Skip to content
Georgia Commons
Menu

Johns Creek · Zoning Ordinance

Appendix A - ZONING / Article XI - COMMUNITY/NEIGHBORHOOD/MOBILE HOME DISTRICTS

12A.3.8.2. Calculation and Evaluation.

About this text

  • As published by Municode, retrieved 2026-11-11
  • The enacted text only: the publisher's notes (editor's notes, state law references, cross references) are not included.

A. Minimum Points. All point values must be awarded based on meeting the minimum requirements of each EcoMeasurement, as indicated in Section 12A.3.8.3. The sum of all assigned values must meet the minimum point requirement per project. No partial points will be accepted.

Measure Value Certified Green Building 3 to 5 points Green Roof 3 points Building Energy Efficiency 2 points Building Water Efficiency 2 points Renewable Energy Sources 3 points Bioretention 2 points Heat Island Reduction 2 points Pervious Paving 2 points Connected Open Space 2 points Consolidated Open Space 3 points Sustainable Landscaping 1 point Additional Landscaped Civic Space 1 to 5 points Transportation Demand 2 to 3 points Enhanced Bicycle Amenities 1 to 2 points Alternative Transportation 1 point Alternative Measures 1 to 3 points

B. Documentation, Review and Approval. Documentation of the measures and total number of points the applicant will achieve must be submitted with the applicable permit application submitted to the City and must be approved by City staff.

Read this code where it is posted (Municode) The source is the city's code as its publisher or its own website posts it. Check it there for later changes.

Version local-code:johns-creek/zoning/12a.3.8.2@2026-11-11-40b5e3c4d0

The assistant can say what this section says in this edition, quoting it and linking to it. It will not apply the law to your situation, and nothing here is legal advice.

Johns Creek Zoning Ordinance, 12A.3.8.2. Calculation and Evaluation | Georgia Commons