilled, stabilized, and grassed or landscaped.
k. Georgia DOT controlled roads.
Sidewalks/multi-use trails located in the right-of-way of roads under the
jurisdiction of the GDOT shall be constructed in accordance with GDOT design and construction standards.
(4) Sidewalk/multi-use trail curb ramp design and construction standards.
a. Intersection radius curb ramps shall be provided at street intersections. Straight ramps may be provided at intersections
of curbed driveways and at streets without sidewalks/multi-use trails.
b. All curb ramps shall be provided with detectable warning strips that comply
with state and ADA specifications.
(5) Damage repair. Damage to sidewalks/multi-use trails and ramps caused by construction or development activity shall be repaired in accordance with this article and subsection 113-147(10) of these regulations.
The repairs shall be made at no cost to the city within ten days or prior to issuance of a certificate of occupancy or completion, whichever is earlier.
The public works director may require the developer or utility responsible for the damage to establish alternate routes or temporary crossings of the obstruction when deemed to be in the best interest of the general public.
History
(Ord. No. 2009-06-18, (11.11), 6-29-2009)
Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.