Skip to content
Georgia Commons
Menu

Johns Creek · Zoning Ordinance

Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 113 - DEVELOPMENT REGULATIONS / Article XII - UTILITIES AND EASEMENTS

Sec. 113-146. Easements.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

The following applies only to easements which have been expressly dedicated to and accepted by to the city.

(1) Drainage easements.

a. Temporary construction easements and permanent easements for drainage shall be dedicated to the city in accordance with these regulations

when said easement is deemed to be in the best interest of the public health, safety or welfare. The city shall not be responsible for any easements that are not: (i) expressly dedicated to the city by execution of an easement agreement filed and recorded with the county superior court which (ii) has been accepted by the city through ratification of the city council. All easements shall be stabilized in accordance with the manual for erosion and sediment control in Georgia.

b. Drainage easements are required for any part of the drainage system which is designed to carry stormwater runoff from more than one parcel, existing or proposed.

c. Drainage easements for improved ditches, pipe construction, and detention facilities shall be cleared, opened, and stabilized at the time

of development to control surface water run-off. Run-off slope and side slopes shall be specified by the developer's engineer, according to good engineering practice, these regulations and the applicable provisions provided in the stormwater management design

manual.

d. Drainage easements for storm drain pipes shall be provided according to the minimum requirements found in the table below. The minimum easement width shall be 20 feet when no other parallel utilities are located therein. For pipe sizes not shown on the table below the easement width shall be based on the pipe diameter (span) plus two feet,

plus two times the pipe invert depth.

This value shall be rounded up to the nearest five feet. For pipes exceeding 16 feet in depth, a presubmittal conference shall be held with the city to determine what additional requirements may be required.

Table 12.6-1 Easements for Storm Drain Pipes Pipe Size (In) Minimum Easement Width (Ft) Invert Depth (Ft) 4 5 6 7 8 9 10 11 12 13 14 15 16 15 20 20 20 20 20 25 25 30 30 30 35 35 40 18 20 20 20 20 20 25 25 30 30 30 35 35 40 24 20 20 20 20 20 25 25 30 30 30 35 35 40 30 20 20 20 20 25 25 25 30 30 35 35 35 40 36 20 20 20 20 25 25 25 30 30 35 35 35 40 42 NA 20 20 20 25 25 30 30 30 35 35 40 40 48 NA 20 20 20 25 25 30 30 30 35 35 40 40

54 NA NA 20 25 25 25 30 30 35 35 35 40 40

60 NA NA 20 25 25 25 30 30 35 35 35 40 40

66 NA NA NA 25 25 30 30 30 35 35 40 40 40

72 NA NA NA 25 25 30 30 30 35 35 40 40 40

(2) Common easements. A common easement for sanitary sewer and drainage purposes may be allowed if the pipes

are parallel and at least ten feet is provided between pipes (outside of pipe to outside of pipe). The easement width

shall be equal to the width shown in the table in subsection (1) of this section plus the distance separating the pipes (minimum of ten feet).

(3) Drainage easements for surface drainage. Drainage easements shall be provided where a development is traversed by or contains a water course, impoundment, detention facility, improved channel, floodplain, natural stream or channel. It shall conform substantially to the flooding limits of the 100-year storm

based on fully developed conditions per the land use plan, but shall be no less than 20 feet in width.

(4) Obstruction of drainage easements.

a. The property owner will be required to keep the easement free of obstruction in such a way as to assure the maximum designed flow at all

times. The property owner shall not alter any drainage improvements.

Structures, except driveways, shall not be constructed or erected in an easement. Driveways shall cross an easement as close to perpendicular as practical. Fences in drainage easements may be accepted with approval from the public works

director as long as the fence makes a perpendicular crossing of the easement and there are gates or removable panels within the easement. Property owners may plant landscaping in an easement that is

piped with the approval of the city.

Some landscape materials, such as large trees or shrubs, may not be appropriate for use within an easement.

b. No structure whatsoever shall be constructed in storm sewer easements that have been expressly dedicated to and accepted by the

city, including vehicular easements around facilities without approval from the public works director. No planting shall take place within the easement that will impede access along the easement or endanger any infrastructure therein. No other pipeline or utility shall be placed in the easement without approval by the public works director.

(5) Stabilization of drainage easements. All drainage, sewer, access or other easements which were required to be cleared shall be fine graded, seeded and mulched

immediately upon the completion of construction work or if any significant delay is anticipated in the completion of the

work. The use of sediment control measures may be required to protect the area until a comprehensive vegetative

cover is obtained.

(6) Placement of fill in drainage easements.

No fill shall be placed on a storm sewer easement that have been expressly dedicated to and accepted by the city without approval from the public works director. All manholes must extend to the ground surface but shall not impede access where the drainage easement is intended to provide for vehicular access.

All easements terminating on a parcel shall extend to the property line.

(7) Sanitary sewer easements. Permanent sanitary sewer easements shall be no less than 20 feet in width when no other parallel utilities are located therein or as required by the sanitary sewer authority.

When warranted, temporary construction easement widths shall be determined by the county.

(8) Potable water easements. Permanent water easements shall be as required by the water authority.

(Ord. No. 2009-06-18, (12.6), 6-29-2009; Ord.

No. 2011-03-06, § 3, 3-28-2011)

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:johns-creek/zoning/113-146@2026-11-11-de9649bc0f

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Johns Creek Zoning Ordinance, Sec. 113-146. Easements | Georgia Commons