Sec. 113-74. Approval of development conformance.
About this text
- As published by Municode, retrieved 2026-11-11
- The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.
The approval of development conformance shall be in a form as required by the director.
(1) Prerequisite to final plat or certificate of occupancy. Approval of development
conformance shall be a prerequisite to the approval of a final plat or issuance of a certificate of occupancy for any part of a project included in a development
permit, except for single-family and two-family residential structures. The request for approval shall reflect the owner's certification that all site work and construction has been accomplished
according to the terms of approved plans and permits, and that all facilities
intended for maintenance, supervision and/or dedication to the public are in compliance with appropriate standards, regulations, codes and ordinances. Such approval shall be revoked in cases of fraud or whenever unauthorized changes are made to the site without the benefit of required permits.
(2) Submission requirements.
a. Documents required. Upon completion of the project as authorized for construction by the land disturbance permit, the owner shall request an approval of development conformance from the director. The owner shall submit the following minimum documentation prior to final approval of development conformance:
1. A storm system as-built which consists of record drawings and an engineer's certificate of all stormwater detention facilities and modifications to the limits of the 100-year floodplain (if any).
2. An "as-built" hydrology study for the project with the actual parameters from the record drawing of the detention facilities.
3. A stormwater facilities maintenance agreement and maintenance surety agreement.
4. An approved record drawing from the utility provider of the water and sanitary sewer facilities.
b. Additional requirements. The director shall further determine that:
1. All public improvements and installations to the development required to be dedicated under the rules and regulations of the city have been completed in accordance with the appropriate specifications; and,
2. All of the stormwater management facilities, water and sewer utilities, street base and curbing construction required for approval have been properly installed and completed and, for those required public improvements not yet completed, within areas to be dedicated, (grassing, pavement topping, required landscaping, sidewalks, etc.)
a performance surety agreement shall have been filed by the developer in accordance with subsections 113-71(7)and 113-71(8) of this chapter.
c. Final approval. Final approval of development conformance shall not be given by the director until all requirements of these and other applicable regulations have been met, and the director has received all required acceptable surety agreements providing for the maintenance of all public improvements and the installation of improvements required by these regulations in the development in accordance with subsections 113-71(7)and/or 113-71(8) of this chapter.
(3) Approval of partial development conformance. For projects that may involve multiple phases or the issuance of multiple certificates of occupancy (i.e.
shopping centers, office complex etc . . . ), the director may issue a partial approval of development conformance
when the director finds the following:
a. Public improvements involving sanitary sewer and potable water have been installed and approved by the appropriate utility;
b. Access improvements intended to be dedicated to the public have been completed;
c. All improvements necessary to provide service to the unit or units are in place and have been improved, i.e. drainage facilities, paving, curb and gutter etc.;
d. Stormwater detention/water quality facilities are completed and approved;
e. A traffic management plan is submitted and approved that demonstrates sufficient separation of construction traffic and the general public; and
f. A performance and maintenance surety agreement is issued in accordance with subsections 113-71(7)and/or 113-71(8) of this chapter that covers the cost of construction and maintenance for all improvements, public or private, within the right-of-way or other dedicated lands, those deemed necessary for compliance with conditions of zoning or other improvements deemed necessary by the director to ensure the health, safety and welfare of the general public.
History
(Ord. No. 2009-06-18, (7.4), 6-29-2009)