(1) Utilities within the roadway. a. All water and sanitary sewer utilities and storm drain facilities within the roadway shall be installed and the ditches backfilled and thoroughly compacted before any pavement or base is installed. b. All utility installations shall comply with applicable local, state and federal requirements for erosion and sediment control. (2) Installation of utilities after the placement of base material.Once the base has been placed, proof-rolled and approved for paving all further installation of utilities under the roadway shall be bored or other wise comply with section 113-147, street cuts. (3) Manholes, valve boxes, etc. within the road section. All utility manholes and valve boxes shall be brought flush to the finished grade within the roadway section.