(1) General. The following permits covering portions of the land development process may be issued in accordance with the requirements of these regulations and other applicable city codes. (2) Land disturbance permit. a. Development activities authorized.A land disturbance permit shall be issued to authorize all activities associated with the land development process, including clearing and grubbing, grading, and the construction of such improvements as streets, surface parking areas and drives, stormwater drainage facilities, sidewalks, or other structures permanently placed on or in the property except for buildings or other structures requiring the issuance of a building permit. Water and sanitary sewer system improvements shall be authorized by the utility provider; however, the location and land disturbing activities associated with those facilities shall be reviewed and permitted by the city to ensure compliance with applicable tree protection, stream buffer, floodplain, zoning buffers or other city standards which may be affected by the construction of these utilities. Utility locations which violate any city code or ordinance shall not be permitted without a variance or modification being issued by the city. b. Permit approval. A land disturbance permit may be issued at the developer's request following approval of all other development plans and documents and payment of applicable fees required to be submitted under article VIII of these regulations. Approvals of water and sanitary sewer plans by the appropriate utility as well as approval from the state department of transportation or other external agencies may be required prior to the issuance of a land disturbance permit. c. Expiration of land disturbance permits. A land disturbance permit shall expire 180 calendar days after issuance unless development activity as authorized by the permit is initiated within that time period or if such authorized activities lapse and the project is abandoned for a period exceeding 180 consecutive calendar days after the work has commenced. The director is authorized to grant, in writing, a maximum of two extensions of time, for periods not more than 180 calendar days each. The extension shall be requested in writing and justifiable cause must be demonstrated. d. Lapse in construction activity. For the purposes of these regulations, a lapse in or suspension of development activity, as authorized by a land disturbance permit, as a direct result of action or inaction on the part of the city which is completely beyond the control of the developer, shall not be considered as a lapse in activity causing the development permit to expire. The 180 calendar days within which development activity must begin shall exclude any such time period during which the activity is prohibited or has been caused to lapse by said city's action or inaction. Any action or inaction on the part of the developer which results in a suspension of development activity shall be counted toward the 180 day time period. e. Posting of permits on-site. The land disturbance permit, along with the approved plans, must be maintained on site until all work as proposed and approved is completed. Work requiring a permit shall not commence until the permit holder or his/her agent posts the permit card in a conspicuous place on the premises. Other permits and approvals required by outside agencies including, but not limited to, Georgia Environmental Protection Division Buffer Variances, United States Army Corps of Engineer Permits, National Pollutant Discharge Elimination System Permits and accompanying documents, must be maintained on site until all work as proposed and approved is completed. f. Tampering with permits. Unauthorized tampering or modification of a permit, permit drawings or permit card shall be deemed a violation of these regulations. (3) Retaining wall permits. a. Additional requirements. In addition to the requirements of this section all retaining walls shall comply with the provisions of article XIII of these regulations. b. Height requirements. A retaining wall permit shall be issued for all retaining walls four feet in height or greater. A site plan shall be submitted with the application that shows the proposed location of the retaining wall relative to the residence, the property boundaries, setback lines, stream buffers (if any), floodplains (if any), septic tank and septic tank drain field (if any), any easements on the site, and erosion and sediment control measures and shall comply with all requirements of the zoning ordinance. c. Certification by professional engineer. In addition to the requirements for a wall four feet in height or greater, any walls more than six feet in height shall include a design signed and sealed by a qualified, professional engineer registered in the State of Georgia. d. Standard for measurement of wall height. The height of the wall shall be measured from the grade level at the front of the wall to the grade level at the back of the wall at the same section. For walls that are not a constant height the largest of these measurements shall be used to determine the height of the wall. (4) Right-of-way encroachment/utility permits. Right-of-way encroachment/utility permits shall be obtained in accordance with the chapter 46 of this Code. (5) Groundwater well and septic permits. No person or company shall install or perform construction of groundwater wells or septic systems without prior approval from the county department of health and wellness.