--- title: Johns Creek Zoning Ordinance, Sec. 113-164. Drainage systems collection: local-codes id: local-code:johns-creek/zoning/113-164 cite_as: Johns Creek, Ga., Zoning Ordinance § 113-164 canonical_url: https://georgiacommons.org/code/local/johns-creek/zoning/113-164 md_url: https://georgiacommons.org/code/local/johns-creek/zoning/113-164.md text_url: https://georgiacommons.org/code/local/johns-creek/zoning/113-164/text source_url: https://library.municode.com/ga/johns_creek/codes/code_of_ordinances date: 2026-11-11 status: active jurisdiction: city:johns-creek jurisdiction_name: Johns Creek place_fips: "1342425" corpus_version: local-codes-johns-creek-d82a33babc69 publisher: Georgia Commons, an independent project of Georgia Civic Data. Not the State of Georgia. Not legal advice. up: https://georgiacommons.org/code/local/johns-creek/zoning/~part-ii/~part-a/~chapter-113/~article-xiii.md previous: https://georgiacommons.org/code/local/johns-creek/zoning/113-163.md next: https://georgiacommons.org/code/local/johns-creek/zoning/113-165.md index: https://georgiacommons.org/code/local/johns-creek.md branch: zoning edition: As published by Municode, retrieved 2026-11-11 edition_date_kind: retrieved source_publisher: Municode version_id: local-code:johns-creek/zoning/113-164@2026-11-11-82d7647c2f --- # Johns Creek Zoning Ordinance, Sec. 113-164. Drainage systems > As published by Municode, retrieved 2026-11-11 > The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included. Part of: Part II - CODE OF ORDINANCES / Part A - GENERAL ORDINANCES / Chapter 113 - DEVELOPMENT REGULATIONS / Article XIII - GRADING AND DRAINAGE (1) Drainage improvements required. Stormwater conveyance facilities, which may include but are not limited to culverts, storm drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutter, swales, channels, and ditches, shall be provided for the protection of public right-of-way and private properties adjoining project sites and/or public rights-of-way. Stormwater conveyance facilities that are designed to carry runoff from more than one parcel, existing or proposed, shall meet the requirements of these regulations. (2) Design criteria—General. a. All stormwater conveyance facility design calculations shall be certified by a registered professional engineer. b. Methods to calculate stormwater flows shall be in accordance with these regulations and the Georgia Stormwater Management Manual. c. The USGS method shall be used where applicable to check the magnitude of peak flows when other hydrologic methods recommended in the manual are used. d. All portions of a stormwater conveyance system with drainage areas falling within the same size category shall be analyzed using the same methodology. e. Run-off coefficients used for the rational method and runoff curve numbers used for the SCS method shall be consistent with those shown in the Georgia Stormwater Management Manual. f. Sizing and location of all drainage structures shall be the responsibility of a registered professional engineer as per accepted standard design procedures, subject to approval by the director. g. All storm drainage designs shall be in accordance with the Georgia Stormwater Management Manual, and GDOT specifications. h. GDOT standards shall be used in determining class (concrete) or gauge of pipe under fill, method of back-filling and pipe installation. i. A certification of the pipe specifications for each pipe may be required prior to the pipe installation. j. Trench construction for storm drainage pipe shall be in accordance with the GDOT specifications, OSHA standards and city ordinances. (3) Design criteria—Culverts. a. When the construction of a proposed public road makes it necessary to cross an open stormwater conveyance system, the developer shall provide and install the required size and length of an acceptable grade of pipe. b. Culvert design is to be in accordance with the methods contained in these regulations and the Georgia Stormwater Management Manual and shall include a thorough analysis of both inlet and outlet control conditions. Culverts within the right of way shall have safety end sections. c. The 100-year ponding limits at and upstream of the culvert shall be shown on the development plans and on the final plat (if applicable). d. Single barrel or single cell culvert structures are less prone to clogging and require less maintenance than multi-barrel or multi-cell installations and should therefore be used whenever feasible. e. The maximum velocity in a corrugated metal culvert for the 100-year flow shall be 15 fps (feet per second). Velocities over ten fps in a pipe of any material shall be considered a special design with particular attention required to pipe or structure invert protection and to fill slope, stream bed, and stream bank stability. f. The minimum allowable slope shall be in accordance with the stormwater design manual. g. Minimum culvert size shall be 18 inches. h. Culverts shall have head walls and appropriate outlet control protection of an approved type on inlet and outlet ends of the pipe. i. The 100-year pond limits at the upstream end of the culvert shall be indicated on the design plans and final plat if applicable. j. Culverts shall be designed to provide a minimum of 1.5 feet of freeboard between the peak design storm elevation and the centerline of the road without raising the established flood elevation on the upstream properties. All crossings shall conform to the floodplain management ordinance. The design storm events are as follows: Table 13.4-1 Required Storm Events for Culvert Design Street Classification Storm Event (Recurrence Interval) Arterial/ major collector 100-year Minor collector/local* 50 year Dead end/alleys* 25 year * For streets that don't have alternative access routes the design storm event shall be the 100-year event for all street classifications. k. Junction boxes having access to the pipe shall be constructed to meet the requirements of GDOT standards and shall be provided with a metal manhole frame and lid for access, poured inverts, and inner and outer collar walls. l. Minimum cover is 18 inches between the bottom of the base or sub base, if used, and the exterior crown of culvert. m. A minimum of one foot between underground utilities and exterior crown of the culvert shall be provided. (4) Materials and installation. a. Acceptable pipe materials shall be as follows: 1. Reinforced concrete pipe (RCP). Required within the right-of-way or when conveying live streams. 2. Fully bituminous coated or aluminized type II corrugated metal pipe. 3. Other materials as approved by the GDOT. b. Pipe installed within the right-of-way shall be reinforced concrete pipe and the class as determined by GDOT specifications. c. All pipes carrying live streams shall be reinforced concrete or HDPE. HDPE pipe shall conform to the standard GDOT specifications. d. Reinforced concrete pipe shall be manufactured in accordance with AASHTO M-1 70 and/or ASTM C76. All pipes shall be in joint lengths of not less than eight feet. All joints shall be bell and spigot and shall be laid with the spigot end pointing downstream. All joints shall use an O-ring gasket conforming to ASTM C-443. Class of pipe and wall thickness shall be accordance with GDOT standard details and specifications. e. Metal pipe shall be fully bituminous coated or aluminized type II, with re-rolled ends and bands to match. f. Culvert pipe on which the coating has been bruised or broken either in the shop or in shipping or which shows defective workmanship shall be rejected. Among others, the following defects are specified as constituting poor workmanship and the presence of any or all of them in any culvert pipe shall constitute cause for rejection: 1. Uneven laps. 2. Elliptical shaping. 3. Variation from a straight centerline. 4. Ragged or diagonal sheared edges. 5. Loose, unevenly lined or spaced rivets. 6. Poorly formed rivet heads. 7. Unfurnished ends. 8. Illegible brand. 9. Lack of rigidity. 10. Bruised, slated or broken coating. 11. Dents or bends in the metal itself. g. Field joints shall be made with coupling bands of the same base metal as the culverts. The bands shall not be less than seven inches wide for diameters of eight inches to 30 inches, inclusive; not less than 12 inches wide for culverts with diameters 36 inches to 60 inches inclusive and not less than 24 inches wide for culverts with diameters greater than 60 inches. Such bands shall be so constructed so as to lap on an equal portion of each of the culvert sections to be connected at the ends by galvanized angles having minimum dimensions of two-inch × two-inch by 3 /16-inch. The seven-inch band shall have at least two galvanized bolts not less than one-half-inch in diameter. The 12-inch band shall have three and the 24-inch band shall have five and one-half-inch bolts. Other equally effective methods of connecting the coupling bands may be used if approved by the director. h. The gauge of the culvert metal will be determined from the thickness of the galvanized sheets as approved by GDOT standards. i. Corrugated metal pipe shall conform to the requirements of AASHTO M36, sizes, shapes, types, base metal, gauges; bituminous coating and paved inverts shall be as provided in the GDOT specifications or a directed by the director. j. All joints and couplings shall be in accordance with the manufacturer's recommendations. Each end of each pipe to be joined by a coupling band shall have minimum of two annular corrugations. Bands shall be manufactured from the same material as the pipe. The minimum band gauges for aluminized pipe shall be as specified in AASHTO M-36, section 9. k. Pipe sections shall be laid in a prepared trench with outside laps of circumferential joints pointing upstream and with longitudinal joints at the sides. Coupling bands fastened by two or more bolts shall join the sections. The space between adjoining sections shall not be more than the width of one corrugation. l. Before any traffic over a storm drain is allowed, the developer shall provide an adequate depth and width of back-fill to protect the structure from damage or displacement. All pipe structures shall be cleaned before the work is accepted. Any damage or displacement that may accrue due to traffic or erosion shall be repaired or corrected at the developer's expense. (5) Bedding and backfill. a. General. All approved pipe material shall be bedded in accordance with the manufacturers' and engineers' specifications. b. Bedding. All pipes shall be placed on stable earth of fine granular foundation, the characteristics of which would be expected to provide long-term stability. In all live stream pipe installations, areas of low bearing capacity, solid or non-uniform foundations, where rock is encountered at the foundation level, or in other locations where conditions warrant, a minimum of six inches of crushed stone bedding is required (maximum size of stone is three inches). Geogrids or geotextiles may also be required by the department in problem areas. When concrete pipe is used all bedding material shall be suitably excavated to allow for the bell and uniformly support the pipe. c. Backfill. Backfill on all pipe installations shall be constructed using foundation backfill material type I or type II as specified in sections 812.2.01 and 812.2.02 respectively in the GDOT standard specifications. These materials shall be placed in layers of not more than six inches loose. Compaction of these materials shall be accomplished by hand tamping or machine tamping. Required compaction levels are as follows: 1. Backfill within all street rights-of-way shall be compacted to 95 percent maximum laboratory dry density as determined by AASHTO method T-99. The top 12 inches shall be compacted to 98 percent maximum density. Base material shall be compacted to 100 percent maximum laboratory dry density as determined by AASHTO method T-180. 2. Backfill in all other areas shall be compacted to 95 percent maximum density using the AASHTO method T-99. (6) Pipe end treatments. a. Headwalls or other end treatments are required on all culverts and at the end of all piped collection systems. Headwalls are to be pre-cast concrete, stone masonry with reinforced footings or poured in place reinforced concrete with reinforced footings. b. End treatments that conform to the slope may be masonry, pre-cast concrete, metal, reinforced concrete slope collars or grouted riprap. Concrete and metal flared end sections shall conform to GDOT standards. (7) Bridges. Bridges shall be designed on a 100-year flood basis and conform to GDOT specifications. Bridge piling shall be driven to state highway load standards for loading. Certification of pile load shall be by registered professional engineer. ## History (Ord. No. 2009-06-18, (13.4), 6-29-2009)