--- title: Johns Creek Zoning Ordinance, Sec. 113-162. Earthwork collection: local-codes id: local-code:johns-creek/zoning/113-162 cite_as: Johns Creek, Ga., Zoning Ordinance ยง 113-162 canonical_url: https://georgiacommons.org/code/local/johns-creek/zoning/113-162 md_url: https://georgiacommons.org/code/local/johns-creek/zoning/113-162.md text_url: https://georgiacommons.org/code/local/johns-creek/zoning/113-162/text source_url: https://library.municode.com/ga/johns_creek/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:johns-creek jurisdiction_name: Johns Creek place_fips: "1342425" corpus_version: local-codes-johns-creek-d82a33babc69 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/johns-creek/zoning/~part-ii/~part-a/~chapter-113/~article-xiii.md previous: https://georgiacommons.org/code/local/johns-creek/zoning/113-161.md next: https://georgiacommons.org/code/local/johns-creek/zoning/113-163.md index: https://georgiacommons.org/code/local/johns-creek.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:johns-creek/zoning/113-162@2026-11-11-b2927cf076 --- # Johns Creek Zoning Ordinance, Sec. 113-162. Earthwork > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 113 - DEVELOPMENT REGULATIONS / Article XIII - GRADING AND DRAINAGE (1) Clearing and grubbing. a. The area within the typical grading section shall be cleared of all trees, brush, stumps, logs, grass roots, vegetable matter, poles, stubs, rubbish, refuse dumps, sawdust piles, and all other matter resting on or protruding through the original ground surface or appearing or being placed on the area within the typical grading section before final acceptance of work. b. This item also includes the removal and proper disposal of all the debris or any obstructions not to be salvaged such as fences and incidental structures within the proposed area to be graded, which might interfere with construction. c. Clearing and grubbing operations shall be conducted in such a manner as to prevent damage to existing structures, trees to remain and/or protected by ordinance, equipment and any proposed work that has been completed, and to provide for the safety of workmen and other personnel on the job site. (2) Grading. a. Grading shall be done in accordance with the lines and grades shown on the approved plan. b. Grading plans shall show existing and proposed contour lines at an interval of not more than two feet and spot elevations and flow arrows where needed. c. A grading plan showing building pad locations may be required to be submitted to ensure adequate lot-to-lot drainage. d. Grading plans shall outline the areas which are required to remain undisturbed, i.e. tree protection areas, undisturbed buffers, stream buffers, wetlands, floodplains etc., and shall indicate protective fencing or staking to be placed around such areas. e. Shoulder sections shall be provided as required in article XI. f. If the proposed grading is within the jurisdiction of the Metropolitan River Protection Act, the grading shall be consistent with the river corridor certificate approved for the project. g. Grading for all roads and improved ditches and channels shall be shown. h. Unclassified excavation consists of all roadway and drainage excavation, regardless of the nature of the material or the manner in which it is removed. It includes the removal and disposal of unsuitable or unstable material under the roadbed section and back filling with suitable materials. i. All rock and boulders in the roadbed shall be excavated to a depth of at least 12 inches below the sub-grade and the space back-filled to the correct grade with material suitable as sub-grade. j. Where materials unsuitable for foundation or roadway purposes occur within the limits of the roadbed and front slopes, the same would be excavated to the bottom of their depth and removed. (3) Cuts and fills. a. All depressions below the ground surface containing water shall be drained, unsuitable material removed and filled with suitable material and compacted to the ground surface before the embankment proper is begun. Any area deemed jurisdictional under federal, state or local regulations shall obtain required approvals or permits prior to any land disturbing activities in those areas. b. The entire area upon which the cut or fill is to be placed shall be plowed, scarified and finely broken up to a depth of at least six inches and all cleavage plains shall be destroyed before the embankment is begun. c. The fill material shall be deposited and spread in uniform horizontal layers not to exceed six inches thick for the full width of the cross sections and the layers shall be kept level by any approved equipment. d. Each layer shall be compacted at moisture content proper to permit the compaction specified below. Material containing too much water shall be dried to the correct moisture content. If the material is too dry, water shall be added and uniformly mixed with the soil before it is compacted. e. The top 12 inches of embankment shall be compacted to at least 100 percent of the maximum laboratory dry density as determined by AASHTO method T-99. Embankment material located between one foot and six feet below the top of the embankment shall be compacted to at least 90 percent of maximum laboratory dry density as determined by AASHTO method T-99. The measurements of depth as described above shall begin at an elevation equal to the bottom of sub-grade treatment where sub-grade treatment material is used. f. Maximum slope in cut or fill sections shall be 2:1. The slope of cut or fill shall be uniform throughout for each section of cut or fill unless benching is approved by the city. g. If the 2:1 slope shows evidence of shearing, non-cohesiveness, sliding, or inability to maintain compaction, the slope shall be stabilized at 3:1 or by using such mechanical methods as needed (such as retaining walls or "grow mats" stapled in place) to maintain slope, height, and integrity. h. When a cut is made in rock that requires blasting, slope may be changed to vertical slope upon the written approval of the city engineer and only under the following conditions: 1. When accompanied by a certification from a registered professional geotechnical engineer stating that the slope material is stable; 2. In no instance shall the slope face be steeper than vertical - one-eighth-inch batter is preferred; and 3. The slope face is free from all deleterious material and is not subject to long-term erosion due to excessive runoff on the face of the slope. [i.] All slopes steeper than 2.5:1 and greater than ten feet in height shall be hydro-seeded and covered with GDOT approved matting and blankets. All slopes must be protected until a permanent vegetative stand is established. [j.] Slopes over 20 feet in height shall be stabilized in stages by matting and vegetation. Stabilization measures shall be placed in vertical increments not to exceed 20 feet immediately at the completion of each 20 foot lift. A minimum of a four-foot bench every 20 feet is required on 2:1 slopes. ## History (Ord. No. 2009-06-18, (13.2), 6-29-2009)